Occupants, Residents, Landowners within 800 metres of the Project Boundary 781656 Alberta Ltd. No Interests Raised Engagement Summary Stakeholder Date Type of Communication Staff Members Description 781656 Alberta Ltd. 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. 781656 Alberta Ltd. 3-Jul-19 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail. 781656 Alberta Ltd. 28-Aug-19 Phone Ron Galbraith I, Ron Galbraith called Gary Babe on August 28, 2016 at 1:20 PM. I left a message for Gary to call me back. Gary returned my call at 1:30. We spoke about the Rattlesnake Ridge Wind Project. He had no concerns about the project. Gary supplied me with phone numbers for sons, Josh(an occupant) and Caleb(a landowner), in the consultation area. Alastair Edward Olsen and Linda Charlotte Olsen No Interests Raised Engagement Summary Stakeholder Date Type of Communication Staff Members Description Alastair Edward Olsen and Linda Charlotte Olsen 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen and Linda Charlotte Olsen 16-May-19 In-Person Ron Galbraith Linda and Alastair Olsen attended the landowner dinner on May 16th, 2019. They are in the 2 Km setback from Whitla. They were disappointed that this was the case but are still supportive of the project. Lin and I chat regularly about the project. She has been instrumental in helping find absentee landowners. The Olsen’s have no concerns about the project. Alastair Edward Olsen and Linda Charlotte Olsen 4-Jun-19 Consultation Ron Galbraith I, Ron Galbraith, Met with Linda and Alastair Olsen on June 4th at 7 PM. I was there to take some pictures of a parcel of land that the Olsen’s own. We are thinking of having the Operations and Maintenance building in this area. Alistair rode with me. We talked about the increased volume of traffic in the area. He said he realized that there would be more people coming and going, especially during construction. I told him that through construction this would be home base for the crews, construction trailers and storage. We talked about the past use of the land. Although it is seeded to grass now, it has in the past been farmed. At this time Alistair and Lynn had no concerns about the project. Alastair Edward Olsen and Linda Charlotte Olsen 3-Jul-19 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail. Albert Kregel and Renee Adriana Kregel No Interests Raised Engagement Summary Stakeholder Date Type of Communication Staff Members Description Albert Kregel and Renee Adriana Kregel 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Albert Kregel and Renee Adriana Kregel 3-Jul-19 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Upload: others

Post on 18-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Occupants, Residents, Landowners within 800 metres of the Project Boundary

781656 Alberta Ltd.

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

781656 Alberta Ltd. 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

781656 Alberta Ltd. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

781656 Alberta Ltd. 28-Aug-19 Phone Ron GalbraithI, Ron Galbraith called Gary Babe on August 28, 2016 at 1:20 PM. I left a message for Gary to call me back.Gary returned my call at 1:30. We spoke about the Rattlesnake Ridge Wind Project. He had no concerns about the project.Gary supplied me with phone numbers for sons, Josh(an occupant) and Caleb(a landowner), in the consultation area.

Alastair Edward Olsen and Linda Charlotte Olsen

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Alastair Edward Olsen and Linda Charlotte Olsen

4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Alastair Edward Olsen and Linda Charlotte Olsen

16-May-19 In-Person Ron Galbraith

Linda and Alastair Olsen attended the landowner dinner on May 16th, 2019. They are in the 2 Km setback from Whitla. They were disappointed that this was the case but are still supportive of the project.Lin and I chat regularly about the project. She has been instrumental in helping find absentee landowners.The Olsen’s have no concerns about the project.

Alastair Edward Olsen and Linda Charlotte Olsen

4-Jun-19 Consultation Ron Galbraith

I, Ron Galbraith, Met with Linda and Alastair Olsen on June 4th at 7 PM. I was there to take some pictures of a parcel of land that the Olsen’s own. We are thinking of having the Operations and Maintenance building in this area. Alistair rode with me. We talked about the increased volume of traffic in the area. He said he realized that there would be more people coming and going, especially during construction. I told him that through construction this would be home base for the crews, construction trailers and storage. We talked about the past use of the land. Although it is seeded to grass now, it has in the past been farmed. At this time Alistair and Lynn had no concerns about the project.

Alastair Edward Olsen and Linda Charlotte Olsen

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Albert Kregel and Renee Adriana Kregel

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Albert Kregel and Renee Adriana Kregel 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Albert Kregel and Renee Adriana Kregel 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Page 2: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Albert Kregel and Renee Adriana Kregel 7-Aug-19 Phone Ron GalbraithI, Ron Galbraith, called Albert Kregel at 10:35. We had spoken earlier in July. At the time he had no concerns. When I asked him if he had any questions he said they were not overjoyed that the turbines were coming but he is accepting of change.

Alberta Crown c/o Alberta Energy Regulator

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Alberta Crown c/o Alberta Energy Regulator 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Angus Nicholson, Walter Sillib and James R Fisher All Trustees for the United Church of Canada

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Angus Nicholson, Walter Sillib and James R FisherAll Trustees for the United Church of Canada

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Bernard Drath and Winnie Drath

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Bernard Drath and Winnie Drath 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Bernard Drath and Winnie Drath 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Bernard Drath and Winnie Drath 30-Aug-19 Social media Mary Lou Kominek

I, Mary Lou Kominek have been attempting to contact Bernard & Winnie Drath. The RES mailing was send to Bernard & Winnie Drath, Box 166, Seven Persons, ALB. & was returned to sender.Through research on obituaries online I have found an obituary for Bernard Rudolph Drath – Medicine Hat, Alb. On SAAMIS Memorial, Medicine Hat site. Born December 27 1944 Died December 7 2015. It was noted that he was from Abbotsford, BC. After further unsuccessful searches for telephone numbers for Drath in Medicine Hat none were found so we searched social media Facebook and located at Winnie Drath of Medicine Hat. On 8/30/2019 I private messaged this one Winnie Drath & explained we were attempting to locate her regarding the Whitla Wind Farm and asked her to please respond to myself by phone or private message.As of today September 4, 2019 I have not received any response. I will continue to monitor FB for a response and if any message is received I will pass on the Whitla Wind Farm information.

Page 3: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Bernard Drath and Winnie Drath 5-Sep-19 Email Mary Lou Kominek

Please note the correction in email below Sent Sept 4 at 4:47 PM regarding the name of the wind project - should be the Rattle Snake Ridge Wind - BHEC-RES Alberta L.P. Not to be confused with the Whitla Wind Energy Project or any other wind projects being developed by other companies in the area.My apologies if this caused any confusion.This is a copy of the content of the message on Facebook Messenger that was sent to Winnie Drath – August 30 at 5:11 PM.Hi Winnie- My name is Mary Lou Kominek and I work for Renewable Energy Systems. I am looking for the Winnie Drath who was married to Bernie Drath and lived in Whitla. If this is you could you please get back to me as we need to contact persons who have ownership of the lands around Whitla regarding the proposed wind energy farm near Whitla. We mailed an information package to a n address of Seven Persons but it was returned. Sorry about contacting you through Facebook but we haven't had any success in reaching you through mail or by phone. My phone number is 403-458-3253.

Blaine Doling and Dawn Doling

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Blaine Doling and Dawn Doling 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Blaine Doling and Dawn Doling 11-Jul-19 In-person Rebecca Crump

New address as per July 11th in person meeting with Dawn: Box 1282 Medicine Hat, AB T1A 7M9

Interest SummarySee Appendix P - Summary of Interests

Caleb Glennis Babe

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Caleb Glennis Babe 15-Aug-19 In-person Ron Galbraith I, Ron Galbraith, stopped at the SW 28-11-8 w4. This parcel of land was formerly the Walter Rempel residence. Walter has moved to Medicine Hat and Caleb Babe now resides there. There was no one there so I left my business card in the door.

Caleb Glennis Babe 30-Aug-19 In-person Ron Galbraith I, Ron Galbraith, stopped at Caleb's residence and dropped off a Project Notification Package. I spoke with Caleb's spouse who was well aware of the Project and stated she had no concerns

Calvin Lunseth and Angela Lunseth

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Calvin Lunseth and Angela Lunseth 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Calvin Lunseth and Angela Lunseth 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Calvin Lunseth and Angela Lunseth 4-Jul-19 Package Rebecca Crump

For the Market Participant Choice (MPC) portion of the Project, RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the July 24, 2019 Public Open House, a letter explaining they were in the consultation zone for the interconnection facilities, there was an explanation of the interconnection facilities in addition to the Electrical Facilities map and an AUC brochure.

Page 4: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Calvin Lunseth and Angela Lunseth 18-Jul-19 Email Ron Galbraith

Good Morning Calvin,This week, starting Wednesday we will have Hawkeye Line Locating in the area doing private locating and staking the drilling location. I am at the county with Rebecca on Wednesday so we will have a RES representative from construction accompany Ryan from Hawkeye. We will try to keep traffic to a minimum and travel the proposed access.The following ¼ sections will be accessed for staking: NW 33-10-8(Schilie)SW 33-10-8(two test holes)NW 28-10-8,SW 28-10-8, test hole at the proposed turbine and the Sub location.SE 17-11-8, NE 13-11-9 (Bergen)SE14-11-9 (Ebon Hill)Drilling will start next week, weather permitting.

Calvin Lunseth and Angela Lunseth 14-Aug-19 In-personRebecca Crump, Ron

Galbraith and Mary Lou Kominek

Rebecca, Mary Lou and I (Ron) had lunch with Calvin and Angela Lunseth, Gilbert Lunseth and George Schile after the County of Forty Mile Land Use Bylaw public hearing in Foremost on August 14th, 2019.Calvin, Gilbert and George each spoke in favor of the Rattlesnake Ridge Wind Power Project at the hearing.We had long discussions with Calvin on the design of the roads for the project as he wanted to see the roads engineered to be able to farm over them and not create ditches and small unfarmable areas. We were able to satisfy these concerns and he is happy that the project may move ahead. As are Angela, Gilbert and George.Calvin and Angela are the owners of Lunseth Farms Ltd.

Calvin Lunseth and Angela Lunseth 14-Aug-19 Phone Ron Galbraith

I Ron Galbraith, consulted with Calvin and Angela Lunseth about the interconnection portion of the Rattlesnake Wind Power Project on August 14th at 12:30 PM in Foremost, AB. They are fully aware of the positioning of the substation and interconnection to the AltaLink transmission line at the south end of their property. They have no concerns regarding the interconnection.The substation is located on the Lunseth’s property SW 28-10-8 W4 and Calvin is the grazing leaseholder on adjacent parcels requiring consultation. Calvin’s father Gilbert was also at this meeting. He is the former grazing lease holder on the adjacent parcels. These parcels include, NE 21-10-8 W4 and NW 21-10-8 W4.

Canadian Pacific Limited c/o Canadian Pacific Railway

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Canadian Pacific Limitedc/o Canadian Pacific Railway

4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Canadian Pacific Limitedc/o Canadian Pacific Railway

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Canadian Pacific Limitedc/o Canadian Pacific Railway

12-Sep-19 Phone Ron Galbraith I, Ron Galbraith, called Jason Morgan at Canadian Pacific to discuss the Rattlesnake Ridge Wind Project. I left a message at 3:45 PM asking him to call me back at his earliest convenience.

Canadian Pacific Limitedc/o Canadian Pacific Railway

12-Sep-19 Email Ron Galbraith

Hi Jason,I got your number from a colleague and I am following up my voicemail with this package.In July we sent a notification package to Canadian Pacific at the Calgary address about our Rattlesnake Ridge Wind Project. I have attached the materials that were in the mailing. Please call me at your earliest convenience and we can discuss.

Canadian Pacific Limitedc/o Canadian Pacific Railway 12-Sep-19 Email Ron Galbraith

Ron,I received your message. Unfortunately, I am no longer in the utility crossing role. I have copied Graeme Dales the new utility supervisor in this message.

Canadian Pacific Limitedc/o Canadian Pacific Railway 12-Sep-19 Email Ron Galbraith

Hi Graeme,I didn’t know if Jason had forwarded the email with attachments.We are developing a wind farm near Whitla, Alberta. Canadian Pacific is a landowner within 800 meters of the project so a personal consultation is required. Once you have had a chance to look at the materials we could chat. Please call at your earliest convenience. We have retained Mark Hoadley of Meridian Land to work with you on the crossing.

Canadian Pacific Limitedc/o Canadian Pacific Railway

13-Sep-19 Email Ron Galbraith

Hi Ron,Is any portion of this project going to have a utility component that crosses over/under CP tracks? If not, then I’ll need to direct this to our Real Estate group as it would fall under their umbrella.

Graeme DalesSupervisor, Utilities & Flagging (West)Office 403-319-3831 7550 Ogden Dale Road SECalgary AB T2C 4X9

Page 5: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Canadian Pacific Limitedc/o Canadian Pacific Railway

13-Sep-19 Email Ron Galbraith

Good Morning Graeme,Yes, there would be a utility crossing under the tracks in SW 5-11-8 W4 adjacent to Range Road 85.If you can supply a contact in the real estate division I could follow up with them as well. As mentioned in the earlier email Meridian Land will be contacting you regarding crossings.Thanks.

Canadian Pacific Limitedc/o Canadian Pacific RailwayReal Estate Division

13-Sep-19 Email Ron Galbraith

To Whom It May Concern,BHEC-RES Alberta LP is proposing to develop, construct and operate a 117.6 MW wind farm in the Whitla, Alberta area. The attached information is a notification requirement of the Alberta Utilities Commission(AUC). Renewable Energy Systems Canada Inc has identified Canadian Pacific as a stakeholder. If you should have any questions or concerns about this project please contact me at the number below or the Project Developer, Rebecca Crump at 647-880-7473 or by email at [email protected] We are also in contact with the Utilities and Flagging Department about crossing agreements.Thank you.

Canadian Pacific Limitedc/o Canadian Pacific RailwayReal Estate Division

16-Sep-19 Email Ron Galbraith

Good Morning Ron,Looking at the map, I see that the site boundary (from Legend) encloses CP ROW/station grounds. Will this project at any time involve the use of CP land?Thank youCyrus NjungReal Estate TechnicianPhone: 403-319-64567550 Ogden Dale Road S.E.Calgary, AB T2C 4X9

Canadian Pacific Limitedc/o Canadian Pacific RailwayReal Estate Division

16-Sep-19 Email Ron Galbraith

Hi Cyrus,This project will not include any CP land. We will require only a crossing to bore under the track with the electrical collection system, parallel to Range Road 85(west of the town site).Thank you.

Canadian Pacific Limitedc/o Canadian Pacific RailwayReal Estate Division

16-Sep-19 Email Ron Galbraith

Hi Ron,If not already done so, your contact person at CP for the crossing will be Graeme Dales whom I have copied in this email.Thank youCyrus NjungReal Estate TechnicianPhone: 403-319-64567550 Ogden Dale Road S.E.Calgary, AB T2C 4X9

Colin Albert Engel and Valerie Joan Engel

no concerns

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Colin Albert Engel and Valerie Joan Engel 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Colin Albert Engel and Valerie Joan Engel 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Colin Albert Engel and Valerie Joan Engel 12-Aug-19 In-person Ron GalbraithI, Ron Galbraith stopped in Whitla to see Colin and Valerie Engel at 5:45 PM on August 12. Colin and Valerie were unable to attend the open house due to prior commitments. They did get the information package in the mail and reviewed it. They had no concerns about the wind project.

Colin Albert Engel and Valerie Joan Engel 27-Aug-19 Phone Ron Galbraith I followed up with Trapper on August 27th, 2019. He had no concerns about the project.

Page 6: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Dale L Buchholz

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Dale L Buchholz 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Dale L Buchholz 24-Jul-19 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the July 24, 2019 Public Open House

Dale L Buchholz 13-Aug-19 In-person Ron Galbraith

I, Ron Galbraith, stopped in Whitla to see Dale Buchholz. Dale did not receive the information package due to an address change. However, he did attend the open house and collected all the pertinent information about the project.Dale is excited about the possibilities that construction of the wind farm may hold. He has a catering business and is also renovating his home, to accommodate workers. Dale had no concerns about the project.Dale supplied his new address so we can keep him updated. It is Box 1048, Bow Island, AB. T0K 0G0

Dalyce Joy Bergen

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Dalyce Joy Bergen 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Dalyce Joy Bergen 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Dalyce Joy Bergen 23-Jul-19 Phone Ron Galbraith

I, Ron Galbraith, spoke to Dalyce Bergen on July 23rd, 2019 to make sure she had a chance to look at the notification materials that were sent. I also asked if she could make the open house the following night. Dalyce had previous commitments but told me that if the fellow that rents her land(Calvin Lunseth) was good with the turbine placement on her land, then she was as well. Dalyce had no concerns.

Dalyce Joy Bergen 24-Jul-19 Phone Ron Galbraith Dalyce called RG at 2:40 pm on July 24 to inform she will not attend the OH but will likely drop by the open office hours.

Darren Begg c/o MacLean and WiedemannNo Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Darren Begg c/o MacLean and Wiedemann 4-Sep-18 Package Rebecca CrumpRES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Darren no longer uses this address of service. The package was refused and returned to sender.

Page 7: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Darren J Rempel and Stephanie C Genereux

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Darren J Rempel and Stephanie C Genereux 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Darren J Rempel and Stephanie C Genereux 8-Aug-19 Phone Ron GalbraithI, Ron Galbraith, called Darren Rempel at 10:55 on August 8th. Darren has received the package of project information in the mail. He and Stephanie had reviewed it and had no concerns about the project.I told Darren we would continue to keep stakeholders updated as the project moved ahead.

Darren Stanely Begg

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Darren Stanely Begg 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Darren Stanley Begg 16-May-19 In-person Ron Galbraith

I, Ron Galbraith, spoke to Darren Begg at the May 16th landowner meeting at the Whitla Hall. The discussion revolved around wetland setbacks on his lands. I explained the definition of a wetland to him according to AEP and that we needed to route some roads in strange alignments sometimes. Darren understood the need to avoid the wetlands and had no concerns about the project moving ahead.I also talked to Darren on August 7th, 2019 to make sure he had seen the notification package. He also supplied me with his sisters phone number so that she could be consulted as an area landowner.

