ny rising community reconstruction program public ...€¦ · ws 500 yr ws 100 yr ws 50 yr ws 25 yr...
TRANSCRIPT
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
NYRCR
Town of Blooming
Grove NY Rising Community Reconstruction Program
Public Engagement Meeting #2
September 3, 2014 l 7:00pm-9:00pm
Working Together to Build Back Better
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Overview of the NYRCR Program
Community Development Block Grant-Disaster Recovery (CDBG-
DR) funds allocated to communities hard-hit by Sandy, Lee, Irene,
2013 floods.
Funds must be used for projects linked to disaster.
Focused on implementation
Eligible projects include: planning/capacity building, property
acquisition, infrastructure/public facility improvements,
clearance, reconstruction, economic development, construction.
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Understanding the NYRCR Program
Focus the NYRCR Strategies and Projects in 6 Major Categories:
1. Infrastructure 2. Housing 3. Economic Development 4. Health and Social Services 5. Natural and Cultural Resources 6. Community Capacity Building
Vulnerable Populations – Need to consider
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Plan Development Process
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Status of Plan JUNE 2014 Blooming Grove NYRCR Committee was established and First
Committee Meetings Held JULY 2014 Tour of Town - Description of Storm Damage Geographic Boundary Finalized Developed Draft Vision Statement and Goals Began Risk Assessment
Begin Review of Critical Assets in Community Develop Public Engagement Strategy
July 30 – Public Engagement Meeting #1
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
AUGUST 2014
Finalized Asset Identification Submitted Section 1 to Committee for Review and
Comments Meeting with First Responders Finalize of Needs and Opportunities
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Where Are We Now?
• Risk Assessment & HEC-RAS Modeling – These are two of several tools to be used by the
Committee to assist them with identifying and prioritizing projects.
0 200 400 600 800 1000 1200 1400295
300
305
310
315
320
325
330
Moodna_DUP Plan: Moodna_Natural_DUP_Existing
RS = 19681 BR South Street
Station (ft)
Ele
va
tio
n (
ft)
Legend
WS 500 yr
WS 100 yr
WS 50 yr
WS 25 yr
WS 10 yr
WS 2 yr
Ground
Ineff
Bank Sta
.04 .04
.034 .04
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Risk Assessment Overview
• Committee assisted in the development and approved community asset list
• Category Types included – – Infrastructure – Housing – Economic Development – Natural and Cultural Resources – Health and Social Services
• Reviewed and analyzed assets with the risk areas - (FEMA regulatory floodplain)
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Next Steps
• The Committee will use the Risk Analysis, along with other tools, to support the identification and prioritization of projects. Other tools and project elements would include: – Funding Eligibility – Program Eligibility – Cost Benefit Analysis (CBA) – Public Support – Timeline and Regulatory Feasibility – Economic and Environmental Benefits – Social and Health Benefits – HEC RAS modelling
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Hydraulic Modeling Baseline
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
HEC-RAS Model
• Developed by U.S. Army Corps of Engineers – Simulate the water flow through a drainage area
• Predict the Water Surface Elevation (WSE) and extents of flooding for a given storm event – E.g., 100-year or 1% annual-chance event
• Assess the effectiveness of flood mitigation alternatives – Evaluate and compare potential benefits in terms
of reduced flooding WSE and extents
12
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Moodna Creek – Existing Floodplain (100-year)
13
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Moodna Creek – Existing Floodplain (500-year)
14
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Moodna Creek (Water Surface Profile)
0 5000 10000 15000 20000 25000 30000 35000270
280
290
300
310
320
330
Moodna_DUP Plan: Moodna_Natural_DUP_Existing
Main Channel Distance (ft)
Ele
va
tio
n (
ft)
Legend
WS 50 yr
WS 100 yr
WS 500 yr
WS 25 yr
WS 10 yr
WS 2 yr
Ground
Clo
ve
...
Ra
il R
oa
d
Un
nam
ed
Bri
dge
Locust S
t.
Un
nam
ed
Bri
dge
Ra
il R
oa
d
Sp
illw
ay
Ma
ys F
ield
Ped
estr
ian B
rid
...
