A presentation about implementing ecosystem restoration projects. Presented by Martha Craig Rheinhardt, Coastal Restoration Project Manager with the Cape Cod Conservation District, during the Buzzards Bay Coalition's 2012 Decision Makers Workshop series. Learn more at www.savebuzzardsbay.org/DecisionMakers

TRANSCRIPT

Page 1: Nuts and Bolts of Restoration Implementation

Nuts and Bolts of Restoration Implementation: Lessons from the

Cape Cod Water Resources Restoration Project

Martha Craig Rheinhardt Coastal Wetland Restoration Project Manager

Cape Cod Conservation District

Buzzards Bay Coalition Restoration Workshop April 5, 2012

Page 2: Nuts and Bolts of Restoration Implementation

Restoration Implementation

• Cape Cod Water Resources Restoration Project

• Planning and Design

• Partnerships

• Funding Sources

• Permitting

• Monitoring

• Construction and

Construction Management

Page 3: Nuts and Bolts of Restoration Implementation

Project Inception

Page 4: Nuts and Bolts of Restoration Implementation

Replace failing fish ladders

Restore anadromous fish runs

Page 5: Nuts and Bolts of Restoration Implementation

Improve water quality for shellfish growing areas

Install stormwater BMPs

Page 6: Nuts and Bolts of Restoration Implementation

Restore tidal flows to restricted salt marshes

Remove tidal restrictions

Page 7: Nuts and Bolts of Restoration Implementation

Cape Cod Water Resources Restoration Project

• 26 Tidal marsh projects

– 1,500 acres of marsh – $ 15 million

• 24 Fish passage projects – 4,200 acres of spawning habitat – $ 5 million

• 26 Stormwater projects – 7,300 acres of shellfishing areas – $ 8 million

Page 8: Nuts and Bolts of Restoration Implementation
Page 9: Nuts and Bolts of Restoration Implementation

Partners and Stakeholders

•Cape Cod Conservation District

•Natural Resources Conservation Service

•Barnstable County Commissioners

•Coastal Resources Committee

•15 Towns of Cape Cod

•Mashpee Wampanoag Tribe

• Commonwealth of Massachusetts

• MA Dept. Fish and Game

•Division of Ecological Restoration

•Division of Marine Fisheries

• MassDOT

• National Oceanic and Atmospheric

Adm.

• National Park Service

• U.S. Fish and Wildlife Service

• U.S. Environmental Protection Agency

Page 10: Nuts and Bolts of Restoration Implementation

Coalition Support Members

Association to Preserve Cape Cod

Cape Cod Chamber of Commerce

Cape Cod Commercial Hook Fishermen’s Association

Cape Cod Salties

Ducks Unlimited

Massachusetts Audubon Society

Trout Unlimited

Page 11: Nuts and Bolts of Restoration Implementation

• Feasibility Studies

• Topographic Survey

• Low-Property Assessments

• Tide Monitoring

• Hydraulic/Hydrologic Modeling

• Alternatives Analyses

• Public Outreach

• Design Stages and Review

Planning and Design

Page 12: Nuts and Bolts of Restoration Implementation

Monitoring

• Association to Preserve Cape Cod

• Pre-construction: Baseline Data

• Vegetation

• Neckton

• Salinity

• Post-construction: Changes

• Phragmites

Page 13: Nuts and Bolts of Restoration Implementation

Funding

• Funding needed every step of the way

• Partner Sources: NRCS, DER, NOAA, USFWS

• Corporate Wetland Restoration Partnership

• State and Federal grants

• Foundation grants

• Be clear about tasks, match

• Priority Status

• Keep asking

Page 14: Nuts and Bolts of Restoration Implementation

Implementation–PL 83-566 (Small Watersheds Program)

• Planning and design costs: 100 percent federal

• Permits and land rights: 100 percent sponsor

• Construction costs: 75 percent federal 25 percent sponsor

Page 15: Nuts and Bolts of Restoration Implementation

Permitting

• Order of Conditions • 401 Water Quality Certification • Chapter 91 • U.S. Army Corps of Engineers • MA Environmental Policy Act • CZM Federal Consistency • MA Endangered Species Act • MA Historical Commission • MassDOT • Other Reviewers: EPA, NMFS, DMF, Wampanoag Tribe

Page 16: Nuts and Bolts of Restoration Implementation

Preparing for Construction

• Final Plans and Specs

• Cost Estimates/Budget

• Bidding: Materials, Labor

• Ordering Materials

• Shop Drawings

• Engineer Review and Sign-off

• Permit Notifications

• Ready to Go!

