    RFI

    Phone:

    Job:

    1

    Date: 1/25/2012

    9008 Oak Park City Hall Public Safe

    RFI #:To: Amanda Gorning

    Harley Ellis Devereaux

    26913 Northwestern Ste 200

    Southfield, MI 48033-3476

    Ph: (248)262-1500 Fax: (248)262-1515

    CC:

    Spec Section: 03450Drawing:

    Subject: Exposed precast concrete

    Schedule Impact:Cost Impact:

    Date Required:

    In the specifications the architect has mentioned the finish for the exposed precast concrete to match Kerkstra 711-411.

    In order to determine if this color is obtained by aggregates or pigments please provide the concrete mix, photograph or other meansto establish the required finish for the Kerkstra 711-411.

    Request: 1/26/2012

    Requested by: Sue Welch

    Frank Rewold and Son, Inc.

    Response:

    See attached photos for precast sample.

  • 8/3/2019 Oak Park Bid Memo 01

    2/9

  • 8/3/2019 Oak Park Bid Memo 01

    3/9

  • 8/3/2019 Oak Park Bid Memo 01

    4/9

  • 8/3/2019 Oak Park Bid Memo 01

    5/9

    Rochester, MI 48307

    333 East Second Street

    Ph : (248) 651-7242

    Fax: (248) 651-5174

    RFI

    Phone:

    Job:

    2

    Date: 1/30/2012

    9008 Oak Park City Hall Public Safe

    RFI #:To: Amanda Gorning

    Harley Ellis Devereaux

    26913 Northwestern Ste 200

    Southfield, MI 48033-3476

    Ph: (248)262-1500 Fax: (248)262-1515

    CC:

    Spec Section:Drawing: Please see attached drawings

    Subject: Additional Section Cuts needed

    Schedule Impact:Cost Impact:

    Date Required:

    Need additional section cuts for 5 locations which have been marked on the attached drawings. See room 190 (Council Chambers),

    along the North, East and West walls.Also see room 127 (Evidence Room) along the South and East walls.

    One issue is weather there is embedded brick in these locations.

    Request: 1/31/2012

    Requested by: Sue Welch

    Frank Rewold and Son, Inc.

    Response:

    See notations on attached plans.

  • 8/3/2019 Oak Park Bid Memo 01

    6/9

    See

    7/S5-13

    See

    11/S5-13

  • 8/3/2019 Oak Park Bid Memo 01

    7/9

  • 8/3/2019 Oak Park Bid Memo 01

    8/9

    Rochester, MI 48307

    333 East Second Street

    Ph : (248) 651-7242

    Fax: (248) 651-5174

    RFI

    Phone:

    Job:

    Prebid RFI 4

    Date: 2/7/2012

    9008 Oak Park City Hall Public Safe

    RFI #:To: Amanda Gorning

    Harley Ellis Devereaux

    26913 Northwestern Ste 200

    Southfield, MI 48033-3476

    Ph: (248)262-1500 Fax: (248)262-1515

    McGee, Barbara (Harley Ellis Devereaux), Welch, Sue (Rewold and Son, Inc.)CC:

    Spec Section:Drawing: MH-01d for example

    Subject: Ductwork sizes

    Schedule Impact:Cost Impact:

    Date Required:

    See attached sketch. Are the proposed ductwork sizes a correct interpretation of Note 2 on the MH-01 sheets? If not please clarify

    duct sizing instructions

    Request: 2/13/2012

    Requested by: Gene P. Ferrera

    Frank Rewold and Son, Inc.

    Response:

    The main duct size downstream of the heat pump is correct. For the branch taps off of that duct refer toNote 1 on the MH-01 sheets. The branch ducts shall match the diffuser neck size as shown on Typical AirTerminal Device Detail on sht. M5-01. The boxed note on the MH-01 sheets reference the reflected ceiling

    plans for diffuser sizes The five branch ducts on the sketch should all be 8" per sht AR 1d

  • 8/3/2019 Oak Park Bid Memo 01

    9/9

    8"

    8"

    8"

    8"

    8"