Ra
il R
oa
d
W.
Ma
in S
tre
et
/ R
oute
94
Ra
il R
oa
d
Dri
ve
wa
y
Moodna Creek 1
15
South
Str
eet
Bridge
Mobile
Hom
es P
ark
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Moodna Creek – South St. Bridge (Cross Section)
16
0 200 400 600 800 1000 1200 1400295
300
305
310
315
320
325
330
Moodna_DUP Plan: Moodna_Natural_DUP_Existing
RS = 19681 BR South Street
Station (ft)
Ele
va
tio
n (
ft)
Legend
WS 500 yr
WS 100 yr
WS 50 yr
WS 25 yr
WS 10 yr
WS 2 yr
Ground
Ineff
Bank Sta
.04 .04
.034 .04
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Perry Creek – Existing Floodplain (100-year)
17
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Perry Creek (Water Surface Profile)
18
0 2000 4000 6000 8000 10000 12000 14000 16000 18000250
300
350
400
450
500
550
Perry_DUP Plan: Perry_Natural_DUP_existing
Main Channel Distance (ft)
Ele
va
tio
n (
ft)
Legend
WS 500-yr
WS 100-yr
WS 50-yr
WS 25-yr
WS 10-yr
WS 2-yr
Ground
Cu
lve
rt (
Wo
odc...
Pe
rry C
reek R
oa
d B
...
Dri
ve
wa
y B
ridg
e (
39
0 ft
do
...
Wo
od B
ridg
e (
10
0 ft
dow
nstr
e...
We
ir (
so
uth
of
Fe
lte
r R
d)
Wo
od F
oo
t B
ridg
e (
up
str
ea
m o
f th
...
We
ir (
no
rth
of M
ou
nta
in L
od
ge
Rd)
Mo
un
tain
Lod
ge R
oad
Bri
dg
e
Cu
lve
rt (
Clo
ve
Roa
d)
Perry 1
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Perry Creek (Water Surface Profile)
19
7200 7400 7600 7800 8000 8200 8400 8600340
360
380
400
420
Perry_DUP Plan: Perry_Natural_DUP_existing
Main Channel Distance (ft)
Ele
va
tio
n (
ft)
Legend
WS 500-yr
WS 100-yr
WS 50-yr
WS 25-yr
WS 10-yr
WS 2-yr
Ground
Dri
ve
wa
y B
ridg
e (
39
0 ft
do
wn
s..
.
Wo
od B
ridg
e (
10
0 ft
dow
nstr
eam
of
...
Fe
lte
r H
ill R
oa
d B
rid
ge
We
ir (
so
uth
of
Fe
lte
r R
d)
Wo
od F
oo
t B
ridg
e (
up
str
ea
m o
f th
e p
on
d)
Perry 1
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Perry Creek – Weir at Felter Hill Rd (Cross Section)
20
0 50 100 150 200 250 300 350405
410
415
420
425
430
435
Perry_DUP Plan: Perry_Natural_DUP_existing
RS = 8303 IS Weir (south of Felter Hill Rd)
Station (ft)
Ele
va
tio
n (
ft)
Legend
WS 500-yr
WS 100-yr
WS 50-yr
WS 25-yr
WS 10-yr
WS 2-yr
Ground
Ineff
Bank Sta
.08 .035 .06
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Satterly Creek – Existing Floodplain (100-year)
21
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Satterly Creek (Water Surface Profile)
22
0 5000 10000 15000 20000300
310
320
330
340
350
Satterly_DUP Plan: Satterly_Natural_DUP_existing
Main Channel Distance (ft)
Ele
va
tio
n (
ft)
Legend
WS 500-yr
WS 100-yr
WS 50-yr
WS 25-yr
WS 10-yr
WS 2-yr
Ground
Hu
dso
n R
oa..
.
