Oakville Triangle/ Route 1 Corridor Planning Advisory Group Meeting #13 April 29, 2015

Upload: others

Post on 30-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

Oakville Triangle/

Route 1 Corridor Planning

Advisory Group Meeting #13April 29, 2015

Page 2: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

2Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

process

Page 3: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

3Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

upcoming meetings

Date Event Topic

April 29 AG – Community Mtg. #13Mount Vernon Rec. Center

Transportation Study Follow –upIntro to Community Benefits

May 21 Parks & Recreation Commission Public Hearingon Mount Jefferson Park Plan

May 28 AG – Community Mtg. #14Charles Houston

Transportation Study Follow-upInfrastructure and Implementation

June 1 AG – Community Mtg.# 15Charles Houston

Retail StudyCommunity Benefits

June 2 Planning Commission Work Session

June 15 Draft Plan/Design Guidelines posted online for public review

June 23 City Council Work Session

June 29 AG – Community Mtg. #16Charles Houston

Draft Plan and Design Guidelines

Page 4: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

4Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

where we were

Page 5: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

5Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

where we are now

Page 6: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

6Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

where we are now

• Plan view

Page 7: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

7Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

where we are now

Proposed North-South Road

Street Section

Plan view

Page 8: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

8Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Vision Plan• Big ideas - Principles• Implementation• Financing

Design Standards• Districts • Plan Framework Streets, Blocks, Land Use, Open Space, Retail and Maker

Space, Building Heights, Gateways, Development Summary• Urban Design Building Streetwall, Building Heights- Variety-Transitions,

Building Types, Fueling/Charging stations, Porches/Stoops, Building Entries, Roofs, Walls/Fences

• Ground Floor Uses • Signage • Streets • Summary of Standards• Appendix - Community Process

Vision Plan and Design

Standards

Page 9: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

9Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Variation in Height

Page 10: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

10Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Variation in Footprint

Page 11: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

11Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Questions – Comments from

March meeting

• Population – Phasing

• Solar study

• Inclusion of Calvert Street sites in Plan

Page 12: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

12Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Phasing

Page 13: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

13Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

1Belle Pre

Rt 1 between Madison and Montgomery

4Belle Del Ray

625 E Monroe Ave

6The Frasier

615 Swann Avenue

3Oakville Block B

52701-2705 Mt. Vernon Ave @

E Randolph Ave

2Oakville Triangle

Block A

Route 1 Route 1

Project comparison

Page 14: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

14Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

So

la

r s

tu

dy

Page 15: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

15Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

So

la

r s

tu

dy

Page 16: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

16Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Calvert Street Sites Existing

Jefferson Davis Highway

Cal

vert

Ave

nu

e

Page 17: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

17Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Calvert Street Sites

Page 18: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

18Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Other SitesThe Dorn587 E Howell Ave

Del Ray Animal Hospital524 E Mt Ida Ave

Zone CSLMax. FAR 0.5 (commercial)Max. FAR 0.75 (residential) Max. Height 50 feet (Commercial)Max. Height 35-45 feet (residential)

Jefferson Davis Highway

Oakville Triangle

Page 19: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

19Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Transportation Study

Follow-Up

Page 20: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

20Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Plan Area

Page 21: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

21Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Transportation Study

FUTURE BUILD: Proposed Development

FUTURE NO BUILD:Future Network and

developmentRegional Growth

EXISTING:Existing traffic / Existing Network

Page 22: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

22Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Existing & Future Transportation

Network

LEGENDMetroway StationsMetroway (Current configuration)

PY Metrorail Station Alternatives

Page 23: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

23Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Proximity to

Potomac Yard

Metro Station

Page 24: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

24Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Transportation Infrastructure:

Existing vs. Future

• Local bus service• Dedicated Transitway with enhanced bus

service• Limited connectivity west of Route 1• Incomplete bicycle and pedestrian

network

• Metro Station• Enhanced bicycle and

pedestrian network (on and off street)

• Additional connectivity

Page 25: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

25Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Street Network Connectivity

1 street1 route

Page 26: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

26Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Street Network Connectivity

5x5 streets = 70 routes

6x6 streets = 252 routes7x7 streets = 924 routes8x8 streets = 3,432 routes9x9 streets = 12,870 routes

Page 27: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

27Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Future Development Assumptions

Development: • 1.5M SF (Oakville)• 1M SF (Rest of plan area)

Background Development:• Approximately 7.3M SF

Potomac Yard Metrorail stationEnhanced bicycle and pedestrian network

Page 28: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

28

Northbound and Southbound

Route 1 Through Movement Delays

Reed

Legend (measured by time in seconds per vehicle):2014 AM Northbound/PM Southbound Peak Hour Vehicle Delays2027 Without Development AM Northbound/PM Southbound Peak Hour Vehicle Delays2027 With Development AM Northbound/PM Southbound Peak Hour Vehicle Delays2027 Mitigation AM Northbound/PM Southbound Peak Hour Vehicle Delays

