Obtaining and Developing Base Flood Elevations
inZone A Areas
National Flood Insurance Program Administered by FEMA
![Page 2: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/2.jpg)
INTRODUCTION 2
YOUR INSTRUCTOR
Shona GibsonFEMA Region 6
Phone: (940) 383-7326Email: [email protected]
Eric SimmonsFEMA Region 9
Phone (510) [email protected]
![Page 3: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/3.jpg)
INTRODUCTION 3
Important Information
• Please turn-off or silence cell phones• Please take phone calls outside and away
from the room• Bathrooms are . . . • Exits are . . .
![Page 4: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/4.jpg)
INTRODUCTION 4
Comments• This course assumes a basic understanding
of the National Flood Insurance Program (NFIP)
• Discussion pertains to minimum NFIP requirements
• Discussion applies to Special Flood Hazard Areas (SFHA), i.e. “100-year” floodplain
Questions and comments are encouraged!
![Page 5: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/5.jpg)
INTRODUCTION 5
Acronyms….• BFE Base Flood Elevation• CRS Community Rating System• FEMA Federal Emergency Management Agency• NFIP National Flood Insurance Program• FIRM Flood Insurance Rate Map• DFIRM Digital Flood Insurance Rate Map• LOMA Letter of Map Amendment• LOMR Letter of Map Revision• SFHA Special Flood Hazard Area• NGVD National Geodetic Vertical Datum of 1929• NAVD North American Vertical Datum of 1988• LFE Lowest Floor Elevation• LAG Lowest Adjacent Grade• HAG Highest Adjacent Grade• WSE Water Surface Elevation
![Page 6: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/6.jpg)
To assist local floodplain officials, surveyors, and engineers develop base flood elevations
in Approximate Zone A areas at a minimal cost
PURPOSE OF WORKSHOP
Workshop will NOT show how to use complex hydrology and hydraulics models,
mapping tools, and survey techniques
INTRODUCTION 6
![Page 7: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/7.jpg)
PURPOSE OF WORKSHOP
Workshop will NOT show how to develop BFEs in areas that experience alluvial fan flooding and
in coastal flood hazard areas
INTRODUCTION 7
Intended to be used in riverine and lake areas where flow conditions are fairly uniform
![Page 8: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/8.jpg)
“MANAGING FLOODPLAIN DEVELOPMENT
INAPPROXIMATE ZONE A AREAS”
Workshop presentation based on:
FEMA’s Publication 265
A Guide for Obtaining and Developing Base Flood (100-year) Elevations
INTRODUCTION 8
![Page 9: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/9.jpg)
WORKSHOP TOPICS
• Floodplain Management Regulations forApproximate Zone A Areas
• Advantages to Develop Base Flood Elevations
• Show Ways to Develop Base Flood Elevationsin Lacustrine and Riverine Systems
INTRODUCTION 9
![Page 10: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/10.jpg)
FLOODPLAIN MANAGEMENT REGULATIONS FOR APPROXIMATE ZONE A AREAS
![Page 11: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/11.jpg)
THE NATIONAL FLOOD INSURANCE PROGRAM (NFIP)
• National Flood Insurance Act of 1968
• Administered by the Federal Emergency Management Agency (FEMA)
FLOODPLAIN MANAGEMENT REGULATIONS 11
![Page 12: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/12.jpg)
Communities must obtain, review and reasonably utilize any base flood elevation and floodway data available from a Federal, State, or other source…
[ 44 CFR 60.3 (b) (4) ]
NFIP REGULATIONS FORZONE A AREAS
Minimum requirements for obtaining BFE Data (areaswhere BFEs have not been provided by FEMA)
FLOODPLAIN MANAGEMENT REGULATIONS 12
Also in your ordinance
![Page 13: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/13.jpg)
NFIP REGULATIONS FORZONE A AREAS
Minimum requirements for Developing BFE Data
Require that all new subdivision proposals and other proposed development (including proposals for manufactured home parks and subdivisions) greater than 50 lots or 5 acres, whichever is the lesser, include within such proposals base flood elevation data;
[ 44 CFR 60.3 (b) (3) ]
FLOODPLAIN MANAGEMENT REGULATIONS 13
Also in your ordinance
![Page 14: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/14.jpg)
NFIP REGULATIONS FORZONE A AREAS
• Enforce Section 60.3(b)(3) of the NFIP regulations and require that BFE data be developed for affected lots through a detailed study.
