Route 606 Loudoun County Parkway / Old Ox Road Reconstruction and Widening Project Lunsford Middle School October 17, 2016

Upload: vdot-northern-virginia

Post on 17-Feb-2017

4.570 views

Category:

Government & Nonprofit


5 download

TRANSCRIPT

Page 1: Oct. 17, 2016 town hall meeting presentation

Route 606 Loudoun County Parkway / Old Ox Road Reconstruction and

Widening Project

Lunsford Middle SchoolOctober 17, 2016

Page 2: Oct. 17, 2016 town hall meeting presentation

2

Objectives

Provide an Overview of the Project Discuss the Project Schedule Describe Construction Sequence Answer Your Questions

Page 3: Oct. 17, 2016 town hall meeting presentation

3

Major Design Features Typical Section

Four lane divided roadway Raised 28’ Wide Grass Median 8’ wide full Depth Shoulders 10’ Wide Shared Use Path on West Side

Page 4: Oct. 17, 2016 town hall meeting presentation

4

Major Design FeaturesModification to Horsepen Dam and

Spillway

Page 5: Oct. 17, 2016 town hall meeting presentation

5

Major Design FeaturesModification to Horsepen Dam and

Spillway

Page 6: Oct. 17, 2016 town hall meeting presentation

6

Project Metrics

Total Project Cost: $107.7 MillionConstruction Contract Value: $89.9 MillionProject Length: 5 MilesRight-of-Way Acquisition: 55 Parcels

(Including up to 40 Acres from MWAA) Adjustments to 9 UtilitiesProject Duration: 50 months

Page 7: Oct. 17, 2016 town hall meeting presentation

7

June 2014 Notice To Proceed

June 2014 - Spring 2015 Complete Design / Permitting

Spring - Fall 2016 Right of Way Acquisition

Fall 2015 – Spring 2017 Utility Relocations

Fall 2015 – Spring 2017 Stage 1 Construction

Early 2017- Spring 2018 Stage 2 Construction

Summer 2018 Stage 3 / Complete Project

Project Schedule

Page 8: Oct. 17, 2016 town hall meeting presentation

8

Construction SequenceStages 1, 2 & 3

Page 9: Oct. 17, 2016 town hall meeting presentation

9

Right-of-way Acquisitions (53 of 55 Properties)Utility Relocations

Dominion Virginia Power & NOVECOverhead – 9,350 feet & 36 polesUnderground – 990 feet

Communications Duct Bank70,000 feet of ducts installed

Completed Project Activities

Page 10: Oct. 17, 2016 town hall meeting presentation

10

Earthwork221,886 Cubic Yards of Dirt Moved (24,654 Truck Loads)5 Stormwater Management Ponds Installed – 658 Tons of

Rip Rap Installed

Completed Project Activities

Page 11: Oct. 17, 2016 town hall meeting presentation

11

Storm Drainage8,648 feet Storm Pipe Installed86 Storm Structures Installed

Waterline Relocation13,538 feet Loudoun Water Waterline Pipe Installed

Completed Project Activities

Page 12: Oct. 17, 2016 town hall meeting presentation

12

Box Culverts 120 feet Precast Double Barrel Box Culvert 500 CY Concrete for Retaining Wing Walls for Box Culvert 175 feet Cast-in-Place Triple Barrel Box Culvert

418 CY Concrete Placed

Completed Project Activities

Page 13: Oct. 17, 2016 town hall meeting presentation

13

Horsepen Dam Spillway Westbound 348 feet 60” Drilled Shafts (13 Shafts) 1,606 CY Concrete Placed (Substructures) 14 Concrete Girders Installed @ 70 Tons Each 321,938 lbs of Rebar Installed

Completed Project Activities

Page 14: Oct. 17, 2016 town hall meeting presentation

16

Loudoun County Parkway Intersection (Open September 2017)

Route 606

Arcola Road

Loudoun County Parkway

Route 606 EB Ramp

Loudoun Co.

Pkwy.

To Route 50

To Route 28

Page 15: Oct. 17, 2016 town hall meeting presentation

17

Shift Traffic Onto New Roadway – Evergreen Mills to Arcola Rd – December 2016

Page 16: Oct. 17, 2016 town hall meeting presentation

18

Shift Traffic Onto New Roadway – Construction Ent. 3 to Pebble Run Pl –

December 2016

Pebb

le R

un P

l.

Arcola Rd

Page 17: Oct. 17, 2016 town hall meeting presentation

20

http://www.virginiadot.org/projects/northernvirginia/old_ox_road_widening.asp

(this webpage will be updated throughout the project development)

Or Google: “Route 606 Widening”

Questions and Answers

For More Information About Route 606 Widening Project: