nys department of transportation d / m / wbe utilization plans · 2019-11-18 · nys department of...
TRANSCRIPT
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D037806 DESCRIPTION: FINAL DESIGN PHASES V & VI, MILLER HILL YARD SITE - BROWNFIELD CLEANUP, STEUBEN COUNTY
PIN #: 6805.60.101
AWARD DATE: 8/27/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 880,000.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
STANTEC CONSULTING SERVICES, INC.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
3 COLUMBIA CIRCLE
ALBANY, NY 12203
47,560.00TOLMAN ENGINEERING, PLLC3610 LAWSON ROAD
JAMESTOWN, NY 14701
MBE 214,116.00WATTS ARCHITECTURE & ENGINEERING, D.P.C.95 PERRY STREET
BUFFALO, NY 14203
TOTAL: 214,116.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D037807 DESCRIPTION: MISC., TERM AGREEMENT FOR TRAFFIC SIGNAL TIMING AND ARTERIAL OPTIMIZATION, UPSTATE WEST, REGIONS 4, 5 & 6.
PIN #: SSOW.18
AWARD DATE: 8/23/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 1,065,000.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
GREENMAN-PEDERSEN, INC.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
325 WEST MAIN STREET
BABYLON, NY 11702
DBE 319,500.00WATTS ARCHITECTURE & ENGINEERING, D.P.C.95 PERRY STREET
BUFFALO, NY 14203
TOTAL: 319,500.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D037825 DESCRIPTION: CI, CONSTRUCTION INSPECTION, OCEAN PARKWAY SHARED USE PATH, REGION 10
PIN #: 0006.16
AWARD DATE: 10/9/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 1,840,000.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
GREENMAN-PEDERSEN, INC.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
325 WEST MAIN STREET
BABYLON, NY 11702
DBE 102,453.00AFRIDI ASSOCIATES19 WEST 21ST STREET
NEW YORK, NY 10010
DBE 583,312.00M & J ENGINEERING, P.C.2003 JERICHO TURNPIKE
NEW HYDE PARK, NY 11040
TOTAL: 583,312.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D037849 DESCRIPTION: CI, PM1: PALISADES INTERSTATE PKWY (PIP) & TACONIC STATE PKWY (TSP), PUTNAM & ROCKLAND COUNTIES.
PIN #: 8814.05, 8127.45
AWARD DATE: 10/25/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 2,202,000.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
KS ENGINEERS, P.C.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
494 BROAD STREET 4TH FLOOR
NEWARK, NJ 07102
DBE 192,676.00C.V. ASSOCIATES NY; PE, LS, P.C.148 ROUTE 17M SUITE 2
HARRIMAN, NY 10926
DBE 234,760.00CSM ENGINEERING, PC626 RXR PLAZA
UNIONDALE, NY 11556
TOTAL: 234,760.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D037860 DESCRIPTION:
PIN #: S000.09.704
AWARD DATE: 8/23/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 1,000,000.00
IS CONTRACTOR D/M/WBE? Yes (DBE)
CONTRACTOR NAME & ADDRESS:
PRUDENT ENGINEERING LLP
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
6390 FLY ROAD
EAST SYRACUSE, NY 13057
DBE 600,000.00PRUDENT ENGINEERING LLP6390 FLY ROAD
EAST SYRACUSE, NY 13057
TOTAL: 600,000.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D037861 DESCRIPTION: CI, CONSTRUCTION INSPECTION, NY25 OVER NY106/107 BRIDGE REHABILITATION, NASSAU COUNTY, REGION 10
PIN #: 0042.42
AWARD DATE: 10/30/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 1,026,000.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
NV5 NEW YORK ENGINEERS ARCHITECTS LANDSCAPE ARCHITECTS AND SURVEYORS (FORMERLY THE RBA GROUP)
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
40 MARCUS DRIVE SUITE 201
MELVILLE, NY 11747
DBE 213,930.00SI ENGINEERING, P.C.39 BROADWAY SUITE 650
NEW YORK, NY 10006
TOTAL: 213,930.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D037939 DESCRIPTION:
PIN #: S005.04
AWARD DATE: 10/23/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 4,000,000.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
ERDMAN, ANTHONY AND ASSOCIATES, INC.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
145 CULVER ROAD, SUITE 200
ROCHESTER, NY 14620
DBE 800,000.00JOSEPH C. LU ENGINEERING P.C. DBA: LU ENGINEERS339 EAST AVENUE
ROCHESTER, NY 14604
TOTAL: 800,000.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D263562 DESCRIPTION: PAVEMENT PRESERVATION INCLUDING MILLING, RESURFACING, STRIPING, FULL & PARTIAL DEPTH REPAIRS AT VARIOUS
PIN #: XM17.48
AWARD DATE: 8/21/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 1,154,704.50
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
P.O. BOX 968038
SCHAUMBURG, IL 60196
WBE CONSTRUCTION 23,100.00AROLD CONSTRUCTION CO., INC.51 POWDER MILL BRIDGE ROAD
KINGSTON, NY 12401
WBE CONSTRUCTION 106,294.34ISLAND PAVEMENT CUTTING CO.84 KEAN STREET
WEST BABYLON, NY 11704
TOTAL: 106,294.34
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D263679 DESCRIPTION: SHOULDER RESTORATION ON BETHPAGE STATE PARKWAY (2.2 M) & ROBERT MOSES CAUSEWAY (3.9 M) IN TOWNS OF OYSTER BAY &
PIN #: 0809.77
AWARD DATE: 8/21/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 1,407,477.73
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
P.O. BOX 968038
SCHAUMBURG, IL 60196
DBE CONSTRUCTION 170,814.55BOHEMIA GARDEN CENTER, INC.608 JOHNSON AVENUE - SUITE #1
BOHEMIA, NY 11716
DBE CONSTRUCTION 22,739.08ISLAND PAVEMENT CUTTING CO.84 KEAN STREET
WEST BABYLON, NY 11704
TOTAL: 170,814.55
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D263681 DESCRIPTION: PAVEMENT REHABILITATION NY ROUTE 135; FROM NY 24 TO NY 25 IN THE TOWN OF OYSTER BAY.
PIN #: 0050.29
AWARD DATE: 8/21/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 10,816,941.48
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
P.O. BOX 968038
SCHAUMBURG, IL 60196
DBE CONSTRUCTION 104,835.80BOHEMIA GARDEN CENTER, INC.608 JOHNSON AVENUE - SUITE #1
BOHEMIA, NY 11716
DBE CONSTRUCTION 21,000.00CONTRACTORS LAYOUT INC.829-4 LINCOLN AVENUE
BOHEMIA, NY 11716
DBE CONSTRUCTION 425,239.00DIVAD CONCRETE INCPO BOX 1179
RONKONKOMA, NY 11779
DBE CONSTRUCTION 143,505.05ISLAND PAVEMENT CUTTING CO.84 KEAN STREET
WEST BABYLON, NY 11704
TOTAL: 425,239.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D263754 DESCRIPTION: ITS MAINTENANCE AND SUPPORT THROUGHOUT NEW YORK CITY.
PIN #: X806.00
AWARD DATE: 10/22/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 6,987,087.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
E-J ELECTRIC INSTALLATION, CO.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
46-41 VERNON BLVD
LONG ISLAND CITY, NY 11101
DBE MATERIAL SUPPLIER 0.60ACT ELECTRICAL AND DATA SUPPLIES, INC43-73 9TH STREET
LONG ISLAND CITY, NY 11101
DBE CONSTRUCTION 1.00A-ECO CLEAN ENVIRONMENT LLC917 HARDING PARK
BRONX, NY 10473
DBE MATERIAL SUPPLIER 0.60ELECTRICAL CONSTRUCTION CONSULTING, INC. D/B/A PROJECTSPAN SERVICES252 WEST 38TH STREET
NEW YORK, NY 10018
DBE MATERIAL SUPPLIER 0.60JASON OFFICE PRODUCTS, INC140 WEST 31ST STREET
NEW YORK, NY 10001
DBE MATERIAL SUPPLIER 0.60LINDEN ELECTRICAL WHOLESALERS DBA LUKEN ELECTRIC SUPPLY725 ST. GEORGES AVENUE
ROSELLE, NJ 07203
DBE MATERIAL SUPPLIER 0.60PETROLEUM KINGS, LLC745 NEPPERHAN AVE
YONKERS, NY 10703
DBE MANUFACTURING 1.00TRAFFIC LANE CLOSURES, LLC1214 ROUTE 52
CARMEL, NY 10512
TOTAL: 1.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D263782 DESCRIPTION: MILLING & RESURFACING WITH DRAINAGE & OTHER WORK ALONG RT. 100 IN THE TOWN OF GREENBURGH.
