number 8 wire - a story on demand response by transpower

10
Number 8 Wire a classic tale of grid challenges and opportunities

Upload: iea-dsm-task-24

Post on 29-Nov-2014

559 views

Category:

Technology


2 download

DESCRIPTION

Quintin Tahau from Transpower, the owner of the NZ grid tells the story of how to maintain, upgrade and improve the NZ grid. Told at the Wellington IEA DSM storytelling workshop on March 17, 2014.

TRANSCRIPT

Page 1: Number 8 Wire - a story on demand response by Transpower

Number 8 Wire

a classic tale of grid challenges and opportunities

Page 2: Number 8 Wire - a story on demand response by Transpower
Page 3: Number 8 Wire - a story on demand response by Transpower
Page 4: Number 8 Wire - a story on demand response by Transpower
Page 5: Number 8 Wire - a story on demand response by Transpower
Page 6: Number 8 Wire - a story on demand response by Transpower
Page 7: Number 8 Wire - a story on demand response by Transpower
Page 8: Number 8 Wire - a story on demand response by Transpower
Page 9: Number 8 Wire - a story on demand response by Transpower
Page 10: Number 8 Wire - a story on demand response by Transpower