oakville triangle/ route 1 corridor planning · advisory group meeting #13 april 29, 2015. meeting...
TRANSCRIPT
![Page 1: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/1.jpg)
Oakville Triangle/
Route 1 Corridor Planning
Advisory Group Meeting #13April 29, 2015
![Page 2: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/2.jpg)
2Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
process
![Page 3: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/3.jpg)
3Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
upcoming meetings
Date Event Topic
April 29 AG – Community Mtg. #13Mount Vernon Rec. Center
Transportation Study Follow –upIntro to Community Benefits
May 21 Parks & Recreation Commission Public Hearingon Mount Jefferson Park Plan
May 28 AG – Community Mtg. #14Charles Houston
Transportation Study Follow-upInfrastructure and Implementation
June 1 AG – Community Mtg.# 15Charles Houston
Retail StudyCommunity Benefits
June 2 Planning Commission Work Session
June 15 Draft Plan/Design Guidelines posted online for public review
June 23 City Council Work Session
June 29 AG – Community Mtg. #16Charles Houston
Draft Plan and Design Guidelines
![Page 4: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/4.jpg)
4Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
where we were
![Page 5: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/5.jpg)
5Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
where we are now
![Page 6: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/6.jpg)
6Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
where we are now
• Plan view
![Page 7: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/7.jpg)
7Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
where we are now
Proposed North-South Road
Street Section
Plan view
![Page 8: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/8.jpg)
8Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Vision Plan• Big ideas - Principles• Implementation• Financing
Design Standards• Districts • Plan Framework Streets, Blocks, Land Use, Open Space, Retail and Maker
Space, Building Heights, Gateways, Development Summary• Urban Design Building Streetwall, Building Heights- Variety-Transitions,
Building Types, Fueling/Charging stations, Porches/Stoops, Building Entries, Roofs, Walls/Fences
• Ground Floor Uses • Signage • Streets • Summary of Standards• Appendix - Community Process
Vision Plan and Design
Standards
![Page 9: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/9.jpg)
9Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Variation in Height
![Page 10: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/10.jpg)
10Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Variation in Footprint
![Page 11: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/11.jpg)
11Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Questions – Comments from
March meeting
• Population – Phasing
• Solar study
• Inclusion of Calvert Street sites in Plan
![Page 12: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/12.jpg)
12Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Phasing
![Page 13: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/13.jpg)
13Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
1Belle Pre
Rt 1 between Madison and Montgomery
4Belle Del Ray
625 E Monroe Ave
6The Frasier
615 Swann Avenue
3Oakville Block B
52701-2705 Mt. Vernon Ave @
E Randolph Ave
2Oakville Triangle
Block A
Route 1 Route 1
Project comparison
![Page 14: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/14.jpg)
14Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
So
la
r s
tu
dy
![Page 15: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/15.jpg)
15Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
So
la
r s
tu
dy
![Page 16: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/16.jpg)
16Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Calvert Street Sites Existing
Jefferson Davis Highway
Cal
vert
Ave
nu
e
![Page 17: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/17.jpg)
17Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Calvert Street Sites
![Page 18: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/18.jpg)
18Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Other SitesThe Dorn587 E Howell Ave
Del Ray Animal Hospital524 E Mt Ida Ave
Zone CSLMax. FAR 0.5 (commercial)Max. FAR 0.75 (residential) Max. Height 50 feet (Commercial)Max. Height 35-45 feet (residential)
Jefferson Davis Highway
Oakville Triangle
![Page 19: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/19.jpg)
19Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Transportation Study
Follow-Up
![Page 20: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/20.jpg)
20Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Plan Area
![Page 21: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/21.jpg)
21Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Transportation Study
FUTURE BUILD: Proposed Development
FUTURE NO BUILD:Future Network and
developmentRegional Growth
EXISTING:Existing traffic / Existing Network
![Page 22: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/22.jpg)
22Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Existing & Future Transportation
Network
LEGENDMetroway StationsMetroway (Current configuration)
PY Metrorail Station Alternatives
![Page 23: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/23.jpg)
23Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Proximity to
Potomac Yard
Metro Station
![Page 24: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/24.jpg)
24Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Transportation Infrastructure:
Existing vs. Future
• Local bus service• Dedicated Transitway with enhanced bus
service• Limited connectivity west of Route 1• Incomplete bicycle and pedestrian
network
• Metro Station• Enhanced bicycle and
pedestrian network (on and off street)
• Additional connectivity
![Page 25: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/25.jpg)
25Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Street Network Connectivity
1 street1 route
![Page 26: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/26.jpg)
26Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Street Network Connectivity
5x5 streets = 70 routes
6x6 streets = 252 routes7x7 streets = 924 routes8x8 streets = 3,432 routes9x9 streets = 12,870 routes
![Page 27: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/27.jpg)
27Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Future Development Assumptions
Development: • 1.5M SF (Oakville)• 1M SF (Rest of plan area)
Background Development:• Approximately 7.3M SF
Potomac Yard Metrorail stationEnhanced bicycle and pedestrian network
![Page 28: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/28.jpg)
28
Northbound and Southbound
Route 1 Through Movement Delays
Reed
Legend (measured by time in seconds per vehicle):2014 AM Northbound/PM Southbound Peak Hour Vehicle Delays2027 Without Development AM Northbound/PM Southbound Peak Hour Vehicle Delays2027 With Development AM Northbound/PM Southbound Peak Hour Vehicle Delays2027 Mitigation AM Northbound/PM Southbound Peak Hour Vehicle Delays
Glebe Swann Custis
![Page 29: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/29.jpg)
29
Eastbound Approach Delays
Reed
Legend (measured by time in seconds per vehicle):2014 AM/PM Eastbound Approach Peak Hour Vehicle Delays2027 Without Development AM/PM Eastbound Approach Peak Hour Vehicle Delays2027 With Development AM/PM Eastbound Approach Peak Hour Vehicle Delays2027 Mitigation AM/PM Eastbound Approach Peak Hour Vehicle Delays
Glebe
![Page 30: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/30.jpg)
30
Traffic Volumes on Residential
Streets
Legend (measured by number of vehicles per hour):2014 Bidirectional AM/PM Peak Hour Traffic Volume2027 without Development Bidirectional AM/PM Peak Hour Traffic Volume2027 with Development Bidirectional AM/PM Peak Hour Traffic Volume
Reed Glebe Custis Howell
![Page 31: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/31.jpg)
31Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Findings
FUTURE- NO BUILD
Congested Intersections:• Route 1 / E. Reed • Route 1 / Glebe
FUTURE- BUILD:
Congested Intersections:• Route 1 / E. Reed• Route 1 / Glebe
![Page 32: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/32.jpg)
32Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Improvements under study
Pedestrian crossing at Fannon St.