PIN #: 8022.51
AWARD DATE: 8/21/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 1,502,577.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
P.O. BOX 968038
SCHAUMBURG, IL 60196
WBE CONSTRUCTION 7,500.00AROLD CONSTRUCTION CO., INC.51 POWDER MILL BRIDGE ROAD
KINGSTON, NY 12401
WBE CONSTRUCTION 14,040.00EAST COAST INDUSTRIAL SERVICE, INC.P.O. BOX 1069
PINE BUSH, NY 12566
MBE CONSTRUCTION 12,699.25IMPERIAL ASPHALT & AGGREGATE DISTRIBUTOR, INC158 SOUTH SECOND AVE
MOUNT VERNON, NY 10550
WBE CONSTRUCTION 19,500.00ISLAND PAVEMENT CUTTING CO.84 KEAN STREET
WEST BABYLON, NY 11704
WBE MATERIAL SUPPLIER 52,716.00TRAFFIC LANE CLOSURES, LLC1214 ROUTE 52
CARMEL, NY 10512
TOTAL: 52,716.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D263945 DESCRIPTION: TACONIC STATE PARKWAY (987G) AT PUDDING STREET. CONSTRUCTION OF DIAMOND INTERCHANGE; NEW BRIDGE (COMPOSITE
PIN #: 8127.26
AWARD DATE: 8/27/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 28,852,932.84
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
LANCASTER DEVELOPMENT AND TULLY CONSTRUCTION CO, LLC/DBA L&T CONSTRUCTION
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
145 PODPADIC ROAD
RICHMONDVILLE, NY 12149
DBE CONSTRUCTION 988,683.00A & K SLIPFORMING, INC.PO BOX 250
COBLESKILL, NY 12043
DBE CONSTRUCTION 379,046.59ALLBAR STEEL, INC.301 E. SEARSVILLLE RD.
MONTGOMERY, NY 12549
DBE CONSTRUCTION 1,119,456.00GRANITEWORKS, INC.415 BROOK AVE.
DEER PARK, NY 11729
DBE CONSTRUCTION 47,029.65IMPERIAL ASPHALT & AGGREGATE DISTRIBUTOR, INC158 SOUTH SECOND AVE
MOUNT VERNON, NY 10550
DBE CONSTRUCTION 14,160.00KOCHER-O'BRIEN CONSTRUCTION COMPANY, INC.PO BOX 328
LAFAYETTE, NY 13084
DBE CONSTRUCTION 125,190.53MCCAREY LANDSCAPING, INC.80 TOWER DRIVE
MIDDLETOWN, NY 10941
DBE CONSTRUCTION 184,227.00MOHEGAN ASSOCIATES INC130 OLD RT 6
CARMEL, NY 10512
TOTAL: 1,119,456.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D263958 DESCRIPTION: SAFETY IMPROVEMENTS ON VARIOUS HIGHWAYS IN NEW YORK CITY.
PIN #: X807.28
AWARD DATE: 10/31/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 2,568,485.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
WESTMORELAND CONSTRUCTION, INC.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
3640 PROVOST AVENUE
BRONX, NY 10466
DBE MANUFACTURING 21,000.00DKN READY MIX, LLC25-50 BORDEN AVENUE
LONG ISLAND CITY, NY 11101
DBE 24,000.00RIZZO ASSOCIATES INC.97 EAST HAWTHORNE AVENUE
VALLEY STREAM, NY 11580
DBE MATERIAL SUPPLIER,MANUFACTURING 83,797.50TRAFFIC LANE CLOSURES, LLC1214 ROUTE 52
CARMEL, NY 10512
TOTAL: 83,797.50
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D263959 DESCRIPTION: ASPHALT CONCRETE MILLING & RESURFACING; PEDESTRIAN SIGNAL & DRAINAGE WORK ON ROUTE 9A IN THE CITY OF PEEKSKILL; TOWN
PIN #: 8103.53
AWARD DATE: 10/25/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 2,656,935.20
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
GRACE INDUSTRIES, LLC
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
336 SOUTH SERVICE ROAD
MELVILLE, NY 11747
DBE CONSTRUCTION 25,012.00IMPERIAL ASPHALT & AGGREGATE DISTRIBUTOR, INC158 SOUTH SECOND AVE
MOUNT VERNON, NY 10550
DBE CONSTRUCTION 44,000.00ISLAND PAVEMENT CUTTING CO.84 KEAN STREET
WEST BABYLON, NY 11704
DBE TRUCKING 48,660.00K & D INDUSTRIES OF NY, LLC129 GALLOWS HILL ROAD
CORTLANDT MANOR, NY 10567
DBE TRUCKING 119,040.00ROSE CONTRACTING OF WESTCHESTER, INCPO BOX 51
HOPEWELL JUNCTION, NY 12533
TOTAL: 119,040.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D263970 DESCRIPTION: ADA COMPLIANT SIDEWALK CONTRACT (INSTALL NEW SIDEWALKS AND UPGRADE EXISTING SIDEWALK CURB RAMPS).
PIN #: 0ADA.01
AWARD DATE: 10/22/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 3,326,325.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
J. ANTHONY ENTERPRISES, INC.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
175 ENGINEERS ROAD
HAUPPAUGE, NY 11788
DBE CONSTRUCTION 21,333.00BOHEMIA GARDEN CENTER, INC.608 JOHNSON AVENUE - SUITE #1
BOHEMIA, NY 11716
DBE TRUCKING 154,560.00DOUBLE NICKEL CONTRACTING, INC.3 TERRELL LANE
HICKSVILLE, NY 11801
TOTAL: 154,560.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D263971 DESCRIPTION: MILL & FILL PAVING ALONG THE PALISADES INTERSTATE PARKWAY IN THE TOWNS OF CLARKSTOWN & ORANGETOWN.
PIN #: 8814.05
AWARD DATE: 8/23/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 10,960,000.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
TILCON NEW YORK, INC.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
9 ENTIN ROAD
PARSIPPANY, NJ 07054
DBE CONSTRUCTION 186,237.50IMPERIAL ASPHALT & AGGREGATE DISTRIBUTOR, INC158 SOUTH SECOND AVE
MOUNT VERNON, NY 10550
DBE TRUCKING 160,650.00K & D INDUSTRIES OF NY, LLC129 GALLOWS HILL ROAD
CORTLANDT MANOR, NY 10567
DBE TRUCKING 165,240.00M FALANGA TRUCKING45 EISENHOWER DRIVE
MIDDLETOWN, NY 10940
DBE MATERIAL SUPPLIER 1,308.96MS UNLIMITED, INC.PO BOX 577
SYRACUSE, NY 13206
DBE TRUCKING 153,600.00PERFECT CUT LANDSCAPING, INC. D/B/A HUDSON VALLEY TRUCKING10A MCNAMARA LANE
GOSHEN, NY 10924
DBE MATERIAL SUPPLIER, 104,760.00TRAFFIC LANE CLOSURES, LLC1214 ROUTE 52
CARMEL, NY 10512
TOTAL: 186,237.50
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D263983 DESCRIPTION: NEW ROUNDABOUT INSTALLATION WITH PEDESTRIAN BRIDGE; ETC.; AT FRONTIER RD AND THE AUDUBON PKWY. IN THE TOWN OF AMHERST.
PIN #: 5761.72
AWARD DATE: 11/8/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 4,213,022.50
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
CONCRETE APPLIED TECHNOLOGIES CORP/DBA: CATCO
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
1266 TOWNLINE ROAD
ALDEN, NY 14004
DBE CONSTRUCTION 178,556.00A & K SLIPFORMING, INC.PO BOX 250
COBLESKILL, NY 12043
DBE MATERIAL SUPPLIER 14,490.54BUFFALO CONCRETE ACCESSORIES250 GRIDER ST
BUFFALO, NY 14215
DBE CONSTRUCTION 31,997.00CERTIFIED SAFETY PRODUCTS, NYROUTE 417
ANDOVER, NY 14806
DBE CONSTRUCTION 28,810.26G & J CONTRACTING, INC.P.O. BOX 255
HEMLOCK, NY 14466
DBE CONSTRUCTION 49,219.50NATURAL RESTORATIONS BY LINDA J & CO., INC.,P.O. BOX 177
WILLIAMSVILLE, NY 14231
DBE CONSTRUCTION 95,109.00PAVILION DRAINAGE SUPPLYPO BOX 219
PAVILION, NY 14525
DBE MATERIAL SUPPLIER 8,736.83SOUTHERN TIER MUNICIPAL SUPPLIES AND CONSTRUCTION EQUIPMENT COMPANY, INC.1801 WASHINGTON STREET
JAMESTOWN, NY 14702
DBE MANUFACTURING 40,083.84UPSTATE REBAR, LLC4605 WALDEN AVENUE
LANCASTER, NY 14086
DBE MANUFACTURING 17,000.00US TRAFFIC CONTROL, INC.100 FIRE TOWER DRIVE
TONAWANDA, NY 14150
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
TOTAL: 178,556.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D263986 DESCRIPTION: INTERSECTION IMPROVEMENTS ON EAST DOMINICK ST. IN THE CITY OF ROME & ROUTE 233 & EAST SOUTH ST. IN THE TOWN OF
PIN #: 2806.17
AWARD DATE: 8/23/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 1,089,191.40
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
DOLOMITE PRODUCTS CO. INC./DBA: A.L. BLADES
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
7610 COUNTY ROUTE 65
HORNELL, NY 14843
DBE CONSTRUCTION 96,285.00APEX STRIPING, INC.6500 NEW VENTURE GEAR DRIVE
EAST SYRACUSE, NY 13057
DBE CONSTRUCTION 22,205.00AUBERTINE & CURRIER ARCHITECTS, ENGINEERS & LAND SURVEYORS522 BRADLEY STREET
WATERTOWN, NY 13601
DBE MATERIAL SUPPLIER 3,600.00MS UNLIMITED, INC.PO BOX 577
SYRACUSE, NY 13206
TOTAL: 96,285.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D263987 DESCRIPTION: ROUTE 30A BRIDGE REHABILITATION OVER THE ERIE CANAL (BEARINGS; JOINTS; BACKWALLS AND SLABS); FULTONVILLE AND FONDA.