Darren Stanely Begg 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Darren Stanley Begg 8-Jul-19 Phone Ron Galbraith

I, Ron Galbraith, spoke to Darren Begg this morning to let him know we will have a line locater in the area this week to stake geo tech locations and identify utilities. He was fine with the activities that will take place.I also asked about the information package that was sent out. We got a notification that it was refused and would be returned to sender. He said that was odd because he had signed for it and had reviewed it. He has no issues with the project.

Darryl Babe

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Darryl Babe 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Darryl Babe 16-May-19 In-person Ron Galbraith

I, Ron Galbraith spoke to Darryl Babe at our May 16th landowner meeting. We talked about road alignment and turbine placement and how it would affect the farming operation. Given the direction that the fields are farmed he felt there would be no major impact to their farm. He had no concerns.Darryl and his father, James(Jim) operate D and J Babe Farms Ltd. They had no concerns.

Darryl Babe 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Darryl Babe 10-Sep-19 Phone Ron Galbraith I spoke to Darryl tonight, September 10th, 2019. I called him to let him know we would settle damages soon for the Geotech drilling that was done. He still had no concerns and was happy to see the project moving forward.

Page 8: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

David Frank Gechter and Jennifer Kim Gechter

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

David Frank Gechter and Jennifer Kim Gechter

4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

David Frank Gechter and Jennifer Kim Gechter

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

David Frank Gechter and Jennifer Kim Gechter

9-Aug-19 Package Rebecca Crump

I, Ron Galbraith, sent a Facebook message to Jennifer on August 8th at 9:30 because I had no contact info for her or David. I asked that she call when she could. I also apologized for the unorthodox way of getting in touch.At 1:45 David called me back. He said Jennifer had relayed the message to call me. I asked David if they had received the information package in the mail. He said they have been getting the mailings from the start. He said because it is not on their land he is not concerned.

Dorothy Agatha Noga and Paul Noga

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Dorothy Agatha Noga 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Dorothy Agatha Noga and Paul Noga 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Douglas H Zorn and Diane Chute

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Douglas H Zorn and Diane Chute 31-Oct-16 Other Ron Galbraith

I, Ron Galbraith, tried to contact Doug Zorn in October of 2016 to discuss the Forty Mile wind power project when the Rattlesnake project was a part of it. I could find no numbers in Canada 411 that worked for him. I resorted to a Facebook message (below) but got no response.Hi Doug, I work for Renewable Energy Systems(RES). We are working on a project in the Bow Island area and we are sending notifications to landowners in the vicinity. Could you possibly give me a call to discuss? Sorry for the means of contacting you, but I could not find a number for you.

Douglas H Zorn 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Douglas H Zorn 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Douglas H Zorn and Diane Chute 10-Jul-19 In-person Ron Galbraith

New address as per July 10th in person meeting with Doug Zorn and Diane.Box 693Bow Island, ABT0K 0G0

Douglas H Zorn and Diane Chute 24-Jul-19 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the July 24, 2019 Public Open House

Douglas H Zorn and Diane Chute 17-Aug-19 Phone Ron Galbraith

I, Ron Galbraith, called Doug Zorn at 8:45, Saturday August 17, 2019. I asked Doug about Marilyn Zorn being an interest holder in the land. I also told Doug it was my understanding that Marilyn had passed away in 2016. He said that was correct, she had passed and that his lawyers were working on removing the caveat from title. It could be the back up at land titles that is the holdup on removal.

Interest SummarySee Appendix P - Summary of Interests

Page 9: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Dwayne David Gechter and Eleanor Gechter

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Dwayne David Gechter 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Dwayne David Gechter and Eleanor Gechter 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Dwayne David Gechter 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Dwayne David Gechter and Eleanor Gechter 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Dwayne Gechter and Eleanor Gechter 8-Aug-19 PhoneRebecca Crump, Ron

Galbraith

On August 8 at 10:45 I called the Gechter residence to see if they might me available to meet with Rebecca Crump and I next Tuesday afternoon. There was no answer so I left a voicemail asking them to call back.Elenore called back around 1:15. We decided on a 3 PM meeting on Tuesday August 13th.

Interest SummarySee Appendix P - Summary of Interests

Ebon Hill Angus Ltd. (Roger Carl Hillestad and Jo Ann Hillestad)

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Ebon Hill Angus Ltd. 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Ebon Hill Angus Ltd. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Eugene Wayne Deering

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Eugene Wayne Deering 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Eugene Wayne Deering 22-May-19 In-Person Ron Galbraith

I, Ron Galbraith, stopped at Eugene Deering’s residence on May 22, 2019 after the May 16th landowner dinner. Gene’s son Stuart was also present. We discussed the alignment of roads past wetlands, coulee setbacks and turbine placement. We also discussed the advancement of the project. Gene had no concerns.

Eugene Wayne Deering 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Eugene Wayne Deering 24-Jul-19 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the July 24, 2019 Public Open House

Page 10: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Fredrick Peter Verhaest and Cindy Lee Verhaest

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Fredrick Peter Verhaest and Cindy Lee Verhaest

4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Fredrick Peter Verhaest 19-Sep-18 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the September 19, 2018 Public Open House

Fredrick Peter Verhaest and Cindy Lee Verhaest

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Fredrick Peter Verhaest and Cindy Lee Verhaest

8-Jul-19 Phone Ron Galbraith

I Ron Galbraith, called Fred Verhaest today, July 8th at 10:50 AM. We spoke about the information package that had been mailed. He had reviewed the package and had no concerns about the project.We also spoke about the line find and the staking of turbine locations for geo tech drilling that is to take place next week. Again Fred had no concerns.

Fredrick Peter Verhaest 24-Jul-19 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the July 24, 2019 Public Open House

G & C Farms Ltd.

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

G & C Farms Ltd. 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

G & C Farms Ltd. 16-May-19 In-Person Ron GalbraithGerard Oosterhuis of G and C Farms attended the May 16th landowner dinner as a new landowner who recently purchased several parcels in the project. We spoke about the positioning of the turbine and how it would affect the placement of a pivot irrigation system. Gerard said that he was aware of the encumbrance on the land and he said he had no concerns about the project.

G & C Farms Ltd. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

George J Voeller

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

George J Voeller 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

George J Voeller 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

George J Voeller 14-Jul-19 Package Ron Galbraith I, Ron Galbraith, spoke to George Voeller on July 14, 2019 by phone. He had received the information package and had reviewed it. He has no concerns about the project.

George J Voeller 18-Jul-19 Phone Ron GalbraithI, Ron Galbraith, spoke to George on the phone on July 18th at 10:45 AM.George had received the information package and had no concerns.He said he would be unable to make the open house the following week but his son Glenn would be there.

George J Voeller 14-Sep-19 Phone Ron Galbraith I, Ron Galbraith, spoke to George Voeller on July 14, 2019 by phone. He had received the information package and had reviewed it. He has no concerns about the project.

Page 11: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

George S Schile

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

George S Schile 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

George S Schile 19-Sep-18 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the September 19, 2018 Public Open House

George S Schile 14-May-19 Phone Ron Galbraith

I, Ron Galbraith, called George Schile to make sure he was coming to the landowner dinner on May 16th, 2019.George said he would be there. I spoke to him at the landowner dinner and he was happy with the layout that was provided. He said that if Calvin was happy with the design he would agree as well. As such George has no concerns..

George S Schile 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

George S Schile 14-Aug-19 In-personRebecca Crump, Ron

Galbraith and Mary Lou Kominek

Rebecca, Mary Lou and I(Ron) had lunch with Calvin and Angela Lunseth, Gilbert Lunseth and George Schile after the County of Forty Mile Land Use Bylaw public hearing in Foremost on August 14th, 2019.Calvin, Gilbert and George each spoke in favor of the Rattlesnake Ridge Wind Power Project at the hearing.We had long discussions with Calvin on the design of the roads for the project as he wanted to see the roads engineered to be able to farm over them and not create ditches and small unfarmable areas. We were able to satisfy these concerns and he is happy that the project may move ahead. As are Angela, Gilbert and George.Calvin and Angela are the owners of Lunseth Farms Ltd.

Gilbert Brian Lunseth

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Gilbert Brian Lunseth 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Gilbert Brian Lunseth 24-Apr-19 Phone Ron GalbraithI, Ron Galbraith, spoke to Gilbert Lunseth on Wednesday April 24th to update his address for our mailing list. Gilbert was happy to provide the change. I told him he would be receiving a project update in the mail soon. At this time he had no concerns about the Project.

Gilbert Brian Lunseth 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Gilbert Brian Lunseth 14-Aug-19 In-personRebecca Crump, Ron

Galbraith and Mary Lou Kominek

Rebecca, Mary Lou and I (Ron) had lunch with Calvin and Angela Lunseth, Gilbert Lunseth and George Schile after the County of Forty Mile Land Use Bylaw public hearing in Foremost on August 14th, 2019.Calvin, Gilbert and George each spoke in favor of the Rattlesnake Ridge Wind Power Project at the hearing.We had long discussions with Calvin on the design of the roads for the project as he wanted to see the roads engineered to be able to farm over them and not create ditches and small unfarmable areas. We were able to satisfy these concerns and he is happy that the project may move ahead. As are Angela, Gilbert and George.Calvin and Angela are the owners of Lunseth Farms Ltd.

Glen Gordon Elliott and Verna Elliott

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Glen Gordon Elliott and Verna Elliott 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Page 12: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Glen Gordon Elliott and Verna Elliott 24-Apr-19 Phone Ron Galbraith

On April 24 I, Ron Galbraith called Glen and Verna Elliott to update their address for our mailing list. I spoke to Verna and she was happy to provide the updated information. I indicated to her that a project update would follow in the coming weeks.I inquired of Verna about a name listed on their title, William Stashofski. She said he was the former owner of property bought by Glen and that he had passed away several years ago.Glen and Verna had no concerns at this time.

Glen Gordon Elliott and Verna Elliott 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Glen Gordon Elliott and Verna Elliott 26-Aug-19 Phone Ron Galbraith

I, Ron Galbraith called Glen and Verna Elliott on August 26, 2019 at 11:10 AM. I spoke to Verna and she said they had received the information packages and had no concerns. She said that they had hoped to get to the final open house but it didn’t work out. Glen has had some health issues and meetings are hard for him.Verna asked that we remove one of the mailings as Glen Elliott and Glen G Elliot are the same person.

Glenn George Voeller

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Glenn George Voeller 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Glenn George Voeller 24-Apr-19 Phone Ron GalbraithOn Wednesday April 24th I called Glenn Voeller and George Voeller to update their address for our consultation record. They were happy to supply an updated address. I told them they would be receiving a project update letter in the mail soon. They had no concerns about the project at this time.

Glenn George Voeller 16-May-19 In-person Ron Galbraith Glenn Voeller attended the landowner dinner held at the Whitla Hall on May 16th, 2019. I, Ron Galbraith, spoke to him there. He was happy with the layout that was presented to all that night and had no concerns.

Glenn George Voeller 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Gordon Gustav Wudrich and Susan M Wudrich

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Gordon Gustav Wudrich and Susan M Wudrich

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Gordon Gustav Wudrich and Susan M Wudrich 17-Jul-19 In-Person Ron Galbraith

I, Ron Galbraith, stopped by the Wudrich residence and spoke to Gord and Sue Wudrich on July 17th, 2019. They had received the notification package and had reviewed it. They had no concerns.They told me they would be unable to make it to the open house the following week.

Gordon R Lunseth and Linda L Lunseth

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Gordon R Lunseth and Linda L Lunseth 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Gordon R Lunseth and Linda L Lunseth 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Page 13: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Gordon R Lunseth 4-Jul-19 Package Rebecca Crump

For the Market Participant Choice (MPC) portion of the Project, RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the July 24, 2019 Public Open House, a letter explaining they were in the consultation zone for the interconnection facilities, there was an explanation of the interconnection facilities in addition to the Electrical Facilities map and an AUC brochure.

Linda L Lunseth 24-Jul-19 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the July 24, 2019 Public Open House

Interest SummarySee Appendix P - Summary of Interests

Harry Jason Verhaest

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Harry Jason Verhaest 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Harry Jason Verhaest 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Harry Jason Verhaest 12-Aug-19 Phone Mary Lou KominekI, Mary Lou Kominek, spoke with Harry Jason Verhaest, today August 12, 2019 at 11:09 AM. He has been away but he did receive the windfarm package and my voice messages. He has reviewed the package and has no concerns. Stated he doesn’t live in the area but has no concerns anyway.

Her Majesty the Queen in Right of AB As Represented by Minister of Municipal Affairs

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Her Majesty the Queen in Right of AB As Represented by Minister of Municipal Affairs

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Her Majesty the Queen in Right of Alberta - Glen Gordon Elliott and Verna Elliott

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Her Majesty the Queen in Right of Alberta - Glen Gordon Elliott and Verna Elliott

4-Jul-19 Package Rebecca Crump

For the Market Participant Choice (MPC) portion of the Project, RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the July 24, 2019 Public Open House, a letter explaining they were in the consultation zone for the interconnection facilities, there was an explanation of the interconnection facilities in addition to the Electrical Facilities map and an AUC brochure.

Her Majesty the Queen in Right of Alberta - Glen Gordon Elliott and Verna Elliott c/o The County of 40 Mile No.8

4-Jul-19 Package Rebecca Crump

For the Market Participant Choice (MPC) portion of the Project, RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the July 24, 2019 Public Open House, a letter explaining they were in the consultation zone for the interconnection facilities, there was an explanation of the interconnection facilities in addition to the Electrical Facilities map and an AUC brochure.

Her Majesty the Queen in Right of Alberta - Glen Gordon Elliott and Verna Elliott 26-Aug-19 Phone Ron Galbraith

I, Ron Galbraith, spoke to the Elliott’s by phone on August 26th regarding the Rattlesnake Ridge wind farm interconnection on the SW 28-10-8 W4. Glen Elliott is the grazing lease holder on SE 29-10-8 W4. Glen was aware of the connection as they had received the information package from RES. He had no concerns.

Page 14: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Her Majesty the Queen in Right of Alberta as Represented by Minister of Municipal Affairs - Gilbert B Lunseth

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Her Majesty the Queen in Right of Alberta as Represented by Minister of Municipal Affairs - Gilbert B Lunseth

4-Jul-19 Package Rebecca Crump

For the Market Participant Choice (MPC) portion of the Project, RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the July 24, 2019 Public Open House, a letter explaining they were in the consultation zone for the interconnection facilities, there was an explanation of the interconnection facilities in addition to the Electrical Facilities map and an AUC brochure.

Her Majesty the Queen in Right of Alberta as Represented by Minister of Municipal Affairs - Gilbert B Lunseth c/o The County of 40 Mile No.8

4-Jul-19 Package Rebecca Crump

For the Market Participant Choice (MPC) portion of the Project, RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the July 24, 2019 Public Open House, a letter explaining they were in the consultation zone for the interconnection facilities, there was an explanation of the interconnection facilities in addition to the Electrical Facilities map and an AUC brochure.

Her Majesty the Queen in the Right of Alberta as Represented by the Minster of Municipal Affairs of Edmonton Alberta

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Her Majesty the Queen in the Right of Albertaas Represented by the Minster of Municipal Affairs of Edmonton Albertac/o Alberta Municipal Affairs

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Hutterian Brethren Church of Winnifred

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Hutterian Brethren Church of Winnifred 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Hutterian Brethren Church of Winnifred 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Hutterian Brethren Church of Winnifred 13-Aug-19 Phone Mary Lou Kominek

I, Mary Lou Kominek, spoke with Amos Hoffer on Aug 13, 2019 at 4:38 pm. Amos stated that he had no concerns about the RR wind farm. He stated he was more concerned wondering about the status of the 40 Mile Wind project. I said that Ron Galbraith would likely be in touch with him in the future as things progressed and I didn't have any information on that project at this time. He said ok to keep him posted with any details as they became available.

Iron Horse Transloading Inc.

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Iron Horse Transloading Inc. 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Page 15: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Iron Horse Transloading Inc. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Iron Horse Transloading Inc. 12-Sep-19 Phone Ron Galbraith

I, Ron Galbraith, called Shaun Murray of Iron Horse Transloading Inc at the Picture Butte, Alberta office on September 12, 2019 at 2:50 PM.I asked Shawn if he had received the notification package for the Rattlesnake Ridge Wind Project. He had reviewed the package and had no concerns. He felt there would be little impact to their business with the 2 Km setback from Whitla. I said there would be some increased traffic at the time of construction but would settle out as the project reached commercial operations.Shawn asked if they could provide any services to RES through construction? I told him we would be in touch closer to construction and chat.

James Babe and Joan Babe

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

James Babe and Joan Babe 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

James Babe and Joan Babe 16-May-19 In-person Ron GalbraithI, Ron Galbraith, spoke to Jim Babe at the May 16th, 2019 landowner dinner at the Whitla Hall. We discussed the project layout and reasoning for the placement of turbines, ie: setbacks from wildlife features, wetlands and county roads. Jim understood these ideas and had no objection to the project moving forward.

James Babe and Joan Babe 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

James Babe 24-Jul-19 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the July 24, 2019 Public Open House

James Cooper and Susan Cooper

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

James Cooper and Susan Cooper 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

James Cooper and Susan Cooper 16-May-19 In-Person Ron Galbraith

I, Ron Galbraith, Spoke to Jim and Susan Cooper at the landowner dinner that was held on May 16th at the Whitla Hall. We discussed the layout and the path forward for the project. They did not have any concerns.I also spoke to Jim on August 30th, we talked about crop damage payments for the drilling that has taken place and that we would settle after harvest when they had time. We also chatted about the notification package that was delivered in July. He had no concerns.

James Cooper and Susan Cooper 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

James Cooper and Susan Cooper 8-Jul-19 Phone Ron GalbraithI, Ron Galbraith spoke to Jim Cooper today, July 8th at 9:30 AM. I told Jim that we would be doing line locates and staking turbine locations for geo tech drilling starting Friday. He had several ¼ sections that we needed to access including some that he is an occupant on. He said that they had received the information package in the mail and had reviewed it. They had no concerns at this time.

