nyc agritecture workshop team 2

Upload: hgordonsmith

Post on 02-Jun-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/10/2019 NYC Agritecture Workshop Team 2

    1/16

    MOTT HAVEN FRESH

    Architect - Megan Gardner

    Hydroponic grower - Kate Ahearn

    Entrepreneur Dustin Betz

    Engineer - Samantha Cohen

    Marketing professional - Evan Bromfield

    Sustainability Manager - Erin McNallyStudent (water) - Marivi Perdomo Caba

    Student (energy) - Francois Cramer

    Student (food) - Shaheen Contractor

    Team 2

  • 8/10/2019 NYC Agritecture Workshop Team 2

    2/16

  • 8/10/2019 NYC Agritecture Workshop Team 2

    3/16

  • 8/10/2019 NYC Agritecture Workshop Team 2

    4/16

    A proposed FreshDirect Warehouse

    + Mott Haven-Port Morris Waterfront

    & Greenway plan South Bronx

    Food Desert

    Visiblyprominent

    from RandallsIslandrecreationalspace

  • 8/10/2019 NYC Agritecture Workshop Team 2

    5/16

    Site Development Proposals

  • 8/10/2019 NYC Agritecture Workshop Team 2

    6/16

    SITE

    South Bronx Greenwayconnection (bike path)

    Rail Line

    Service Loading

    Greenhouses

    Storm surgeprotection berm

    Bioswales

    Admin & CommunityBuilding on Roof5,000 sf Warehouse

    Community Greenspace

    Parking

    Randalls Island

  • 8/10/2019 NYC Agritecture Workshop Team 2

    7/16

    ELEVATION PLAN

  • 8/10/2019 NYC Agritecture Workshop Team 2

    8/16

    SECTION PLAN

  • 8/10/2019 NYC Agritecture Workshop Team 2

    9/16

    Exposure Placement GrowingMedium

    Integration ProductionPurpose

    OrganizationSize

    OrganizationType

    Typology

  • 8/10/2019 NYC Agritecture Workshop Team 2

    10/16

    Business Model

    FreshDirect - contract growingHunts Point Produce Market - contractgrowing to vendors

    Isolated Educational Greenhouse,GrowNYC

    Waterfront Greenway, Phytoremediation

    Excess Produce Shared with Community

    (food desert, low income)

  • 8/10/2019 NYC Agritecture Workshop Team 2

    11/16

    Rooftop Greenhouse Hydroponic

    Production

    PRODUCTION Green Bibb/Butterhead Lettuce

    COMMUNITY/EDUCTIONAL GROWING SPACEFlexible in crop selection based on needs and

    preferences of community Collard greens

    Mustard Greens

    Cilantro Epazote

    Bok choy Callaloo

    Ruby chard

  • 8/10/2019 NYC Agritecture Workshop Team 2

    12/16

    Sustainability Considerations-

    WATER

    Rainwater Harvesting= 1,200,000 gallons/month

    Total Water Usage

    = 900,000 gallons/month

    Water Usage

    Hydroponics63,000

    Drip Irrigation500,000

  • 8/10/2019 NYC Agritecture Workshop Team 2

    13/16

    Sustainability Considerations-

    ENERGY

    ENERGY SOURCES TO BE CONSIDERED INTHE FUTURE:

    Solar PV Wind Turbines On-Site Co-generation LED Grow Lights

    Heat Exchange HVAC System Passive Instulated Greenhouse Evaporative Cooling River Current Turbines

  • 8/10/2019 NYC Agritecture Workshop Team 2

    14/16

    Sustainability Considerations-FLOOD MANAGEMENT AND BIOFILTRATION

    BIOSWALESBERMS

    BRONX KILLRIVER

    COMMUNITYGREENWAY

    MOTT HAVEN

    FRESH AND

    FRESH DIRECT

    WAREHOUSE

    FLOODWATER

  • 8/10/2019 NYC Agritecture Workshop Team 2

    15/16

    Sustainability Considerations-

    COMMUNITY AND ENVIRONMENT

    JOB CREATION (GREENHOUSEOPERATIONS): 54 jobs in first year of operation

    CLEANER AIR (Green Roof)

    REDUCED URBAN HEAT ISLAND (Green Roof) CLEANER WATER (Filtration System) EDUCATION (Community Garden and

    Partnership with Local Schools) WATERFRONT ACCESS MASSIVE AMOUNT OF HYPER-LOCAL FOOD!

  • 8/10/2019 NYC Agritecture Workshop Team 2

    16/16

    KEY PROJECT METRICS

    TOTAL GREENHOUSE AREA 105,000 SQ. FT.

    TOTAL PRODUCTIONGREENHOUSE SPACE

    65,000 SQ. FT.

    ANNUAL CROP YIELD 2.4 MILLION LBS

    ANNUAL CROP REVENUE $17.3 MILLION

    CAPITAL COSTS $19 MILLION

    ANNUAL OPERATING COSTS $1 MILLION

    EMPLOYEES 54 (50 LABORERS, 3 ASSISTANTMANAGERS, 1 GREENHOUSEMANAGER)

    ANNUAL LABOR COSTS $1.8 MILLION

    SIMPLE PAYBACK ~1.3 YEARS