PIN #: 2806.01
AWARD DATE: 8/30/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 2,138,588.50
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
SLATE HILL CONSTRUCTORS, INC.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
6573 HERMAN ROAD
WARNERS, NY 13164
DBE CONSTRUCTION 26,363.75APEX STRIPING, INC.6500 NEW VENTURE GEAR DRIVE
EAST SYRACUSE, NY 13057
DBE CONSTRUCTION 2,200.00EMI GUIDE RAIL LLC693 RIVER ROAD
SCHENECTADY, NY 12306
DBE CONSTRUCTION 51,638.00KOCHER-O'BRIEN CONSTRUCTION COMPANY, INC.PO BOX 328
LAFAYETTE, NY 13084
DBE CONSTRUCTION 23,770.00LONGHOUSE CONSTRUCTION GROUP. LLC409B BROOKFIELD ROAD
SYRACUSE, NY 13211
DBE MATERIAL SUPPLIER 3,360.00MOOR METALS INC.2 KUNIHOLM DRIVE
HOLLISTON, MA 01746
DBE MATERIAL SUPPLIER 39,978.00MS UNLIMITED, INC.PO BOX 577
SYRACUSE, NY 13206
DBE CONSTRUCTION 9,000.00ROMMEL FENCE, LLC17 RAILROAD STREET
POLAND, NY 13431
TOTAL: 51,638.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D263995 DESCRIPTION: BRIDGE REPLACEMENT OF US RTE. 6 OVER METRO NORTH RAILROAD IN THE VILLAGE OF BREWSTER.
PIN #: 8392.01
AWARD DATE: 8/26/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 10,896,702.56
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
D.A. COLLINS CONSTRUCTION CO., INC.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
269 BALLARD ROAD
WILTON, NY 12831
DBE MATERIAL SUPPLIER,CONSTRUCTION 218,499.75A & K SLIPFORMING, INC.PO BOX 250
COBLESKILL, NY 12043
DBE CONSTRUCTION 6,000.00AROLD CONSTRUCTION CO., INC.51 POWDER MILL BRIDGE ROAD
KINGSTON, NY 12401
DBE 213,410.00DARRAH LAND SURVEYING, PLLC3764 NORTH SHORE ROAD
HADLEY, NY 12835
DBE TRUCKING 55,000.00ELMSFORD TRANSPORT INC44 WARING DR
CARMEL, NY 10512
DBE CONSTRUCTION 114,367.75EMI GUIDE RAIL LLC693 RIVER ROAD
SCHENECTADY, NY 12306
DBE MATERIAL SUPPLIER 4,447.20PAVILION DRAINAGE SUPPLYPO BOX 219
PAVILION, NY 14525
DBE TRUCKING,CONSTRUCTION 306,262.60PERFECT CUT LANDSCAPING, INC. D/B/A HUDSON VALLEY TRUCKING10A MCNAMARA LANE
GOSHEN, NY 10924
DBE CONSTRUCTION 23,039.30ROMMEL FENCE, LLC17 RAILROAD STREET
POLAND, NY 13431
DBE TRUCKING 61,250.00SPEEDWAY TRANSPORTATION, INC.21 MARIAN DRIVE
NEWBURGH, NY 12550
DBE MATERIAL SUPPLIER 15,606.00TRAFFIC LANE CLOSURES, LLC
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
1214 ROUTE 52
CARMEL, NY 10512
TOTAL: 306,262.60
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D263996 DESCRIPTION: TACONIC STATE PARKWAY PAVEMENT MAINTENANCE; TOWNS OF CARMEL AND PUTNAM VALLEY
PIN #: 8127.45
AWARD DATE: 8/26/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 11,739,938.86
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
LANCASTER DEVELOPMENT AND TULLY CONSTRUCTION CO, LLC/DBA L&T CONSTRUCTION
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
145 PODPADIC ROAD
RICHMONDVILLE, NY 12149
DBE CONSTRUCTION 179,550.00A & K SLIPFORMING, INC.PO BOX 250
COBLESKILL, NY 12043
DBE CONSTRUCTION 1,072,463.00GRANITEWORKS, INC.415 BROOK AVE.
DEER PARK, NY 11729
DBE CONSTRUCTION 112,213.15IMPERIAL ASPHALT & AGGREGATE DISTRIBUTOR, INC158 SOUTH SECOND AVE
MOUNT VERNON, NY 10550
DBE CONSTRUCTION 157,893.41MCCAREY LANDSCAPING, INC.80 TOWER DRIVE
MIDDLETOWN, NY 10941
TOTAL: 1,072,463.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D263997 DESCRIPTION: ASPHALT CONCRETE MILLING AND RESURFACING ON ROUTE 9A IN THE VILLAGE OF ARDSLEY & TOWN OF GREENBURGH
PIN #: 8103.54
AWARD DATE: 9/10/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 2,397,385.30
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
ELQ INDUSTRIES INC
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
567 FIFTH AVENUE
NEW ROCHELLE, NY 10801
MBE CONSTRUCTION 152,391.00ALCAIDE INC. D/B/A A&J CONSTRUCTION150 LAUREL HILL ROAD
BROOKFIELD, CT 06804
WBE CONSTRUCTION 16,000.00AROLD CONSTRUCTION CO., INC.51 POWDER MILL BRIDGE ROAD
KINGSTON, NY 12401
MBE 13,434.00C.V. ASSOCIATES NY; PE, LS, P.C.148 ROUTE 17M SUITE 2
HARRIMAN, NY 10926
WBE CONSTRUCTION 9,660.00EAST COAST INDUSTRIAL SERVICE, INC.P.O. BOX 1069
PINE BUSH, NY 12566
MBE CONSTRUCTION 17,790.00IMPERIAL ASPHALT & AGGREGATE DISTRIBUTOR, INC158 SOUTH SECOND AVE
MOUNT VERNON, NY 10550
WBE CONSTRUCTION 16,672.16ISLAND PAVEMENT CUTTING CO.84 KEAN STREET
WEST BABYLON, NY 11704
WBE TRUCKING 98,472.00ROSE CONTRACTING OF WESTCHESTER, INCPO BOX 51
HOPEWELL JUNCTION, NY 12533
WBE 36,920.00TRAFFIC LANE CLOSURES, LLC1214 ROUTE 52
CARMEL, NY 10512
TOTAL: 152,391.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D263998 DESCRIPTION: 1.8 MILES OF ASPHALT CONCRETE MILLING & PAVING ON ROUTE 32 IN THE VILLAGE & TOWN OF WOODBURY
PIN #: 8460.61
AWARD DATE: 9/10/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 2,366,555.62
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
KUBRICKY CONSTRUCTION CORP.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
269 BALLARD ROAD
WILTON, NY 12831
WBE CONSTRUCTION 10,500.00AROLD CONSTRUCTION CO., INC.51 POWDER MILL BRIDGE ROAD
KINGSTON, NY 12401
WBE CONSTRUCTION, 60,830.41DONNELLY CONSTRUCTION, INC.PO BOX 150
MECHANICVILLE, NY 12118
WBE CONSTRUCTION 15,990.00EAST COAST INDUSTRIAL SERVICE, INC.P.O. BOX 1069
PINE BUSH, NY 12566
WBE CONSTRUCTION 1,397.16MCCAREY LANDSCAPING, INC.80 TOWER DRIVE
MIDDLETOWN, NY 10941
MBE CONSTRUCTION 111,055.00MEXCON INCPO BOX 34
CENTRAL VALLEY, NY 10917
MBE TRUCKING 4,100.00SPEEDWAY TRANSPORTATION, INC.21 MARIAN DRIVE
NEWBURGH, NY 12550
MBE TRUCKING 4,100.00WHYTE'S TRUCKING3 LORIE LANE
POUGHKEEPSIE, NY 12603
TOTAL: 111,055.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264001 DESCRIPTION: INTERSECTION RECONFIGURATION; ASPHALT CONCRETE MILLING & RESURFACING & OVERHEAD SIGN MAINTENANCE AT VARIOUS
PIN #: 2806.08
AWARD DATE: 9/5/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 7,637,722.74
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
HANSON AGGREGATES NEW YORK LLC
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
4800 JAMESVILLE RD
JAMESVILLE, NY 13078
DBE CONSTRUCTION 29,475.00AUBERTINE & CURRIER ARCHITECTS, ENGINEERS & LAND SURVEYORS522 BRADLEY STREET
WATERTOWN, NY 13601
DBE MANUFACTURING 20,000.00CERTIFIED SAFETY PRODUCTS, NYROUTE 417
ANDOVER, NY 14806
DBE CONSTRUCTION 20,446.00LONGHOUSE CONSTRUCTION GROUP. LLC409B BROOKFIELD ROAD
SYRACUSE, NY 13211
DBE TRUCKING 40,500.00MOHAWK VALLEY MATERIALS INCPO BOX 449
MARCY, NY 13403
DBE MATERIAL SUPPLIER 1,870.80MS UNLIMITED, INC.PO BOX 577
SYRACUSE, NY 13206
DBE CONSTRUCTION 10,400.00ROMMEL FENCE, LLC17 RAILROAD STREET
POLAND, NY 13431
TOTAL: 40,500.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264008 DESCRIPTION: REHABILITATION OF RTE. 394 BRIDGE OVER WESTERN NY & PENNSYLVANIA RR; NY & LAKE ERIE RR & CONEWANGO CREEK IN THE TOWN
PIN #: 5064.33
AWARD DATE: 10/22/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 4,835,585.34
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
CONCRETE APPLIED TECHNOLOGIES CORP/DBA: CATCO
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
1266 TOWNLINE ROAD
ALDEN, NY 14004
DBE MATERIAL SUPPLIER 7,155.60BUFFALO CONCRETE ACCESSORIES250 GRIDER ST
BUFFALO, NY 14215
DBE TRUCKING 10,551.77M.O. TRUCKING5617 ROUTE 380
SINCLAIRVILLE, NY 14782
DBE CONSTRUCTION 242,679.25PAVILION DRAINAGE SUPPLYPO BOX 219
PAVILION, NY 14525
DBE TRUCKING 10,000.00TRIPI TANSPORTATION, INC77 WEST DRULLARD AVE
LANCASTER, NY 14086
DBE MANUFACTURING 166,045.95UPSTATE REBAR, LLC4605 WALDEN AVENUE
LANCASTER, NY 14086
TOTAL: 242,679.25
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264012 DESCRIPTION: MILL & FILL ALONG NY RTE. 22 IN THE TOWN OF SOUTHEAST AND THE VILLAGE OF BREWSTER.
