ocean freight rfp webinar_ocean freight... · ffw –freight forwarder intermediary ... request for...
TRANSCRIPT
-
2020-01-22
1
OCEAN FREIGHT RFP
RFP or Not RFP
1
2
-
2020-01-22
2
Ocean Freight RFP
AGENDA
❖ Ocean Shipping Industry: History and Modern Containerized Market
▪ History of Ocean Shipping
▪ Containerized Services – Birth of “Intermodalism”
▪ Modern Ocean Container Carriers & Intermediaries
▪ Services included in Ocean Container Shipping
❖ Ocean Rate Structure and Attributes
▪ Basics of Containerized Ocean Pricing
▪ Ocean Rate Surcharges and Rate Structure
▪ Ocean Rate Dynamics and Seasonality
❖ Ocean Request For Proposal (RFP)
▪ Legal Requirements & Technicalities
▪ Preparation Steps and Considerations: Timeline
▪ Templates
▪ Execution and Wrap-up
❖ Agreeing on Terms and Execution
▪ Terms Agreement
▪ Further Execution of the Ocean Shipping Contract – it takes two parties
History of Ocean Shipping
➢ Importance of commercial shipping
➢ New Canals – Suez (1869) & Panama (1945)
➢ Shipping before 1956
Ocean Shipping Industry: History and Modern Containerized Market
3
4
-
2020-01-22
3
Containerized Services – Birth of “Intermodalism”
• Intermodalism
➢ Early examples of intermodal containers include railroads from
1830s and Pennsylvania Railroad regular container service
(1929)
Ocean Shipping Industry: History and Modern Containerized Market
➢ US Army uses the “Transporter”
container, developed for
removals of Korean War supply
movements (1950).
Containerized Services – Inception
• Inception
➢ 26 April 1956, Malcom McLean's - Sea-Land Services
➢ SS Ideal X with 58 metal container boxes sailed from Port
Newark, NJ to Houston, TX
Ocean Shipping Industry: History and Modern Containerized Market
5
6
-
2020-01-22
4
Containerized Services – Standardization
• Container Sizes
• Fleet Measurements
20’ TEU vs. FEU (FFE) 40’
Ocean Shipping Industry: History and Modern Containerized Market
Modern Ocean Container Carriers & Intermediaries
Modern carriers & intermediaries
➢ VOCC – Vessel Operating Common Carrier
Actual Operator
➢ NVOCC – Non-Vessel Operating Common Carrier
Aggregator/Consolidator
➢ FFW – Freight Forwarder
Intermediary
Ocean Shipping Industry: History and Modern Containerized Market
O.T.I.
(Ocean
Transp
ortatio
n
Interm
ediary)
7
8
-
2020-01-22
5
Modern Ocean Container Carriers & Intermediaries
Modern carriers & intermediaries
➢ VOCC ~50 carriers
➢ FFW & NVOCC (O.T.I.) > 40,000
Ocean Shipping Industry: History and Modern Containerized Market
= Christal Line = Danmar Lines
= Blue Anchor Line = Painter Express Line
= Expeditors International = Schenker Ocean
FFW NVOCC FFW NVOCC
Services included in Ocean Container Shipping
• Liner Service – Port to Port
• Intermodal Service – Door to Door
Ocean Shipping Industry: History and Modern Containerized Market
9
10
-
2020-01-22
6
Basics of Containerized Ocean Pricing
Terms
Glossary of Shipping Terms
Ocean Rate Structure and Attributes
Term Description Term Description
FCL Full Container Load LCL Less Than Container Load
ETD Estimated Time of Departure ETA Estimated Time of Arrival
CY Container Yard RY Rail Yard
Port Ocean Container Terminal Door Pick-up/Delivery Location
TEU/FEU Twenty/Forty Foot Equivalent Unit FAK Freight All Kinds
DMR Demurrage – storage at port DTN Detention – equipment usage
DC/DV Standard Dry Container HC High Cube Container
REEF Standard Reefer Container HCRF High Cube Reefer Container
OT Open Top Container FR Flat Rack Container
OTI Ocean Transportation Intermediary FFW Freight Forwarder
NVOCC Non-Vessel Operating Com. Carrier VOCC Vessel Operating Com. Carrier
Basics of Containerized Ocean Pricing
Terms
Glossary of Shipping Terms
Ocean Rate Structure and Attributes
Term Description Term Description
FCL Full Container Load LCL Less Than Container Load
ETD Estimated Time of Departure ETA Estimated Time of Arrival
CY Container Yard RY Rail Yard
Port Ocean Container Terminal Door Pick-up/Delivery Location
TEU/FEU Twenty/Forty Foot Equivalent Unit FAK Freight All Kinds
DMR Demurrage – storage at port DTN Detention – equipment usage
DC/DV Standard Dry Container HC High Cube Container
REEF Standard Reefer Container HCRF High Cube Reefer Container
OT Open Top Container FR Flat Rack Container
OTI Ocean Transportation Intermediary FFW Freight Forwarder
NVOCC Non-Vessel Operating Com. Carrier VOCC Vessel Operating Com. Carrier
11
12
https://www.maritime.dot.gov/sites/marad.dot.gov/files/docs/resources/3686/glossaryfinal.pdfhttps://www.maritime.dot.gov/sites/marad.dot.gov/files/docs/resources/3686/glossaryfinal.pdf
-
2020-01-22
7
Ocean Rate Surcharges and Rate Structure
Ocean Rate Structure
Why so complicated?
