1 OCL GROUP INC. PROJECT PROFILE Client Project Location Project Title Project Value Regional Municipality of Wood Buffalo Hilldrive, McLeod Street/Fort McMurray QU4211 UIRP 2017 Contract 4 $4.6M Start Date: June 2017 Finish Date: November 2017 Project Description: This project consisted of removing and installing a new sanitary sewer, water main and storm sewer system by using an open cut excavation; pipe depths ranged from 3 meters to 6 meters. Utilization of a manhole tap box shoring system was required. Furthermore, this project also included the tie ins of the new water main, valve and hydrant assembly installations, water main hot taps, hydro testing, chlorination, installing sanitary sewer & storm system piping. This included tying into to the existing system which required several critical bypass pumps with flows ranging from 50-1000 L/s. OCL also removed and replaced the concrete curb, sidewalk and installed temporary water for residents. Project Statistics: Pipe Installation (Open Cut) Sanitary 270 m of 250 mm dia. PVC DR35 Sanitary Sewer 100 m of 300 mm dia. PVC DR35 Sanitary Sewer 100 m of 200 mm dia. PVC DR35 Sanitary Sewer 76 ea of 100 mm dia. PVC DR35 Sanitary Sewer Manhole Installation 31 vm of 1200 mm dia. Concrete Manhole 12 vm of 2400 mm dia. Concrete Manhole 8 vm of 3000 mm dia. Concrete Manhole Pipe Installation (Open Cut) Water Main 780 m of 300 mm dia. PVC DR18 Water Main 40 m of 150 mm dia. PVC DR18 Water Main 76 ea. of 19 mm dia. 19mm Copper Pipe Installation (Open Cut) Storm Sewer 52 m of 375 mm dia. PVC DR35 260 m of 1500 mm dia. PVC DR35 Asphalt Construction – Residential Driveway 9438 m2 of 40mm Depth Hot Mix Asphaltic Concrete 9438 m2 of 60mm Depth Hot Mix Asphaltic Concrete 850 m2 of 100mm Depth Hot Mix Asphaltic Concrete Civil Road Activities 1700 m2 of Topsoil 1700 m2 of Sod Installation 12,098 m2 600mm depth of Granular Sub Base 75mm 3025 m2 250mm depth of Granular Base 20mm Concrete Activities 1500 m Rolled Face (RF) Monolithic Curb, Gutter and Sidewalk 1350 m2 120mm depth Residential Concrete Driveways 2 ea. New Concrete Pararamp

Upload: others

Post on 11-Jan-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OCL GROUP INC. PROJECT PROFILE

1

OCL GROUP INC. PROJECT PROFILE

Client Project Location Project Title Project Value

Regional Municipality of Wood Buffalo

Hilldrive, McLeod Street/Fort McMurray

QU4211 UIRP 2017 Contract 4 $4.6M

Start Date: June 2017 Finish Date: November 2017

Project Description:

This project consisted of removing and installing a new sanitary sewer, water main and storm sewer system by using an open cut excavation; pipe depths ranged from 3 meters to 6 meters. Utilization of a manhole tap box shoring system was required. Furthermore, this project also included the tie ins of the new water main, valve and hydrant assembly installations, water main hot taps, hydro testing, chlorination, installing sanitary sewer & storm system piping. This included tying into to the existing system which required several critical bypass pumps with flows ranging from 50-1000 L/s. OCL also removed and replaced the concrete curb, sidewalk and installed temporary water for residents.

Project Statistics:

Pipe Installation (Open Cut) Sanitary ▪ 270 m of 250 mm dia. PVC DR35 Sanitary Sewer ▪ 100 m of 300 mm dia. PVC DR35 Sanitary Sewer ▪ 100 m of 200 mm dia. PVC DR35 Sanitary Sewer ▪ 76 ea of 100 mm dia. PVC DR35 Sanitary Sewer

Manhole Installation

▪ 31 vm of 1200 mm dia. Concrete Manhole ▪ 12 vm of 2400 mm dia. Concrete Manhole ▪ 8 vm of 3000 mm dia. Concrete Manhole ▪

Pipe Installation (Open Cut) Water Main ▪ 780 m of 300 mm dia. PVC DR18 Water Main ▪ 40 m of 150 mm dia. PVC DR18 Water Main ▪ 76 ea. of 19 mm dia. 19mm Copper ▪

Pipe Installation (Open Cut) Storm Sewer ▪ 52 m of 375 mm dia. PVC DR35 ▪ 260 m of 1500 mm dia. PVC DR35

Asphalt Construction – Residential Driveway ▪ 9438 m2 of 40mm Depth Hot Mix Asphaltic Concrete ▪ 9438 m2 of 60mm Depth Hot Mix Asphaltic Concrete ▪ 850 m2 of 100mm Depth Hot Mix Asphaltic Concrete

Civil Road Activities

▪ 1700 m2 of Topsoil ▪ 1700 m2 of Sod Installation ▪ 12,098 m2 600mm depth of Granular Sub Base 75mm ▪ 3025 m2 250mm depth of Granular Base 20mm

Concrete Activities

▪ 1500 m Rolled Face (RF) Monolithic Curb, Gutter and Sidewalk

▪ 1350 m2 120mm depth Residential Concrete Driveways ▪ 2 ea. New Concrete Pararamp

Page 2: OCL GROUP INC. PROJECT PROFILE

2

OCL GROUP INC. PROJECT PROFILE

Civil Stripping Asphalt & Concrete, Exposing Pipe

Installation of 300 mm Diameter DR 18 Water Main, Services, Hydrant, Valves

Page 3: OCL GROUP INC. PROJECT PROFILE

3

OCL GROUP INC. PROJECT PROFILE

Installation of 300 mm Diameter SDR 35 Sanitary, Services, Manhole

Road Construction

Page 4: OCL GROUP INC. PROJECT PROFILE

4

OCL GROUP INC. PROJECT PROFILE

Concrete Curb, Gutter & Sidewalk

Storm Sewer 1500 mm SDR 35

Page 5: OCL GROUP INC. PROJECT PROFILE

5

OCL GROUP INC. PROJECT PROFILE

Additional Photos