PIN #: 8131.26
AWARD DATE: 9/17/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 3,193,116.79
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
PALEEN CONSTRUCTION CORP.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
MILL POND OFFICES - STE. 106
SOMERS, NY 10589
MBE CONSTRUCTION 370,868.00ALCAIDE INC. D/B/A A&J CONSTRUCTION150 LAUREL HILL ROAD
BROOKFIELD, CT 06804
WBE CONSTRUCTION 9,000.00AROLD CONSTRUCTION CO., INC.51 POWDER MILL BRIDGE ROAD
KINGSTON, NY 12401
MBE TRUCKING,CONSTRUCTION 10,000.00K & D INDUSTRIES OF NY, LLC129 GALLOWS HILL ROAD
CORTLANDT MANOR, NY 10567
MBE CONSTRUCTION 28,600.00MEXCON INCPO BOX 34
CENTRAL VALLEY, NY 10917
WBE TRUCKING 143,500.00ROSE CONTRACTING OF WESTCHESTER, INCPO BOX 51
HOPEWELL JUNCTION, NY 12533
WBE MATERIAL SUPPLIER, 37,580.00TRAFFIC LANE CLOSURES, LLC1214 ROUTE 52
CARMEL, NY 10512
TOTAL: 370,868.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264013 DESCRIPTION: HARSH WINTER PAVING ON ROUTE 199 IN THE TOWNS OF PINE PLAINS & MILAN
PIN #: 8505.23
AWARD DATE: 9/13/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 1,793,007.93
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
PECKHAM ROAD CORPORATION
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
375 BAY ROAD SUTE 201
QUEENSBURY, NY 12804
WBE CONSTRUCTION 3,000.00AROLD CONSTRUCTION CO., INC.51 POWDER MILL BRIDGE ROAD
KINGSTON, NY 12401
MBE CONSTRUCTION 31,628.70CUTTING EDGE GROUP, LLC14 WALKUP CUTOFF ROAD
LAKE GEORGE, NY 12845
WBE CONSTRUCTION 17,015.00DONNELLY CONSTRUCTION, INC.PO BOX 150
MECHANICVILLE, NY 12118
MBE CONSTRUCTION 28,794.25IMPERIAL ASPHALT & AGGREGATE DISTRIBUTOR, INC158 SOUTH SECOND AVE
MOUNT VERNON, NY 10550
WBE TRUCKING 73,440.00MJB ENTERPRISES, LLCPO BOX 764
PAWLING, NY 12564
MBE CONSTRUCTION 13,200.00SANG Y. KIM LAND SURVEYOR PC/DBA: SY KIM LAND SURVEYOR, P.C.424 NORTH GREENBUSH ROAD
RENSSELAER, NY 12144
TOTAL: 73,440.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264016 DESCRIPTION: BRIDGE REHAB: FREEMAN'S BRIDGE ROAD; TOWN OF GLENVILLE; CITY OF SCHENECTADY
PIN #: 1810.26
AWARD DATE: 10/24/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 2,959,708.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
BETTE & CRING, LLC
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
22 CENTURY HILL DRIVE
LATHAM, NY 12110
DBE CONSTRUCTION 116,552.50A & K SLIPFORMING, INC.PO BOX 250
COBLESKILL, NY 12043
DBE MATERIAL SUPPLIER 3,000.00ACCESS SAFETY PRODUCTS INC13639 ROUTE 9W
HANNACROIX, NY 12087
DBE CONSTRUCTION 39,592.40APEX STRIPING, INC.6500 NEW VENTURE GEAR DRIVE
EAST SYRACUSE, NY 13057
DBE CONSTRUCTION 77,307.00EMI GUIDE RAIL LLC693 RIVER ROAD
SCHENECTADY, NY 12306
DBE CONSTRUCTION 21,892.00INTERSTATE REINFORCING, INC.127 BLIND ROAD
MEXICO, NY 13114
DBE CONSTRUCTION 10,000.00SANG Y. KIM LAND SURVEYOR PC/DBA: SY KIM LAND SURVEYOR, P.C.424 NORTH GREENBUSH ROAD
RENSSELAER, NY 12144
TOTAL: 116,552.50
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264018 DESCRIPTION: WHERE & WHEN REPAIRS INCLUDING WORK ON BRIDGE DECKS; RETAINING WALLS; PAVING; ETC. THROUGHOUT NEW YORK CITY.
PIN #: XM20.20
AWARD DATE: 11/14/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 18,687,250.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
EL SOL CONTRACTING - ES II ENTERPRISES JV
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
43-06 54TH ROAD
MASPETH, NY 11378
MBE CONSTRUCTION 5.00GCCOM CONSTRUCTION COMPANY, INC.18-35 130TH ST
COLLEGE POINT, NY 11356
WBE CONSTRUCTION 5.00HIGHWAY SAFETY PROTECTION CORP.15-11 130TH STREET
COLLEGE POINT, NY 11356
TOTAL: 5.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264020 DESCRIPTION: REPLACEMENT OF ROUTE 248 BRIDGE (COMPOSITE GIRDER) OVER WILEYVILLE CREEK (SPRING MILLS CREEK) IN THE TOWN OF
PIN #: 6048.27
AWARD DATE: 10/10/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 2,509,887.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
THE LC WHITFORD CO. INC.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
P.O. BOX 663
WELLSVILLE, NY 14895
DBE MATERIAL SUPPLIER 7,800.00BUFFALO CONCRETE ACCESSORIES250 GRIDER ST
BUFFALO, NY 14215
DBE CONSTRUCTION 12,215.00CERTIFIED SAFETY PRODUCTS, NYROUTE 417
ANDOVER, NY 14806
DBE CONSTRUCTION 32,118.98G & J CONTRACTING, INC.P.O. BOX 255
HEMLOCK, NY 14466
DBE CONSTRUCTION 86,911.25PAVILION DRAINAGE SUPPLYPO BOX 219
PAVILION, NY 14525
DBE 36,757.64UPSTATE REBAR, LLC4605 WALDEN AVENUE
LANCASTER, NY 14086
TOTAL: 86,911.25
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264021 DESCRIPTION: SIGNAL REPLACEMENTS AND UPGRADES AT VARIOUS LOCATIONS.