Surcharges
Ocean Rate Structure and Attributes
Term Description Term Description
BAS Basis ocean freight THC Terminal Handling Charge
BAF Bunker Adjustment Factor VAS Value Added Services
CAF Currency Adjustment Factor PSS Peak Season Surcharge
D/ODF Documentation Fee – Des./Ori. GRI General Rate Increase
Ocean Rate Dynamics and Seasonality
Ocean Rates Seasonality
Rates Fluctuations Depend on:➢ Supply and Demand
➢ Seasonality
➢ Bunker costs
Ocean Rate Structure and Attributes
Fluctuations of 40’ container
rate from Shanghai, CN to Le
Havre, FR
2012, APR
2014, APR
2016, APR
13
14
http://freightfilter.com/charges-glossary/
-
2020-01-22
8
Legal Requirements & Technicalities
Request for Proposal (RFP) can be simple or complex – usually results in contract to the proponent with the best compliant proposal.
• Request for bids creates expectation that all bidders will be treated fairly
and equally:➢ Same information to each bidder
➢ Communications through controlled processes
➢ Bids will be evaluated on disclosed terms only
• Private sector owner generally has discretion to award contract to bidder
with lowest price or any other bidder (depending on extent of privilege
clause) BUT in no event may contract be awarded to a non-compliant
bid.
• Owner may also cancel RFP, even if one or more bids compliant, if
privilege clause explicitly foresees this.
Ocean Request For Proposal (RFP)
Preparation Steps and Considerations
• What is the core service?
• What is the geographical scope and volume?
• What is the timeline of the RFQ?
Ocean Request For Proposal (RFP)
15
16
-
2020-01-22
9
Preparation Steps and Considerations
• What is the core service?
– Ocean
– Pre-carriage / Delivery
– Export declaration / Customs clearance
– Value added service such as online visibility
Ocean Request For Proposal (RFP)
Preparation Steps and Considerations
• What is the geographical scope and volume?
– Worldwide
– Specific markets or regions
Ocean Request For Proposal (RFP)
17
18
-
2020-01-22
10
Preparation Steps and Considerations: Timeline
• What is the timeline of the RFQ?
– When is the best time to run RFQ?• March – May
– What does it take and how much time is required?
Ocean Request For Proposal (RFP)
Templates
• RFQ Clarification Document
– “RFP Fixed Price For Logistics Services”• Cover page
• Instructions
– Definitions
– Proposal Deadline and Requirements
– Offer Validity
– Financial Responsibility
– Negotiations
– Rejection of Proposals
• Statement of Work
– Scope and Volume of Work
– Validity Period
– Expectations of Work
– Contract Conditions and Clarifications
• Terms and Conditions
– Service Requirements
– Freight Payment Policy
– Minimum Technology Requirements
Ocean Request For Proposal (RFP)
19
20
-
2020-01-22
11
Templates
• RFQ Pricing Document
– “RFP Fixed Price Ocean Rate Submission”• Contains information ready for pricing
• Outlines format required by the customer
Ocean Request For Proposal (RFP)
The COMPANY A
Company Legal Name:
XXXX XXXXX Tel. Main: XXX-XXX-XXXX Forwarder Operating Name:
Toronto, ON Forwarder National SCAC Code:XXX XXX
RFP Submitter's Name:
RFP Administrator Name: XXXXX XXXXXX RFP Submitter's Phone Number:
RFP Administrator Email: XXXXXXXX@the companya.com RFP Submitter's Email Address:
RFP Submission Deadline:
System last access date:
COUNTRY PORT PORT CODE ORIGIN SERVICE COUNTRY CITY Prov. / StateDESTINATION
SERVICE
LCL - DOOR TO DOOR
(By CBM ALL-IN)40' HC (ALL-IN)
TOTAL ORIGIN
CHARGES
TRANSIT TIME
(ORIGIN TO DEST.)