James Cooper and Susan Cooper 26-Aug-19 Phone Ron Galbraith

I, Ron Galbraith, spoke to Jim Cooper at 12:45 PM on August 26, 2019.Jim and Susan had received the information package in the mail and had reviewed it. Jim said he was very pleased with the engineering of the infrastructure. The way we had run access roads with the field lines (farming direction) was very considerate.The Cooper’s are participating landowners and have no concerns about the project.

Page 16: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

James Kenneth Babe

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

James Kenneth Babe 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

James Kenneth Babe 16-May-19 In Person Rebecca CrumpI, Ron Galbraith, spoke to Jim Babe at the May 16th, 2019 landowner dinner at the Whitla Hall. We discussed the project layout and reasoning for the placement of turbines, ie: setbacks from wildlife features, wetlands and county roads. Jim understood these ideas and had no objection to the project moving forward.

James Kenneth Babe 24-Jul-19 Package Rebecca Crump Attended the July 24, 201 Public Open House. no concerns

Josh Babe

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Josh Babe 30-Aug-19 Phone Ron Galbraith

I, Ron Galbraith, spoke to Josh Babe on August 30, 2019 at 10:00 AM.I told Josh that we had to get together after harvest to settle damages where we had drilled for Geotech. I also asked if he had seen the information package that was sent out? He said that his landlord, Walter Rempel had shared information about the project. I offered to send the package by email and he gave me his email address. I sent the package to him at 11:00 AM.I told Josh I would be in touch to chat after he has had a chance to look at the package. At this time Josh did not express any concerns about the project.

Justin Bradley Olson, Oscar Stewart Olson and Carla Leanne Olson

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Justin Bradley Olson, Oscar Stewart Olson and Carla Leanne Olson

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Justin Bradley Olson, Oscar Stewart Olson and Carla Leanne Olson

21-Aug-19 In-person Ron Galbraith

I, Ron Galbraith, stopped in Bow Island at the Vitarra Bean Plant at 1:15 pm on August 21, 2019. We had been told Justin Olson of Whitla worked there. Justin came to the office. After introductions, I asked Justin if he had received the information package in the mail? He had not. I gave him a package to review. He said that he was aware of the project previously but was happy to get more information. I told Justin about the 2 Km setback from the townsite and he was happy to hear this. At this time Justin had co concerns about the Rattlesnake Ridge Project.We confirmed Justin’s address and phone number for future consultation.Upon further investigation the package that was mailed was signed for by another family member,Carla OlsonBox 982Bow Island, AB.T0K 0G0

Page 17: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Kenneth William Zorn and Gail Marilyn Zorn

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Kenneth William Zorn and Gail Marilyn Zorn 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Kenneth William Zorn 19-Sep-18 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the September 19, 2018 Public Open House

Kenneth William Zorn and Gail Marilyn Zorn 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Kenneth William Zorn and Gail Marilyn Zorn 22-Jul-19 Phone Ron Galbraith

I, Ron Galbraith, spoke to Gail Zorn on July 22 to see if they had received the notification package in the mail. She said they had received the package and had no concerns.Gail indicated to me that they had been to an open house for the RES Forty Mile Project and she was familiar with the procedures we had to follow. She said that they would not be able to make the open house this time due to the distance from their home but they were fully supportive of the project.

Leonard Heydlauff

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Leonard Heydlauff 29-May-19 In-person Ron Galbraith

On May 29, 2019, I, Ron Galbraith, stopped at the Heydauff residence at Whitla. There was no one home so I left a card in the door.Leonard called me later that evening.I told him about the development of a wind farm in the area. I asked him for his contact information so we could continue to keep him informed as to progress of the wind farm. I told him he would see information in the mail and we would have a public open house in the near future.Leonard thanked me for being in touch with him and invited me to stop for coffee soon.He had no issues with the development at this time.

Leonard Heydlauff 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Leonard Heydlauff 24-Jul-19 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the July 24, 2019 Public Open House. no concerns.

Leslie A Hallett and Brenda G Hallett

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Leslie A Hallett and Brenda G Hallett 25-Apr-19 Phone Ron Galbraith

I, Ron Galbraith, left a message for Les and Brenda Hallett of Whitla on April 25 at 1:50 PM. Les called back at 7:15 that evening. I explained to Les that we were updating the area addresses after Canada Post had changed their mail delivery policy. Les was happy to provide an updated address. I told him that we would be sending out an project update in the coming weeks. Les had no concerns at this time.

Leslie A Hallett and Brenda G Hallett 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Leslie A Hallett and Brenda G Hallett 5-Aug-19 Phone Mary Lou KominekI, Mary Lou Kominek, spoke with Leslie Hallett on Aug 8, 5:09 PM. He said he received the package. “no concerns, good to see these things happening, it’s the way of the future.” He said they have a nephew working on a wind farm near Pincher Creek.

Page 18: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Louis Simon (Deceased), Dorothy Mae Simon and Lorne Scott Simon

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Louis Simon, Dorothy Mae Simon and Lorne Scott Simon

4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Louis Simon, Dorothy Mae Simon and Lorne Scott Simon

16-May-19 In-Person Ron Galbraith I also spoke to Ron Simon, PoA for Louis and Dorothy Simon at the May 16th, 2019 landowner dinner. He was happy with the turbine placement and road alignment. He had concerns.

Louis Simon, Dorothy Mae Simon and Lorne Scott Simon

16-Jun-19 Phone Ron Galbraith I, Ron Galbraith, spoke to Lorne (Buddy) Simon on June 16th letting him know that we would be doing some geotech drilling on their property. This included surveyors accessing the land. Buddy had no concerns about the project.

Louis Simon, Dorothy Mae Simon and Lorne Scott Simon

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Louis Simon, Dorothy Mae Simon and Lorne Scott Simon

9-Jul-19 Phone Ron Galbraith

I, Ron Galbraith, called Buddy after speaking with his brother Ron on July 8th.We talked about the line locates happening for Geotech and the drilling that would take place next week.Buddy was concerned that his 120 foot sprayer would not fit between the road and a tower. I assured him with county setbacks this would not be an issue. He was happy to hear this and had no other concerns with the project.

Louis Simon, Dorothy Mae Simon and Lorne Scott Simon

9-Jul-19 Phone Ron Galbraith

I, Ron Galbraith, called Ron Simon, POA for Louis and Dorothy Simon, to let him know that there would be a line locator in the area this week to stake turbine locations and locate utilities. Ron asked that I text him the name of the company and the worker so he knew who was entering the land. I did so when the call ended. Ron also asked that I call his brother Lorne (Buddy) to inform him as well. Ron has no concerns about the project at this time.

Louis Simon, Dorothy Mae Simon and Lorne Scott Simon

21-Aug-19 Phone Kathryn Menard I, Kathryn Menard, just spoke with Stacey from Meridian Land, who informed me of Louis Simon’s passing on Aug 21st. Obituary Published in today’s Medicine Hat News. https://pattisonfuneralhome.com/obituaries/710.

Louis Simon, Dorothy Mae Simon and Lorne Scott Simon

6-Sep-19 In-Person Ron Galbraith I met with Ron Simon again last week, September 6, to go over the notification package. He had not been able to study it as his father Louis had recently passed. He had no concerns.

Lunseth Farms Ltd.

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Lunseth Farms Ltd. 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Lunseth Farms Ltd. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Mario Biemans

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Mario Biemans 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Mario Biemans 23-Jul-19 Phone Ron GalbraithSpoke to Mario Biemans this morning, July 23rd at 9:30 AM. I inquired if Mario had received the information package and did he have a chance to review it. He said that he had seen the package and would try to make the open house but could say for sure. I asked if he may have concerns about the project. “He said not really. It doesn’t affect me because it is over a half mile away.”

Page 19: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Marlene Gail Campbell

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Marlene Gail Campbell 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Marlene Gail Campbell 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Marlene Gail Campbell 20-Aug-19 Phone Mary Lou Kominek

I, Mary Lou Kominek, spoke with Marlene Campbell, today 8/20 at 11:39 AM.Yes she received the package in the mail. She had no concerns and just wanted to verify there was no infrastructure on her land. She said there was no residence on the lands she owned and there would be no impact. She said if she had any questions she would contact us but also her family has land signed into the project and she could always speak with her brother Glen Voeller. We had called her home phone several times and ended up getting her cell # from Glen.

Michael Patrick Weisgerber and Michelle Elizabeth Weisgerber

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Michael Patrick Weisgerber and Michelle Elizabeth Weisgerber

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Michael Patrick Weisgerber and Michelle Elizabeth Weisgerber

19-Aug-19 In-person Ron Galbraith

I, Ron Galbraith, stopped at the residence of Michelle and Michael Weisgerber on August 19, 2019 at 6:30 PM.Michelle was outside when I arrived and asked that I speak to Michael. Michael said that they had received the registered mail and had reviewed the information. He asked if there were any turbines east of their property as that is their view, of the Cypress Hills. I told him all turbines were to the west of them. He asked about noise from the turbines and I told him that we had done a noise model and it would be available on the website soon. I also told him that his residence would be compliant with the rules. Michael said that he probably should have gone to the meetings to find out more. I told him if he did have more questions that he should call.

Nick Kregel

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Nick Kregel 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Nick Kregel 3-Sep-19 Phone Ron Galbraith

I, Ron Galbraith, called Nick Kregel on Sept. 3rd, 2019 at 5:25 PM.Nick had seen the information package but asked that I send it to him by email as well. Nick asked if it was true that turbines kill birds? I said that there is always the possibility but we have done studies of the migratory paths and avian use. These studies are then sent to Alberta Environment and Parks to review and sign off on. He said that he thought that bird kills may be overstated.I asked Nick about the Ron Zeigler land that he bought, including the crown lease. He said that the title transfer is in the works but may not have happened yet.Nick had no other concerns.

Page 20: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Nyle Lynn Starner and Nancy Lea Starner

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Nyle Lynn Starner and Nancy Lea Starner 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Nyle Lynn Starner and Nancy Lea Starner 9-Aug-19 Phone Mary Lou KominekI, Mary Lou Kominek, left message at 4:22 pm for Nyle Starner. At 4:42 pm Nyle returned my call. Nyle is very much in favour of the wind farm and offered to sign his lands that are just 1 mile west of the project area. He has some land signed with Enerfin also. He has concernss other than why we didn’t sign his lands! Let him know if we wish to use his land in the future.

Occupant

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Occupant 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Occupant 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Pat Cardell Stearns and Sheila Elizabeth Stearns

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Pat Cardell Stearns and Sheila Elizabeth Stearns

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Pat Cardell Stearns and Sheila Elizabeth Stearns 23-Jul-19 Phone Ron Galbraith

I, Ron Galbraith, spoke to Sheila Stearns on July 23rd about the open house the following day in Whitla. I sent her the information package by email that day. She was unsure if they could make the open house but she had no concerns.Sheila also provided me with an updated address. Box 583, Bow Island AB. T0K 0G0.

Pat Cardell Stearns and Sheila Elizabeth Stearns 6-Aug-19 Phone Ron Galbraith

Today, August 6, 2019 I called the Stearns household again to see if they had a chance to review the package and if so did they have concerns? Pat said they had reviewed the package and did not have concerns. He and I had spoken at length about the Forty Mile Project in 2016. Pat said he would call if questions arose.

Patrick Jack Drader and Lori Michele Drader

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Patrick Jack Drader and Lori Michele Drader 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Page 21: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Patrick Jack Drader and Lori Michele Drader 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Patrick Jack Drader and Lori Michele Drader 10-Jul-19 In-person Rebecca Crump, Ron Galbraith

I, Ron Galbraith and Rebecca Crump, Project Developer of the Rattlesnake Ridge Wind Farm stopped at project participants, Jack and Lori Drader’s home on July 10, 2019.We spoke to Lori about the project. They had received the information package and had no concernss about the information that was supplied.Lori said they would try to make the open house but did have other things happening as well.

Patrick Jack Drader and Lori Michele Drader 10-Jul-19 In-person Rebecca Crump, Ron Galbraith

July 10th 4:15-4:30pmRon and I drove up to see Lori to see if she had received her information package about the Project. She had not checked the mail yet. Lori seemed ok that she had no turbines on her land or close by, but was content that she would be receiving part of the Community Shared Benefit payment. RES had paid her for a potential met tower that was never installed so she felt good that we still made the payment. She told us that she would be selling the property to her daughter in the near future (next couple of years). We told her about the open house in Whitla on July 24th and showed her the wind turbine layout. She didn’t have very many questions and we small talked for a awhile.

Ralph Gechter

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Ralph Gechter 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Ralph Gechter 19-Sep-18 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the September 19, 2018 Public Open House

Ralph Gechter 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Ralph Gechter 4-Jul-19 Package Rebecca Crump

For the Market Participant Choice (MPC) portion of the Project, RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the July 24, 2019 Public Open House, a letter explaining they were in the consultation zone for the interconnection facilities, there was an explanation of the interconnection facilities in addition to the Electrical Facilities map and an AUC brochure.

Ralph Gechter 9-Aug-19 Phone Ron Galbraith

I, Ron Galbraith called Ralph Gechter at 1:33 PM on August 9th. I asked if he had received the information for the wind farm and the Point of Interconnection. He said that he had gotten the information.Ralph said that he was not in favor of renewable energy, that he thought it was not sustainable for the future. I mentioned to him that there were no subsidies for the project, and it was to be built with private funds. He said he understood that and shared some strong opinions about Warren Buffet, BHE and their agenda.We also talked about the POI and where his land was situated. Ralph said that there was not much he could do to stop the project. I told him that there was a process through the AUC that he could object. He said there wasn’t much point as others in the area want it. Ralph mentioned that he hoped that the substation would be safe for animals. I told him that the latest technologies would be used to be as safe as possible.I asked Ralph to be in touch if he had any other questions. I also said we would keep him informed as the project progressed.

Interest SummarySee Appendix P - Summary of Interests

Robert G Gaetz (Deceased), Penny D Gaetz and Kyle Gaetz

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Robert G Gaetz, Penny D Gaetz and Kyle Gaetz

4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Robert G Gaetz, Penny D Gaetz and Kyle Gaetz

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Page 22: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Robert G Gaetz, Penny D Gaetz and Kyle Gaetz

20-Aug-19 Phone Mary Lou Kominek

Gaetz family received mail package acknowledged by Kyle 8/20 to myself, Mary Lou Kominek. I had left voice messages to Kyle 8/8, 8/9, 8/12, 8/13 – he returned call 8/20.Kyle said his family really had no interest in having any part of the wind farm impact their property. I asked Ron Galbraith to join the call to verify this. Ron had met with Kyle some time ago to determine if they were interested in participating in the wind farm and at that time they said no they were not. Ron verified their land would not be implicated and that since they were not participating landowners there would also not be shared community payments to them the way the plans are at this time. Kyle again reiterated that they really did not want to participate but did not say they had any other concerns.

Roger Carl Hillestad and Jo Ann Hillestad

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Roger Carl Hillestad and Jo Ann Hillestad 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Roger Carl Hillestad and Jo Ann Hillestad 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Roger Carl Hillestad and Jo Ann Hillestad 22-Jul-19 In-Person Ron Galbraith

I, Ron Galbraith, stopped at Roger and Joanne Hillestad’s residence on July 22nd , 2019 to make sure they remembered the open house on Thursday the 24th. They said they would be there. We had a short discussion that day about the mailout they had received. I visited with them at the open house as well about turbine placement and the reason for road alignment because of wetlands. Roger and Joann understood the need for these alignments. They are keen to see the project move ahead and have no concerns.Roger and Joann also own Ebon Hill Angus Ltd.

Roger Carl Hillestad and Jo Ann Hillestad 24-Jul-19In-person

(Open House)Brittney Sammons

(Golder)

Jo (lives outside the project area to the south of Hwy 3 on the west). She was there with her husband. She was very interested in the photo simulations and we found her homestead on two of the view sheds. She liked that she was able to see what the final project build would look like and had no negative feedback.

Roger Carl Hillestad and Jo Ann Hillestad 24-Jul-19 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the July 24, 2019 Public Open House

Roman Catholic Bishop of the Diocese of Calgary

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Roman Catholic Bishop of the Diocese of Calgary

4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Roman Catholic Bishop of the Diocese of Calgary

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Roman Catholic Bishop of the Diocese of Calgary(Alejandro Henao)

4-Jul-19 Email Ron GalbraithHi Alejandro,Please find the attached materials for you review. We can talk next week when you have had a chance to look at the information.Thank you.

Roman Catholic Bishop of the Diocese of Calgary

13-Sep-19 Phone Ron Galbraith I, Ron Galbraith, called the Roman Catholic Diocese of Calgary on September 13, 2019 at 2:30 PM. I left a message for Susan Lumby to return my call to discuss the notification package that had been sent.

Ronald Merle Noga and Beatrice Lynn Noga

No Interests RaisedEngagement Summary

Stakeholder Date Type of Communication Staff Members Description

Ronald Merle Noga and Beatrice Lynn Noga 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Page 23: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Ronald Merle Noga and Beatrice Lynn Noga 25-Apr-19 Phone Ron Galbraith

I, Ron Galbraith, called the Ron and Beatrice Noga residence on Thursday, April 25th. I spoke to Beatrice Noga and she was happy to provide an updated address for our mailing list. I told Beatrice that she will receive some updated information on the project in the coming weeks.At this time she had no concerns about the project.

Ronald Merle Noga and Beatrice Lynn Noga 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Ronald Merle Noga and Beatrice Lynn Noga 21-Aug-19 Phone Ron Galbraith I, Ron Galbraith, called the residence of Ron and Beatrice Noga at 3:40 PM on August 21, 2019. I left a message, asking them to call back to confirm they had reviewed the information package for the Rattlesnake Ridge Wind Project.