PIN #: 5810.95
AWARD DATE: 10/9/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 2,081,066.25
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
CONCRETE APPLIED TECHNOLOGIES CORP/DBA: CATCO
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
1266 TOWNLINE ROAD
ALDEN, NY 14004
DBE CONSTRUCTION,MANUFACTURING 104,719.00US TRAFFIC CONTROL, INC.100 FIRE TOWER DRIVE
TONAWANDA, NY 14150
TOTAL: 104,719.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264023 DESCRIPTION: ASPHALT CONCRETE MILLING AND RESURFACING; 1.5 MILES ON ROUTE 59 IN THE TOWN OF CLARKSTOWN
PIN #: 8030.47
AWARD DATE: 9/13/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 2,754,265.80
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
GRACE INDUSTRIES, LLC
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
336 SOUTH SERVICE ROAD
MELVILLE, NY 11747
MBE CONSTRUCTION 164,270.00ALCAIDE INC. D/B/A A&J CONSTRUCTION150 LAUREL HILL ROAD
BROOKFIELD, CT 06804
WBE MATERIAL SUPPLIER 1,679.10AXELA SERVICES, LLC104 KENSINGTON WAY
MOUNT KISCO, NY 10549
WBE CONSTRUCTION 20,860.00EAST COAST INDUSTRIAL SERVICE, INC.P.O. BOX 1069
PINE BUSH, NY 12566
MBE CONSTRUCTION 26,710.00IMPERIAL ASPHALT & AGGREGATE DISTRIBUTOR, INC158 SOUTH SECOND AVE
MOUNT VERNON, NY 10550
WBE CONSTRUCTION 55,000.00ISLAND PAVEMENT CUTTING CO.84 KEAN STREET
WEST BABYLON, NY 11704
MBE TRUCKING 30,780.00K & D INDUSTRIES OF NY, LLC129 GALLOWS HILL ROAD
CORTLANDT MANOR, NY 10567
WBE TRUCKING 144,000.00M FALANGA TRUCKING45 EISENHOWER DRIVE
MIDDLETOWN, NY 10940
WBE TRUCKING 29,000.00MAC CONTRACTING OF SI INC291 CHELSEA RD
STATEN ISLAND, NY 10314
WBE MATERIAL SUPPLIER,MANUFACTURING 25,200.00TRAFFIC LANE CLOSURES, LLC1214 ROUTE 52
CARMEL, NY 10512
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
TOTAL: 164,270.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264029 DESCRIPTION: TRAFFIC SIGNAL INSTALLATIONS & UPGRADES; ETC. AT VARIOUS LOCATIONS.
PIN #: 3807.34
AWARD DATE: 10/30/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 2,489,721.21
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
M.L. CACCAMISE ELECTRIC CORP
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
721 PORTLAND AVENUE
ROCHESTER, NY 14621
DBE CONSTRUCTION 8,628.00APEX STRIPING, INC.6500 NEW VENTURE GEAR DRIVE
EAST SYRACUSE, NY 13057
DBE ENGINEERING 118,000.00PRUDENT ENGINEERING LLP6390 FLY ROAD
EAST SYRACUSE, NY 13057
TOTAL: 118,000.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264030 DESCRIPTION: PAVEMENT RESURFACING: NORTHERN STATE PARKWAY; TOWN OF NORTH HEMPSTEAD
PIN #: 0516.55
AWARD DATE: 9/19/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 18,189,107.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
H&L CONTRACTING LLC
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
38 HOMAN AVENUE
BAY SHORE, NY 11706
DBE CONSTRUCTION 148,629.00BOHEMIA GARDEN CENTER, INC.608 JOHNSON AVENUE - SUITE #1
BOHEMIA, NY 11716
DBE CONSTRUCTION 82,000.00CONTRACTORS LAYOUT INC.829-4 LINCOLN AVENUE
BOHEMIA, NY 11716
DBE CONSTRUCTION 448,150.00DIVAD CONCRETE INCPO BOX 1179
RONKONKOMA, NY 11779
DBE CONSTRUCTION 313,529.00ISLAND PAVEMENT CUTTING CO.84 KEAN STREET
WEST BABYLON, NY 11704
DBE MATERIAL SUPPLIER 30,000.00NAUGHTON ENERGY CORP.1898 ROUTE 940
POCONO PINES, PA 18350
DBE MATERIAL SUPPLIER 36,000.00TRAFFIC LANE CLOSURES, LLC1214 ROUTE 52
CARMEL, NY 10512
TOTAL: 448,150.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264031 DESCRIPTION: BRIDGE REHABILITATION OF SEVEN BRIDGES IN THE CITY OF AMSTERDAM.
PIN #: 2805.64
AWARD DATE: 9/13/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 10,603,210.40
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
TIOGA CONSTRUCTION COMPANY, INC.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
333 GROS BLVD.
HERKIMER, NY 13350
DBE CONSTRUCTION 941,555.00EMI GUIDE RAIL LLC693 RIVER ROAD
SCHENECTADY, NY 12306
DBE CONSTRUCTION 80,756.00LONGHOUSE CONSTRUCTION GROUP. LLC409B BROOKFIELD ROAD
SYRACUSE, NY 13211
DBE CONSTRUCTION 59,087.00ROMMEL FENCE, LLC17 RAILROAD STREET
POLAND, NY 13431
TOTAL: 941,555.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264032 DESCRIPTION: GUIDE RAIL REHAB: SUNKEN MEADOW PARKWAY; TOWNS OF ISLIP AND SMITHTOWN
PIN #: 0339.15
AWARD DATE: 11/6/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 4,464,797.20
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
CONSTAR, INC.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
81 BRIGHTSIDE AVE
CENTRAL ISLIP, NY 11722
DBE MATERIAL SUPPLIER 240,000.00MS UNLIMITED, INC.PO BOX 577
SYRACUSE, NY 13206
TOTAL: 240,000.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264033 DESCRIPTION: CRACK SEALING AND MASTIC: VARIOUS LOCATIONS THROUGHOUT REGION 8
PIN #: 8813.99
AWARD DATE: 10/9/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 2,551,091.50
IS CONTRACTOR D/M/WBE? Yes (DBE)
CONTRACTOR NAME & ADDRESS:
ANNSEAL, INC.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
130 MAIN STREET
JOHNSON CITY, NY 13790
DBE CONSTRUCTION 2,383,797.10ANNSEAL, INC.130 MAIN STREET
JOHNSON CITY, NY 13790
TOTAL: 2,383,797.10
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264035 DESCRIPTION: REPLACEMENT OF RETAINING WALL ON ROUTE 98 IN THE TOWN OF GREAT VALLEY
PIN #: 5813.44
AWARD DATE: 10/3/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 666,393.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
UNION CONCRETE AND CONSTRUCTION CORP.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
435 MEYER ROAD
WEST SENECA, NY 14224
DBE CONSTRUCTION 14,859.00PAVILION DRAINAGE SUPPLYPO BOX 219
PAVILION, NY 14525
DBE MATERIAL SUPPLIER 10,800.00UPSTATE STEEL, INC.1800 DALE ROAD
BUFFALO, NY 14225
TOTAL: 14,859.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264038 DESCRIPTION: REHABILITATION OF QUAKER/O'NEIL BRIDGE OVER ERIE CANAL; TOWN OF MACEDON
PIN #: 4EST.06
AWARD DATE: 11/1/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 3,765,325.75
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
RAMSEY CONSTRUCTORS, INC.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
5711 GATEWAY PARK
LAKEVILLE, NY 14480
DBE CONSTRUCTION 24,091.25AL SLAWSON, INC3 PRINCETON PLACE
PITTSFORD, NY 14534
DBE CONSTRUCTION 5,578.50APEX STRIPING, INC.6500 NEW VENTURE GEAR DRIVE
EAST SYRACUSE, NY 13057
DBE TRUCKING 38,578.24BILL'S TOPSOIL SAND & GRAVEL3 CARRIAGE HOUSE LANE
ROCHESTER, NY 14624
DBE MATERIAL SUPPLIER 1,578.00BUFFALO CONCRETE ACCESSORIES250 GRIDER ST
BUFFALO, NY 14215
DBE MANUFACTURING 874.58CERTIFIED SAFETY PRODUCTS, NYROUTE 417
ANDOVER, NY 14806
DBE CONSTRUCTION 18,518.78G & J CONTRACTING, INC.P.O. BOX 255
HEMLOCK, NY 14466
DBE MATERIAL SUPPLIER,CONSTRUCTION 32,870.37PAVILION DRAINAGE SUPPLYPO BOX 219
PAVILION, NY 14525
DBE CONSTRUCTION 2,500.00SANG Y. KIM LAND SURVEYOR PC/DBA: SY KIM LAND SURVEYOR, P.C.424 NORTH GREENBUSH ROAD
RENSSELAER, NY 12144
DBE 19,713.54UPSTATE REBAR, LLC4605 WALDEN AVENUE
LANCASTER, NY 14086
DBE CONSTRUCTION 168,875.10ZEHR'S FLOWERS AND LANDSCAPING, LLC
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
8484 VANAMBER ROAD
CASTORLAND, NY 13620
TOTAL: 168,875.10
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264039 DESCRIPTION: SIGN REQUIREMENTS CONTRACT
PIN #: 9TSR.20
AWARD DATE: 10/25/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 384,285.60
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
ELDERLEE, INC.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
729 CROSS ROAD
OAKS CORNERS, NY 14518
DBE CONSTRUCTION 10,060.00ZEHR'S FLOWERS AND LANDSCAPING, LLC8484 VANAMBER ROAD
CASTORLAND, NY 13620
TOTAL: 10,060.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264040 DESCRIPTION: REPLACEMENT OF THE NY ROUTE 29 BRIDGE (COMPOSITE GIRDER) OVER THE BATTENKILL RIVER IN THE TOWNS OF EASTON &
PIN #: 1236.27
AWARD DATE: 10/23/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 4,640,809.50
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
TIOGA CONSTRUCTION COMPANY, INC.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
