Oakland to San Jose Phase 2A Planning Studies, Environmental Documentation, and Final Design RFSOQ Pre-Submittal Meeting October 16, 2018 Capitol Corridor Joint Powers Authority (CCJPA)

Upload: others

Post on 10-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Oakland to San Jose Phase 2A Planning Studies ... · Oral Presentation 50%. Qualifications and experience of the Project Team. Proposer’s approach to the Project and demonstrated

Oakland to San Jose Phase 2A Planning Studies, Environmental Documentation, and Final Design RFSOQ

Pre-Submittal MeetingOctober 16, 2018Capitol Corridor Joint Powers Authority (CCJPA)

Page 2: Oakland to San Jose Phase 2A Planning Studies ... · Oral Presentation 50%. Qualifications and experience of the Project Team. Proposer’s approach to the Project and demonstrated

Agenda

• RFSOQ Overview

• Key Project Elements

• CCJPA DBE Program

• RFSOQ Dates and Process

• Evaluation Criteria

• Q&A

Page 3: Oakland to San Jose Phase 2A Planning Studies ... · Oral Presentation 50%. Qualifications and experience of the Project Team. Proposer’s approach to the Project and demonstrated

RFSOQ Overview• Complete pre-construction planning, environmental, and

engineering design for Oakland to San Jose Phase 2A Service Expansion Project Budget: $5 million initially, but will expand as scope is developed with

more details Schedule: 6 years Work Directive-based

• Primary Project goals Reduce travel time for passenger rail services between Oakland and

Newark Increase overall railroad capacity between Oakland and Newark Reduce freight and passenger rail conflicts Provide better opportunities for intermodal connections between

Peninsula and East Bay

Page 4: Oakland to San Jose Phase 2A Planning Studies ... · Oral Presentation 50%. Qualifications and experience of the Project Team. Proposer’s approach to the Project and demonstrated

Key Project Elements

Page 5: Oakland to San Jose Phase 2A Planning Studies ... · Oral Presentation 50%. Qualifications and experience of the Project Team. Proposer’s approach to the Project and demonstrated

Key Project Elements• Industrial Parkway

• Vital for optimizing freight rail movements

DRAFT Conceptual Alternative

Page 6: Oakland to San Jose Phase 2A Planning Studies ... · Oral Presentation 50%. Qualifications and experience of the Project Team. Proposer’s approach to the Project and demonstrated

• Niles Junction/Shinn connection• Vital for optimizing freight

rail movements• Consolidation of rail lines

can open “rail locked” parcels to land use changes

Option A

Option B

Option C

DRAFT Conceptual Alternative

DRAFT Conceptual Alternative

DRAFT Conceptual Alternative

Page 7: Oakland to San Jose Phase 2A Planning Studies ... · Oral Presentation 50%. Qualifications and experience of the Project Team. Proposer’s approach to the Project and demonstrated

Key Project ElementsProposed intermodal (rail + bus) station at intersection of Coast Subdivision and SR 84, in the Ardenwood Fremont/Newark area:

• Two-level station (passenger rail on bottom and bus/highway on top)

• Median busway facility connecting with SR 84

• Parking structure

Key stakeholders:• Caltrans• AC Transit• Private shuttle providers • Cities of Fremont and Newark

Page 8: Oakland to San Jose Phase 2A Planning Studies ... · Oral Presentation 50%. Qualifications and experience of the Project Team. Proposer’s approach to the Project and demonstrated

Key Project Elements• RTC modeling (UPRR led) to scope rail network capacity

• Ridership modeling Passenger rail AC Transit Private shuttle providers

• Environmental documentation analyses Some creek crossings Noise impacts Freight rail impacts

• Public outreach Local communities Public agencies

Page 9: Oakland to San Jose Phase 2A Planning Studies ... · Oral Presentation 50%. Qualifications and experience of the Project Team. Proposer’s approach to the Project and demonstrated

CCJPA DBE Program

CCJPA/BART DBE Policy

• The CCJPA, through BART, its managing agency, is committed to carrying out the all of the Disadvantaged Business Enterprise (DBE) Requirements of 49 CFR Part 26, as amended

• Ensure non-discrimination• Create a level playing field

Page 10: Oakland to San Jose Phase 2A Planning Studies ... · Oral Presentation 50%. Qualifications and experience of the Project Team. Proposer’s approach to the Project and demonstrated

CCJPA DBE Program

DBE Goal: NO Goal

* BART Office of Civil Rights will be monitoring the overall Agreement for DBE participation per your DBE commitment goal, if any

DBE Program Still Applies

* DBE primes, including DBE JV partners, will not count towards the DBE commitment

* Monthly DBE reports will be due, if DBEs listed

* Substitutions of DBEs will require replacement with DBEs or good faith efforts

* DBEs, as listed on Exhibit 1, must perform a commercially useful function

* DBEs will be counted only for the work for which they are certified

Page 11: Oakland to San Jose Phase 2A Planning Studies ... · Oral Presentation 50%. Qualifications and experience of the Project Team. Proposer’s approach to the Project and demonstrated

CCJPA DBE Program

Certifications:

• DBEs must be certified prior to the proposal submission date• DBEs must be certified by the California Unified Certification Program

(CUCP)• www.bart.gov/about/business/ocr/• www.californiaucp.com

Page 12: Oakland to San Jose Phase 2A Planning Studies ... · Oral Presentation 50%. Qualifications and experience of the Project Team. Proposer’s approach to the Project and demonstrated

RFSOQ Dates and Process

SOQ Submission

Nov 30

Notification for Oral

InterviewsDec 14

Oral Interviews

Jan 11

All questions about the RFSOQ received at this meeting and over email will be recorded and the answers will be made available online at http://www.capitolcorridor.org/opportunities.

Page 13: Oakland to San Jose Phase 2A Planning Studies ... · Oral Presentation 50%. Qualifications and experience of the Project Team. Proposer’s approach to the Project and demonstrated

Evaluation CriteriaProject Team Qualifications

25%

Qualifications and relevant experience of the Key Personnel relative to the Scope of Services.

Overall strength and approach of the Project Team, including any previous working relationships among the team members. Project Team’s approach and understanding of the project should be included in SOQ, including a draft project schedule.

Experience of the Firms

25%

Demonstrated experience and capability of the firms on similar environmental documentation and railroad engineering design projects for Class I freight/passenger rail operators, including projects performed directly for UPRR following their design standards. Experience in intermodal transit center design and planning, including busways and park-and-ride facilities should also be demonstrated.

Oral Presentation

50%

Qualifications and experience of the Project Team.

Proposer’s approach to the Project and demonstrated technical knowledge of Project requirements.

Page 14: Oakland to San Jose Phase 2A Planning Studies ... · Oral Presentation 50%. Qualifications and experience of the Project Team. Proposer’s approach to the Project and demonstrated

Q & A