october 2008 -...
TRANSCRIPT
October 2008 Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 TDA PUD bridge demo
2 3 4
5 6 TDA U20 dewater- TDA-E AWS OOS for two hours. JDA TSW FFDRWG
7 8 BON FGE FFDRWG
9 FPOM Meeting NWP dewatering schedules due. Happy Birthday
10 11
12 13 14
15 BON BI transformer pad work (1800)
16 Happy Birthday
17
18
19 JDA T-1 line OOS Happy Birthday
20 BON BGS dive JDA T-1 line OOS
21 BON BGS dive JDA T-1 line OOS
22 AFEP proposals sent. JDA T-1 line OOS
23 MCN fish pump dive JDA T-1 line OOS
24 MCN fish pump dive TDA MU3&4 priority change until 15 December.
25 MCN fish pump dive
26 27 28 29 30 NWP FFDRWG
31 Normal Adult Fish Counting Ends Most Dams BON JMF to bypass
November 2008 Sunday Monday Tuesday Wednesday Thursday Friday Saturday
30
1
2 3 4 5 6 TDA spillwall call
7 8
9 10 11 Veteran’s Day
12
13 FPOM Meeting SMP metric meeting Draft FPP input due.
14 AFEP proposal review- NWW
15 Happy Birthday
16
17 ERDC model trip- JDA & MCN
18 ERDC model trip- JDA & MCN Happy Birthday
19 ERDC model trip- JDA & MCN
20 ERDC model trip- JDA & MCN TDA spillwall call
21 ERDC model trip- JDA & MCN
22
23 24 Happy Birthday
25 26 27 Happy Thanksgiving
28 Draft FPP Due in NWD
29
December 2008 Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 BON BI to orifice flow BON F1 OOS JDA SMF dewater
2 TDA-E dewater Chum workshop
3 JDA-N dewater BON BI dewater
4 FPOM at TDA JDA-N ent dewater TDA spillwall tour
5 SMP metric meeting at FPC
6
7 8 AFEP Research review- NWP
9 AFEP Research review- NWP
10 AFEP Research review- NWP
11 AFEP Research review- NWP
12 13
14 15 Adult fish counting ends LWG. STS removal begins
16
17
18 TDA spillwall call BON DSM2 dewater
19 20
21 Happy Hanukkah 22 BON AFF dewater
23 BON two-mile pipe
24 25 Merry Christmas 26 Happy Kwanzaa 27
28 29
30
31
January 2009 Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 Happy New Year TDA spillwall call
2 NWW adult fish facility begins
3
4 5 JDA south turbine ROV
6 JDA-S dewater
7 NWP FFDRWG SMP metrics mtg
8 FPP Meeting- NOAA
9 BON CI pickets pulled. BON north blkhd installed.
10 BON WS to orifice flow BON F2 OOS
11 12 BON WS dewater NWW Direct Capture special FFDRWG- RDP 1300-1600
13 JDA TSW special FFDRWG- RDP 0900-1200
14 TDA-N dewater TDA-N ent dewater BON ROV inspection
15 AFEP- brief on funded proposals TDA spillwall call BON 2-mile pipe
16 17 BON CI to orifice flow
18 19 HOLIDAY
20 BON CI dewater
21 22 23
24
25 26 MCN/LMN ERDC trip BON DSM1 dewater
27 MCN/LMN ERDC trip
28 MCN/LMN ERDC trip Smith-Root sea lion barrier meeting.
29 MCN/LMN ERDC trip TDA spillwall call
30 MCN/LMN ERDC trip
31
February 2009 Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 2 SLEDs installed
3 4 NWW FFDRWG
5 NWW FFDRWG
6 7
8 9 JDA/TDA ERDC trip
10 JDA/TDA ERDC trip
11 JDA/TDA ERDC trip TMT
12 JDA/TDA ERDC trip
13 JDA/TDA ERDC trip
14
15 16 HOLIDAY
17 FPAC
18 TDA PUD ROV BON north monolith dewater.
19 SCT FPOM- NOAA
20
21
22
23 BON CI lamprey tour Lamprey plan discussion w/Tribes
24 FPAC call NWW sockeye mtg MCN turbine mtg
25 TMT JDA south turbine trashrack ROV FPC training at BON
26 NWP FFDRWG TDA spillwall call
27 BON spillway mtg
28 Annual FPP Issued Adult fish facility maintenance ends
March 2009 Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 Adult Passage Season Begins – Start counting at Lower Granite Dam
