26
Occidental of Elk Hills, Inc. May 21, 2010 Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project Oxy CO 2 EOR Project

Upload: ngothien

Post on 24-Apr-2018

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery

Occidental of Elk Hills, Inc.

May 21, 2010

Occidental of Elk Hills, Inc.

May 21, 2010

Oxy CO2 EOR ProjectOxy CO2 EOR Project

Page 2: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery

• Oxy CO2 Business

• HECA Project Description

• Oxy CO2 EOR Project Description

• Site Suitability for Sequestration

• Oxy CO2 Business

• HECA Project Description

• Oxy CO2 EOR Project Description

• Site Suitability for Sequestration

OutlineOutline

Page 3: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery

CO2 EOR in the United StatesCO2 EOR in the United States

(17)

8 Projects

13,000 Gross Bbls/d

Operators: Merit/Chaparral/Whiting

CO2 Source: Manufacturing

8 Projects

13,000 Gross Bbls/d

Operators: Merit/Chaparral/Whiting

CO2 Source: Manufacturing

Mid-Continent

17 Projects

42,000 Gross Bbls/d

Operators: Denbury

CO2 Source: Natural

Eastern Gulf Coast

20 Projects

39,500 Gross Bbls/d

Operators: Exxon/Anadarko/Merit

CO2 Source: Natural/Manufacturing

Rockies

69 Projects

187,000 Gross Bbls/d

Operators: Various

CO2 Source: Natural

Permian Basin

(17)

8 Projects

13,000 Gross Bbls/d

Operators: Merit/Chaparral/Whiting

CO2 Source: Manufacturing

8 Projects

13,000 Gross Bbls/d

Operators: Merit/Chaparral/Whiting

CO2 Source: Manufacturing

Mid-Continent

17 Projects

42,000 Gross Bbls/d

Operators: Denbury

CO2 Source: Natural

Eastern Gulf Coast

20 Projects

39,500 Gross Bbls/d

Operators: Exxon/Anadarko/Merit

CO2 Source: Natural/Manufacturing

Rockies

69 Projects

187,000 Gross Bbls/d

Operators: Various

CO2 Source: Natural

Permian Basin

Page 4: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery

CO2 Floods in the Permian BasinCO2 Floods in the Permian Basin

0

5

10

15

20

25

30

Occide

ntal

XTOChe

vron

Pure R

esource

sApa

che

Conoco

Phillips

Faske

nHes

s

Kinder Morg

anCha

parral

Energ

enExx

onMobil

Georg

e R. B

rown

Great

Wester

nOrla

Petco

Stanbe

rry O

il

Whiting Pet.

0

5

10

15

20

25

30

Occide

ntal

XTOChe

vron

Pure R

esource

sApa

che

Conoco

Phillips

Faske

nHes

s

Kinder Morg

anCha

parral

Energ

enExx

onMobil

Georg

e R. B

rown

Great

Wester

nOrla

Petco

Stanbe

rry O

il

Whiting Pet.

Number of Active Operated CO2 Projects

16 other companies

•• First floods initiated 35 years agoFirst floods initiated 35 years ago

•• Over 60 COOver 60 CO22 floods in Permian Basinfloods in Permian Basin

Oxy transports and injects more CO2 than any other company in the world

Page 5: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery

0

20

40

60

80

100

120

1972

1974

1976

1978

1980

1982

1984

1986

1988

1990

1992

1994

1996

1998

2000

2002

2004

2006

2008

US

EO

R P

rooj

ects

Note: Based on data obtained from the 2010 O&G Journal bi-annual EOR Survey

CO2 EOR is GrowingCO2 EOR is Growing

COCO22 EOR is a EOR is a proven technology proven technology and is growingand is growing

2009

Page 6: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery

Oxy Operated CO2 Projects(Date Started)Oxy Operated CO2 Projects(Date Started)

– North Cross (1972)– GMK South (1982)– Denver Unit (1983)– Central Mallet (1984)– Frazer Unit (1984)– Slaughter Estate (1984)– Wasson ODC (1984)– South Wasson Clfk (1985)– Willard Unit (1986)– South Cross (1988)– Salt Creek Unit (1993)– South Welch Unit (1993)– Cedar Lake Unit (1994)– Elmar Delaware Unit (1994)– Bennett Ranch Unit (1995)

– North Cowden Unit (1995)– Anton Irish Clfk Unit (1997)– Mid Cross (1997)– North Dollarhide Dvn (1997)– West Welch Pilot (1997)– Sharon Ridge Unit (1999)– TSTAR Abo (1999)– Cogdell Unit (2001)– HT Boyd (2001)– North Hobbs Unit (2003)– Levelland Unit (2004)– Igoe Smith Unit (2005)– West RKM (2006)– North West Mallet (2007)