Ho
rto
n R
oad
Ro
und
Hill
Ro
ad
Satterly Creek 1
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Satterly Creek – Horton Road Bridge (Cross Section)
23
0 500 1000 1500 2000320
330
340
350
360
370
380
Satterly_DUP Plan: Satterly_Natural_DUP_existing
RS = 10101 BR Horton Road
Station (ft)
Ele
va
tio
n (
ft)
Legend
WS 500-yr
WS 100-yr
WS 50-yr
WS 25-yr
WS 10-yr
WS 2-yr
Ground
Ineff
Bank Sta
.07 .03 .07
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Preliminary Scenario: Remove all buildings and structures
24
0 1000 2000 3000 4000 5000290
295
300
305
310
315
320
Moodna_DUP Plan: Moodna_Natural_DUP_Existing 1/26/2014 RS = 14755
Station (ft)
Ele
va
tio
n (
ft)
Legend
WS 500 yr
WS 100 yr
WS 50 yr
WS 25 yr
WS 10 yr
WS 2 yr
Ground
Levee
Bank Sta
.04 .035
.08 .04
0 50 100 150 200 250 300 350395
400
405
410
415
420
425
Perry_DUP Plan: Perry_Natural_DUP_existing
RS = 8057 BR Felter Hill Road Bridge
Station (ft)
Ele
va
tio
n (
ft)
Legend
WS 500-yr
WS 100-yr
WS 50-yr
WS 25-yr
WS 10-yr
WS 2-yr
Ground
Ineff
Bank Sta
.06 .034 .06
0 50 100 150 200 250 300 350405
410
415
420
425
430
435
Perry_DUP Plan: Perry_Natural_DUP_existing
RS = 8303 IS Weir (south of Felter Hill Rd)
Station (ft)
Ele
va
tio
n (
ft)
Legend
WS 500-yr
WS 100-yr
WS 50-yr
WS 25-yr
WS 10-yr
WS 2-yr
Ground
Ineff
Bank Sta
.08 .035 .06
0 500 1000 1500 2000 2500 3000320
330
340
350
360
370
380
390
Satterly_DUP Plan: Satterly_Natural_DUP_existing
RS = 13315
Station (ft)
Ele
va
tio
n (
ft)
Legend
WS 500-yr
WS 100-yr
WS 50-yr
WS 25-yr
WS 10-yr
WS 2-yr
Ground
Ineff
Bank Sta
.07 .035
.08
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Remove All Buildings/Structures Moodna Creek (Profile)
25
0 5000 10000 15000 20000 25000 30000 35000270
280
290
300
310
320
330
Moodna_DUP Plan: 1) Existing 2) All-Obs-Rem
Main Channel Distance (ft)
Ele
va
tio
n (
ft)
Legend
WS 100 yr - Existing
WS 100 yr - All-Obs-Rem
Ground
Clo
ve
...
Ra
il R
oa
d
Un
nam
ed
Bri
dge
Locust S
t.
Un
nam
ed
Bri
dge
Ra
il R
oa
d
Sp
illw
ay
Ma
ys F
ield
Ped
estr
ian B
rid
...
Ra
il R
oa
d
W.
Ma
in S
tre
et
/ R
oute
94
Ra
il R
oa
d
Dri
ve
wa
y
Moodna Creek 1
Max DWSE = -8.2’
(Dam removed)
Max DWSE = -1.3’
(Bridge removed)
Mobile
Hom
es P
ark
South
Str
eet
Bridge
W. M
ain
Str
eet
/ R
oute
94 B
ridge
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
0 200 400 600 800 1000 1200 1400295
300
305
310
315
320
325
330
Moodna_DUP Plan: 1) Existing 2) All-Obs-Rem
RS = 19720
Station (ft)
Elev
atio
n (ft
)
Legend
WS 100 yr - Existing
WS 100 yr - All-Obs-Rem
Ground
Ineff
Bank Sta
.04 .04
.035 .04
Remove All Buildings/Structures Moodna Creek (Cross Section)
26
0 200 400 600 800 1000 1200 1400295
300
305
310
315
320
325
330
Moodna_DUP Plan: Moodna_Natural_DUP_Existing
RS = 19681 BR South Street
Station (ft)
Elev
atio
n (ft
)
Legend
WS 100 yr
Ground
Ineff
Bank Sta
.04 .04
.034 .04
DWSE= -0.5’
South St Bridge (removed)
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Remove All Buildings/Structures Moodna Creek (100-year Floodplain)
27
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Remove All Buildings/Structures Perry Creek (Profile)
28
0 2000 4000 6000 8000 10000 12000 14000 16000 18000250
300
350
400
450
500
550
Perry_DUP Plan: 1) Existing 2) All Obs. Removed
Main Channel Distance (ft)
Ele
va
tio
n (
ft)
Legend
WS 100-yr - Existing
WS 100-yr - All Obs. Removed
Ground
Cu
lve
rt (
Wo
odc...