• Follow FEMA’s “Guidelines and Specifications for Flood Hazard Mapping Partners”, April 2003. https://www.fema.gov/media-library/assets/documents/13948
For large developments greater than 5 acres or 50 lots whichever is the lesser, communities must…
FLOODPLAIN MANAGEMENT REGULATIONS 14
![Page 15: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/15.jpg)
NFIP REGULATIONS FORZONE A AREAS
• Review and determine that the study is reasonable and accurate. Methods used are comparable to original FIS
• Make sure the lowest floor elevation is certified by a licensed land surveyor or registered P.E.
• Make sure that the applicant revises the FIRM, i.e, obtains a Letter of Map Revision from FEMA when required.
(continued)
For large developments greater than 5 acres or 50 lots whichever is the lesser, communities must…
FLOODPLAIN MANAGEMENT REGULATIONS 15
![Page 16: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/16.jpg)
EXCEPTIONS
• Floodplain is contained entirely within an open space lot and building sites are CLEARLY outside of the Zone A area.
• If community has more stringent regulations, those higher standards should be applied.
BFE may not be required if…
FLOODPLAIN MANAGEMENT REGULATIONS 16
![Page 17: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/17.jpg)
Proposed 56-lot Subdivision Is BFE Required?
Zone A
17FLOODPLAIN MANAGEMENT REGULATIONS
![Page 18: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/18.jpg)
Proposed 6.7 Acre SubdivisionIs BFE Required?...
Zone A
18FLOODPLAIN MANAGEMENT REGULATIONS
![Page 19: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/19.jpg)
Proposed 56-lot Subdivision Is BFE Required?
Zone A
19
Open Space
FLOODPLAIN MANAGEMENT REGULATIONS
![Page 20: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/20.jpg)
Proposed 6.7 Acre SubdivisionIs BFE Required?...
Zone A
280
275
20FLOODPLAIN MANAGEMENT REGULATIONS
![Page 21: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/21.jpg)
Proposed 6.7 Acre SubdivisionIs BFE Required?...
Zone A235
275
21FLOODPLAIN MANAGEMENT REGULATIONS
![Page 22: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/22.jpg)
Proposed 40 Acre Dairy Farm. Is BFE Required?
Zone A
280
275
40 Acres
D
A
I
R
Y
Storage barn
22FLOODPLAIN MANAGEMENT REGULATIONS
Storage barn
![Page 23: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/23.jpg)
NFIP REGULATIONS FORZONE A AREAS
For small developments less than 5 acres or 50 lots with no BFE’s determined, communities should…
• Determine that construction will be reasonably safe from flooding
• Obtain, review, and reasonably use any base flood elevation and floodway data from federal, State, or other sources (60.3 (b)(4))
• Use local official’s knowledge of flood conditions in area to establish a BFE
• Determine if a previous study was developed by a consultant or agency for the area in question
• Use the methods described in FEMA P-265 manual to estimate a BFE
FLOODPLAIN MANAGEMENT REGULATIONS 23
![Page 24: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/24.jpg)
NFIP REGULATIONS FORZONE A AREAS
For small developments less than 5 acres or 50 lots with no BFE’s determined, communities should…
• Obtain the elevation of the as-constructed lowest floor and maintain these records with community’s files
• Elevate lowest floor to at least 2 feet or more above HAG for better insurance rates.
FLOODPLAIN MANAGEMENT REGULATIONS 24
(continued)
![Page 25: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/25.jpg)
Questions?