333 GROS BLVD.
HERKIMER, NY 13350
DBE CONSTRUCTION 121,446.00EMI GUIDE RAIL LLC693 RIVER ROAD
SCHENECTADY, NY 12306
DBE CONSTRUCTION 99,103.00KAL HARBOUR/DBA: HARBOUR ROADSPO BOX 4087
ALBANY, NY 12204
DBE CONSTRUCTION 145,950.81LONGHOUSE CONSTRUCTION GROUP. LLC409B BROOKFIELD ROAD
SYRACUSE, NY 13211
DBE CONSTRUCTION 7,236.50ZEHR'S FLOWERS AND LANDSCAPING, LLC8484 VANAMBER ROAD
CASTORLAND, NY 13620
TOTAL: 145,950.81
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264042 DESCRIPTION: MILLING & RESURFACING OF GRUMMAN LANE & SEVERSKY RD. WITH STRIPING; CROSSWALKS & TRAFFIC LOOPS IN THE TOWN OF BABYLON.
PIN #: 0903.37
AWARD DATE: 9/5/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 730,730.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
H&L CONTRACTING LLC
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
38 HOMAN AVENUE
BAY SHORE, NY 11706
WBE CONSTRUCTION 5,900.00CONTRACTORS LAYOUT INC.829-4 LINCOLN AVENUE
BOHEMIA, NY 11716
WBE CONSTRUCTION 43,585.00ISLAND PAVEMENT CUTTING CO.84 KEAN STREET
WEST BABYLON, NY 11704
WBE MATERIAL SUPPLIER 1,374.00MS UNLIMITED, INC.PO BOX 577
SYRACUSE, NY 13206
MBE MATERIAL SUPPLIER 1,440.00NAUGHTON ENERGY CORP.1898 ROUTE 940
POCONO PINES, PA 18350
MBE TRUCKING 40,047.50SOUTH BAY INDUSTRIES, INC.321 LAGOON DRIVE
COPIAGUE, NY 11726
WBE MANUFACTURING 5,000.00TRAFFIC LANE CLOSURES, LLC1214 ROUTE 52
CARMEL, NY 10512
TOTAL: 43,585.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264043 DESCRIPTION: GUIDERAIL REPLACEMENT ON VARIOUS ROUTES AND LOCATIONS IN REGION 8.
PIN #: 8814.68
AWARD DATE: 11/14/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 1,290,919.70
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
ELDERLEE, INC.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
729 CROSS ROAD
OAKS CORNERS, NY 14518
DBE CONSTRUCTION 2,000.00ZEHR'S FLOWERS AND LANDSCAPING, LLC8484 VANAMBER ROAD
CASTORLAND, NY 13620
TOTAL: 2,000.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264044 DESCRIPTION: GUIDE RAIL REPLACEMENT ON VARIOUS ROUTES AND LOCATIONS.
PIN #: 8813.30
AWARD DATE: 10/16/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 1,949,399.00
IS CONTRACTOR D/M/WBE? Yes (DBE)
CONTRACTOR NAME & ADDRESS:
MOHEGAN ASSOCIATES INC
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
130 OLD RT 6
CARMEL, NY 10512
DBE CONSTRUCTION 1,949,399.00MOHEGAN ASSOCIATES INC130 OLD RT 6
CARMEL, NY 10512
TOTAL: 1,949,399.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264046 DESCRIPTION: CONSTRUCTION OF MULTI-USE TRAILS AT VARIOUS LOCATIONS ON THE EMPIRE STATE TRAIL - BUFFALO SECTION..
PIN #: 5EST.01
AWARD DATE: 9/26/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 2,135,500.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
MCLAUGHLIN CONSTRUCTION CORP./DBA: EDBAUER CONSTRUCTION
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
2790 CLINTON STREET
WEST SENECA, NY 14224
WBE MANUFACTURING 37,160.00A & B HERITAGE INC. DBA ASI SIGNAGE INNOVATIONS (ASI)2957 ALT BLVD
GRAND ISLAND, NY 14072
WBE 17,186.94BUFFALO CONCRETE ACCESSORIES250 GRIDER ST
BUFFALO, NY 14215
WBE TRUCKING 19,699.78DIG IT OF NEW YORK, LLC3529 BROADWAY
BUFFALO, NY 14227
WBE CONSTRUCTION 23,585.00E.J. MILITELLO CONCRETE, INC8565 ROLL ROAD
CLARENCE CENTER, NY 14032
MBE TRUCKING,MANUFACTURING 144,913.81IROQUOIS BAR CORP. DBA: ONEIDA TRUCKING155 COMMERCE DRIVE
LACKAWANNA, NY 14218
MBE CONSTRUCTION 27,146.00PAVILION DRAINAGE SUPPLYPO BOX 219
PAVILION, NY 14525
WBE 18,262.08SOUTHERN TIER MUNICIPAL SUPPLIES AND CONSTRUCTION EQUIPMENT COMPANY, INC.1801 WASHINGTON STREET
JAMESTOWN, NY 14702
WBE CONSTRUCTION 85,384.00US TRAFFIC CONTROL, INC.100 FIRE TOWER DRIVE
TONAWANDA, NY 14150
TOTAL: 144,913.81
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264054 DESCRIPTION: REGION 8 HIGHWAY WHERE & WHEN
PIN #: 8814.15
AWARD DATE: 11/6/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 2,077,000.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
BEN CICCONE, INC.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
151 DALEY ROAD
POUGHKEEPSIE, NY 12603
WBE CONSTRUCTION 3.00ANNANDALE CONSTRUCTION CORP.38 CORNELL AVE
RED HOOK, NY 12571
WBE CONSTRUCTION 3.00AROLD CONSTRUCTION CO., INC.51 POWDER MILL BRIDGE ROAD
KINGSTON, NY 12401
WBE CONSTRUCTION 3.00DECAR FENCE16 TAMIDAN ROAD
POUGHKEEPSIE, NY 12601
WBE CONSTRUCTION 3.00MCCAREY LANDSCAPING, INC.80 TOWER DRIVE
MIDDLETOWN, NY 10941
WBE MATERIAL SUPPLIER 0.60MS UNLIMITED, INC.PO BOX 577
SYRACUSE, NY 13206
WBE MATERIAL SUPPLIER 0.60NORTHSIDE SUPPLIES, LLC67 FALLKILL AVENUE
POUGHKEEPSIE, NY 12601
MBE MATERIAL SUPPLIER 0.60ORGANIC RECYCLING, INC.117A ROUTE 303
TAPPAN, NY 10983
MBE CONSTRUCTION 3.00SANG Y. KIM LAND SURVEYOR PC/DBA: SY KIM LAND SURVEYOR, P.C.424 NORTH GREENBUSH ROAD
RENSSELAER, NY 12144
WBE MATERIAL SUPPLIER 0.60TRAFFIC LANE CLOSURES, LLC1214 ROUTE 52
CARMEL, NY 10512
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
TOTAL: 3.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264059 DESCRIPTION: WHERE & WHEN HIGHWAY CONTRACT
PIN #: 6805.05
AWARD DATE: 11/14/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 222,870.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
THE LC WHITFORD CO. INC.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
P.O. BOX 663
WELLSVILLE, NY 14895
WBE MATERIAL SUPPLIER 0.60BUFFALO CONCRETE ACCESSORIES250 GRIDER ST
BUFFALO, NY 14215
WBE CONSTRUCTION 1.00CERTIFIED SAFETY PRODUCTS, NYROUTE 417
ANDOVER, NY 14806
MBE CONSTRUCTION 1.00IROQUOIS BAR CORP. DBA: ONEIDA TRUCKING155 COMMERCE DRIVE
LACKAWANNA, NY 14218
MBE CONSTRUCTION 1.00PAVILION DRAINAGE SUPPLYPO BOX 219
PAVILION, NY 14525
WBE CONSTRUCTION 1.00SCOTT LAWN YARD, INC.3305 HASELEY DR
NIAGARA FALLS, NY 14304
WBE CONSTRUCTION 1.00US TRAFFIC CONTROL, INC.100 FIRE TOWER DRIVE
TONAWANDA, NY 14150
TOTAL: 1.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264060 DESCRIPTION: ASPHALT CONCRETE MILLING AND RESURFACING ON ROUTE I-86 IN THE TOWNS OF CAMPBELL; CORNING AND ERWIN & VILLAGES OF
PIN #: 6067.29
AWARD DATE: 11/5/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 3,248,119.48
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
DOLOMITE PRODUCTS CO. INC./DBA: A.L. BLADES
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
7610 COUNTY ROUTE 65
HORNELL, NY 14843
DBE CONSTRUCTION 202,653.00PAVILION DRAINAGE SUPPLYPO BOX 219