Ronald Merle Noga and Beatrice Lynn Noga 30-Aug-19 Phone Ron Galbraith

I, Ron Galbraith, received a call back from Ron Noga at 8:30 AM August 30, 2019. I had previously left messages for Ron on 8/7 and 8/21, Mary Lou Kominek had left a message on 8/29.Ron and Lynn had received the information package and had reviewed it. Ron had a few questions as to the timeline of the project. I told him that if al went well we would like to start next August. He wondered if it was a go for sure? I told him we were working hard to commercialize the project and we had some work to do yet but we were hopeful.Ron asked about surrounding landowners getting a nuisance payment. I told him we had a shared payment for those participating landowners. I explained that our project boundary was decided on wind resource and we used Township Road 114 as a “natural boundary”, Ron understood this.He said it will be interesting when all these wind farms ramp up. He said they had no residence on the affected lands.I thanked Ron for calling back and told him we will update him as necessary. The Noga’s had no concerns.

Sand Box Farms Inc.

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Sand Box Farms Inc. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Sand Box Farms Inc. 10-Sep-19 Phone Ron Galbraith

Sand Box Farms Inc is owned by Roger Lobb. He has sold his land to G and C Farms Ltd of Bow Island. I spoke to Roger on September 10th, 2019 at 7:15 PM. Roger said that he had got the notification package but had not really looked at it much.Roger said the title will change hands in January of 2020 and we could remove him from the list now as long as we were keeping Gerard from G and C informed.

Shanlee A Gyorfi

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Shanlee A Gyorfi 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Shanlee A Gyorfi 6-Aug-19 Phone Ron Galbraith I, Ron Galbraith, spoke to Shanlee Gyorfi on August 6th at 2 PM. They had received and reviewed the information package and had no concerns about the project.

Page 24: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Sherry Anne Irvine (Also see Schlenker Airfield)

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Sherry Anne Irvine 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Sherry Anne Irvine 13-Aug-19 Phone Ron Galbraith

On August 13, 2019 at 11:10 AM I received a call from Sherry Ervine after I left a message at her home number to call back regarding the Rattlesnake Ridge Wind Project.Sherry has land in the consultation area of our project. Sherry has been concerned in the past that the project would encroach on recreational properties close to Rattlesnake Lake. After reviewing the map and knowing the project boundary, Sherry was relieved to see the turbines were not close to the lake.I asked Sherry about the Schlenker airstrip that she and her husband operate close to Medicine Hat. She was glad to hear we were thinking of the airspace and pilot safety. Sherry requested information packages for the 6 pilots that fly out of the airstrip. I told her we would get those packages to her soon.

Stephen Voeller and Dallas Voeller

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Stephen Voeller and Dallas Voeller 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Stephen Voeller and Dallas Voeller 9-Aug-19 Phone Ron Galbraith

I called Dallas Voeller, August 8th at 10:50 AM. Dallas said he had received the project information package in the mail and had reviewed it. He had no concernsDallas asked if it was too late to participate in the project. He bought the land just after the signings had taken place and was curious. I committed to looking into it for him and getting back to him in the coming weeks.

The Manager of the St Mary & Milk Rivers Development c/o St. Mary River Irrigation District

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

The Manager of the St Mary & Milk Rivers Development c/o St. Mary River Irrigation District

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Timothy Carl Voeller

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Timothy Carl Voeller 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Page 25: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Timothy Carl Voeller 24-Apr-19 Phone Ron GalbraithOn Wednesday April 24th, I called Tim Voeller to update his address for our consultation record. Tim provided a new address for mailings. I told him he would be seeing a project update letter in the mail soon. At this time Tim had no concerns about the project.

Timothy Carl Voeller 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Timothy Carl Voeller 24-Jul-19 Consultation Ron Galbraith

I, Ron Galbraith, have spoken to Tim numerous times about the Rattlesnake Ridge Wind Farm, the latest being July 24, 2019. We, RES have had several meetings at the Whitla Community Hall. Tim has delivered the key and made the hall ready for us. He has attended those meetings and stayed after to visit.Tim is aware of the project and has no concerns about the information provided.

Victor Joseph Rooks and Patty Diane Rooks

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Victor Joseph Rooks and Patty Diane Rooks 10-Jun-19 Phone Ron Galbraith I, Ron Galbraith called Joeseph and Patty Rooks on June 10, 2019 at 9:45. I left a voice mail asking that they return my call so that we can update their address for consultation purposes.

Victor Joseph Rooks and Patty Diane Rooks 17-Jun-19 In-person Ron GalbraithRon Galbraith spoke in person to Joseph Rooks and he gave me his new address and stated his concern about visual impact. His new address is:Box 398, Medicine Hat, AB. T1A 7G2

Victor Joseph Rooks and Patty Diane Rooks 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Interest SummarySee Appendix P - Summary of Interests

W & G Rempel Farm Ltd. (Walter J Rempel and Gladys Rempel)

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

W & G Rempel Farm Ltd. (Walter J Rempel and Gladys Rempel)

4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

W & G Rempel Farm Ltd. (Walter J Rempel) 19-Sep-18 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the September 19, 2018 Public Open House

W & G Rempel Farm Ltd. (Walter J Rempel and Gladys Rempel)

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

W & G Rempel Farm Ltd. (Walter J Rempel and Gladys Rempel)

10-Jul-19 Phone Ron GalbraithI, Ron Galbraith, Spoke to Walter Rempel on July 10th, 2019 to confirm his address after RES received a delivery exception. The correct address is 63 Park Meadows Lane, Medicine Hat T1B 4E3. This address is also good for W and G Rempel Farm.Walter had the project information package in hand, he had reviewed it and had no concerns about the project.

W & G Rempel Farm Ltd. (Walter J Rempel ) 24-Jul-19 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the July 24, 2019 Public Open House

Page 26: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Wesley D Yeoman and Laurie D Yeoman

No Interests Raised

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Wesley D Yeoman and Laurie D Yeoman 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Wesley D Yeoman and Laurie D Yeoman 12-Aug-19 In-person Ron GalbraithI stopped to see the Yeoman’s at Whitla at 4 PM on August 12. I spoke to Wes. He said they had not received any information about the project in the mail. I left an information package with them and told him I would stop back in a few days to chat. They had only moved to the area in December of 2018.

Wesley D Yeoman and Laurie D Yeoman 19-Aug-19 ConsultationMary Lou Kominek, Ron

Galbraith

I, Ron Galbraith and Mary Lou Kominek stopped at the Wes and Laurie Yeoman residence on August 19, 2019 at 6:10 PM. We had dropped an information package off on August 12th.I asked if he had a chance to review the package? He said he had and he was somewhat shocked that there was a wind farm planned. When I asked if he was advised of the wind farm when he bought the property a year ago he said neither the previous owner or the real estate agents had mentioned it. I told him we had been developing the project since 2016 and had advertised open houses and several mailouts. The original address we had from the title was incorrect. We got his new address tonight when we were there.Box 1401, Bow Island, T0K 0G0Wes had some questions about noise and the positions of the turbines. We explained that the AUC requires a detailed noise study which has been done and their residence is compliant with the model. He said that his wife Laurie was not as concerned as he was. We also got Wes’ cell phone number and told him we would let him know when the noise model was available on the Rattlesnake Ridge web site.

Wesley D Yeoman and Laurie D Yeoman 26-Aug-19 Phone Ron Galbraith

I, Ron Galbraith, called Wes Yeoman of Whitla, on August 26th, 2019 at 10:05 AM.We had previously spoken to Wes and told him when the noise model was available we would let him know as this was a concern of his. I directed him to the www.rattlesnakeridgewind.com website to have a look at the project documents. In that section are the models of single and two story homes. The Yeoman home is in the under 35 db. We talked about how loud 35 decibels would be, I related it to a quiet conversation. Wes said that at that level it would probably be not noticeable indoors. I agreed.Wes wondered if there would be a devaluation in his property value. I told him there was a report available from Ontario that show no significant devaluation. I committed to getting that report to him on August 27th, and delivered it same day.Wes said neither the realtor or the vendor had said anything about the wind farm. Wes asked if the previous owner of his property would have received compensation? I told him only the project participants received payments. However I told Wes that we felt the wind farm will be a benefit to all as we have made contributions to community endeavors in the past and would most likely continue. Also that the tax revenue from the project will help the county continue to provide services with little added cost. Wes thanked me for the call.

Occupants, Residents, Landowners within 2,000 metres of the Project Boundary

Alta Irma Magee

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Alta Irma Magee 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Alta Irma Magee 9-Jun-19 Phone Ron Galbraith I, Ron Galbraith, called Alta Magee at 4 PM on June 9th. I left a voice mail for her to call me as we are updating mailing addresses.

Alta Irma Magee 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Alta Irma Magee 19-Aug-19 In-person Ron Galbraith

I, Ron Galbraith, stopped at the residence of Alta Magee at 5:45 on August 19, 2019.Alta had not received the package in the mail but was aware of the project. I left an information package with her and asked her to give me a call if she had questions. She said that she was a supporter of wind projects. She said that she felt a mix of power sources was a smart idea. She also stated she had no concerns about the Rattle Snake Ridge Wind Project.

Page 27: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Blue Horizon Charolais Ltd.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Blue Horizon Charolais Ltd. 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Blue Horizon Charolais Ltd. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Bonnie Ann Ligard and Ralph Weimer

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Bonnie Ann Ligard and Ralph Weimer 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Bonnie Ann Ligard 24-Jul-19 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the July 24, 2019 Public Open House

Bonnie Ann Ligard and Ralph Weimer 20-Aug-19 PhoneMary Lou Kominek

Ron Galbraith

I, Mary Lou Kominek, spoke with Ralph Weimer last night 8/19/19 at 7:19 PM - after many attempts to connect (8/13; 8/19) but call was disconnected so Ron Galbraith and I went to his residence 8/19 to find him but no one home. Ralph did not receive the mail package and asked me to forward him the items by email which I have done today 8/20/19. Ralph was pleased to hear about the development and asked if he “could hook up directly to a turbine to get power?” He said he had no issues with the wind farm and looked forward to reading the materials and if he had any questions he would contact us. I have asked Ralph to verify his mailing address. I will update the list if any change to his address.

Bonnie Ann Ligard and Ralph Weimer 20-Aug-19 Email Mary Lou KominekGood morning RalphThank you for speaking with me last night. I have attached the information we have mailed out to persons in the project area for you to review. If you have any questions please let me know either by email or phone or feel free to stop by our office in Bow Island.

Bonnie Ann Ligard and Ralph Weimer 20-Aug-19 Email Mary Lou Kominek

Hello again RalphSorry I neglected to ask you to verify your mailing address when I was speaking with you. The address we used was Box 2525, Medicine Hat, T1A 8G8. The package was returned non deliverable. Could you please let me know your correct mailing address so we can modify our lists?Thank you.

Bonnie Ann Ligard and Ralph Weimer 3-Sep-19 Email Mary Lou Kominek

I have tried unsuccessfully to reach you by phone ( 8/27, 8/30, 9/3 ) so consequently this email as a follow up. Hoping you have had a chance to review the information I forwarded to you by email August 20 and I would like to answer any questions you may have regarding the proposed Whitla Wind Farm. As part of our consultation requirements with the Alberta Utilities Commission we also need to verify your mailing address as a landowner within our project area so we can continue to keep you informed of the projects progress in the future. The address we have is Box 2525, Medicine Hat, T1A 8G8. Could you please verify this is correct or send me over the correct address? Please feel free to contact me by phone at 403-458-3253 or email at your earliest convenience.

I have also tried the phone number of Bonnie Ligard (on title with Ralph) on the Open House 7/24 sign in sheet on 8/21 and the number is not in service.

Bonnie Ann Ligard and Ralph Weimer 5-Sep-19 Email Mary Lou Kominek

RalphPlease note the correction in email below regarding the name of the wind farm I was corresponding to you about should be the Rattle Snake Ridge Wind - BHEC-RES Alberta L.P. Not to be confused with the Whitla Wind Energy Project or any other wind projects being developed by other companies in the area.My apologies if this caused any confusion.

Page 28: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Chance Rockabar

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Chance Rockabar 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Chance Rockabar 7-Aug-19 Phone Ron GalbraithOn August 7th, 2019 Chance Rockabar called me back after I had left messages for him. Chance is a grazing lease holder on NW 3-11-9 w4. We discussed the information package that he received in the mail. He had no concerns about the Rattlesnake Ridge Wind Project.Chance updated his address with us to 8016 Township Road 104 Cypress County T0K 1Z0

D & J Babe Farms Ltd.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

D & J Babe Farms Ltd. 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

D & J Babe Farms Ltd. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

D & J Babe Farms Ltd. 9-Jul-19 Phone Ron Galbraith I spoke to Jim Babe tonight of D and J Babe Farms Ltd about returned mail Their address has changed from Box 554, Medicine Hat to Box 1405, Medicine Hat, AB T1A 7N3. Darryl Babe’s address is correct at Box 554 Medicine Hat.

David Frank Gechter and Jennifer Kim Gechter

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

David Frank Gechter and Jennifer Kim Gechter

4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

David Frank Gechter and Jennifer Kim Gechter

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

David Frank Gechter and Jennifer Kim Gechter

9-Aug-19 Other Ron Galbraith

I, Ron Galbraith, sent a Facebook message to Jennifer on August 8th at 9:30 because I had no contact info for her or David. I asked that she call when she could. I also apologized for the unorthodox way of getting in touch.At 1:45 David called me back. He said Jennifer had relayed the message to call me. I asked David if they had received the information package in the mail. He said they have been getting the mailings from the start. He said because it is not on their land he is not concerned.

Page 29: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Ebel's Desert Hill Farm Corp.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Ebel's Desert Hill Farm Corp. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Ebel's Desert Hill Farm Corp. 24-Jul-19 Phone Ron GalbraithJuly 24 – Ron Galbraith spoke to Donna – 7 AM– no concerns about the project. Gave new address:Ebel’s Desert Hill Farm Corp. Box 579, Medicine Hat, AB T1A 7G5Initial mailing returned to sender – New info package mailed Aug 13, 2019

Gary W Yates

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Gary W Yates 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Gary W Yates 10-Jul-19 Phone Ron Galbraith I, Ron Galbraith, spoke to Gary Yates in Bow Island on July 10th . Gary had received the information package and had reviewed it. He had no concerns about the project.

Gordon A Roeder and Donna L Roeder

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Gordon A Roeder and Donna L Roeder 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Gordon A Roeder and Donna L Roeder 15-Aug-19 Phone Mary Lou Kominek

I, Mary Lou Kominek, today after many attempts and messages have made contact with Gordon & Donna Roeder today 8/15 at 10:58 AM. They did receive our mail package and have reviewed it and have no concerns or questions. She said depending on actual construction dates they could be involved with the project for revenue purposes or legal requirements by actual title holder. I said Gerard was at our open house and is aware of the Wind Farm. She said just to keep them and also Gerard informed of anything they need to do during the development or next few years.

Contacts were: 8/8, 8/9,voice messages left: 8/12 – no answer: 8/13 no answer: 8/15 – 10:57 AM spoke with Donna Roeder.

Page 30: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Gordon and Ty and Leann Tessmann

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Gordon and Ty and Leann Tessmann 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Gordon and Ty and Leanne Tessmann 15-Aug-19 Phone Mary Lou KominekI, Mary Lou Kominek just spoke with Leann Tessmann today, 8/15 at 11:03 AM. Yes they received and read our package. The address we have on our list is correct. They all live there and this phone number would reach them all and she said she could speak for them all that they had no issues, questions or concerns about the Rattle Snake Ridge Wind project.

Iluminada B Giles

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Iluminada B Giles 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Iluminada B Giles 14-Aug-19 In-person Mary Lou Kominek, Ron Galbraith

I. Mary Lou Kominek and Ron Galbraith attended to Iluminada Giles' house today August 14 2019 at 5:10 PM. Iluminada was outside and she said she had received the package and could not attend the open house but had no concerns. No follow up required but we indicated that we will keep her informed and she gave us her phone number. We have her correct mailing address.

Iluminada B Giles 14-Aug-19 In-person Ron Galbraith/ Mary Lou Kominek

I. Mary Lou Kominek and Ron Galbraith attended to Iluminada Giles' house today August 14 2019 at 5:10 PM. Iluminada was outside and she said she had received the package and could not attend the open house but had no concerns. No follow up required but we indicated that we will keep her informed and she gave us her phone number. We have her correct mailing address.

Jennifer Stacy Begg

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Jennifer Stacy Begg 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Jennifer Stacy Begg 12-Aug-19 Phone Ron Galbraith I Ron Galbraith, called Jennifer Begg at 10:55 on August 12th. Jennifer said she had received the information package and had no concerns about the project.

Page 31: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Murray Hill Ranching Ltd.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Murray Hill Ranching Ltd. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Murray Hill Ranching Ltd. 8-Aug-19 Email Ron GalbraithHi Mack,Thanks for taking time to speak to me this afternoon about the project. I have attached the information that was sent in the mail.Call if you have any questions.

Rodney Gary Gechter and Conny Rita Gechter

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Rodney Gary Gechter and Conny Rita Gechter

30-Apr-19 Phone Ron Galbraith

I, Ron Galbraith, called Rod and Conny Gechter to update their mailing address after Canada Post changed their delivery requirements. I spoke to Conny who was happy to supply their new address so they could be updated on the project status.I also asked Conny about a name that was registered on title that had the same address, Alois Gechter. She indicated to me that this was Rod’s uncle and he has passed away.At this time Conny had no concerns about the project.

Rodney Gary Gechter and Conny Rita Gechte 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Rodney Gary Gechter and Conny Rita Gechter

3-Sep-19 Phone Ron Galbraith

I, Ron Galbraith, spoke to Rod Gechter on Friday August 30, 2019 at 1:15 PMI asked Rod if he had a chance to look at the project information that had been sent to them. He said that it was probably in the pile of mail at home but had not come to his attention. I asked that he have a look at the info and call me if he had concerns. At the time of this call Rod did not raise concerns.

Roger Biemans

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Roger Biemans 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Roger Biemans 20-Aug-19 Phone Ron Galbraith

I, Ron Galbraith, called Roger Beimans at his office at Vantage Energy in Englewood, CO. at 10:15 on August 20, 2019.Roger had received our information package and had reviewed the contents. His land is in the notification area and he said that his brother Mario would be the one that is closest to the project and if Mario was ok with the wind farm so was he. The conversation I had with Mario he had no concerns.We chatted a bit more about the Whitla/Seven Persons area as he was raised here. We also talked about RES and their origins.

