october 17, 2018 the challenges of change: from rbcs to ... rbc - cr… · the challenges of...

50
The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference October 17, 2018 Tom Crouse & Bill Marten Tim Reel

Upload: others

Post on 28-Sep-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

The Challenges of Change: From RBCs to BNR Activated Sludge

at Whitewater

52 nd Annua l WWOA Annual Conference

October 17, 2018

Tom Crouse & Bill Marten Tim Reel

Page 2: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Outline

Review Background & Upgrade Project Nutrient Removal Configuration/Facilities Startup/Initial Operations Results to Date

Page 3: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Existing Whitewater WWTF (Circa 2009)

Page 4: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Existing WWTF

Processes

Screening and Grit Removal

RWW Pumping

Rotating Biological Contactors (RBCs)

Secondary Clarifiers and SSD Pumping

Tertiary Filters

Anaerobic Digestion and Biosolids Storage

UV Disinfection

Primary Clarifiers and PSD Pumping

Page 5: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Whitewater WWTF

Average flow 1.5 MGD, service population ~15,000 Key challenges: Future design flow (max month 3.8 MGD; peak hour 11 MGD) UW-Whitewater impacts on flows and loadings (in/out of session) Aging infrastructure (35 years old) Code compliance issues (RWW pump station, digester complex & tunnel) RBC shaft failures Nutrient removal performance

• Nitrification • P Removal

Page 6: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Aging Infrastructure

Page 7: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

RBCs – Limited Nutrient Removal Capability…

Page 8: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

…Along With Loading & Shaft Failure Issues

Page 9: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Upgrade Project: 2014 FP to 2018 S/U

New activated sludge system New Aeration basins with BPR Conversion of one existing clarifier to an

aeration basin Construction of two new secondary clarifiers

New process building: RAS and WAS pumping Sludge thickening WAS/DSD Aeration blowers Electrical switchgear Relocated generators

Control Building renovation Storage building

MCC replacements NFPA 820 upgrades Fiber optic network Septage receiving 6mm Screen Primary sludge pumps Filter Building HVAC Post aeration blowers Filter bypass control Digester 2 mixing system Digester/building heat boiler system

Page 10: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Upgrade Encompassed Entire Plant

Upgrade Element Total Project Cost BNR Activated Sludge $10.3M Electrical Systems $3.5 M Fire and Safety Guidelines

$0.4 M

HVAC and Lab QC Areas $0.5M Lab Expansion/Space Use $0.6M Aging Site Infrastructure $0.9M Hydraulics, Controls, Aging Equipment

$2.5M

Digestion Complex Improvements

$2.0M

Total Project $20.7M

BDG New BNR Activated

Sludge

Reuse Primary Clarifiers Renovate

Administration, Lab, Shop

Reuse Tertiary Filtration

Upgrade Preliminary Treatment

BDG

Storage

Reuse Digestion and Storage

Page 11: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

The Heart of the Upgrade: BNR Activated Sludge

Bio-P Configuration with Nitrifying Activated Sludge: Modified UCT’

& Nitrification

Page 12: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Key Challenge: UW-Whitewater Loadings

New Volume 0.64 MG Selectors 0.24 MG Aeration 0.40 MG Re-purpose Volume 0.40 MG

Flexible Bioreactor Volume While Minimizing New Construction

Page 13: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Circular Aeration Tank A5: Aeration & Mixing

Diffuser Grids

Mixer

Avoids Over-Aeration Due to Mixing Limited Condition

Page 14: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Layout of Rectangular Aeration Basins

Primary Effluent

RAS

PE

PE

RAS

RAS

Mixed Liquor Effluent to A5 or Clarifiers

Page 15: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Primary Effluent

RAS

PE

PE

RAS

RAS

Mixed Liquor Effluent to A5 or Clarifiers

MUCT’ Configuration Provides Efficient Bio-P

Page 16: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Primary Effluent 42

1-G

-041

1

Step Feed

Key Challenge: Ave Flow 1.5 MGD/Peak

Flow 11+ MGD

Approach: Peak Flow

Step Feed

Page 17: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Peak Flow Step Feed

Maintains Higher MLSS in Rectangular Basins Optimize BNR

Aerated Circular Bioreactor Ensures Full Treatment & Nitrification

Clarifier Solids Loading Rates are Minimized to Ensure Effective Clarifier Performance

Page 18: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Instrumentation Provides Key Process Control Supplement

Page 19: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

New, Optimized Activated Sludge Secondary Clarifiers

RAS Header

Weir Washer

Stamford Baffle

Energy Dissipating

Inlet

Cathodic Protection Secondary Clarifiers 1 & 2

80 ft diameter 14.75 ft side water depth

Page 20: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

As With Such Projects, Kudos to Plant Staff for Maintaining Operations & Compliance of Their Facility During Upgrades

Page 21: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference
Page 22: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference
Page 23: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference
Page 24: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference
Page 25: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Let’s Get to Some Results

Transitional Startup 2018 Required Key Activated Sludge Elements to Be Finished & Ready for Operation: Rectangular Bioreactor Zones

• Required Removal of 1 Bank of RBCs

New Secondary Clarifiers New RAS/WAS Pump Station Partial Diversion of PE to New System (Seed Bio-P Sludge from Beloit)

Final Startup Circular Aeration Tank A5 Transformed From RBC Clarifier

• Required Removal of Second Bank of RBCs

Page 26: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

RBC Splitter

Diesel Pump

RBC 2

RBC 3 Transitional Startup Required

Temporary Pumping

Page 27: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Transitional Startup Required Temporary Pumping

Page 28: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Ready for Startup…

Late December

2017

Page 29: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Staff Get an Extra

Christmas Present (Winter Startup)

Page 30: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Key Challenges at Startup

Winter! Working in Coordination (& Around)

Ongoing Construction Phased Startups Going From a Process That Runs Itself

(RBCs) to a Fairly Complicated Process Requiring Diligent Process Monitoring & Control

Page 31: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Nitrification & Temperature

The temperature for optimum growth of nitrifying bacteria is between 77-86° F (25-30° C).