Page 7: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery

• Oxy CO2 Business

• HECA Project Description

• Oxy CO2 EOR Project Description

• Site Suitability for Sequestration

• Oxy CO2 Business

• HECA Project Description

• Oxy CO2 EOR Project Description

• Site Suitability for Sequestration

OutlineOutline

Page 8: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery

8

HECA Site LocationHECA Site Location

HECA site close to:

• CO2 injection point and geologic storage formation

• Adequate non-potable water supply

• Electric transmission system

Elk Hills Oil Field

Page 9: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery

HECA / Oxy Integrated SystemHECA / Oxy Integrated System

Page 10: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery

• Oxy CO2 Business

• HECA Project Description

• Oxy CO2 EOR Project Description

• Site Suitability for Sequestration

• Oxy CO2 Business

• HECA Project Description

• Oxy CO2 EOR Project Description

• Site Suitability for Sequestration

OutlineOutline

Page 11: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery

Oxy CO2 EOR Project Site LocationSouthern San Joaquin ValleyOxy CO2 EOR Project Site LocationSouthern San Joaquin Valley

0 2 MilesN

NWSNWS

31S31S29R29R

ELK HILLS OIL FIELDLOCATION OF THREE DEEP STEVENS STRUCTURES

Page 12: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery

Conceptual Stevens Phased DevelopmentConceptual Stevens Phased Development

31S & NWS Stevens Reservoirs contain:

• 640 active producing wells, 185 active injection wells

• Over 7.5 billion Bbls reservoir pore volume

• Sequestering 20 yrs CO2 off-take from HECA will require less than 1 billion Bbls reservoir pore volume

CO2 EOR Project:

~ 250 Injection Wells/ Patterns

~ 250 New Wells

~ 107 MMCF/d CO2 Injection

~ 15% OOIP Recovery

Backup EOR AreaPrimary EOR Areas

NWS

31S

29R

Page 13: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery

HECA / Elk Hills Location MapHECA / Elk Hills Location Map

Central Tank Battery

Reinjection Compression Facility

CO2 Recovery Plant

Page 14: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery

DriveWater CO2 Water CO2

MiscibleZone

OilBank

AdditionalOil

Recovery

What is the CO2 Water-Alternating-Gas (WAG) Flood Process?What is the CO2 Water-Alternating-Gas (WAG) Flood Process?

Page 15: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery

CO2 EOR PhysicsWater injection (blue) recovers oil in large pores; leaving trapped oil (red) in small pores

CO2 (yellow) dissolves and displaces trapped oil; leaving only heavy ends (brown) in the reservoir.

Frequently, chase water is injected after CO2. In this case, a significant fraction of CO2 is trapped / retained by the injected water.

Waterflood

CO2 Flood

Chase Water

Predictions of CO2 EOR & Trappingvia integrated Reservoir Modeling StudyPredictions of CO2 EOR & Trappingvia integrated Reservoir Modeling Study

Page 16: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery

• CO2 EOR Results in Sequestration– During each CO2 injection cycle, 30 – 50%

CO2 is typically unrecoverable and sequestered with each pass through the reservoir

– When field no longerproduces economicoil/gas rates, all wells will be plugged according to regulations,trapping all CO2 in thereservoir

• CO2 EOR Results in Sequestration– During each CO2 injection cycle, 30 – 50%

CO2 is typically unrecoverable and sequestered with each pass through the reservoir

– When field no longerproduces economicoil/gas rates, all wells will be plugged according to regulations,trapping all CO2 in thereservoir

Nexus Between CO2 EOR and CO2 SequestrationNexus Between CO2 EOR and CO2 Sequestration

Source: Metz, B., 2005 Special Report on Carbon Dioxide Capture and Storage, Intergovernmental Panel on Climate Change, Cambridge, England. http://www.ipcc.ch/publications_and_data/publications_and_data_reports_carbon_dioxide.htm.

Page 17: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery

Injection

Producing Reservoir

Sequestered

Separation

RecycledCO2 = 137

SuppliedCO2 = 115

TrappedCO2 = 115

Operating & fugitive CO2 = <0.3%

Injected CO2 = 252 Produced

CO2 = 137

•All CO2 data in million metric tons

•Data from Denver Unit CO2 EOR Project

CO2 Material Balance – Closed LoopCO2 Material Balance – Closed Loop

Page 18: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery

• CO2 Injection and Recovery Equipment– CO2 Supply System– Satellite Gathering Stations– Infield Gathering and Injection Distribution Pipelines

• Recovered CO2 Purification and Compression– Central Tank Battery Test (CTB)– Reinjection Compression Facility (RCF)– CO2 Recovery Plant (CRP)– Produced Water Injection Plant

• Backup CO2 EOR Injection Facility

• CO2 Injection and Recovery Equipment– CO2 Supply System– Satellite Gathering Stations– Infield Gathering and Injection Distribution Pipelines