Indonesia Surabaya IDSUB Port CANADA TORONTO ON Rail Yard FOB VANCOUVER - VIA RAIL
Indonesia Surabaya IDSUB Port CANADA TORONTO ON Rail Yard FOB MONTREAL - VIA RAIL
Indonesia Surabaya IDSUB Port CANADA CALGARY AB Rail Yard FOB VANCOUVER - VIA RAIL
Indonesia Surabaya IDSUB Port CANADA EDMONTON AB Rail Yard FOB VANCOUVER - VIA RAIL
Indonesia Surabaya IDSUB Port CANADA HALIFAX NS Rail Yard FOB VANCOUVER - VIA RAIL
Germany Hamburg DEHAM Port CANADA TORONTO ON Rail Yard FOB MONTREAL - VIA RAIL
Germany Hamburg DEHAM Port CANADA CALGARY AB Rail Yard FOB MONTREAL - VIA RAIL
Germany Hamburg DEHAM Port CANADA EDMONTON AB Rail Yard FOB MONTREAL - VIA RAIL
Germany Hamburg DEHAM Port CANADA HALIFAX NS Rail Yard FOB MONTREAL - VIA RAIL
Germany Hamburg DEHAM Port CANADA MONTREAL QC Port FOB MONTREAL - ALL WATER
Portugal Porto Port CANADA TORONTO ON Rail Yard FOB MONTREAL - VIA RAIL
Portugal Porto Port CANADA CALGARY AB Rail Yard FOB MONTREAL - VIA RAIL
Portugal Porto Port CANADA EDMONTON AB Rail Yard FOB MONTREAL - VIA RAIL
Portugal Porto Port CANADA HALIFAX NS Rail Yard FOB MONTREAL - VIA RAIL
Portugal Porto Port CANADA MONTREAL QC Port FOB MONTREAL - ALL WATER
Portugal Porto Port CANADA VANCOUVER BC Port FOB VANCOUVER - ALL WATER
Portugal Porto Port UNITED STATES TACOMA WA Door FOB TACOMA - ALL WATER
Sunday, June 10, 2018 4:21:16 PM
Origin DestinationSUPPLIER
INCOTERMS
SERVICE TYPE (DEST
PORT/MODE)
Rate Submission (Ocean Freight)
Thursday, May 31, 2018
- Transit time to be entered based on total transit time required from pick-up till delivery
- Xxxxxxxxx XXXXXX
- Xxxxxxxxx XXX-XXX-XXXX
- Any questions should be address to the cotact indicated as contact point XXXXXX
- All rates are to be in USD XXXXXX
Transportation RFP Request - Forwarder Submission Document (all information
protected and confidential once submitted) RFP # - 2018-OCEAN-01
RFP Request By: RFP SUBMISSION INSTRUCTIONS - PLEASE READ CAREFULLY AS FAILURE COULD RESULT IN SUBMISSION REJECTION RFP Submission By:The COMPANY A - The document should not be changed except for entering ocean rates XXXXXX
Execution and Wrap-up
• Execution
– Information Sessions
– Distribution of RFP to All Participants Simultaneously
– Blind Distribution of Q&A to All Participants
– Dedicated Team to Proposals Review
– Equal Approach to All Proposals
• Wrap-up
– Inform All Participants of Decision and Thank Them
Ocean Request For Proposal (RFP)
21
22
-
2020-01-22
12
Terms of Agreement
• Terms of Agreement
– In Writing
– Part of the Agreement
– Signed by both Parties
• Further Execution of the Ocean Shipping Contract
– It Takes Two Parties
Agreeing on Terms and Execution
Q&A
Ocean Freight RFP
23
24
-
2020-01-22
13
VALERII KUCHERENKOPMP, M.Eng, CCLP
M: 647 447 [email protected]
Contact Information
25
mailto:[email protected]