Growth rate is decreased by 50% at 64° F (18° C). Growth rate is decreased by 75% at 46-50° F. No growth will occur at 39° F (4° C) Nitrifying bacteria will die at 32° F (0° C). Nitrifying bacteria will die at 120° F (49° C)

Tom Crouse on the Pre-Conference Bike Ride

Yesterday!!!

Page 32: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Key Process Control (New) Practices

Clarifier Blankets Mixed Liquor Monitoring Bioreactor Conditions

• D.O., ORP

Settleability/SVI Microscopic Exams

Balancing RAS Clarifiers vs Bio-P

SRT-Based Wasting

Page 33: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference
Page 34: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

WAS Can Come From RAS Header or MLSS Dropbox

RAS Secondary Clarifier No. 2

RAS Secondary Clarifier No. 1

RAS to STR 410 RAS Splitter

MLSS from MLSS Dropbox

Solids to Primary Clarifier for Co-

Thickening

Thickened Solids to Digester Complex

Scum from Secondary Clarifiers

Centrate Tank

Dra

in

RAS Pump

WAS Pumps

Secondary Scum Pump

Centrifuge Air Compressor

Solids from Anaerobic Digester Complex

Drain Valve

(typical)

Page 35: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Results: Effluent BOD5

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

BOD5

(mg/

L)

Date

Page 36: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Results: Effluent Ammonia

0.0

1.0

2.0

3.0

4.0

5.0

6.0

NH3

-N (m

g/L)

Date

Page 37: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Results: Effluent Phosphorus

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

1.6

1.8

2.0

TP (m

g/L)

Date

Page 38: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Facility Prior to Upgrades

Page 39: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Transitional Startup: 2 Down, 1 to Go…

(dated Google Earth image – circa

Spring 2018)

Page 40: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Thanks for Being Here!

Tim Reel/City of Whitewater ([email protected]) Tom Crouse/Donohue ([email protected])

Bill Marten/Donohue ([email protected])

Page 41: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Centrifuge for Sludge Thickening

Dual Use Waste Activated Sludge Digested Sludge

Page 42: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Centrifuge Piping (STR 800)

RAS Secondary Clarifier No. 2

RAS Secondary Clarifier No. 1

RAS to STR 410 RAS Splitter

MLSS from MLSS Dropbox

Solids to Primary Clarifier for Co-

Thickening

Thickened Solids to Digester Complex

Scum from Secondary Clarifiers

Centrate Tank

Dra

in

RAS Pump

WAS Pumps

Secondary Scum Pump

Centrifuge Air Compressor

Solids from Anaerobic Digester Complex

Drain Valve

(typical)

Piping Change

Page 43: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Alum Pumping (STR 200) Mixed Liquor

Drop Box

Hauled Waste Storage /

Centrate Tank

Digester Complex

Filter Bypass Box

Primary Clarifier Inlet

W3

W3

W3

W3

W3

No.1

No.2

No.3

No.4

Page 44: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Ortho Phosphate Analyzer (STR 600)

Ortho Phosphate Analyzer in Chlorine Room of STR 600 used for control of chemical phosphorus removal using Alum Pumps

Ortho Phosphate Analyzer in Chlorine Room of STR 600

Page 45: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Orthophosphate Analyzer (STR 600)

Page 46: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Other Plant Improvements

Digester Gas Treatment (STR 700) Condensate/Sediment Traps Auto Drip Traps

Digester Piping (STR 700) Sludge Loadout More flexibility New digester mixing nozzles

Page 47: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

Other Plant Improvements

Natural Gas Boilers (STR 700) Two new natural gas boilers New Boiler and Heating Pumps

Emergency Generators & Switchgear (STR 800) Relocated engine generators New Switchgear

Septage Receiving Station (STR 160)

Page 48: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

PO4

RAS

PE

Anoxic Aerobic

RAS Denitrification MLSS

Anaerobic Processes • P release • Fermentation • Reclaim Alkalinity

Anoxic Processes • Denitrification • Reclaim alkalinity

Aerobic Processes • P uptake • Nitrification • BOD removal • Consumes alkalinity

NO3

COD Alkali

N2 Gas

NH4-N O2

Alkali

NO3

VFA

PO4

Anaerobic

MUCT process - Modified University of Cape Town Process (South Africa)

Page 49: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

+400

+50

0

-150

-400

ORP (mV) Reactions

Aerobic Processes •Nitrification •BOD removal •P uptake

Anoxic Processes •Denitrification •Some instances of Bio-P uptake

Anaerobic Processes •P release •Fermentation (VFA production)

ORP values are relative – every wastewater and wastewater treatment plant is different treatment

Page 50: October 17, 2018 The Challenges of Change: From RBCs to ... RBC - Cr… · The Challenges of Change: From RBCs to BNR Activated Sludge at Whitewater 52 nd Annual WWOA Annual Conference

First Let’s Focus on the Bioreactors…