Glebe Swann Custis

Page 29: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

29

Eastbound Approach Delays

Reed

Legend (measured by time in seconds per vehicle):2014 AM/PM Eastbound Approach Peak Hour Vehicle Delays2027 Without Development AM/PM Eastbound Approach Peak Hour Vehicle Delays2027 With Development AM/PM Eastbound Approach Peak Hour Vehicle Delays2027 Mitigation AM/PM Eastbound Approach Peak Hour Vehicle Delays

Glebe

Page 30: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

30

Traffic Volumes on Residential

Streets

Legend (measured by number of vehicles per hour):2014 Bidirectional AM/PM Peak Hour Traffic Volume2027 without Development Bidirectional AM/PM Peak Hour Traffic Volume2027 with Development Bidirectional AM/PM Peak Hour Traffic Volume

Reed Glebe Custis Howell

Page 31: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

31Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Findings

FUTURE- NO BUILD

Congested Intersections:• Route 1 / E. Reed • Route 1 / Glebe

FUTURE- BUILD:

Congested Intersections:• Route 1 / E. Reed• Route 1 / Glebe

Page 32: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

32Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Improvements under study

Pedestrian crossing at Fannon St.

N-S Road (Calvert to Raymond)

N-S Road (Raymond to Glebe)

Glebe Improvements (Phase 1)

Glebe Improvements (Phase 2)

2 34

5

1

1

2

3

4

5

Page 33: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

33Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Phasing of Improvements

Phase Io Signal modificationso N-S road Calvert to Raymondo E. Glebe/ Rte. 1 Phase Io Pedestrian crossing at Fannon Street

Phase IIo Lane modifications on Custis at Route 1o N-S road Raymond to E. Glebeo E. Glebe/Rte. 1 Phase II

Page 34: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

34Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Additional Study

• Access for development parcels along Route 1• Additional east-west connectivity north of E. Glebe• Development triggers

Page 35: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

35Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Potential Community

Benefits

Page 36: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

36Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Early Feedback on Potential

Community Benefits

April 29, 2014 (first meeting)

• Mount Jefferson Park• Utility Undergrounding • Public art• Affordable Housing• Community meeting space• Small business/industrial incubator space/educational space• Open air market• Below-grade/wrapped parking• Dog Park• Co-op/neighborhood garden• Environmental remediation• Retail• Public spaces

Page 37: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

37Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Required Community Benefits

with development SUP

• Undergrounding utilities and streetscaping onsite• Environmental upgrades – stormwater

management• Open space• Affordable housing contribution• Public art contribution• Transportation Management Plan contribution• Sanitary Sewer

Page 38: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

38Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Additional Community Benefits

Rezonings – Large Projects

• Require a higher level of contribution to mitigate impact, over and above standard conditions

• Economic analysis to determine value added Examples:

• Transportation infrastructure On-site affordable housing

• Additional open space• Plan-specific mitigation of impact

Page 39: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

39Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Plans that Work - Implementation

Page 40: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

40Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Shallow parcels

Page 41: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

41Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Underground utilities

Page 42: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

42Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Community Benefits

under consideration

• Mount Jefferson Park Improvements• Glebe/Route 1 Improvements• Calvert Street Warehouse• Utility Undergrounding & Streetscaping (plan-

wide)• Affordable Housing• Fannon Pedestrian Connection

Page 43: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

43Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Budget Implementation

RevenueTax incrementDeveloper contributions

Expense• Mount Jefferson Park

Improvements• Utility Undergrounding &

Streetscaping (plan-wide)• Affordable Housing• Calvert Street Warehouse• Glebe/Route 1

Improvements• Pedestrian Crossing at

Fannon

FactorsFunding SourceTimingStrategy

Page 44: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

Provide feedback on proposed phasing and prioritization of potential community benefits.

Staff will take input and present a refined proposal with more detail during June 1st A.G. and Community meeting.

Discussion

Community Benefits

Page 45: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph

45Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15

Upcoming Meetings

Date Event Topic

May 21 Parks & Recreation Commission Public Hearingon Mount Jefferson Park Plan

May 28 AG – Community Mtg. #14Charles Houston

Transportation Study Follow-upInfrastructure and Implementation

June 1 AG – Community Mtg.# 15Charles Houston

Retail StudyCommunity Benefits

June 2 Planning Commission Work Session

June 15 Draft Plan/Design Guidelines posted online for public review

June 23 City Council Work Session

June 29 AG – Community Mtg. #16Charles Houston

Draft Plan and Design Guidelines