2 JDA avian array construction begins
3 FPAC NWD F/W meeting- ID JDA navlock OOS JDA fish pump trashrack dive
4 NWD F/W meeting- ID BON B2CC open for debris flush.
5 NWD F/W meeting- ID TDA AWS mtg
6 BON ITS OOS for U7/8 dive Happy Birthday
7
8 Daylight Savings
9 10 FPAC Hydraulic scale assessment- RDP
11 TMT BON BGS dive
12 TDA spillwall site visit FPOM Meeting- TDA BON BGS dive
13 BON ITS OOS for automated gates. Happy Birthday
14 BON ITS OOS for automated gates.
15 16 SRWG- lamprey & adult salmon
17 FPAC SRWG- passage and survival
18
19 SCT B2CC triggers mtg
20 SRWG- Transportation and delayed mortality
21
22 23 24 FPAC
25 TMT
26 TDA spillwall call
27 28
29 30 31 FPAC
April 2009 Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 Adult Fish Counting Starts Juvenile Bypass Season Begins SRWG- Biological index testing
2 Juvenile Spill Starts Snake River Dams – Pools to MOP SRWG- Avian Predation
3 B2CC opens
4
5 6 TDA avian line install ERDC- NWP
7 FPAC TDA avian line install ERDC- NWP
8 TMT TDA avian line install ERDC- NWP
9 TSW tour FPOM meeting- MCN MCN JBS tour TDA spillwall call ERDC- NWP
10 NWP spill begins BON ITS OOS ERDC- NWP
11
12 Easter
13 BON bank 7/8 OOS
14 FPAC BON bank 7/8 OOS B2CC PIT test CI weir mtg- USACE
15 BON bank 7/8 OOS SCT B2CC PIT test BON T11/12 OOS (PM)
16 BON bank 7/8 OOS SCT tour-LGS/LMN BON T11/12 OOS (PM) MCN ESBSs installed
17 AFEP research summaries BON Auditorium
18
19 Happy Birthday
20 Snake River Juvenile Transport Begins
21 FPAC FFDRWG- JDA FFDRWG- BON 30%
22 TMT
23 TDA spillwall call FFDRWG- NWP FFDRWG -BON spillway alt 90%
24 25
26
27 Happy Birthday
28 FPAC
29 FFDRWG- NWW
30 FFDRWG- NWW
May 2009 Sunday Monday Tuesday Wednesday Thursday Friday Saturday
31
1 2
3 4
5 FPAC
6 TMT
7 B2CC PIT outage JDA avian array call
8
9
10
11 GDACS auto adjust call
12 FPAC
13 14 FPOM Meeting- NOAA
15 16
17 18 19 FPAC BON NDE lamprey ramp install
20 TMT
21 SRWG: JDA Summer Study Decision (after SCT)
22 23
24 25 Memorial Day HOLIDAY
26 FPAC
27 28 29 30
June 2009 Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 TDA T2 outage
2 FPAC TDA T2 outage
3 TMT TDA T2 outage
4 LMN barge test TDA T2 outage
5 TDA T2 outage
6
7
8 TDA fish unit outage SRWG @ TDA 1-pgrs
9 FPAC
10 Avian Predation mtg
11 Avian Predation mtg
12
13
14 15 ERDC trip- JDA
16 FPAC ERDC trip- JDA
17 TMT ERDC trip- JDA
18 ERDC trip- JDA
19 ERDC trip- JDA
20
21
22 FPOM at NOAA Saybr work over CI
23 FPAC Saybr work over CI
24 SCT Saybr work over CI
25 NWP FFDRWG AFF mtg after FFDRWG Saybr work over CI Happy Birthday
26 Saybr work over CI
27
28 29 30 FPAC
July 2009 Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 TMT
2
3 4 Independence Day
5 6
7 FPAC
8 Happy Birthday
9 FPOM Meeting- NOAA
10
11
12 13 14 FPAC
15 TMT
16 SCT
17 18
19 20 TDA ITS mtg Performance standards mtg
21 FPAC
22 FFDRWG- NWW Happy Birthday
23 FFDRWG-NWW Hevlin to look at LGS weir
24 25
26 27 28 FPAC
29 TMT
30
31
August 2009 Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1
2 3 ERDC- MCN
4 FPAC TDA ROV ERDC- MCN
5 JDA ROV BON ROV ERDC- MCN BON trashrack mtg
6 ERDC- MCN
7 ERDC- MCN
8
9 10 Corps golf tournament
11 FPAC
12 TMT SRWG- preliminary review
13 SRWG- preliminary review
14 SRWG- preliminary review
15
16 17 AFF mtg @ BON
18 FPAC
19
20 SCT FPOM- NOAA
21
22
23 24 ERDC- JDA
25 FPAC ERDC- JDA
26 TMT ERDC- JDA
27 ERDC- JDA
28 ERDC- JDA
29
30 31
September 2009 Sunday Monday Tuesday Wednesday Thursday Friday Saturday
1 FPAC
2 3 BON PH1 STSs installed by today NWP – FFDRWG
4 5
6 7 8 FPAC TDA spill wall work scheduled to begin
9 TMT Happy Birthday
10 FPOM Meeting
11 12
13 Happy Birthday
14 15 FPAC
16 17 Happy Birthday
18 19
20 21 JDA avian array mtg
22 FPAC
23 TMT JDA deflector mtg
24 TDA spillwall call
25 26
27 Happy Birthday
28 29 FPAC
30