25
![Page 26: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/26.jpg)
ADVANTAGES OF DEVELOPING BFES
![Page 27: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/27.jpg)
ADVANTAGES OF DEVELOPING BFE DATA…
• Elevating Lowest Floor Elevation (LFE) to or above the BFE will help reduce future flood losses
• Assure compliance with the community’s floodplain management regulations
• Flood insurance policies are lower cost with an established BFE
• Flood insurance requirement could be removed from the building or property (LOMC)
• CRS program provides credit points (Activity 410)
ADVANTAGES OF DEVELOPING BFE DATA 27
![Page 28: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/28.jpg)
$785 $1,641$3,101
$0 $-
$2,000
$4,000
$6,000
$8,000
$10,000
5' orHigher
2' to 4' 1' 0 orBelow
Year
ly P
rem
ium
s($
250,
000/
Stru
ctur
e,$1
00,0
00/C
onte
nt)
Lowest Floor Elevation Above HAG, No BFE (ft)
SUBMIT
FOR
Effective April 1, 2016, Flood Insurance Manual
ADVANTAGES OF DEVELOPING BFE DATA 28
INSURANCE COST vs. LOWEST FLOOR ELEVATIONZONE A (One floor, no basement, NO BFE)
![Page 29: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/29.jpg)
$802$2,218
$6,060
$0 $-
$2,000
$4,000
$6,000
$8,000
$10,000
2' orHigher
0' to 1' -1' -2' orBelow
Year
ly P
rem
ium
s($
250,
000/
Stru
ctur
e $1
00,0
00/C
onte
nts)
Lowest Floor Elevation
SUBMIT
FOR
Effective April 1, 2016, Flood Insurance Manual
INSURANCE COST vs. LOWEST FLOOR ELEVATIONZONE A (One floor, no basement, With BFE)
ADVANTAGES OF DEVELOPING BFE DATA 29
![Page 30: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/30.jpg)
$-
$2,000
$4,000
$6,000
$8,000
$10,000
5' orHigher
2' or 4' 1' 0' to 1' -1' -2' orBelow
Year
ly P
rem
ium
s($
250,
000/
Stru
ctur
e,
$100
,000
/Con
tent
s)
Lowest Floor Elevation Above Estimated BFE or HAG
With BFE
Effective April 1, 2016, Flood Insurance Manual
POST-FIRM COST COMPARISON OF NO BFE vs. BFE
ADVANTAGES OF DEVELOPING BFE DATA 30
![Page 31: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/31.jpg)
ADVANTAGES OF DEVELOPING BFE DATA 31
http://www.fema.gov/national-flood-insurance-program
CHANGES TO THE NFIPBW-12 and HFIAA
![Page 32: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/32.jpg)
SOURCES FOR EXISTING BASE FLOOD ELEVATIONS.
![Page 33: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/33.jpg)
DATA SOURCES FOR BFE DEVELOPMENT
• Flood Insurance Study “Best Available Data”
• Engineering studies (published or non-published)
• High water marks from severe storms• High flow staking conducted by a Federal,
State, or Local agency• Aerial photogrammetry• Preliminary Firms• LOMRs• Backup data from LOMAs
DATA SOURCES 33
![Page 34: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/34.jpg)
DATA SOURCES FOR BFE DEVELOPMENT
• Local Public Works Department
• Flood Control Districts
• Levee Improvement Districts
• Local Planning Commissions
• Municipal Water Districts
• River Basin Commissions
• Water Control Board
DATA SOURCES 34
![Page 35: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/35.jpg)
COUNTY AGENCIESLocal Floodplain Managers
Contact Info can be found at: www.hawaiinfip.org
• City and County of HonoluluMario Siu-Li, CFM
• County of MauiCarolyn Cortez, CFM
• County of KauaiStanford Iwamoto, P.E.
• County of HawaiiKelly Gomes, P.E. (East Hawaii)Kiran Emler, P.E. (West Hawaii)
DATA SOURCES 35
![Page 36: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/36.jpg)
STATE AGENCIESDepartment of Land and Natural Resources
Engineering Divisionhttps://dlnreng.hawaii.gov/
• Contacts:Flood Control / Dam Safety Section Head – Edwin Matsuda, P.E., CFMState NFIP Coordinator - Carol Tyau-Beam, P.E., CFMState General Flood Control Plan Administrator – Jesse Colandrea, P.E.