Pe
rry C
reek R
oa
d B
...
Dri
ve
wa
y B
ridg
e (
39
0 ft
do
...
Wo
od B
ridg
e (
10
0 ft
dow
nstr
e...
We
ir (
so
uth
of
Fe
lte
r H
ill R
d)
Wo
od F
oo
t B
ridg
e (
up
str
ea
m o
f th
...
We
ir (
no
rth
of M
ou
nta
in L
od
ge
Rd)
Mo
un
tain
Lod
ge R
oad
Bri
dg
e
Cu
lve
rt (
Clo
ve
Roa
d)
Perry 1
Max DWSE = -4.6’
(Bridge removed)
Max DWSE = -10.2’
(Dam removed)
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
0 50 100 150 200 250 300 350405
410
415
420
425
430
435
Perry_DUP Plan: 1) Existing 2) All Obs. Removed
RS = 8312
Station (ft)
Elev
atio
n (ft
)
Legend
WS 100-yr - Existing
WS 100-yr - All Obs. Removed
Ground
Ineff
Bank Sta
.08 .035 .06
0 50 100 150 200 250 300 350405
410
415
420
425
430
435
Perry_DUP Plan: 1) Existing 2) All Obs. Removed
RS = 8303 IS Weir (south of Felter Hill Rd)
Station (ft)
Elev
atio
n (ft
)
Legend
WS 100-yr - Existing
Ground
Ineff
Bank Sta
.08 .035 .06
DWSE= -2.3’
Weir at Felter Hill Rd
(removed)
Remove All Buildings/Structures Perry Creek (Cross Section)
29
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Remove All Buildings/Structures Perry Creek (100-year Floodplain)
30
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Remove All Buildings/Structures Satterly Creek (Profile)
31
0 5000 10000 15000 20000300
310
320
330
340
350
Satterly_DUP Plan: 1) Existing 2) All Obs. Removed
Main Channel Distance (ft)
Ele
va
tio
n (
ft)
Legend
WS 100-yr - Existing
WS 100-yr - All Obs. Removed
Ground
Hu
dso
n R
oa..
.
Ho
rto
n R
oad
Ro
und
Hill
Ro
ad
Satterly Creek 1
Max DWSE = -1.0’
(Bridge removed)
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
What will the Committee be working on during upcoming months?
SEPTEMBER 2014
Begin Identification of Resiliency Strategies and Actions Tour community with engineers and HEC-RAS modelers By September 19 – Develop a list of strategies Finalize HEC-RAS modeling Begin developing preliminary project lists
OCTOBER 2014
By October 3 – Final draft list of projects and actions By October 22 – Draft #1 CR Plan
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
What will the Committee be working on during upcoming months?
NOVEMBER 2014 By November 14 – Draft #2 CR Plan By November 14 – Public Engagement Meeting #3
DECEMBER 2014 By December 5 – Final CR Plan
JANUARY 2015 By January 16 – Public Engagement Meeting #4
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Public Comment Period
The Committee is Looking For Your Input!
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
Information Resources
http://stormrecovery.ny.gov (Main Site)
http://stormrecovery.ny.gov/resources-0 (Plan Elements)
http://stormrecovery.ny.gov/nyrcr/faq (FAQs)
Photos non-attributed are courtesy of Tetra Tech
Working Together to Build Back Better NYRCR Town of Blooming Grove Public Engagement Meeting
THANK YOU