• Recovered CO2 Purification and Compression– Central Tank Battery Test (CTB)– Reinjection Compression Facility (RCF)– CO2 Recovery Plant (CRP)– Produced Water Injection Plant

• Backup CO2 EOR Injection Facility

Major Surface Project ComponentsMajor Surface Project Components

Page 19: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery

• Oxy CO2 Business

• HECA Project Description

• Oxy CO2 EOR Project Description

• Site Suitability for Sequestration

• Oxy CO2 Business

• HECA Project Description

• Oxy CO2 EOR Project Description

• Site Suitability for Sequestration

OutlineOutline

Page 20: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery

• Engineering Study– Reservoir characteristics (porosity, permeability, thickness, area, frac

gradient, temp., press., saturations)

– Reservoir fluid data (gravity, viscosity, quality)

– Casing diagrams all wells (cement fill, cement plugs & evidence no well adversely affects projects)

– Planned drilling & well work to support project (map of all well locations, purpose & unit boundaries)

• Geologic Study– Structural contour map on all injection zones

– Isopachous map of all injection zones

– Geologic cross-section through injection well

– Geophysical logs of all zones & aquifers

• Engineering Study– Reservoir characteristics (porosity, permeability, thickness, area, frac

gradient, temp., press., saturations)

– Reservoir fluid data (gravity, viscosity, quality)

– Casing diagrams all wells (cement fill, cement plugs & evidence no well adversely affects projects)

– Planned drilling & well work to support project (map of all well locations, purpose & unit boundaries)

• Geologic Study– Structural contour map on all injection zones

– Isopachous map of all injection zones

– Geologic cross-section through injection well

– Geophysical logs of all zones & aquifers

Regulatory Requirements – Class II UICRegulatory Requirements – Class II UIC

Page 21: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery

• Engineering Study– Original reservoir fluid contacts – Current reservoir pressure differences– Reservoir capacity calculations

• Geologic Study– Cap rock characteristics– Structure defined using sonic imaging– Core analysis– Geochemical analysis

• Measurement, Verification and Reporting Plan Being Developed

• Engineering Study– Original reservoir fluid contacts – Current reservoir pressure differences– Reservoir capacity calculations

• Geologic Study– Cap rock characteristics– Structure defined using sonic imaging– Core analysis– Geochemical analysis

• Measurement, Verification and Reporting Plan Being Developed

Supplements to Class II RequirementsSupplements to Class II Requirements

Page 22: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery

Engineering and Geologic UnderstandingEngineering and Geologic Understanding

Fault

Faults Terminating

Above & Below the Reef

Ridge Shale

324-35S

318X-35S

313-2G

Reef Ridge Shale

Confining Zone

N Shale(red line)

Shallow Oil Zone

StevensReservoir

Zone

~~2,450 Wells drilled 2,450 Wells drilled 19981998--20092009

Page 23: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery

Elk Hills Stratigraphic SectionElk Hills Stratigraphic Section

PLIOCENE

MIOCENE

ETCHEGOIN

N SHALE

SCALEZ

MONTEREY MCDONALD /DEVILWATER / GOULD

~ 5,000 ft

SHALLOW

OIL ZONE

ESOZ

WSOZ

ANTELOPESHALE-----

STEVENS SST

24z / 26r

MBB

W31S

C / D / PG

N / AN / AN / A

BBB

C / DC / DC / DPGPGPG

AGE FORMATION MEMBER / ZONE RESERVOIR

REEF RIDGEREEF RIDGEUpperUpper

BasalBasal

C4DC4DC4DSHALESSHALESSHALES

C4D

Upper

BasalN / A

B

C / DPG

Reef RidgeReef Ridge

MontereyMonterey

ShalesShales

Elk Hills Stratigraphic SectionElk Hills Stratigraphic Section

CO2TARGET

Geologic Seal

Page 24: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery

• Reef Ridge Core Analysis– Mineralogy– Oil Saturation

• Extensive Structural Imaging Data

• Geochemical Analysis– Supports Vertical Isolation

• Reef Ridge Core Analysis– Mineralogy– Oil Saturation

• Extensive Structural Imaging Data

• Geochemical Analysis– Supports Vertical Isolation

Additional Confirmation of ContainmentAdditional Confirmation of Containment

Page 25: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery

• Comprehensive knowledge of field history & geology

• Stevens reservoirs are ideal for EOR / sequestration

• Class II UIC permit needed• HECA CO2 sequestration will need to

be measured, verified & reported

• Comprehensive knowledge of field history & geology

• Stevens reservoirs are ideal for EOR / sequestration

• Class II UIC permit needed• HECA CO2 sequestration will need to

be measured, verified & reported

Site Suitability SummarySite Suitability Summary

Page 26: Occidental of Elk Hills, Inc. - California Energy Commission · 5/21/2010 · Occidental of Elk Hills, Inc. May 21, 2010 Oxy CO 2 EOR Project • Oxy CO ... – Central Tank Battery