Page 32: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Timothy Laczkowski

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Timothy Laczkowski 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Todd Ryan Woodward

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Todd Ryan Woodward 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Todd Ryan Woodward 30-Aug-19 In-person Ron Galbraith

I, Ron Galbraith, dropped off an information package about the Rattlesnake Ridge Wind Project at 3 PM on August 30th,2019.A package had been delivered and signed for at his Lethbridge address however he resides at 11022 Range 81, Cypress County, AB. T0K 1Z0. Todd had not seen the package. We discussed the project size, timeline and his location to the project.Todd had no concerns at this time.

Municipal Governments

The County of Forty Mile No.8

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

The County of Forty Mile No.8 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

The County of Forty Mile No.8 23-Apr-19 Email Ron Galbraith

Hi Nathan and Dale,As I said this morning on the phone Dale, I apologize for the lateness of this application. The company that owns and will be installing the tower did not think a permit was necessary. I want to make sure we are following the proper procedures. I have signed the application for Rigstar.I have included a couple of pictures of the equipment to be on site. It would be there from May 1st until October 31st.With this tower there is no ground disturbance, the guy wires are secured to the outriggers on the trailer.Thanks, I hope to hear from you Wednesday after your review.

The County of Forty Mile No.8 23-May-19 Email Ron Galbraith

I spoke to The County of Forty Mile No. 8 (Nathan Ogden) at the County of Forty Mile regarding setback requirements from county road allowances. I also sent him a screenshot and email about a turbine we had identified as a possible issue. He said that the county would consider a relaxation of setback requests on a case by case basis. He said the council can’t give a definitive answer until they see the actual development permit application. He said that environmental constraints would be given reasonable consideration. Nathan also said if placement inside of a setback is just for economic reasons, chances are it may not be approved.We also talked about roads on quarter section lines and he said that unless there is an instrument on title there is no road setback. We talked about existing oil and gas roads that it made sense to use these where possible with an agreement with industry.We have a meeting scheduled for 9 AM on June 6th to look at the entire layout with CAO The County of Forty Mile No. 8 (Keith Bodin) and Planner The County of Forty Mile No. 8 (Nathan Ogden).

Page 33: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

The County of Forty Mile No.8 6-Jun-19 Consultation Ron Galbraith

I, Ron Galbraith, met with County of Forty Mile representatives, COA The County of Forty Mile No. 8 (Keith Bodin), Planning and Development Officer The County of Forty Mile No. 8 (Nathan Ogden) and Reeve Steve Winkerink on June 6th at 9 AM. We discussed the Rattlesnake Ridge Wind Project located in the county at Whitla. This included the turbine layout, collector system design and the constraints encountered in the design. We talked about the project timeline for consultation, permitting and construction. The county had a couple asks of RES. One being that we generate reasonable photo simulations (we should supply a layout with the proposed vantage points for their review. The second being that they be included on a vendor list for construction of undeveloped county RoWs.At this time they had no other concerns. I indicated to them that our consultation process is on going and if they had any questions or concerns arise that they be in touch.

The County of Forty Mile No.8 7-Jun-19 Email Ron Galbraith

Hi Nathan and Keith,Again, thanks for meeting on Thursday morning.I have attached the pdf of the viewpoints we are proposing for the photo simulations. We are planning to do these very soon if you can get a consensus that this covers the project.We are working on the WEF zoning application as well and would submit the photo sims with the application.

The County of Forty Mile No. 8 (Keith Bodin) 26-Jun-19 Email Rebecca Crump

Hi Keith – I just called the office and was told that you handle delegations to Council.From what I understand the first reading of the Rattlesnake Ridge Wind Project WEF Rezoning Application will be heard at the July 10th Municipal Meeting. I think it would be beneficial if Ron and I attended and gave a presentation on the project, schedule, etc.Is there room on the Agenda for our delegation?I could also present to Council and yourselves estimated tax income. We hired an Albertan tax expert last year and she worked through our projects and we believe we have accurate estimations of revenue for the County.Thanks, Rebecca

The County of Forty Mile No.8 28-Jun-19 Consultation Rebecca Crump On June 28th, I had a discussion with The County of Forty Mile No. 8 (Nathan Ogden) about a complete WEF re-zoning application.

The County of Forty Mile No. 8 (Nathan Ogden)

28-Jun-19 Email Ron Galbraith

Just to follow up on our conversation, we require the information listed in the WEF portion of the Land Use Bylaw Section 81(8) to accompany the application form. Could you please also send a short summary about the project such as a bit about the company, expected power in kW or MW, number of turbines, expected timing of construction (ie begin q3 2020 with road preparation, project completion expected q4 2021), and any other relevant information Council should consider?

The County of Forty Mile No. 8 (Keith Bodin) 28-Jun-19 Email Rebecca Crump

Ron and I will be there July 10th at 10:45am to present.If you and the team have any specific questions please let me know so we can be prepared to present on those points.I will send you the presentation in advance.

The County of Forty Mile No.8 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

The County of Forty Mile No. 8 (Nathan Ogden)

4-Jul-19 Email Rebecca Crump

Attached please find a complete Rezoning Application package.I have inserted what I had previously sent you so it’s all in one PDF. I have reattached the excel file for the properties we are seeking to have rezoned. It is included in the PDF, but likely easier to work with in excel.Please let me know if you have any questions.

The County of Forty Mile No.8 10-Jul-19 In-person Rebecca Crump

On July 10, 2019 at 10:45amRebecca and Ron presented the Project to Council. Council is very aware of RES in the community, from the development of the 40 Mile Project.We presented the attached presentation (with the exception of the Property tax slides, which was suggested by the CAO to keep that for an in-camera session).

The County of Forty Mile No. 8 (Gerald Reimer)

24-Jul-19 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the July 24, 2019 Public Open House

The County of Forty Mile No. 8 (Nathan Ogden)

29-Jul-19 Email Rebecca Crump

Below is a download link to the Visual Simulations that were completed for the open house. They are too large to send by email.I could bring copies to the hearing if you think that would be helpful.I have attached the presentation I gave to Council on July 10th.Please let me know if you’d like a copy of the full set of open house panels and I can get a download link from Golder.

Page 34: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

The County of Forty Mile No.8 14-Aug-19 ConsultationMary Lou Kominek,

Rebecca Crump, Ron Galbraith

Today myself, Ron and Mary Lou attended the County of 40 Mile Council hearing on the rezoning application for the wind farm. 5 participating landowners attended and all spoke up in support of the project and of the RES-BHEC development team. Other than the local reporter the only other attendees were Diane Chute and Doug Zorn (with whom we had coffee with before the hearing). Diane is the lady I have previously mentioned, who lives just outside the NW corner of the Project area and has various concerns about wind energy. She spoke up and expressed some of her concerns relating to wildlife, health and a few other issues. I took notes and had an opportunity to respond to each concern. I told Council that we have on-going discussions with Diane and Doug and will be getting a wildlife expert and a health expert, both independent from the Project to answer their questions based upon their independent research and experience. Everyone seemed very happy we were taking this proactive approach.Diane expressed that she was not opposed to wind power and told Council that the RES-BHEC development team were doing a great job and working with her but she has many questions as this is very new to her and the area and she wants to understand the true impacts of this type of development. We will get the results of our application soon. Overall I believe it was a very successful event.

The County of Forty Mile No. 8 (Nathan Ogden) 16-Sep-19 Email Rebecca Crump

Good Morning Rebecca,Thank you for your request for a copy of the approval letter for the Wind Energy Facility district. The original was mailed out mid August and a copy is attached. If you have any questions please let us know.

The County of Forty Mile No. 8 (Nathan Ogden, Keith Bodin and Bill Nicoll)

3-Oct-19 In-person Rebecca Crump, Ron Galbraith

The Proponent’s representatives met with the County to provide an update on the Project, including consultations with the community, the PIP, the timing of the AUC application and the general timing of the anticipated development permit process. Other items that were discussed include: the Road Use Agreement, lessons learned from the current construction of a wind project in the County, road works and Water Act applications.

The County of Forty Mile No. 8 (Wes Hollingsworth and Alan Mastel)

16-Oct-19 In-person Scott Ward, Ron GalbraithThis was primarily a construction related meeting to introduce Scott Ward, construction manager, to the County’s municipal staff. Items discussed were the Municipal Requirements for Road allowances and construction, culverts, road allowances, dust control, haul route options, permit to take water, laydown yard location, public road maintenance, over-permitting work areas and access road entrances.

The Town of Bow Island

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

The Town of Bow Island 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

The Town of Bow Island 5-Jul-19 In-person Ron Galbraith

On Friday July 5th, 2019, I Ron Galbraith, stopped at the Town of Bow Island to purchase a business licence for the RES consultation office. While I was there I took the opportunity to introduce myself and RES to the new CAO, Dave Matz. We discussed the Rattlesnake Ridge Wind project location, timing and benefits to the town. I told Dave that we had previously engaged with the town on the Forty Mile Wind Project with former CAO Anna Marie Bridge and Mayor Gordon Reynolds. I also told him they would be receiving an information package in the coming days. We agreed to keep in touch as the project proceeded.At this time Dave had no concerns about the project.

The Town of Bow Island 9-Jul-19 Email Ron Galbraith

Hi Gordon,I was in the office last week to purchase a business licence for our consultation office located in Pat Bishop’s building. While I was there I was able to introduce myself to Dave and had a good chat with him.Would you have time to meet on Thursday just after lunch? Our Rattlesnake Ridge Project Developer, Rebecca Crump is in Alberta for a few days of meetings. We would like to discuss any impact to the town with you.We have sent an information package to the town for review. It should have arrived in the last few days.

The Town of Bow Island 11-Jul-19 In-person Rebecca Crump, Ron Galbraith

Ron and I met with the Town of Bow Island Mayor, Gordon Reynolds at 1pm on Thursday July 11. We discussed any potential concerns about the Bow island airport, which is run by the Town. The mayor stated that project is far enough away from the airport that there are no concerns. We provided him with a project update and he seemed happy with how the project was proceeding.

The Town of Bow Island(Ron Ficiur)

24-Jul-19 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the July 24, 2019 Public Open House

Page 35: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

The City of Medicine Hat

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

The City of Medicine Hat 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

The City of Medicine Hat 10-Sep-19 Email Ron GalbraithThe Airport has not identified any issues related to the development of this wind project that could impact the continued safe operations. It is my understanding that Nav Canada has issued a “no objection” letter with respect to the first phase and that as the project develops there may be further approvals required as impacts are cumulative.

The Village of Foremost

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

The Village of Foremost (Lorne Buis) 10-Jul-19 Phone Rebecca Crump

Lorne called Rebecca this morning, after receiving a Project Information Package about the Project.He was interested in us using the 40Mile rail yard to ship in turbine components, as Capital Power is currently doing.Lorne, Ron Galbraith and I had lunch and discussed the Rattlesnake Project and the potential opportunity to use the local rail yard.Rebecca will follow up with the RES – BHEC technical team and it will ultimately be up to the turbine supplier on how they want to ship the project components, but we will make a suggestion to use the local railyard.

Cypress County

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Cypress County 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Cypress County 27-Aug-19 Email Ron Galbraith Received, thank you Ron. I will review and respond back to you with the County’s comments.

Cypress County(Kaylene Simpson)

27-Aug-19 Phone Ron Galbraith

Hi Kaylene,Thank you for taking time to speak with me regarding our wind project in the County of Forty Mile. As I mentioned we added Cypress County as an interested stakeholder due to proximity. RES had mailed the info package in July. I have attached the information that was included in the package and would appreciate your feedback asap.Now that we have your contact info we will address any further correspondence to you directly.

Cypress County(Kaylene Simpson)

27-Aug-19 Email Ron Galbraith

Thank you for providing Cypress County with the opportunity to review and provide comments on the proposed Rattlesnake Ridge Wind Power Project. It is our understanding that the project lands are located in proximity to the Hamlet of Whitla and extend 1 mile west of the boundary of Cypress County. The project is anticipated to consist of 28, 4.2MW wind turbines capable of producing 117.6 MW of electricity and related infrastructure.Cypress County’s Municipal Development Plan encourages the integration of renewable wind energy facilities with existing land uses. In terms of compatibility, Cypress County wishes to advise that lands within the boundaries of Cypress County are predominantly agricultural, with a number of existing farm residences and country residential subdivisions.

Page 36: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Relevant Federal and Provincial Ministries, Agencies, Local Jurisdictions and Special Interest Groups

Alberta Environment and Parks

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Alberta Environment and Parks 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Alberta Environment and Parks 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Alberta Environment and Parks c/o Kristin Cline

12-Jul-19 Email Trevor Cuthbert (Golder)

Good afternoon Kristin and Brandy,On behalf of RES Canada Inc., as agent for BHEC-RES Alberta L.P., please find attached the Wildlife Submission to Alberta Environment and Parks – Wildlife Management (AEP-WM) for the Rattlesnake Ridge Wind Power Project for your review.Please contact Rebecca Crump or me if you have any questions. We would be happy to provide any clarifications you require to assist with your review.

Alberta Environment and Parks c/o Kristin Cline

15-Jul-19 Email Kristin Cline (Environment and Parks)

Hi Trevor, Thanks for the submission. I received the attached file so file size wasn’t an issue. Could you please send the PDF with the commenting and highlighting functions as well as the content copying function enabled? I’m currently skimming the file to see if all required questions are completed so once you get the file back to me I should be able to accept it into queue quite quickly.

In my quick scan of the file, I noticed that the bird migration and breeding bird surveys have not yet been fully completed and therefore not all the results are available at this time. Since AEP-WM only reviews complete submissions, I am not able to accept the project into the queue until all surveys are complete and all questions in the template are fully and completely answered. Please resubmit the project in the template format once those surveys are done and all other information is available. I look forward to seeing this project again soon, but let me know if you have any questions in the meantime.

Alberta Environment and Parks c/o Kristin Cline

19-Jul-19 Email Trevor Cuthbert (Golder)

Good afternoon Kristin and Brandy,On behalf of BHEC-RES Alberta L.P., we would like to set up an in-person meeting with AEP-WM to discuss your response and gain a better understanding of the specific rationale for the determination that the submission is incomplete. We believe that we have met the necessary level of effort and prepared a complete submission that meets the requirements as outlined in the September 2018 Wildlife Directive for Wind Energy Projects in Alberta and the October 2018 Renewable Energy Project Submission Template.We understand that you have busy schedules, but this is an important and urgent matter to BHEC-RES so would like some clarity on how we the matter may be addressed without significant delays to the permitting of the Rattlesnake Ridge wind project. Please let us know if you would be available for an in-person meeting next week, except for Wednesday, of if not please identify when you would have availability for a meeting or conference call at your earliest convenience.

Alberta Environment and Parks c/o Kristin Cline

23-Jul-19 Email Kristin Cline (Environment and Parks)

Hi Trevor,As I described on the phone, I apologize for scanning the submission too quickly and coming to the wrong conclusion that the submission was incomplete. I had read that two surveys were “to be submitted upon permit completion” and assumed that not all of the surveys were completed yet. I have taken another look and have found that all surveys have been done at least once, but more rounds may yet be complete. Again, I apologize for my mistake and since there has been no other submissions in the meantime, the project is in the same place in queue that it would have been had I accepted it previously. See below for tracking number. AEP – Wildlife Management (AEP-WM) has received your request for review of the proposed wind project as per the Alberta Utilities Commission (AUC) process described within AUC Rule 007. Upon a brief and precursory review of the submission template and associated files, all the required information appears to be included in the submission. It should be noted that AEP-WM only reviews complete submissions and our precursory review of the project does not guarantee all required information has been provided in the submitted material.AEP-WM is experiencing a large number of renewable energy submissions so we have implemented a tracking number system to help us identify the order in which the applications were submitted. The tracking number for Rattlesnake Ridge Wind Power Project by BHEC-RES Alberta LP is SSR2019-45W. Once the project has been reviewed it is likely that there will be questions that need to be answered before the referral report is completed. I’ll be in contact once I have started to review the project and have questions.

With the submission of PDF that has content copying and commenting enabled, AEP-WM has everything we need to review the project once it comes to the front of the queue.

Page 37: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Alberta Environment and Parks c/o Kristin Cline 15-Aug-19 Phone Rebecca Crump

I just received a call from Alberta Environment and Parks (Jessie Malik). Our mail went to the general mail room and they were going to return it but called instead.Please change the mailing address for Alberta Environment and Parks to:Kristin Cline, M.Sc., P.Biol.Wildlife Biologist, Renewable Energy ProjectsEnvironment and Parks2nd Floor, Avail Building530-8th St. South Lethbridge, AB T1J 2J8Email: [email protected] (403)388-5326

Alberta Environment and Parks c/o Kristin Cline 26-Aug-19 Email Trevor Cuthbert (Golder)

Good afternoon Kristin,On behalf of BHEC-RES, I’m hoping to enquire about your anticipated timelines for review of the Wildlife Submission report for the Rattlesnake Ridge Wind Project? As a follow up to your conversation with Rebecca Crump on July 23 regarding the, BHEC-RES is very eager to advance this project through the regulatory approvals process as they have a private power purchase agreement in place to allow construction to proceed, so any updates you are able to provide would be appreciated.

Alberta Environment and Parks c/o Kristin Cline

10-Sep-19 Email Kristin Cline (Environment and Parks)

Hi Trevor, I am unable to give an approximate date of completion for the referral report of this, or any, project. We review projects in the order in which they were received, unless I received management direction to do otherwise. We are currectly working through the review process to make sure each project is consistently reviewed. The review time is highly variable, due to project complexity, alignment with policy and the ease of which we can find all relevant information needed for our review. This limits our ability to calculate how long it will take to review each project, thus we are unable to provide turnaround times. We will contact you once we have questions about your project. I apologize that I can’t be more specific and ask for your patience in the meantime.