N-S Road (Calvert to Raymond)
N-S Road (Raymond to Glebe)
Glebe Improvements (Phase 1)
Glebe Improvements (Phase 2)
2 34
5
1
1
2
3
4
5
![Page 33: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/33.jpg)
33Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Phasing of Improvements
Phase Io Signal modificationso N-S road Calvert to Raymondo E. Glebe/ Rte. 1 Phase Io Pedestrian crossing at Fannon Street
Phase IIo Lane modifications on Custis at Route 1o N-S road Raymond to E. Glebeo E. Glebe/Rte. 1 Phase II
![Page 34: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/34.jpg)
34Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Additional Study
• Access for development parcels along Route 1• Additional east-west connectivity north of E. Glebe• Development triggers
![Page 35: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/35.jpg)
35Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Potential Community
Benefits
![Page 36: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/36.jpg)
36Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Early Feedback on Potential
Community Benefits
April 29, 2014 (first meeting)
• Mount Jefferson Park• Utility Undergrounding • Public art• Affordable Housing• Community meeting space• Small business/industrial incubator space/educational space• Open air market• Below-grade/wrapped parking• Dog Park• Co-op/neighborhood garden• Environmental remediation• Retail• Public spaces
![Page 37: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/37.jpg)
37Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Required Community Benefits
with development SUP
• Undergrounding utilities and streetscaping onsite• Environmental upgrades – stormwater
management• Open space• Affordable housing contribution• Public art contribution• Transportation Management Plan contribution• Sanitary Sewer
![Page 38: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/38.jpg)
38Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Additional Community Benefits
Rezonings – Large Projects
• Require a higher level of contribution to mitigate impact, over and above standard conditions
• Economic analysis to determine value added Examples:
• Transportation infrastructure On-site affordable housing
• Additional open space• Plan-specific mitigation of impact
![Page 39: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/39.jpg)
39Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Plans that Work - Implementation
![Page 40: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/40.jpg)
40Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Shallow parcels
![Page 41: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/41.jpg)
41Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Underground utilities
![Page 42: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/42.jpg)
42Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Community Benefits
under consideration
• Mount Jefferson Park Improvements• Glebe/Route 1 Improvements• Calvert Street Warehouse• Utility Undergrounding & Streetscaping (plan-
wide)• Affordable Housing• Fannon Pedestrian Connection
![Page 43: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/43.jpg)
43Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Budget Implementation
RevenueTax incrementDeveloper contributions
Expense• Mount Jefferson Park
Improvements• Utility Undergrounding &
Streetscaping (plan-wide)• Affordable Housing• Calvert Street Warehouse• Glebe/Route 1
Improvements• Pedestrian Crossing at
Fannon
FactorsFunding SourceTimingStrategy
![Page 44: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/44.jpg)
Provide feedback on proposed phasing and prioritization of potential community benefits.
Staff will take input and present a refined proposal with more detail during June 1st A.G. and Community meeting.
Discussion
Community Benefits
![Page 45: Oakville Triangle/ Route 1 Corridor Planning · Advisory Group Meeting #13 April 29, 2015. Meeting #13: ... 615 Swann Avenue 3 Oakville Block B 5 2701-2705 Mt. Vernon Ave @ E Randolph](https://reader034.vdocuments.us/reader034/viewer/2022052007/601c428818f31476181188b6/html5/thumbnails/45.jpg)
45Meeting #13: Transportation Study Follow-up / Intro Community Benefits 04.29.15
Upcoming Meetings
Date Event Topic
May 21 Parks & Recreation Commission Public Hearingon Mount Jefferson Park Plan
May 28 AG – Community Mtg. #14Charles Houston
Transportation Study Follow-upInfrastructure and Implementation
June 1 AG – Community Mtg.# 15Charles Houston
Retail StudyCommunity Benefits
June 2 Planning Commission Work Session
June 15 Draft Plan/Design Guidelines posted online for public review
June 23 City Council Work Session
June 29 AG – Community Mtg. #16Charles Houston
Draft Plan and Design Guidelines