• Hawaii Flood Hazard Assessment Toolhttp://gis.hawaiinfip.org/fhat/www.hawaiinfip.org
• State General Flood Control Planhttps://dlnreng.hawaii.gov/fcds/gfcp/
DATA SOURCES 36
![Page 37: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/37.jpg)
Topo Contours from LIDAR & Flood Zones+• Hawaii FHAT: http://gis.hawaiinfip.org/FHAT/
![Page 38: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/38.jpg)
FEDERAL AGENCIES• U.S. Army Corps of Engineers
• Federal emergency Management Agency
• U.S. Department of Interior, Geological Survey
• U.S. Department of Agriculture, Natural Resources Conservation Service (NRCS)
• U.S. Department of Transportation, Federal Highway Administration
DATA SOURCES 38
![Page 39: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/39.jpg)
Honolulu DistrictCivil Works Technical Branch
Building T-223Fort Shafter, HI 96858
(916) [email protected]
http://www.poh.usace.army.mil/About/Offices-and-Units/Engineering-Construction-Division/Civil-Works-Technical/
U.S. Army Corps of Engineers
U.S. Department of Interior, Geological SurveyPacific Island Water Science Center
http://hi.water.usgs.gov/
DATA SOURCES 39
National Weather ServicePacific Island Water Science Center
http://hi.water.usgs.gov/
![Page 40: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/40.jpg)
Federal Emergency Management Agency
http://www.fema.gov/fhm/
DATA SOURCES 40
REGION IX http://www.r9map.org
FEMA, Federal Insurance and Mitigation Division 1111 Broadway, Suite 1200
Oakland, California 94607-4052 (510) 627-7100
![Page 41: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/41.jpg)
DOWNLOADS • FEMA P-265 (1995)https://www.fema.gov/media-library/assets/documents/1911
• FEMA’s Quick-2 Software v.2.0http://www.fema.gov/quick-2-version-20#1
• USGS National Streamflow Statistics Program v.6http://water.usgs.gov/software/NSS/
41DATA SOURCES
![Page 42: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/42.jpg)
WEBSITES
• FEMA’s Map Service Centerhttps://msc.fema.gov/portal/
• FEMA’s National Flood Hazard Layer (Geoplatform)http://fema.maps.arcgis.com/home/webmap/viewer.html?webmap=cbe088e7c8704464aa0fc34eb99e7f30
42DATA SOURCES
![Page 43: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/43.jpg)
WEBSITES
• USGS StreamStats v.3 http://water.usgs.gov/osw/streamstats/
• USGS The National Map Viewerhttp://viewer.nationalmap.gov/viewer/
43DATA SOURCES
![Page 44: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/44.jpg)
Topographic Data Availability for Hawaii• Federal Inventory: https://coast.noaa.gov/inventory/
![Page 45: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/45.jpg)
DEVELOPING BASE FLOOD ELEVATIONS FEMA’S P-265
![Page 46: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/46.jpg)
DOWNLOADS • FEMA P-265 (1995)https://www.fema.gov/media-library/assets/documents/1911
• FEMA’s Quick-2 Software v.2.0http://www.fema.gov/quick-2-version-20#1
• USGS National Streamflow Statistics Program v.6http://water.usgs.gov/software/NSS/
46DATA SOURCES
![Page 47: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/47.jpg)
METHODS OF DEVELOPING BFES
Simplified Methods
Limited Detailed Method (Quick-2)
METHODS OF DEVELOPING BFES 47
![Page 48: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/48.jpg)
METHODS OF DEVELOPING BFES
Simplified Methods
Contour InterpolationData Extrapolation
METHODS OF DEVELOPING BFES 48
![Page 49: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/49.jpg)
SIMPLIFIED METHOD
• May be used to determine if the development is reasonably safe from flooding
• Limitations of BFEs using simplified methods– May not be used to apply for a Letter of Map
Change – May not be used for flood insurance rating– May not be used to complete an Elevation
Certificate
SIMPLIFIED METHOD 49
![Page 50: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/50.jpg)
SIMPLIFIED METHOD 50
METHODS OF DEVELOPING BFES
Simplified Methods
Data Extrapolation
![Page 51: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/51.jpg)
DATA EXTRAPOLATION
• Requires existing 100-yr profile computed by detailed methods
Extrapolate existing 100-yr profile computed by detailed methods to obtain BFE
SIMPLIFIED METHOD 51
![Page 52: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/52.jpg)
100-YEAR PROFILE
SIMPLIFIED METHOD 52
![Page 53: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/53.jpg)
DATA EXTRAPOLATION
• Requires existing 100-yr profile computed by detailed methods
• Only used if site is within 500 ft (upstream) from limit of detailed study
Extrapolate existing 100-yr profile computed by detailed methods to obtain BFE