Alberta Environment and Parks c/o Kristin Cline

1-Oct-19 Email Trevor Cuthbert (Golder)

Hi Kristin,Thank you very much for your feedback below, and I am appreciative of the volume of your workload and that your review process is consistent and details. As a quick update, the Rule 007 Application for the Rattlesnake Ridge Wind Project is planned for submission to the AUC on October 25, 2019. If you are able to share any updates on the status of your review prior to that, it would be helpful as part of the AUC process. I would also like to provide a minor clarification on the proponent information that should be used for any formal correspondence should be Renewable Energy Systems (RES) Canada Inc., as representative for BHE Canada Rattlesnake G.P. Inc. (the Proponent). Apologies for any confusion, please follow up with Rebecca if you require any clarifications on this.

Alberta Environment and Parks c/o Kristin Cline 17-Oct-19 Email Rebecca Crump

Hi Kristin, I am just following up on Trevor’s email from October 1st to ensure you received the name change of the Proponent for the Rattlesnake Ridge Wind Power Project – “BHE Canada Rattlesnake G.P. Inc.” As Trevor stated, RES (myself) is still the main contact as we are acting on behalf of the Proponent. Prior to our submission to the AUC it would be nice to include an update from yourself, on behalf of AEP, on any known or anticipated timeline for review of the Project’s Wildlife Report submission.

Alberta Environment and Parks c/o Kristin Cline 21-Oct-19 Email

Kristin Cline (Environment and Parks)

Hi Rebecca, Thanks for the clarification regarding the proponent name change. I believe we have a clear understanding, but if ever you find a technical error (e.g. incorrect proponent name) in the referral report, please bring it to our attention as soon as possible and we will issue a corrected version. As for a project update, the submission is currently being reviewed and we will soon send you a spreadsheet of questions that need response before we finish the referral report. I am unable to provide an anticipated timeline because there are many factors that may slow the process such as waiting for your response to the questions and occasionally further clarification is required after we receive your responses.

Alberta Environment and Parks c/o Kristin Cline

23-Oct-19 Email Rebecca Crump

Hi Kristin, Thank you for the update. I’ve heard through the grapevine that the Red Deer office may be reviewing the Rattlesnake Ridge Wildlife Report submission. I have worked with Scott and Jason in the past on another project, so I have included them in cc. I wanted to see now the Report is under review if we could set up an in-person meeting to discuss any questions the reviewer might have to streamline and expedite the review process. We have done this in the past and it has worked out very well. Should I continue to correspond through yourself to set up such a meeting? We can be available as early as next week or at the reviewer’s earliest convenience for a meeting.

Alberta Environment and Parks 23-Oct-19 EmailScott Stevens

(Environment and Parks)

Hi Rebecca,Thank you for cc’ing me on this and I apologize for jumping in Kristin.Rebecca, the Rattlesnake Ridge Wildlife Report Submission is being reviewed by Rachael, working out of the Red Deer office with Jason and I. Rachael and Kristin will coordinate the initial questions for the Project. Barring emergencies, the initial review and questions will be completed by next Wednesday, October 30. Since this AEP file is a co-region review at this stage, I would like to attend the meeting and expect the same for Brandy and Jason if they are available.Given the travel distances involved, I would like to suggest a conference call in the morning of Monday November 4 if that works for your colleagues and mine to discuss the review and address any questions you may have.

Page 38: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Alberta Public Lands

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Alberta Public Lands c/o Wendy Mingo

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Alberta Transportation

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Alberta Transportation 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Alberta Transportation 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Alberta Transportation 5-Sep-19 Email Rebecca Crump

My name is Darren Davis, one of the planning and design technologists in the Southern Region where the Rattlesnake Ridge wind power project is located in Alberta.I have looked at the applications and just want to have a chat about a few things.If you follow this link: http://www.transportation.alberta.ca/projects/south_flash.html and then follow the highlighted lines from top to bottom on the picture Capture.jpgThis will be an link to the functional planning study for the highway 3 twinning project. Select the full detail arrow and at the bottom select the final alignment access plans. When you zoom into the section and RR 84 (the access for this portion of the project), you will see that the RR 84 will not be an access for the highway in the future as it does not meet our Access Management. If you would like to reconsider the access option at this point, please do so and then resubmit a finalized drawing. We will allow that access to be improved to Alberta Transportation Standards and the project may build the RR 84 to County standards with their permission, but with the understanding that it will be removed as part of the highway twinning project and access will need to be form a local road that is indicated. The picture Capture 2.jpg is for your reference of the location of the proposed T6 tower.If you would like to continue with the application, you will need to submit for construction drawings instead of the submitted DRAFT drawing.If you have any further questions, please call. As for right now, I will hold this application till I get further direction from you on how you want to proceed.

Alberta Transportation 11-Sep-19 Email Rebecca Crump

As per our conversation on Monday afternoon, we will be proceeding with the application as is, with the understanding that in the long range plan the access from Hwy 3 to RR84 will be removed. We will have IFC drawings completed for the Project in March/April 2020 time frame and will submit them at that time to support our application. In a couple of weeks we will be submitting another Development application for directional drilling of our collector system under Hwy 3.

Alberta Transportation 8-Oct-19 Email Brittney Sammons(Golder)

Hi Darren, As a follow-up to Rebecca’s email below, we’re submitting a second Roadside Development Application related to the Rattlesnake Ridge Wind Power Project. This application is specific to directional drilling of the Projects collector system under Hwy 3. The populated application form and figure 1 showing the proposed developments is attached for review. Please note there’s been an ownership name change from ‘Renewable Energy Systems Canada Inc., as agent for BHEC-RES Alberta L.P.’ to ‘Renewable Energy Systems (RES) Canada Inc., as representative for BHE Canada Rattlesnake G.P. Inc.’.

RES is entering a detailed design phase and would like to request your design standards for underground crossings of Provincial Highways as per the attached application. Do you have a document you could provide to inform their design?

Alberta Transportation 9-Oct-19 Email Leah Olsen (Alberta Transportation)

Good Afternoon Brittney,Darren is away from the office today so I will reply on his behalf.This is the link to the procedures you are looking for is: https://www.alberta.ca/permits-for-utility-line-installation-by-a-provincial-highway.aspxPlease do not hesitate to contact our office at your convenience should you have any questions and/or concerns.

Page 39: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Alberta Transportation 9-Oct-19 Email Brittney Sammons(Golder)

Brittney Sammons called Leah Olsen (Alberta Transportation) for clarification and Alberta Transportation requested more detailed mapping.

Alberta Transportation 23-Oct-19 EmailBrittney Sammons

(Golder)

Hi Leah, As discussed, Renewable Energy Systems (RES) Canada Inc., as representative for BHE Canada Rattlesnake G.P. Inc. has revised the roadside development application related to turbine T6 to include a more detailed Site plan depicting distance to Highway 3 and labelling access roads and related development components. Please confirm that this revised application (Rev 1 attached) meets the requirements to qualify as complete and ready for your review. In addition, thank you for clarifying that a roadside development application is not required for the directional drilling of the Projects collector system under Hwy 3. Please cancel our second application file titled “tr-roadside-development-application-RES RR collector_Rev0”. As discussed, once designs are compete, Renewable Energy Systems (RES) Canada Inc., as representative for BHE Canada Rattlesnake G.P. Inc. will follow the “Application Procedures and Placement Conditions for Electrical Lines in the Vicinity of Provincial Highways..” document to submit the appropriate application.

Canada Revenue Agency

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Canada Revenue Agency 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Department of National Defence

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Department of National Defence 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Department of National Defence 30-Aug-19 Email Ron Galbraith

To Whom It May Concern,BHEC-RES Alberta LP is proposing to develop, construct and operate a 117.6 MW wind farm in the Whitla, Alberta area. The attached information is a notification requirement of the Alberta Utilities Commission(AUC). Renewable Energy Systems Canada Inc has identified The DND as a government agency stakeholder. If you should have any questions or concerns about this project please contact the Project Developer, Rebecca Crump at 647-880-7473 or by email at [email protected]

Environment and Climate Change Canada

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Environment and Climate Change Canada (ECCC)

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Page 40: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Environment and Climate Change Canada (ECCC) 26-Aug-19 Email Brittney Sammons (Golder)

Good afternoon,On behalf of Renewable Energy System (RES) Alberta LP, we would like to contact you regarding the Proposed Rattlesnake Ridge Wind Power Project (the Project). The purpose of our enquiry is to assess whether there is any potential for the Project to interfere with Environment and Climate Change Canada’s (ECCC) weather radar system. The Project is located in Alberta’s County of Forty Mile No. 8, approximately 30 kilometres (km) southwest of the City of Medicine Hat. The current layout consists of 28, 4.2 MW wind turbines. The Project has a 20 year power purchase agreement, proceeding with construction in August 2020 and a commence operations date (COD) of December 2021. Please find the attached turbine layout map and excel table identifying the 28 turbine locations and elevations for the Project. The proposed turbines have each have a hub height of 110 m and blade length of 77.5 m for a maximum height of 187.5 m.Please advise if any additional information is required to process this submission.

Environment and Climate Change Canada (ECCC) 16-Sep-19 Email Troy Beechinor (ECCC)

Dear BrittneyThank you for contacting the Meteorological Service of Canada, a branch of Environment and Climate Change Canada, regarding your wind energy intentions.Our preliminary assessment of the information provided to us via email on 26 August, 2019 indicates that any potential interference that may be created by the Rattlesnake Ridge Wind Power Project Wind Farm near Medicine Hat, AB will not be severe. Although we would prefer our radar view to be interference free, this is not always reasonable. As a consequence, we do not have strong objections to the current proposal.If your plans are modified in any manner (e.g. number of turbines, height, placement or materials) this analysis would no longer be valid. An updated analysis must be conducted.Please contact us at: [email protected] Thank you for your ongoing cooperation and we wish you success.

Government of Alberta

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Government of AB 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

NAV Canada

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

NAV Canada 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

NAV Canada 9-Oct-19 Package Rebecca CrumpA Land Use Submission Package was submitted to NAV CANADA in August 2019.On October 9, 2019 Nav Can confirmed that the initial review of the Land Use Submission was completed and has been sent to stakeholders for their assessments. The Project has been assigned File # 19-2660.

Parliament of Canada

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Parliament of Canada 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Page 41: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Royal Canadian Mounted Police (Bow Island)

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Royal Canadian Mounted Police (Bow Island)

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Royal Canadian Mounted Police (Sergeant Bailey)

29-Aug-19 Phone Ron Galbraith

I, Ron Galbraith, spoke to Sargent Bailey of the Bow Island RCMP detachment at 12:40 PM on August 29, 2019. They had received the information package about the Rattlesnake Ridge wind project and had reviewed it. I told Sargent Bailey that we will stay in contact with them and inform them of our emergency measures plan as the project development advanced. He appreciated RES touching base with the detachment to keep them informed. He mentioned that they have been doing drive by patrols of the Capital Power project and would do the same with our project when the time comes.

Transport Canada

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Transport Canada 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Transport Canada 26-Aug-19 Email Brittney Sammons (Golder)

Good afternoon,On behalf of Renewable Energy Systems Canada Inc. (RES), as agent for BHEC - RES Alberta LP, please find attached the Aeronautical Obstruction Clearance submission for the proposed Rattlesnake Ridge Wind Power Project, located in the County of Forty Mile No. 8, approximately 30 km southwest of the City of Medicine Hat, Alberta. Please confirm receipt of this application and advise if any additional information is required to process this submission.

Transport Canada 27-Aug-19 EmailTeresa Stewart (Transport

Canada)Hi Brittney, did you win the bidding competition? We do not assess unless your going to build with 90 days of your project. Your construction date is not until next year. See attached letter sent to the Alberta Utilities Commission.

Transport Canada 27-Aug-19 Email Rebecca Crump

Hi Terry, The Rattlesnake Ridge Wind Project has signed a 20 year Power Purchase Agreement with a private Canadian corporation and has the same required commercial operations date as the AESO REP 2/3 winners. We will include the letter you provided to Brittney Sammons in our Application to the Alberta Utilities Commission and will be back in touch 90 days prior to the commencement of construction. Thank you.

Industry Operators and Businesses Including Oil and Gas and Industrial Interest Holders and Other Caveators Within the Project Area

Agriculture Financial Services Corporation

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Agriculture Financial Services Corporation 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Agriculture Financial Services Corporation

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Page 42: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Agriculture Financial Services Corporation 28-Aug-19 Phone Ron Galbraith

I, Ron Galbraith, called the AFSC office in Camrose Alberta on August 28, 2019 at 2 PM.I spoke to receptionist Holly and she put me in touch with Sam Backus a representative in loan compliance. She called in back and said she was unsure where the information package would have ended up. I emailed her the information at [email protected] and she said she would take a look at it and respond today.

Agriculture Financial Services Corporation 28-Aug-19 Email Ron Galbraith

Hi Sam,Thanks for the quick response to my voicemail today.I have included the information that was in the package that was mailed.Please have a look at the materials and advise if there are concerns.

Alberta Treasury Branches

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Alberta Treasury Branches 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Alberta Treasury Branches 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Alphabow Energy Ltd.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Alphabow Energy Ltd. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

AltaGas Utilities Inc. as successor in interest to Plains Western Gas & Electric Co Ltd.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

AltaGas Utilities Inc.as successor in interest to Plains Western Gas & Electric Co Ltd.

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Altalink Management Ltd.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Altalink Management Ltd. 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Page 43: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Altalink Management Ltd. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

ATB Financial

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

ATB Financial 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Bank of Montreal

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Bank of Montreal 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Bank of Montreal 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Bellatrix Exploration Ltd.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Bellatrix Exploration Ltd. 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Bellatrix Exploration Ltd. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Canadian Imperial Bank of Commerce

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Canadian Imperial Bank of Commerce 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Canadian Imperial Bank of Commerce 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Page 44: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Canadian Natural Resources Limited

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Canadian Natural Resources Limited 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Canadian Natural Resources Limited 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Cenovus Energy Inc.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Cenovus Energy Inc. 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Cenovus Energy Inc. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Community Credit Union Ltd.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Community Credit Union Ltd. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Connect First Credit Untion Ltd.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Connect First Credit Untion Ltd. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Page 45: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Ducks Unlimited Canada

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Ducks Unlimited Canada 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Ducks Unlimited Canada 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Enerfin Energy Company of Canada Inc.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Enerfin Energy Company of Canada Inc. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

EQUS REA Ltd.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

EQUS REA Ltd. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Farm Credit Canada

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Farm Credit Corporation 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Farm Credit Canada 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Farm Credit Corporation 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Farm Credit Canada 20-Aug-19 Other Ron Galbraith The address for FCC in Medicine Hat is, 107-2702 Box Springs Rd, Medicine Hat, AB T1C 0C8This is the local office where most in this area will deal.

Page 46: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Fortis Alberta Inc.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Fortis Alberta Inc. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Forty Mile Gas Co-op Ltd.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Forty Mile Gas Co-op Ltd. 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Forty Mile Gas Co-op Ltd. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Frank Gechter

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Frank Gechter 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Frank Gechter 8-Aug-19 Phone Ron Galbraith

I, Ron Galbraith called Frank Gechter on August 8th at 12:05 PM. There was no answer so I left a voice mail asking him to call me back.I called Frank again on August 10th at 10 AM. I asked Frank about the notification package that he had received. He said that he no longer owned the land, he sold it to his sons, Dwayne, Rod and grandson David. He stated no concerns for the project.Frank also supplied phone numbers for his son Rod and son Brian.

Gentra One Resources Inc.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Gentra One Resources Inc. 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Gentra One Resources Inc. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Page 47: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Liberty Mortgage Corp.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Liberty Mortgage Corp. 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Olympia Trust Company

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Olympia Trust Company 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Pengrowth Energy Corporation

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Pengrowth Energy Corporation 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Piper Energy Inc. c/o Glenogle Energy Inc.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Piper Energy Inc. c/o Glenogle Energy Inc. 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Rogers Cantel Inc.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Rogers Cantel Inc. 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Rogers Cantel Inc. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Page 48: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Rogers Communications Inc.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Rogers Communications Inc. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Rogers Communications Inc. 5-Sep-19 Phone Ron Galbraith

I, Ron Galbraith, spoke to Trent Hunt of Rogers Communications on Sept 5, 2019 at 1:20 PM. Trent is a local Rogers technician. I explained the Rattlesnake Ridge Wind Farm to him and the need to notify Rogers of the project. He said that he no longer looks after the Whitla tower as it is now in the Lethbridge division. He said he would text me his email and I could send him what ever I needed too and he would forward it to head office.

Rogers Communications Inc. 6-Sep-19 Email Ron GalbraithJess, please see below. I thought I should start with you as I'm not quite sure which department should be notified. Ron, Jess works in our Field Services office and hopefully can direct this information to the appropriate people within Rogers. Thanks again for getting in touch with me today.

Rogers Communications Inc. 10-Sep-19 Email Ron GalbraithI have forwarded the material to our real estate and engineering managers. I will follow up and will update you by end of week.ThanksJess

Rogers Communications Inc. 10-Sep-19 Email Ron Galbraith

Hi Jess,I am reaching out after Trent Hunt copied you on an email last week about our Rattlesnake Ridge Wind Power Project. I am wondering if you have had a chance to review the materials we supplied. I have included them again.The Rogers Tower is located on NE 5-11-8 W4.

Rogers Communications Inc. 30-Sep-19 Email Ron Galbraith

Hi Jess, Several weeks ago Trent Hunt from Rogers forwarded you some information on our Rattlesnake Ridge Wind Power Project.I wonder if you or someone in the organization has reviewed the materials and has comments? I have attached the information again for efficiency.We are hoping to submit our AUC application very soon.BHEC-RES Alberta LP is proposing to develop, construct and operate a 117.6 MW wind farm in the Whitla, Alberta area. The attached information is a notification requirement of the Alberta Utilities Commission(AUC). Renewable Energy Systems Canada Inc has identified Rogers as an interested stakeholder as there is a Rogers communications tower in the project area. It is located on NE 5-11-8w4. An information package was mailed to Rogers on July 3rd . Our engineering team has taken the tower into account when designing the project.If you should have any questions or concerns about this project please contact the Project Developer, Rebecca Crump at 647-880-7473 or by email at [email protected] Thank you.