PAVILION, NY 14525
TOTAL: 202,653.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D264061 DESCRIPTION: EMPIRE STATE TRAIL; PLATTSBURGH - COOPERSVILLE; PAVEMENT RESURFACING; TRAFFIC SIGNAL; SIGNS & PAVEMENT MARKINGS
PIN #: 7EST.02
AWARD DATE: 10/25/2019 12:00:00AM
CONTRACT COMPLETION DATE: 8/31/2020 12:00:00
CONTRACT AMOUNT: 699,699.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
LUCK BROTHERS INC.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
73 TRADE ROAD
PLATTSBURGH, NY 12901
WBE CONSTRUCTION 76,421.25EMI GUIDE RAIL LLC693 RIVER ROAD
SCHENECTADY, NY 12306
WBE CONSTRUCTION 166,618.25STILSING ELECTRIC, INC500 SOUTH STREET
RENSSELAER, NY 12144
TOTAL: 166,618.25
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D900046 DESCRIPTION: I-390 INTERCHANGE IMPROVEMENTS AT I-490; STAGES 3 AND 4
PIN #: 4390.54
AWARD DATE: 11/4/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 86,274,000.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
COLD SPRING CONSTRUCTION CO
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
43 JACKSON STREET
AKRON, NY 14001
DBE CONSTRUCTION 507,035.00A & K SLIPFORMING, INC.PO BOX 250
COBLESKILL, NY 12043
DBE CONSTRUCTION 472,000.00EASTWOOD INDUSTRIES, INCP O BOX 305
NORTH BOSTON, NY 14110
DBE CONSTRUCTION 976,518.00G & J CONTRACTING, INC.P.O. BOX 255
HEMLOCK, NY 14466
DBE 1,675,000.00LARSEN, PE, LS, PC700 WEST METRO PARK
ROCHESTER, NY 14623
DBE 235,500.00LDA COMPLIANCE CONSULTING INC5700 ARLINGTON AVE 34
BRONX, NY 10471
DBE TRUCKING 2,113,369.00M.J. DREHER TRUCKING, INC.50 OWENS ROAD
BROCKPORT, NY 14420
DBE CONSTRUCTION 650,372.00NATURAL RESTORATIONS BY LINDA J & CO., INC.,P.O. BOX 177
WILLIAMSVILLE, NY 14231
DBE CONSTRUCTION 1,619,594.00PAVILION DRAINAGE SUPPLYPO BOX 219
PAVILION, NY 14525
DBE CONSTRUCTION 21,000.00ROMMEL FENCE, LLC17 RAILROAD STREET
POLAND, NY 13431
DBE 1,773,000.00UPSTATE REBAR, LLC
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
4605 WALDEN AVENUE
LANCASTER, NY 14086
DBE CONSTRUCTION 50,000.00US TRAFFIC CONTROL, INC.100 FIRE TOWER DRIVE
TONAWANDA, NY 14150
DBE 272,000.00WATTS ARCHITECTURE & ENGINEERING, D.P.C.95 PERRY STREET
BUFFALO, NY 14203
TOTAL: 2,113,369.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: D900047 DESCRIPTION: HUNTS POINT INTERSTATE ACCESS IMPROVEMENT PROJECT
PIN #: X731.63
AWARD DATE: 10/7/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 459,710,000.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
SKANSKA ECCO III HPA JV
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
75-20 ASTORIA BLVD
EAST ELMHURST, NY 11370
DBE 600,000.00ATHENA CONSULTING GROUP INC85 LIVINGSTON STREET #5N
BROOKLYN, NY 11201
DBE CONSTRUCTION 5,055,044.00CHAMPION PAINTING SPECIALTY SERVICES CORP130 SW 22 STREET
FORT LAUDERDALE, FL 33315
DBE 1,200,000.00HUDSON VALLEY ENGINEERING ASSOCIATES, PC DBA/ HVEA ENGINEERS560 ROUTE 52 - SUITE 201
BEACON, NY 12508
DBE ENGINEERING 750,000.00INFRA TECH ENGINEERING, LLC40 BROAD STREET SUITE 401
NEW YORK, NY 10004
DBE ENGINEERING 462,129.00JERSEY BORING & DRILLING CO., INC.36 PIER LANE WEST
FAIRFIELD, NJ 07004
DBE 20,000,000.00M & J ENGINEERING, P.C.2003 JERICHO TURNPIKE
NEW HYDE PARK, NY 11040
DBE ENGINEERING 865,000.00MALICK & SCHERER, P.C.53 FRONTAGE ROAD
HAMPTON, NJ 08827
DBE ENGINEERING 50,000.00MATRIX NEW WORLD ENGINEERING, LAND SURVERYING AND LANDSCAPE ARCHITECHTURE PC, DBA MATRIX NEW WORLD ENGINEERING26 COLUMBIA TURNPIKE
FLORHAM PARK, NJ 07932
DBE ENGINEERING 1,500,000.00SJH ENGINEERING PC40 RECTOR ST
NEW YORK, NY 10006
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
TOTAL: 20,000,000.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: DR35908-2 DESCRIPTION: SYRACUSE INTERMODAL CONTAINER TRANSFER FACILITY IMPROVEMENTS
PIN #: 3935.70
AWARD DATE: 9/3/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 11,843,213.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
COLD SPRING CONSTRUCTION CO
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
43 JACKSON STREET
AKRON, NY 14001
WBE CONSTRUCTION 739,782.00EARTH ROAD, INC.277 NORTH STREET
AUBURN, NY 13021
MBE CONSTRUCTION 74,808.00INTERSTATE REINFORCING, INC.127 BLIND ROAD
MEXICO, NY 13114
WBE CONSTRUCTION 149,615.00NATURAL RESTORATIONS BY LINDA J & CO., INC.,P.O. BOX 177
WILLIAMSVILLE, NY 14231
WBE CONSTRUCTION 257,122.00ROMMEL FENCE, LLC17 RAILROAD STREET
POLAND, NY 13431
WBE CONSTRUCTION 1,755,207.00WEYDMAN ELECTRIC INC747 YOUNGS STREET
TONAWANDA, NY 14150
TOTAL: 1,755,207.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: K007329-2 DESCRIPTION: BUILDING DEMOLITION AT COLUMBIA COUNTY AIRPORT
PIN #: 8904.93
AWARD DATE: 8/23/2019 12:00:00AM
CONTRACT COMPLETION DATE: 8/1/2019 12:00:00A
CONTRACT AMOUNT: 131,000.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
GORICK CONSTRUCTION CO., INC.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
27 TRACK DRIVE
BINGHAMTON, NY 13904
WBE CONSTRUCTION 3,500.00ALPINE SEEDING LLC2030 OLD MARKET ROAD
WINTHROP, NY 13697
MBE MATERIAL SUPPLIER 5,263.56JHP INDUSTRIAL SUPPLY CO.321 WEST TAYLOR STREET
SYRACUSE, NY 13202
WBE 4,500.00MONROE TRACTOR & IMPLEMENT CO INC1001 LEHIGH STATION RD
HENRIETTA, NY 14467
TOTAL: 5,263.56
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: LD004649 DESCRIPTION: BLACK RIVER TRAIL, CITY OF WATERTOWN CONNECTION
PIN #: 7806.62
AWARD DATE: 9/17/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 798,973.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
LUCK BROTHERS INC.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
73 TRADE ROAD
PLATTSBURGH, NY 12901
DBE CONSTRUCTION 5,775.00ALPINE SEEDING LLC2030 OLD MARKET ROAD
WINTHROP, NY 13697
DBE CONSTRUCTION 4,800.00APEX STRIPING, INC.6500 NEW VENTURE GEAR DRIVE
EAST SYRACUSE, NY 13057
DBE CONSTRUCTION 15,725.00AUBERTINE & CURRIER ARCHITECTS, ENGINEERS & LAND SURVEYORS522 BRADLEY STREET
WATERTOWN, NY 13601
DBE CONSTRUCTION 65,500.00ROMMEL FENCE, LLC17 RAILROAD STREET
POLAND, NY 13431
TOTAL: 65,500.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: LD022225 DESCRIPTION: LINKING LANDMARKS ALONG THE HUDSON
PIN #: 8780.12
AWARD DATE: 9/18/2019 12:00:00AM
CONTRACT COMPLETION DATE: 11/15/2019 12:00:0
CONTRACT AMOUNT: 544,579.93
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
TJR EXCAVATING CONTRACTORS, INC
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
5 ROUTE 376
HOPEWELL JUNCTION, NY 12533
