nwp activities at inm

24
NWP Activities at INM José A. García-Moya SMNT – INM 27th EWGLAM & 12th SRNWP Meetings Ljubljana, October 2005

Upload: altessa

Post on 24-Jan-2016

35 views

Category:

Documents


0 download

DESCRIPTION

NWP Activities at INM. José A. García-Moya SMNT – INM 27th EWGLAM & 12th SRNWP Meetings Ljubljana, October 2005. Introduction. Operational activities. Computer resources Hirlam as operational model. Wave model. Verification. Research in NWP: Hirlam project. Data Assimilation - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: NWP Activities at INM

NWP Activities at INM

José A. García-MoyaSMNT – INM

27th EWGLAM & 12th SRNWP MeetingsLjubljana, October 2005

Page 2: NWP Activities at INM

October 2005 27th EWGLAM & 12th SRNWP Meetings

2

Introduction

Operational activities. Computer resources Hirlam as operational model. Wave model. Verification.

Research in NWP: Hirlam project.

Data Assimilation Coupling dynamic-physic in Hirlam Physical parameterizations

SREPS

Page 3: NWP Activities at INM

October 2005 27th EWGLAM & 12th SRNWP Meetings

3

Computer resources

Cray X1e 15 nodes, 8 MSP’s each node 4 SSP’s each MSP 320 Gb memory 2.3 TF peak performance

Official acceptance: June 2005

Page 4: NWP Activities at INM

October 2005 27th EWGLAM & 12th SRNWP Meetings

4

Cray X1e MSP

Page 5: NWP Activities at INM

October 2005 27th EWGLAM & 12th SRNWP Meetings

5

Hirlam operational model

ONR 0.16 deg latxlon, 40 levels 72 hours forecast, 4 times a day 3DVAR BC’s from ECMWF

HNR and CNN 0.05 deg latxlon, 40 levels 36 hours forecast, 4 times a day 3DVAR BC’s from ONR

Page 6: NWP Activities at INM

October 2005 27th EWGLAM & 12th SRNWP Meetings

6

ONR integration area

Page 7: NWP Activities at INM

October 2005 27th EWGLAM & 12th SRNWP Meetings

7

HNR – CNN integration areas

Page 8: NWP Activities at INM

October 2005 27th EWGLAM & 12th SRNWP Meetings

8

Verification 2005

Standard verification against observations.

Verification against Spanish High Resolution precipitation network.

Monthly comparison ONR-HNR models for Spain.

Page 9: NWP Activities at INM

October 2005 27th EWGLAM & 12th SRNWP Meetings

9

Geopotential June-August 2005

Page 10: NWP Activities at INM

October 2005 27th EWGLAM & 12th SRNWP Meetings

10

MSLP June-August

Page 11: NWP Activities at INM

October 2005 27th EWGLAM & 12th SRNWP Meetings

11

Precip. by thresholds POD-FAR

Page 12: NWP Activities at INM

October 2005 27th EWGLAM & 12th SRNWP Meetings

12

Wave operational model

WAM 4 for Atlantic and Mediterranean

High resolution shallow water model

Page 13: NWP Activities at INM

October 2005 27th EWGLAM & 12th SRNWP Meetings

13

Wave operational model

Page 14: NWP Activities at INM

October 2005 27th EWGLAM & 12th SRNWP Meetings

14

High Resolution Wave operational model

Page 15: NWP Activities at INM

October 2005 27th EWGLAM & 12th SRNWP Meetings

15

Hirlam Project – Data Assimilation

3DVAR in operational models. Assimilation of GPS data (TOUGH project). Test of Hirlam 4DVAR in the Cray X1e. Soil moisture analysis comparison

between Hirlam reference system and 1DVAR version (ELDAS project).

Mesoscale Rapid Update Cycle of analysis of surface parameters.

Assimilation of VAD winds from INM radar network.

Page 16: NWP Activities at INM

October 2005 27th EWGLAM & 12th SRNWP Meetings

16

Spring period: 15 April-15 May 2004

Impact of introducing 31 new GPS sites

ETS and TSS show that increasing the number of GPS sites improves model precipitation.

Verification with INM Climate stations (upscaled to 22km).

PP thresholds (0.1, 0.3, 1., 3., 10., 30., 100. mm in 24 hours)

Page 17: NWP Activities at INM

October 2005 27th EWGLAM & 12th SRNWP Meetings

17

Hirlam Project – Dynamics

Different strategies of coupling dynamics-physic in Hirlam.

Stability and same meteorological quality with larger time step.

Page 18: NWP Activities at INM

October 2005 27th EWGLAM & 12th SRNWP Meetings

18

Hirlam Project – Physics

Surface processes: Snow OI analysis. ECOCLIMAP database in Hirlam. New formulation of snow processes

using two additional tiles: snow over open land Snow over forest

Page 19: NWP Activities at INM

October 2005 27th EWGLAM & 12th SRNWP Meetings

19

Hirlam Project – Physics

Convection: New moist scheme based on Kain-Fritsch

convection and Rasch-Kristjannsson large scale implemented into the HIRLAM reference system.

Forecast 10-20 % more expensive and even more on vector computers (vector optimization in progress).

Improvement of precipitation over Iberia.

Page 20: NWP Activities at INM

October 2005 27th EWGLAM & 12th SRNWP Meetings

20

True Skill Statistic + Equitable Threat Score over Iberia (2-3 months)

Page 21: NWP Activities at INM

October 2005 27th EWGLAM & 12th SRNWP Meetings

21

SREPS - Multi-model Multi-boundaries

Models: Hirlam. HRM MM5 UM

Boundaries ECMWF UM AVN GME

Page 22: NWP Activities at INM

October 2005 27th EWGLAM & 12th SRNWP Meetings

22

Ensemble

72 hours forecast four times a day (00, 06, 12 y 18 UTC).

Characteristics: 4 models. 4 boundary conditions. 4 last ensembles (HH, HH-6, HH-12, HH-18).

16 member ensemble every 6 hours Time-lagged Super-Ensemble of 64

members every 6 hours.

Page 23: NWP Activities at INM

October 2005 27th EWGLAM & 12th SRNWP Meetings

23

SREPS

BCs / Model

AVN ECMWF

GME UM

Hirlam X X X X

Hrm X X X X

MM5 X X X X

UM O O O X

Page 24: NWP Activities at INM

October 2005 27th EWGLAM & 12th SRNWP Meetings

24

Road Map2003-2004

Research to find best ensemble for the Short Range

Jun 04 – Jun 05

Building Multimodel System

Jun 05-Dec 05

Mummubn/16 members

Daily run non-operational

Mar 06 Mummub 16/16

members

Full operations

Jun 06 Mummub+4lag64 members

First try