Rogers Communications Inc. 2-Oct-19 Email Jess Saxena (Rogers)

Hello Ron,I’m away at this time, our engineering team in the region was reviewing site in the area.I have added Pauline, manager engineering for western region.Thanks

Rogers Communications Inc. 9-Oct-19 Email Pauline Pham (Rogers)

Hi Ron,My team does not think it will impact our cellular coverage but I will forward this to our microwave team to see if there could be any LOS obstructions.Thanks

Roman Catholic Cemetery

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Roman Catholic Cemetery 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Roman Catholic Cemetery 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Page 49: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Ronald Ziegler

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Ronald Ziegler 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Ronald Ziegler 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Royal Bank of Canada

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Royal Bank of Canada 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Servus Credit Union

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Servus Credit Union 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Servus Credit Union 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

South Alta Rural Electrification Association Ltd. c/o EQUS

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

South Alta Rural Electrification Association Ltd. c/o EQUS

4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

South Alta Rural Electrification Association Ltd.c/o EQUS

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Page 50: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

South Alta Rural Electrification Association Ltd.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

South Alta Rural Electrification Association Ltd. 4-Sep-18 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

South Alta Rural Electrification Association Ltd. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

South Country Co-op Limited

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

South Country Co-op Limited 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

South Country Co-op Limited 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

St. Mary River Irrigation District

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

St. Mary River Irrigation District 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

St. Mary River Irrigation District 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Suncor Energy Inc., as successor in interest to Petro Can Oil & Gas Corporation Ltd.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Suncor Energy Inc., as successor in interest to Petro Can Oil & Gas Corporation Ltd. 4-Sep-18 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Suncor Energy Inc., as successor in interest to Petro Can Oil & Gas Corporation Ltd.

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Page 51: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Telus Communications Inc.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Telus Communications Inc. 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Telus Communications Inc. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Telus Communications Inc. 3-Sep-19 Email Ron Galbraith

Hi Karen,BHEC-RES Alberta LP is proposing to develop, construct and operate a 117.6 MW wind farm in the Whitla, Alberta area. The attached information is a notification requirement of the Alberta Utilities Commission(AUC). Renewable Energy Systems Canada Inc has identified Telus as an interested stakeholder as there is a Telus communications tower in the project area. It is located on SW 9-11-8w4. An information package was mailed to Telus on July 3rd and delivered and signed for on July 8, 2019. Our engineering team has taken the tower into account when designing the project.If you should have any questions or concerns about this project please contact the Project Developer, Rebecca Crump at 647-880-7473 or by email at [email protected]

Telus Communications Inc. 10-Sep-19 Email Ron GalbraithI, Ron Galbraith called Karen Dolan of Telus on September 10th, 2019 at 1:35PM to follow up on the information that was sent by email. At her office number I was unable to leave a message as the mailbox was full. I then left a voice mail on her cell phone asking her to call me back regarding the Rattlesnake Ridge Wind Project.

Telus Communications Inc. 30-Sep-19 Email Ron Galbraith

Hi Karen,My apologies Karen, I had an incorrect spelling of your name in the previous email.BHEC-RES Alberta LP is proposing to develop, construct and operate a 117.6 MW wind farm in the Whitla, Alberta area. The attached information is a notification requirement of the Alberta Utilities Commission(AUC). Renewable Energy Systems Canada Inc has identified Telus as an interested stakeholder as there is a Telus communications tower in the project area. It is located on SW 9-11-8w4. An information package was mailed to Telus on July 3rd and delivered and signed for on July 8, 2019. As discussed on our call, our engineering team has taken the tower into account when designing the project.If you should have any questions or concerns about this project please contact the Project Developer, Rebecca Crump at 647-880-7473 or by email at [email protected] Thank you.

Telus Communications Inc. 2-Oct-19 Email Karen Dolan (Telus)

HI Ron, TELUS has reviewed the proposal and we can advise that it is close but we believe we are outside of your zone and should not be affected. and would like to ask if you could send along the lat/long coordinates of each turbine so I can plot them on map to ensure we are aware for any future mw. This information will ensure that we don’t design a LOS path that will be impacted by the turbine. Thank you for your assistance in this regard.

Telus Communications Inc. 9-Oct-19 Email Ron Galbraith

Hi Karen,Thank you for your review of the project.I have attached a kmz and a pdf document of turbine coordinates as requested.Let me know if you need anything else.

Telus Communications Inc., as successor in interest to AGT Limited

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Telus Communications Inc., as successor in interest to AGT Limited

4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Telus Communications Inc., as successor in interest to AGT Limited

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Page 52: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

The Bank of Nova Scotia

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

The Bank of Nova Scotia 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

The Royal Trust Company

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

The Royal Trust Company 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

The Toronto Dominion Bank

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

The Toronto Dominion Bank 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

The Toronto Dominion Bank 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

True Energy Inc. c/o Bellatrix Exploration Ltd.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

True Energy Inc.c/o Bellatrix Exploration Ltd.

4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

True Energy Inc.c/o Bellatrix Exploration Ltd.

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Page 53: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Whitla Water Co-op Ltd.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Whitla Water Co-op Ltd. 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Whitla Water Co-op Ltd. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Other Identified Stakeholders (including self-identified)

Amanda Deeley

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Amanda Deeley 19-Sep-18 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the September 19, 2018 Public Open House

Anglican Church Canada

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Anglican Church Canada 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Board of Trustees Cherry Coulee District No. 2171

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Board of Trustees Cherry Coulee District No. 2171

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Page 54: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Bow Island & District Health Foundation

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Bow Island & District Health Foundation 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Bow Island Chamber of Commerce

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Bow Island Chamber of Commerce 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Bow Island Commentator

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Bow Island Commentator 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Bow Island Commentator 23-Jul-19 In-person Ron Galbraith

Samantha Johnson, freelance reporter for the Commentator stopped at our consultation office in Bow Island at 4 PM on Tuesday, July 23. She is working on a story for the newspaper about tomorrow’s open house. I gave her some background on RES but asked her to get the details of the project from our project developer, Rebecca Crump. Samantha said she would type up some points and present them to Rebecca at the open house. She said she would be there at 5 PM.

Bow Island Municipal Airport c/o Town of Bow Island

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Bow Island Municipal Airport c/o Town of Bow Island

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Page 55: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Brad and Bruce Hausauer

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Brad and Bruce Hausauer 24-Jul-19 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the July 24, 2019 Public Open House

Brian Frank Gechter

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Brian Frank Gechter 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Brian Frank Gechter 4-Sep-19 Phone Mary Lou Kominek

I, Mary Lou Kominek, have been attempting to contact “Brian Frank Gechter”. REF # 27The mailing to his address -General Delivery, Seven Persons, T0K 1A0 was returned to sender.We found though the local family history book that he is son of Frank Gechter and on August 30th Ron Galbraith contacted Frank Gechter by phone to obtain Brian’s phone number. Frank gave the number as 403-501-3434. I, Mary Lou Kominek, called this number on 8/30 at 12:18 PM. Left voice message. I called this number on 9/3 10:29 AM. Left voice message.I called this number on 9/3 5:52 PM. Left voice message.I called this number on 9/4 10:46 AM. Left voice message.The recorded message says “you have reached 403-501-3434 please leave your message” It does not verify the name of the person.To this date 9/4/2019 no one has returned my calls

Canadian Aerial Applicators Association

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Canadian Aerial Applicators Association 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Canadian Aerial Applicators Association 18-Jul-19 Phone Ron Galbraith

I, Ron Galbraith, called the Canadian Aerial Applicators Association office on July 18th at 9:20. I spoke to Shauna Prokopchuk. I told her that RES was developing a wind farm in the Medicine Hat/Bow Island area and that we had sent an information package to them. I asked if they had received the package and if they had a chance to review it. Shauna said she had not seen the package yet but it would have probably gone to Shara Tardiff, the Executive Director. She said Sara was not in but put me through to her voice mail.I left a voice mail for Shara about the information package and asked that she call me back once she had reviewed the package. I left my cell number and asked her to call anytime.

Canadian Aerial Applicators Association 5-Sep-19 Phone Ron GalbraithI, Ron Galbraith, called Shara Tardiff of the Canadian Aerial Applicators Association, on September 5th, 2019 at 10:35 AM to follow up on a call made earlier in July to make sure they had received the information package that had been sent to them. I had to leave a voice mail and asked her to call back.

Page 56: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

CanWest Air

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

CanWest Air 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

CanWest Air 9-Jul-19 Phone Ron Galbraith

I, Ron Galbraith, called the Can West Air toll free number, 1 866 849 5353 and spoke to Wes. We had received an exception notice from Canada Post saying it may not be the correct address. The mailing address is different than the address at the airport provided on their website.The mailing address is Box 2290, La Crete, AB. T0H 2H0I told Wes that we would get another package in the mail right away and when they had reviewed it they could call us if they had concerns.

CanWest Air 9-Jul-19 Phone Ron Galbraith

I, Ron Galbraith, called the Can West Air toll free number, 1 866 849 5353 and spoke to Wes. We had received an exception notice from Canada Post saying it may not be the correct address. The mailing address is different than the address at the airport provided on their website.The mailing address is Box 2290, La Crete, AB. T0H 2H0I told Wes that we would get another package in the mail right away and when they had reviewed it they could call us if they had concerns.

CanWest Air 5-Sep-19 Phone Ron Galbraith

I, Ron Galbraith, called Josh Fehr of CanWest Air, on September 5th, 2019 at 10:20 AM.I left a voicemail asking that he call me back regarding the two information packages that had been sent to CanWest. One to the Edmonton Office and one to the La Crete office.CanWest operates fixed wing medical aircraft out of the Medicine Hat Airport, 25 kilometers NW of the project area.

Dave Hill

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Dave Hill 22-Aug-19 In-person Ron Galbraith

Office hours were held today from 8 am to 11:30 am.One visitor to the office today, Dave Hill, Better Homes and Gardens, local realtor, stopped by today to understand the timeline of the project and when workers may start to arrive.While Dave was here we discussed some people’s concerns of lower property values in proximity to the wind farm. We talked about studies that have been done in the past about property values. Dave did not think there would be a large devaluation.

Economic Development Alliance of Southeast AB

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Economic Development Alliance of Southeast AB

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Page 57: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Etzikom Museum

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Etzikom Museum 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Forty Mile Railway Inc.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Forty Mile Railway Inc. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Gerald Oosterhuis

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Gerald Oosterhuis 24-Jul-19 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the July 24, 2019 Public Open House. No concerns

HALO Rescue

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Halo Rescue 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Page 58: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

HALO Rescue 6-Sep-19 In-Person Mary Lou Kominek

I, Mary Lou Kominek, sat beside Doug Little / Director – of HALO & Rangeland Helicopter on a flight from Medicine Hat Alb. to Calgary on Sept 6 2019. Rangeland Helicopters is the company that operates, maintains services for the HALO – Helicopter Air Lift Operation – which performs emergency rescue services to southern Alberta & Saskatchewan.Rangeland is a family company founded by Doug Little’s father and his sons are flight instructors and mechanics for their private and public aircrafts out of Medicine Hat. Doug is also a fulltime pilot for 30 years with Westjet.Our hour long conversation included the impact of windfarms being developed and operated in southern Alberta on aircraft operating in the same areas as wind turbines. In Doug’s opinion any trained pilot operating an aircraft should be able to maneuver their aircraft over and around wind turbine operations without problems. He said most aircraft would not be operating at heights low enough to come in contact with turbines. He also said he is somewhat familiar with regulations (NAV Can & Transport Canada) on design and permitting wind farm developments and these are sufficient to enable safety for both pilots and wind turbine operators. Doug has offered to assist BHEC-RES in any way possible during development and operations of RattleSnake Ridge Wind Farm including safety consultation, mapping, flight siting, inspecting land & powerlines or other means if requested.

Jason Pigeon (Enerfin Land Agent)

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Jason Pigeon (Enerfin Land Agent) 24-Jul-19 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the July 24, 2019 Public Open House

Jason Pigeon (Enerfin Land Agent) 24-Jul-19 Open House Rebecca Crump

Enerfin sent a land agent, Jason Pigeon, from Scott Land to our open house last night. He had 2 questions for me. 1. they would like to request a transmission easement through our project area and stated I would have to discuss this with enerfin and BHEC-RES management and,2. They wanted to know how quickly we were proceeding. I stated we will be submitting an AUC application, no other details.

Jeffrey J Neumann c/o Niblock & Company

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Jeffrey J Neumann c/o Niblock & Company 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Jody Pansachuck

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Jody Pansachuck 24-Jul-19 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the July 24, 2019 Public Open House

Jody Pansachuck 20-Aug-19 Phone Mary Lou Kominek

I, Mary Lou Kominek, spoke with Jody Pansachuck, today August 20th at 4:18 p.m. I told Jody I was following up from the open house in Whitla. He said he had no further questions until the build actually started as he was there as a contractor for WhiteFox contractors who are building as a subcontractor in the project south of Whitla currently. He said he spoke with Scott from RES and gave his business card to him for future possible work with RES. Consequently no further follow-up necessary at present time.

Page 59: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Kathy Reimer

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Kathy Reimer 24-Jul-19 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the July 24, 2019 Public Open House

Kinniburgh Spray Service Ltd.

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Kinniburgh Spray Service Ltd. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Liz Collinge

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Liz Collinge 24-Jul-19In-person

(Open House)Brittney Sammons

(Golder)Another woman had the opinion that energy storage is the way of the future and noted that RES had no storage projects in Alberta as per the panel board. Andrew mentioned that there are some storage project development applications in the works.

Liz Collinge 24-Jul-19 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the July 24, 2019 Public Open House

Liz Collinge 20-Aug-19 Phone Mary Lou Kominek

I, Mary Lou Kominek, spoke with Liz Collinge today August 20th 4:26 p.m. I inquired if they had any further questions regarding the open house and the development of the Wind Farm near Whitla. She said no they thought they had all their questions answered at the open house and they had the information package. They have an acreage by Roads 83 & 120. She said no other questions at this time but they knew of the office hours in Bow Island and if anything came up they had our contact information also and they would contact us but no further questions or concerns at this time.

Marvin Collinge

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Marvin Collinge 24-Jul-19 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the July 24, 2019 Public Open House

Page 60: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Medicine Hat Regional Airport

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Medicine Hat Regional Airport 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

General Public

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

General Public 24-Jul-19 In-person(Open House)

Brittney Sammons(Golder)

I did received a few questions about the protected bat area. I carefully advised that this was not a regulatory setback and it was a decision on RESs behalf to avoid area where high bat activity was detected throughout our field surveys.

General Public 24-Jul-19In-person

(Open House) Andrew Faszer (Golder)Question from the lady whom brought girl with her (she was unable to provide me which receptor they were on the map – somewhat indicated the middle of the Project area), if wind turbines cause migrainesAs above, indicated the Health Canada study.

Nick Manus (Peter's Restaurant)

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Nick Manus (Peter's Restaurant) 19-Sep-18 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the September 19, 2018 Public Open House

Pat Shannon (Silver Sage Motel)

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Pat Shannon (Silver Sage Motel) 19-Sep-18 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the September 19, 2018 Public Open House

Pat Shannon (Silver Sage Motel) 24-Jul-19 In-person(Open House)

Brittney Sammons(Golder)

Discussion with Motel owner (Bow Island Silver Sage). The woman was impressed with the professionalism of Golder staff using her accommodation. She discussed how the Capital Power Whitla projects economic benefits are a glimpse of what could be if RR were to proceed. This has been her most profitable year to date by a landslide with profits from this year already far exceeding the total profits from last year.

Pat Shannon (Silver Sage Motel) 24-Jul-19 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the July 24, 2019 Public Open House

Page 61: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Perry and Vytte Oledowski

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Perry and Vytte Oledowski 24-Jul-19 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the July 24, 2019 Public Open House

Vytte Oledowski 24-Jul-19 In-person(Open House)

Brittney Sammons(Golder)

Another resident lady, mentioned that she was not happy with the government and how they treat archeological sites. It didn’t have anything to do with out project but I believe the point she was trying to make was that money talks and if you give enough money to indigenous or government agencies, the protected sites become less of an issue. She wanted to know what archaeological zone the project was in.

Rangeland Helicopter

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Rangeland Helicopter 6-Sep-19 In-Person Mary Lou Kominek

I, Mary Lou Kominek, sat beside Doug Little / Director – of HALO & Rangeland Helicopter on a flight from Medicine Hat Alb. to Calgary on Sept 6 2019. Rangeland Helicopters is the company that operates, maintains services for the HALO – Helicopter Air Lift Operation – which performs emergency rescue services to southern Alberta & Saskatchewan.Rangeland is a family company founded by Doug Little’s father and his sons are flight instructors and mechanics for their private and public aircrafts out of Medicine Hat. Doug is also a fulltime pilot for 30 years with Westjet.Our hour long conversation included the impact of windfarms being developed and operated in southern Alberta on aircraft operating in the same areas as wind turbines. In Doug’s opinion any trained pilot operating an aircraft should be able to maneuver their aircraft over and around wind turbine operations without problems. He said most aircraft would not be operating at heights low enough to come in contact with turbines. He also said he is somewhat familiar with regulations (NAV Can & Transport Canada) on design and permitting wind farm developments and these are sufficient to enable safety for both pilots and wind turbine operators. Doug has offered to assist BHEC-RES in any way possible during development and operations of RattleSnake Ridge Wind Farm including safety consultation, mapping, flight siting, inspecting land & powerlines or other means if requested.

Richard Deeley

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Richard Deeley 19-Sep-18 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the September 19, 2018 Public Open House

Robert Rapson

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Robert Rapson 19-Jul-19 Phone Ron Galbraith

I, Ron Galbraith, got a call today from Robert Rapson of Bow Island. They live and farm north of the Rattlesnake Ridge Project in Twp 12 Range 9. He wondered if this was the same project that had been proposed to him a couple years ago. It was not. Robert is not in our consultation area but would like some information about the project. I invited him to drop in at the office on Tuesday and I could fill him in. He said he would appreciate that.He did not have any concerns about the project.