SIMPLIFIED METHOD 53
![Page 54: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/54.jpg)
ZONE AE
ZONE A
Plan View
Y
500 ft
Property within 500 ft from Limit of Detailed Study
SIMPLIFIED METHOD 54
![Page 55: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/55.jpg)
DATA EXTRAPOLATION
• Requires existing 100-yr profile computed by detailed methods
• Only used if site is within 500 ft (upstream) from limit of detailed study
• Channel width and slope similar to downstream reaches
Extrapolate existing 100-yr profile computed by detailed methods to obtain BFE
SIMPLIFIED METHOD 55
![Page 56: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/56.jpg)
SIMPLIFIED METHOD 56
![Page 57: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/57.jpg)
DATA EXTRAPOLATION
• Requires existing 100-yr profile computed by detailed methods
• Only used if site is within 500 ft (upstream) from limit of detailed study
• Channel width and slope similar to downstream reaches
• Free of backwater effects and slope breaks close to end of study
Extrapolate existing 100-yr profile computed by detailed methods to obtain BFE
SIMPLIFIED METHOD 57
![Page 58: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/58.jpg)
SIMPLIFIED METHOD 58
![Page 59: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/59.jpg)
ZONE AE
ZONE A
3 STEPDATA EXTRAPOLATION METHOD
• Step 1: Determine location of site on flood profile
Plan View
Y
Z
500 ft
Property Y within 500 ft of extrapolation limit – Obtain BFE from ProfileProperty Z beyond 500 ft of extrapolation limit – Cannot obtain BFE from Profile
SIMPLIFIED METHOD 59
![Page 60: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/60.jpg)
3 STEPDATA EXTRAPOLATION METHOD
• Step 2: extend 100-yr profile line to the site
SIMPLIFIED METHOD 60
![Page 61: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/61.jpg)
3 STEPDATA EXTRAPOLATION METHOD
• Step 3: Obtain BFE from extended profile
BFE 33
SIMPLIFIED METHOD 61
![Page 62: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/62.jpg)
Proposed Structure
DATA EXTRAPOLATIONBACKWATER EFFECTS
ZONE A
500 ftData extrapolation cannot be used due to backwater effects caused by bridge.
SIMPLIFIED METHOD 62
![Page 63: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/63.jpg)
PROPOSED STRUCTURE
DATA EXTRAPOLATIONCHANNEL CHARACTERISTICS
PROPOSED STRUCTURE
Data extrapolation cannot be used due to variable channel characteristics
SIMPLIFIED METHOD 63
![Page 64: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/64.jpg)
DATA EXTRAPOLATIONPROFILE SLOPE BREAKS
Data extrapolation cannot be used when profile changes
slope too close to limit of study
SIMPLIFIED METHOD 64
![Page 65: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/65.jpg)
SIMPLIFIED METHOD 65
METHODS OF DEVELOPING BFES
Simplified Methods
Contour Interpolation
![Page 66: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/66.jpg)
CONTOUR INTERPOLATION• Superimposing contour maps (topographic data) on
top of FIRM to obtain BFE
• Used on riverine systems and level-ponding from lakes
• Assumed accuracy of ½ contour interval of contour map used
• Smaller contour interval, higher accuracy
• Conservative estimate of BFE
SIMPLIFIED METHOD 66
![Page 67: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/67.jpg)
ACCEPTABILITY
• Floodplain conforms to the contour map
SIMPLIFIED METHOD 67
![Page 68: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/68.jpg)
SIMPLIFIED METHOD 68
CONFORMING MAP
![Page 69: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/69.jpg)
NON-CONFORMING MAPS
Zone A
SIMPLIFIED METHOD 69
![Page 70: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/70.jpg)
ACCEPTABILITY
• Riverine flooding – difference between the left and right bank elevations (along a cross-section) are within ½ contour interval
SIMPLIFIED METHOD 70
![Page 71: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/71.jpg)
ACCEPTABILITY
SIMPLIFIED METHOD 71
420
430
440
450
460
470
0 100 200 300 400 500 600 700 800 900 1000
Station, ft
Elev
atio
n, ft
5-ft contour interval
438 440
440 - 438 = 2 ft
2 ft < 2.5’ (½ contour interval)
![Page 72: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/72.jpg)
ACCEPTABILITY
• Lake flooding – difference between the highest and lowest surface elevations, around the lake perimeter, are within ½ contour interval
SIMPLIFIED METHOD 72
![Page 73: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/73.jpg)
ACCEPTABILITY
SIMPLIFIED METHOD 73
USGS 5-ft contour
281
280280
281 - 280 = 1 ft
1 ft < 2.5’ (½ contour interval)