Page 17: Nuts and Bolts of Restoration Implementation

Construction

• Pre-construction Meeting

• Site Preparation/Limits of Work

• Dewatering (Coffer dams, pumps, flow diversion)

• Culvert Removal/Installation

• Open flow and close-up site (Paving, planting)

• Engineering Oversight: Check grades, inverts; Reporting; Sign-offs

• Permit compliance/notifications

Page 18: Nuts and Bolts of Restoration Implementation

What happens after construction?

• Restoration Begins!

• Monitoring

• Operations and Maintenance

• Plantings

• Check for erosion/slumping

• Permit compliance and close-out

Page 19: Nuts and Bolts of Restoration Implementation

Sunken Meadow, Eastham

Page 20: Nuts and Bolts of Restoration Implementation
Page 21: Nuts and Bolts of Restoration Implementation
Page 22: Nuts and Bolts of Restoration Implementation
Page 23: Nuts and Bolts of Restoration Implementation
Page 24: Nuts and Bolts of Restoration Implementation

Sunken Meadow

• Removal of 610’ earthen berm and culvert • No culvert replacement/No hydrologic modeling • Pre- and Post-construction monitoring • Town DPW did work (25% match) • Funding Partners: DER, USFWS • Permitting: 3 months (no Chapter 91!) • Construction Timeline: 5 days • Costs: Construction: $57,000

Engineering/Design: $32,000 Permitting: $18,000

Page 25: Nuts and Bolts of Restoration Implementation

Red River Beach, Harwich

Page 26: Nuts and Bolts of Restoration Implementation
Page 27: Nuts and Bolts of Restoration Implementation
Page 28: Nuts and Bolts of Restoration Implementation
Page 29: Nuts and Bolts of Restoration Implementation
Page 30: Nuts and Bolts of Restoration Implementation

Red River Beach, Harwich

• Replace 2 24” pipes with 3’x4’ and 4’x8’ culverts • Low property: Tide gate needed on upstream

culvert • Town Highway Dept. doing construction (25%

match) • Funding Partners: DER • Permitting: 7 months • Timing of Construction/Arrival of materials • Costs: Construction: $354,000;

Engineering/Design: $94,500 Permitting: $30,000

Page 31: Nuts and Bolts of Restoration Implementation

Rushy Marsh, Cotuit (Barnstable)

Page 32: Nuts and Bolts of Restoration Implementation

Rushy Marsh

• Reconnect tidal flow with new 5’x10’ culvert and channel

• Town initiated design and permitting

• Permitting adjustments and O&M plan

• Bid Range: $149,000-$424,000

Page 33: Nuts and Bolts of Restoration Implementation

Freemans Pond, Brewster

Page 34: Nuts and Bolts of Restoration Implementation

Freeman’s Pond

• Replace 36” diameter pipe with 6’x10’ culvert

• Restore tidal flow to salt pond

• TOY restrictions for herring

• Safety requirements

• Funding Partners: DER, NOAA, CWRP

• Costs: Construction:$400,000 Engineering/Design: $62,250

Permitting: $30,000

Page 35: Nuts and Bolts of Restoration Implementation

Lessons Learned: Planning and Design

• Technical Expertise Important

• Property Ownership

• Low Properties

• Culvert Selection: Safety; Constructability; Cost-Effectiveness

• Every site is different!

• Don’t get “over-engineered”

• If something doesn’t seem right, it probably isn’t

• Don’t be afraid to ask questions

Page 36: Nuts and Bolts of Restoration Implementation

Lessons Learned: Permitting

• Pre-application meeting VERY helpful

• Know your regulators (and have them know you)

• Definitions are important

• Pay attention to permit conditions

• Think about timing

• Expensive and often grueling

Page 37: Nuts and Bolts of Restoration Implementation

Lessons Learned: Construction

• Dewatering is KEY

• Experience of contractor critical

• Order materials well ahead of time

• Get easements/entry agreements in place

• Coordinate utilities

• Give yourself plenty of room to work

• Timing: TOY restrictions, fish, plantings, summer season

• Troubleshooting: Expect the unexpected!

Page 38: Nuts and Bolts of Restoration Implementation

Project/Construction Management

• Define roles as early as possible

• Strong local support important

• Remember your partners and experts

• Ask questions

• Document everything

• Work with a comfortable budget

• Understand invoicing, billing, etc.

• Have cell phone and phone numbers handy

Page 39: Nuts and Bolts of Restoration Implementation

Questions

Questions?