Page 62: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Samantha Johnson (Commentator)

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Samantha Johnson (Commentator) 24-Jul-19 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the July 24, 2019 Public Open House

Schlenker Airfield (Sherry Anne Irvine)

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Schlenker Airfield (Sherry Anne Irvine) 3-Sep-19 Phone Ron Galbraith

I, Ron Galbraith, called Sherry Irvine O/O of Schlenker Airfield on September 3 at 7:10 PM. I left a voice mail asking if she could supply names of the pilots so we could follow up.Sherry texted me later that night with a response….

Hi Ron,We got home late, received your phone message. Yes, I received the information packets you dropped off (thank you for taking the time to do that), and I have left them for the Pilots at the Airport, as well as texting them with a notice of the info being there for them and your name & phone number to contact you if they wish to follow up & discuss further.Please be aware that a couple of the pilots have been on vacation and just returned and a couple others have land and have been tied up with harvesting, so they haven’t had opportunity to pick up the information and review it yet.I am leaving it in their hands to contact you if they have concerns or input to the project.

Schlenker Airfield (Sherry Anne Irvine) 21-Aug-19 Phone Ron GalbraithI, Ron Galbraith, delivered 6 information packages to Sherry Ervine, as she requested during an earlier conversation, to distribute to the pilots that fly out of the Schlenker Air Field near Medicine Hat. I delivered them to 142 Park Meadows Lane and dropped them in the mail box at the front door. I then called and left a message for Sherry that they were there.

Schlenker Airfield (Sherry Anne Irvine) 3-Sep-19 Text Message Ron Galbraith

Hi Ron,We got home late, received your phone message. Yes, I received the information packets you dropped off (thank you for taking the time to do that), and I have left them for the Pilots at the Airport, as well as texting them with a notice of the info being there for them and your name & phone number to contact you if they wish to follow up & discuss further.Please be aware that a couple of the pilots have been on vacation and just returned and a couple others have land and have been tied up with harvesting, so they haven’t had opportunity to pick up the information and review it yet.I am leaving it in their hands to contact you if they have concerns or input to the project

Sébastien Verzeni (Enerfin Land Agent)

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Sébastien Verzeni (Enerfin) 24-Jul-19 In-person(Open House)

Brittney Sammons(Golder)

Discussion with Enerfin Land Agent. He was very organised and came with a notebook full of questions. He asked if the RR project was on an abnormally aggressive timeline. I wasn’t able to comment on too much on that front other than details for environmental permitting, such as we’ve been working to collect data since 2016 and now that a turbine layout is determined, Golder submitted the AEP Environmental Submission and is working to submit the AUC application as quickly as possible. He wanted to know if RES would be amenable to having a transmission or collection line pass through their project area. I pulled in Ron and he advised that Rebecca would be the one to discuss this with but that it seemed like a feasible thing to negotiate. I later saw Enerfin talking with Rebecca. He wanted to know about how RES was able to collect the required wildlife data so quickly. I explained about how the earlier data was part of a larger study area for a separate project.

Sébastien Verzeni (Enerfin) 24-Jul-19 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the July 24, 2019 Public Open House

Page 63: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Stacey Dueck

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Stacey Dueck 19-Sep-18 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the September 19, 2018 Public Open House

STARS Air Ambulance

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

STARS Air Ambulance 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Theresa Hardiker

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Theresa Hardiker 19-Sep-18 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the September 19, 2018 Public Open House

Theresa Hardiker 24-Jul-19 In-person BHEC-RES Alberta L.P.;Golder Associates Ltd.

Attended the July 24, 2019 Public Open House

Top Crop Applicators

No Interests Raised

Engagenment SummaryStakeholder Date Type of Communication Staff Members Description

Top Crop Applicators 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Top Crop Applicators 8-Jul-19 Phone Ron Galbraith

I, Ron Galbraith, Called Nathan Hoffman of Top Crop Applicators, on Monday July 8th at 10:13 AM. I left a voicemail that there had been an information package sent to Top Crop and that if he had questions or concerns he would like to discuss, he could call me. I also mentioned that the project developer, Rebecca Crump would be in the area Wednesday and Thursday if he wanted to meet in person. I left my number.

Top Crop Applicators 26-Aug-19 Phone Ron Galbraith

I, Ron Galbraith, called Nathan Hoffman of Top Crop Applicators on August 26, 2019 at 4:00 PM. Nathan’s response to my call was “Oh great”. I told Nathan that I was just doing my job and following up to see if he had a chance to look at the Rattlesnake Ridge Wind information package that they had signed for. Nathan said he hadn’t looked at the information as he was busy operating his business and that we would have to talk at a later date. He could not say when that would be.

Page 64: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

First Nations

Bloodtribe

no concerns

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Bloodtribe (Mike Oka) 3-Jul-19 Email Ron Galbraith

As you recall in October of 2016 Renewable Energy Systems(RES) conducted a tour of the RES Forty Mile wind power project which you or a representative attended. Since that tour date we have split the NE portion of that project in to a new smaller project that we call the Rattlesnake Ridge Wind project. As you may be aware, we, RES, were unsuccessful in the Government of Alberta RFPs. Despite this, we are currently moving forward with the Rattlesnake Ridge Wind project as we have a viable opportunity to commercialize the project. This will enable us to construct and operate the Rattlesnake Ridge Wind Project. We are working towards a commercial operations date of December 2021. The Project is located entirely on privately owned, cultivated land. There are a few parcels of Crown land scattered amongst the project but they will not be impacted by project infrastructure. We have spent a considerable amount of time designing the Project to avoid native prairie and Class 3 and above wetlands. Due to the nature of a wind farm, there will be some minor wetland impacts and we will be required to submit a Water Act Application.I want to assure you know that we have initiated the consultation process through the ACO and we will be sending an information package for your perusal in the near future. As representatives from your community have previously been involved in discussions about this project area, we thought it would be prudent to provide you with an informal project update. Thank you for your time and please feel free to contact Rebecca or myself if you have any questions in advance of the formalized ACO process.

Rebecca CrumpProject [email protected]

Bloodtribe (Mike Oka)

3-Jul-19 Email Ron Galbraith I received an OOO email from Mike Oka of the blood tribe. I have called the Tribal Government office for the contact information of JJ and Mike. No response yet.

Bloodtribe (Mike Oka)

9-Jul-19 Phone Ron Galbraith

After receiving an auto response from Mike Oka of the Blood consultation team last week. I have been trying to reach those standing in for him. I got a return call from Lorna Day Chief with Cell numbers for both Mike Tail Feathers and JJ Shade.I called JJ’s number, it went to voicemail but it was not set up. I then called Mike’s number and left a message for him to call me regarding the Rattlesnake Ridge Wind Project

Bloodtribe (Mike Oka) 15-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project via Priority Post. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure.

Bloodtribe (Mike Oka)

15-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Bloodtribe (Mike Oka) 3-Sep-19 Email Ron Galbraith

Hi Mike,I sent the previous email some time ago and received an out of office reply for you.I tried unsuccessfully to reach JJ Shade and Mike Tail Feathers. We are planning to submit our AUC application soon and would appreciate any feedback you may have. We will always keep consultation open as the project continues but would appreciate you having a look. Please reach out if you have questions.

Bloodtribe (Mike Oka)

3-Sep-19 Email Ron Galbraith We definitely would like to complete the TLU on the Crown Portions.

Page 65: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Piikani First Nation

no concerns

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Piikani(Ira Provost ) 2-Jul-19 Email Ron Galbraith

Hi Ira,I hope this correspondence finds you well.As you recall in October of 2016 Renewable Energy Systems(RES) conducted a tour of the RES Forty Mile wind power project which you or a representative attended. Since that tour date we have split the NE portion of that project in to a new smaller project that we call the Rattlesnake Ridge Wind project. As you may be aware, we, RES, were unsuccessful in the Government of Alberta RFPs. Despite this, we are currently moving forward with the Rattlesnake Ridge Wind project as we have a viable opportunity to commercialize the project. This will enable us to construct and operate the Rattlesnake Ridge Wind Project. We are working towards a commercial operations date of December 2021. The Project is located entirely on privately owned, cultivated land. There are a few parcels of Crown land scattered amongst the project but they will not be impacted by project infrastructure. We have spent a considerable amount of time designing the Project to avoid native prairie and Class 3 and above wetlands. Due to the nature of a wind farm, there will be some minor wetland impacts and we will be required to submit a Water Act Application.I want to assure you know that we have initiated the consultation process through the ACO and we will be sending an information package for your perusal in the near future. As representatives from your community have previously been involved in discussions about this project area, we thought it would be prudent to provide you with an informal project update. Thank you for your time and please feel free to contact Rebecca or myself if you have any questions in advance of the formalized ACO process.

Rebecca CrumpProject [email protected]

Piikani First Nation(Megan Crowshoe)

3-Jul-19 Email Ron Galbraith

Hi Megan,I am wondering about your availability for a meeting to reintroduce RES and our project. The project developer, Rebecca Crump, is here next week to meet with the County of Forty Mile officials the morning of the 10th. We would be available the afternoon of the 10th, a Wednesday or Thursday morning, the 11th. Also wondering if you would like to meet in Bow Island? We could have lunch and do a tour of the project. If next week doesn’t work for you, Rebecca is back in Alberta for an open house for the project two weeks later. We could meet the afternoon of July 23, the morning of the 24 or midday on the 25. Again if you could make the trek to Bow Island it would be appreciated as Rebecca has a limited window to be here.Thanks for considering a meeting with us to give an update to project activities.Please feel free to call me at either number below to work out a plan.

Piikani(Ira Provost ) 3-Jul-19 Email

Ron Galbraith/ Rebecca Crump

Greetings Ron/Rebecca,Thank you for this project update; as you hear from the ACO, I am certain they will appropriately redirect you back to us as required. You are welcomed at any point to re-engage with us when your time allows.Should you like to set up some time with us, please contact Megan, our Consultation Officer, for a date and time, again, when you feel appropriate. Megan is cc'ed.Ira Provost

Piikani First Nation(Megan Crowshoe) 5-Jul-19 Email Ron Galbraith

Hello Ron,Thanks for your email.Next week is a little short notice as the summer is busy for us, I’m sure your just as busy too. We are available for a meeting the afternoon of July 23. Once we confirmed July 23, we can work out the details of the meeting.For our office purposes could you provide us with shape files of the project if they are available. If your should have questions please feel free to contact me.

Piikani First Nation(Megan Crowshoe)

5-Jul-19 Email Rebecca Crump

Hi Megan,I’d like to confirm the meeting for the afternoon of July 23rd. We are flexible to have the meeting in Brocket, Lethbridge or near the Project site if you’d like a site tour.Yes we are certainly having a busy summer as well! Looking forward to our meeting. I will have our GIS department package up our constraint and layout files and send them to you early next week.

Page 66: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Piikani First Nation(Megan Crowshoe) 8-Jul-19 Email Rebecca Crump

Hi Megan,Attached are the infrastructure shapefiles and all the project constraint shapes for your review prior to our meeting.A couple of items for you to be aware of. We are permitting the project with 28 – 4.2MW wind turbines, but keeping flexibility to remove 2 turbine locations and increasing the nameplate of the turbines to 4.5MW (all dependent on on-going discussions with manufacturer). Therefore the nameplate capacity of the Project would be between 117.0MW to 117.6MW.In the attached underground collection line file - I have overlaid the collection that would be required in 2 designs, the 28 and the 26 turbine layouts). So the impact that is shown will not be as large as what is depicted. The 2 turbines that would be removed are labeled differently, E1 and E2.I have also attached a clean map of the project components.Please let Ron and I know where it would be most convenient to meet on the afternoon of July 23rd.If you have any questions in the interim please feel free to give me a call.

Piikani First Nation 15-Jul-19 Package Rebecca CrumpRES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project via Priority Post. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure.

Siksika First Nation

no concerns

Engagement SummaryStakeholder Date Type of Communication Staff Members Description

Siksika(Glenda Spotted Eagle)

3-Jul-19 Email Ron Galbraith

Hi Glenda,I hope this correspondence finds you well.As you recall in October of 2016 Renewable Energy Systems(RES) conducted a tour of the RES Forty Mile wind power project which you or a representative attended. Since that tour date we have split the NE portion of that project in to a new smaller project that we call the Rattlesnake Ridge Wind project. As you may be aware, we, RES, were unsuccessful in the Government of Alberta RFPs. Despite this, we are currently moving forward with the Rattlesnake Ridge Wind project as we have a viable opportunity to commercialize the project. This will enable us to construct and operate the Rattlesnake Ridge Wind Project. We are working towards a commercial operations date of December 2021. The Project is located entirely on privately owned, cultivated land. There are a few parcels of Crown land scattered amongst the project but they will not be impacted by project infrastructure. We have spent a considerable amount of time designing the Project to avoid native prairie and Class 3 and above wetlands. Due to the nature of a wind farm, there will be some minor wetland impacts and we will be required to submit a Water Act Application.I want to assure you know that we have initiated the consultation process through the ACO and we will be sending an information package for your perusal in the near future. As representatives from your community have previously been involved in discussions about this project area, we thought it would be prudent to provide you with an informal project update. Thank you for your time and please feel free to contact Rebecca or myself if you have any questions in advance of the formalized ACO process.Rebecca CrumpProject [email protected]

Response From Richard Right Hand from Siksika 3/7/19: Thanks for the update.

Siksika First Nation 15-Jul-19 Package Rebecca CrumpRES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project via Priority Post. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure.

Dropped Stakeholders

Stakeholder Date Type of Communication Staff Members Description

Alois Gechter 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Brigade Enterprises Limited 4-Sep-18 Package Rebecca CrumpRES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Page 67: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Brigade Enterprises Limited 5-Sep-18 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Dalco Petroleum Ltd. (DISSOLVED) 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Dalco Petroleum Ltd. (DISSOLVED) 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Elizabeth J Biemans 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Estate of Elizabeth J Biemans (Deceased) c/o Mario Biemans

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Ethel Begg 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Gustav Egan Wudrich 5-Jun-19 Email Ron Galbraith Gus passed in October of 2018. Attached is a link to his obituary.https://pattisonfuneralhome.com/obituaries/507

Joyce Voeller 14-Aug-19 Email Meridian Land

The Lis Pendens for Joyce Voeller is no longer on the current title (as attached) in Timothy’s name only for the SE 9.Instrument # 161 160 232 –Certificate of Lis Pendens By – Joyce Elizabeth Voeller was on the previous title ( see the attached title for SE 9 in the name of Timothy Voeller and Joyce Voeller and the interest is highlighted in yellow) It is no longer showing on the new titleThe Caveat by Stephen Voeller and Dallas Voeller (Instrument #171 278 268) is a Right of First Refusal. Please let us know if you would like us to pull the particular registered document against the title

Joyce Voeller 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Joyce Voeller 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

JSE Weldin' Ltd. 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Marilyn Gilford Zorn 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Marilyn Gilford Zorn 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Marilyn Gilford Zorn 17-Aug-19 Phone Ron Galbraith

I, Ron Galbraith, called Doug Zorn at 8:45, Saturday August 17, 2019. I asked Doug about Marilyn Zorn being an interest holder in the land. I also told Doug it was my understanding that Marilyn had passed away in 2016. He said that was correct, she had passed and that his lawyers were working on removing the caveat from title. It could be the back up at land titles that is the holdup on removal.Correction on the date of Marilyn Zorn’s passing, should read 2017.Link to obituary included. https://cooksouthland.com/obituaries/obituaries/1498604108/zorn

Marilyn Gilford Zorn (Deceased)

Rocky Lane Hornung Law12-Aug-19 Email Mary Lou Kominek

KirstinAs per our phone calls regarding Marilyn Gilford Zorn.We sent a package to Ms. Zorn c/o your law firm Rocky Lane Hornung. The Canada Post tracking reports are attached that the item was received and signed for by your firm July 16, 2019 as discussed.We are obligated to contact the persons on title to lands within our proposed Wind Farm area near Whitla, ALB. and Ms. Zorn is one of those persons. We have learned today that Ms. Zorn actually passed away June 26, 2017.We need to verify your firm received the package and would also need to know if it was passed over to a firm handling her estate and if it is not your firm, who that firm would be?Could you please verify these questions for us at your earliest convenience?

Page 68: Occupants, Residents, Landowners within 800 metres of the ...€¦ · information, an invitation to the September 19, 2018 Public Open House and an AUC brochure. Alastair Edward Olsen

Rodney R Maier and Shirley D Maier 20-Aug-19 Phone Mary Lou Kominek

Rodney & Shirley Maier – Ref # 109 Property sold – new owners not known to them (Drath, Bernard and Winnie). Our mailing went to Pritchard law office and was returned to RES. Law office would not offer any information to us when we called.After many trials of wrong R Maiers phone numbers, we located Shirley who now lives in Newfoundland and is remarried. Rodney Maier passed away in 2001 and Shirley sold the property. She did not know the current owner but understood there was a shop on the property that since went bankrupt.Possible owner could have been JSE Welding who’s mail was also returned and we are currently searching for JSE building in Whitla we think could be said property that the Maiers owned is now vacant and run down. We will follow up search on current property owner with County of 40 Mile and update list as appropriate.

Rodney R Maier and Shirley D Maier 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

Roger Bernard and Cheryl Marie Lobb 4-Sep-18 Package Rebecca CrumpRES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Terence Michael and Reta Joyce Lobb 4-Sep-18 Package Rebecca CrumpRES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Whila Community Clubc/o Alma Smith

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

William Stachofski 3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.

William Stachofski 4-Sep-18 Package Rebecca Crump RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included a project information, an invitation to the September 19, 2018 Public Open House and an AUC brochure.

Darren Beggc/o MacLean and Wiedemann -

3-Jul-19 Package Rebecca Crump

RES mailed a Project Specific Information Package for the Rattlesnake Ridge Wind Power Project. The package included an introductory letter, project information, an invitation to the July 24, 2019 Public Open House, Drop-in Office Hours schedule, a Project Layout Map, a Contraints Map and an AUC brochure. On July 11, 2019 a letter of clarification was sent via registered mail.