![Page 74: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/74.jpg)
EXAMPLE 1CONTOUR INTERPOLATION METHOD
![Page 75: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/75.jpg)
5 STEPCONTOUR INTERPOLATION
METHOD• Step 1: Obtain topographic map and FIRM
• Step 2: Superimpose one map over the other
• Step 3: Check map scales
• Step 4: Check acceptability
• Step 5: Determine BFE at location of interest
SIMPLIFIED METHOD 75
![Page 76: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/76.jpg)
CONTOUR INTERPOLATION
1”=400’5-ft contour interval
450
Proposed Structure
440
440
450
460
Zone A
SIMPLIFIED METHOD 76
![Page 77: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/77.jpg)
1”=400’5-ft contour interval
450
Proposed Structure 440
440
450
460
ZONE AE
lk
Roa
d
CONTOUR INTERPOLATION
• Obtain contour/topo map and appropriate FIRM
• Make scales equal
• Check acceptability
- Draw x-section
x
x
SIMPLIFIED METHOD 77
![Page 78: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/78.jpg)
420
430
440
450
460
470
0 100 200 300 400 500 600 700 800 900 1000
Station, ft
Elev
atio
n, ft
CROSS-SECTION PLOTSta Elevation
080160180270430470500530600680750850890
448445440438435430435438440445450455460463
SIMPLIFIED METHOD 78
![Page 79: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/79.jpg)
420
430
440
450
460
470
0 100 200 300 400 500 600 700 800 900 1000
Station, ft
Elev
atio
n, ft
ACCEPTABILITY CHECK1. Determine where
Zone A crosses contour on both left and right banks, interpolate if necessary:
Left Elev: _________
Right Elev: ________
2. If difference is less than ½ of contour interval, topo is acceptable
(440 – 438 = 2 < 2.5)
Okay!3. If difference is not
less than ½ contour interval, this method cannot be used
438440
SIMPLIFIED METHOD 79
![Page 80: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/80.jpg)
BFE COMPUTATION
420
430
440
450
460
470
0 100 200 300 400 500 600 700 800 900 1000
Station, ft
Ele
vatio
n, ft
1. Take lower of the two elevations: _________
2. Add ½ of contour elevation
_____ + _____ = _____
3. BFE = ________ ft
438Lower elevation
440.5
438 2.5 440.5
Note: A topographic map with large contour intervals may result in excessively conservative BFE estimates
SIMPLIFIED METHOD 80
![Page 81: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/81.jpg)
CONTOUR INTERPOLATION
1”=400’5-ft contour interval
450
Proposed Structure
440
440
450
460
Zone A
SIMPLIFIED METHOD 81
![Page 82: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/82.jpg)
EXAMPLE 2CONTOUR INTERPOLATION METHOD
![Page 83: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/83.jpg)
RIVERINE FLOODING EXAMPLE
USGS 10 ft contour interval map
1. Zone A Elevations on:
Left bank _______
Right bank _______ 3. Less than ½ contour interval (5 ft >) ________
2. Difference between elevations = ________154
148
6’
NO
4. BFE = Lo elev + ½ contour interval
_______ + _______ = ______ ft
Proposed Structure
SIMPLIFIED METHOD 83
![Page 84: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/84.jpg)
EXAMPLE 2CONTOUR INTERPOLATION METHOD
![Page 85: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/85.jpg)
LACUSTRINE
USGS 10 ft contour interval map
1. WS Elevations along perimeter
Hi ______ Lo _______2. Difference between ws
elevations = ________
3. Less than ½ contour interval (5 ft ) ________
4. BFE = Lo elev + ½ contour interval
_______ + _______ = ______ ft
283 280
YES
3’280 5 285
283
280280
SIMPLIFIED METHOD 85
![Page 86: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/86.jpg)
SIMPLIFIED METHOD 86
Questions?
![Page 87: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/87.jpg)
SIMPLIFIED METHODSUMMARY
• Appropriate for floodplain management purposes
• Appropriate only for developments less than 5 acres or 50 lots in size
• Not suitable to apply for Letters of Map Change
SIMPLIFIED METHOD 87
![Page 88: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/88.jpg)
Questions?
88
![Page 89: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/89.jpg)
FEMA’S QUICK-2 LIMITED DETAILED METHOD
![Page 90: Obtaining and Developing BFEs in A Zones 08162016 · INTRODUCTION 4 Comments • This course assumes a basic understanding of the National Flood Insurance Program (NFIP) • Discussion](https://reader035.vdocuments.us/reader035/viewer/2022071100/5fd91b7eab028f52db6c79cc/html5/thumbnails/90.jpg)
DOWNLOADS • FEMA P-265 (1995)https://www.fema.gov/media-library/assets/documents/1911
• FEMA’s Quick-2 Software v.2.0http://www.fema.gov/quick-2-version-20#1
• USGS National Streamflow Statistics Program v.6http://water.usgs.gov/software/NSS/
90DATA SOURCES