DBE 7,500.00ANDES CONSULTING ENGINEERING, PLLC, DBA ANDES CONSULTING234 HANCOX AVE
NUTLEY, NJ 07110
DBE MATERIAL SUPPLIER 30,396.00K & D INDUSTRIES OF NY, LLC129 GALLOWS HILL ROAD
CORTLANDT MANOR, NY 10567
TOTAL: 30,396.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: LD034726 DESCRIPTION: RAILS TO TRAILS: PORT JEFFERSON TO WADING RIVER BICYCLE AND PEDESTRIAN PATH, TOWNS OF BROOKHAVEN AND RIVERHEAD
PIN #: 0758.16
AWARD DATE: 8/22/2019 12:00:00AM
CONTRACT COMPLETION DATE: 3/31/2021 12:00:00
CONTRACT AMOUNT: 6,469,167.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
D.F. STONE CONTRACTING LTD.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
1230 STATION ROAD
MEDFORD, NY 11763
DBE 30,000.00CASSONE LEASING, INC.1900 LAKELAND AVENUE
RONKONKOMA, NY 11779
DBE CONSTRUCTION 256,915.00DEN-VIC CONTRACTING INC.6 RON COURT
COMMACK, NY 11725
DBE CONSTRUCTION 25,000.00HIRANI ENGINEERING & LAND SURVEYING, P.C.120 WEST JOHN STREET
HICKSVILLE, NY 11801
DBE MATERIAL SUPPLIER 28,593.60MS UNLIMITED, INC.PO BOX 577
SYRACUSE, NY 13206
DBE CONSTRUCTION 307,875.00TIKI INDUSTRIES, INC.8 TREE HAVEN LANE
RIVERHEAD, NY 11901
TOTAL: 307,875.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: LD035733 DESCRIPTION: SIDEWALKS ON GRAND ISLAND BLVD
PIN #: 5762.27
AWARD DATE: 11/4/2019 12:00:00AM
CONTRACT COMPLETION DATE: 7/3/2020 12:00:00A
CONTRACT AMOUNT: 1,445,135.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
NOVA SITE COMPANY, LLC
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
6 LENA COURT
WEST SENECA, NY 14224
DBE TRUCKING 95,000.00DIG IT OF NEW YORK, LLC3529 BROADWAY
BUFFALO, NY 14227
DBE MATERIAL SUPPLIER,MANUFACTURING 21,494.11SOUTHERN TIER MUNICIPAL SUPPLIES AND CONSTRUCTION EQUIPMENT COMPANY, INC.1801 WASHINGTON STREET
JAMESTOWN, NY 14702
DBE CONSTRUCTION 21,467.00US TRAFFIC CONTROL, INC.100 FIRE TOWER DRIVE
TONAWANDA, NY 14150
TOTAL: 95,000.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: LD035784 DESCRIPTION: HURLEY AVENUE PAVING AND COMPLETE STREETS PROJECT
PIN #: 8761.94
AWARD DATE: 9/19/2019 12:00:00AM
CONTRACT COMPLETION DATE: 12/15/2019 12:00:0
CONTRACT AMOUNT: 1,139,455.43
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
KINGSTON EQUIPMENT RENTAL INC.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
78 STONE ROAD
WEST HURLEY, NY 12491
DBE CONSTRUCTION 104,740.00ANNANDALE CONSTRUCTION CORP.38 CORNELL AVE
RED HOOK, NY 12571
TOTAL: 104,740.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: LD036050 DESCRIPTION: ST. LAWRENCE COUNT BRIDGE PRESERVATION PROJECT
PIN #: 7753.78
AWARD DATE: 11/4/2019 12:00:00AM
CONTRACT COMPLETION DATE: 12/11/2020 12:00:0
CONTRACT AMOUNT: 5,544,690.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
J. E. SHEEHAN CONTRACTING CORPORATION
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
208 SISSONVILLE ROAD
POTSDAM, NY 13676
DBE CONSTRUCTION 14,044.00APEX STRIPING, INC.6500 NEW VENTURE GEAR DRIVE
EAST SYRACUSE, NY 13057
DBE CONSTRUCTION 386,429.50EMI GUIDE RAIL LLC693 RIVER ROAD
SCHENECTADY, NY 12306
TOTAL: 386,429.50
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: LD036177_C1 DESCRIPTION: WEST COLVIN STREET OVER ONONDAGA CREEK BRIDGE REHABILITATION PROJECT
PIN #: 3756.57
AWARD DATE: 10/17/2019 12:00:00AM
CONTRACT COMPLETION DATE: 8/1/2021 12:00:00A
CONTRACT AMOUNT: 113,600.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
LABELLA ASSOCIATES, P.C.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
300 STATE STREET
ROCHESTER, NY 14614
DBE 14,096.02BRYANT ASSOCIATES, P.C.108 WEST JEFFERSON STREET SUITE 400
SYRACUSE, NY 13202
DBE 7,200.00ENVIRONMENTAL DESIGN & RESEARCH LANDSCAPE ARCHITECTURE274 NORTH GOODMAN STREET
ROCHESTER, NY 14607
TOTAL: 14,096.02
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: LD036244 DESCRIPTION: GLENVILLE BUSINESS & TECHNOLOGY PARK - RAIL TRACK IMPROVEMENT
PIN #: 1936.00
AWARD DATE: 9/4/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 428,550.46
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
WJ RIEGEL RAIL SOLUTIONS LLC
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
46 BRIDGE ST
SELKIRK, NY 12158
WBE CONSTRUCTION 26,175.00KAL HARBOUR/DBA: HARBOUR ROADSPO BOX 4087
ALBANY, NY 12204
TOTAL: 26,175.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: LD036381_C1 DESCRIPTION: HAWLEY ST/WASHINGTON ST TRAFFIC SIGNAL UPGRADE
PIN #: 9754.87
AWARD DATE: 9/18/2019 12:00:00AM
CONTRACT COMPLETION DATE: 12/31/2020 12:00:0
CONTRACT AMOUNT: 89,271.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
MCFARLAND-JOHNSON, INC.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
49 COURT STREET
BINGHAMTON, NY 13901
DBE 15,227.00PRUDENT ENGINEERING LLP6390 FLY ROAD
EAST SYRACUSE, NY 13057
TOTAL: 15,227.00
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: LD036442_C1 DESCRIPTION: TRAFFIC SIGNAL UPGRADES AND PEDESTRIAN IMPROVEMENTS AT TWO INTERSECTIONS
PIN #: 9754.93
AWARD DATE: 9/27/2019 12:00:00AM
CONTRACT COMPLETION DATE:
CONTRACT AMOUNT: 260,735.00
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
MCFARLAND-JOHNSON, INC.
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
49 COURT STREET
BINGHAMTON, NY 13901
DBE 24,501.42PRUDENT ENGINEERING LLP6390 FLY ROAD
EAST SYRACUSE, NY 13057
TOTAL: 24,501.42
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019
CONTRACT #: LD036468 DESCRIPTION: SOUTH SHORE ROAD OVER OSWEGATCHIE RIVER
PIN #: 7753.71
AWARD DATE: 11/7/2019 12:00:00AM
CONTRACT COMPLETION DATE: 6/30/2021 12:00:00
CONTRACT AMOUNT: 3,915,906.85
IS CONTRACTOR D/M/WBE? No
CONTRACTOR NAME & ADDRESS:
VECTOR CONSTRUCTION CORP
D/M/WBE SUBCONTRACTORS PROGRAM TYPE TYPE OF WORK COMMITMENT
6364 ISLAND ROAD
CICERO, NY 13039
DBE CONSTRUCTION 4,650.00APEX STRIPING, INC.6500 NEW VENTURE GEAR DRIVE
EAST SYRACUSE, NY 13057
DBE CONSTRUCTION 39,735.00AUBERTINE & CURRIER ARCHITECTS, ENGINEERS & LAND SURVEYORS522 BRADLEY STREET
WATERTOWN, NY 13601
DBE CONSTRUCTION 89,555.00EMI GUIDE RAIL LLC693 RIVER ROAD
SCHENECTADY, NY 12306
DBE CONSTRUCTION 100,676.73INTERSTATE REINFORCING, INC.127 BLIND ROAD
MEXICO, NY 13114
DBE MATERIAL SUPPLIER 15,464.22MS UNLIMITED, INC.PO BOX 577
SYRACUSE, NY 13206
DBE CONSTRUCTION 27,045.60ZEHR'S FLOWERS AND LANDSCAPING, LLC8484 VANAMBER ROAD
CASTORLAND, NY 13620
TOTAL: 100,676.73
NYS Department of TransportationD / M / WBE Utilization Plans
11/18/2019