May 25, 2012
Mr. Michael D. SkaggsSenior Vice PresidentNuclear Generation Development and ConstructionTennessee Valley Authority6A Lookout Place1101 Market StreetChattanooga, TN 37402-2801
SUBJECT: MEETING SUMMARY — PUBLIC MEETING WATTS BAR NUCLEARUNIT 2
Dear Mr. Skaggs:
This refers to the meeting conducted at our request at the Spring City Municipal Building inSpring City, TN on May 22, 2012 at 1:00 p.m. The meeting’s purpose was to discuss the statusof the Watts Bar Unit 2 Construction Project, including major milestones and potentialchallenges that may impact the project schedule with the public.
On May 22, 2012, the NRC held a Category 1 meeting in which TVA provided a presentationabout the current progress and scheduling plans for the Waifs Bar Nuclear (WBN) Unit 2construction project. The NRC staff presented information on the current status of the NRC’slicensing and construction inspection programs for WBN Unit 2. Additional topics related to theWBN Unit 2 construction project were discussed between the NRC and TVA. Following thesepresentations and discussions, members of the public had an opportunity to provide commentsand ask questions. The agenda (Enclosure 1), the list of attendees (Enclosure 2), the TVApresentation material used for discussions (Enclosure 3), and the NRC presentation materialused for discussions (Enclosure 4) are attached to this letter.
In accordance with 10 CFR 2.390 of the NRC’s “Rules of Practice,” a copy of this letter will beavailable electronically for public inspection in the NRC PubHc Document Room (PDR) or fromthe Publicly Available Records (PARS) component of NRC’s document system (ADAMS).
![Page 2: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/2.jpg)
TVA 2
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (thePublic Electronic Reading Room). Should you have any questions concerning this meeting,please contact James Baptist at 404-997-4506.
Since rely,
IRAI
Robert Haag, ChiefConstruction Projects Branch 2Division of Construction Projects
Docket No. 50-391Construction Permit No: CPPR-92
Enclosures: 1. Agenda2. List of Attendees3. Presentation - TVA4. Presentation - NRC
![Page 3: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/3.jpg)
TVA 3
cc w/encl:Mr. G. P. Arent,General Manager, Nuclear ConstructionLicensingTennessee Valley Authority1101 Market StreetLookout Place 5AChattanooga, Tennessee 37402-2801
Mr. 0. J. ZeringueGeneral ManagerEngineering and ConstructionWBN Unit TwoWatts Bar Nuclear PlantTennessee Valley AuthorityP.O. Box 2000Spring City, Tennessee 37381
Mr. R. A. HrubyGeneral MangerTechnical ServicesWBN Unit 2Watts Bar Nuclear PlantTennessee Valley AuthorityP.O. Box 2000Spring City, Tennessee 37381
Ms. D. K. GuinnManager, Licensing and Industry AffairsWatts Bar Nuclear PlantTennessee Valley AuthorityP.O. Box 2000Spring City, Tennessee 37381
Mr. P. D. SwaffordChief Nuclear Officer and Executive VicePresidentTennessee Valley Authority1101 Market Place3R Lookout PlaceChattanooga, Tennessee 37402-2801
County Executive375 Church StreetSuite 215Dayton, Tennessee 37321
County MayorP.O. Box 156Decatur, Tennessee 37322
Mr. D. H. GronekPlant Manager, WBN Nuclear PlantTennessee Valley AuthorityP.O. Box 2000Spring City, Tennessee 37381
Mr. D. C. RomashkoGeneral Manager, Nuclear ConstructionQuality AssuranceTennessee Valley Authority1101 Market StreetBlue Ridge 3AChattanooga, Tennessee 37402-2801
Mr. Joseph Shea, ManagerCorporate Nuclear LicensingTennessee Valley Authority3R Lookout Place1101 Market StreetChattanooga, TN 37402-2801
Mr. E.J. VigluicciAssistant General CounselTennessee Valley Authority400 West Summit Hill DriveWest Tower 6AKnoxville, Tennessee 37902
Mr. Lawrence E. Nanney, DirectorTennessee Department of EnvironmentalHealth and ConservationDivision of Radiological Health3rd Floor, L&C Annex401 Church StreetNashville, TN 37243-1532
Mr. D. E. GrissetteSite Vice PresidentWatts Bar Nuclear PlantTennessee Valley AuthorityP.O. Box 2000Spring City, Tennessee 37381
Ms. Ann P. HarrisPublic341 Swing LoopRockwood, TN 37854
![Page 4: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/4.jpg)
TVA 4
cc email distribution w/encl:Greg ScottTennessee Valley AuthorityElectronic Mail Distribution
Watts Bar 2 LicensingTennessee Valley AuthorityElectronic Mail Distribution
Brenda DerrickElectronic Mail Distribution
![Page 5: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/5.jpg)
TVA 2
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (thePublic Electronic Reading Room). Should you have any questions concerning this meeting,please contact James Baptist at 404-997-4506.
Sincerely,
IRN
Robert Haag, ChiefConstruction Projects Branch 2Division of Construction Projects
Docket No. 50-391Construction Permit No: CPPR-92
Enclosures: 1. Agenda2. List of Attendees3. Presentation - TVA4. Presentation — NRC
* See Previous Concurrence
• PUBLICLY AVAILABLE D NON-PUBLICLY AVAILABLE C SENSITIVE • NON-SENSITIVE
ADAMS: C Yes ACCESSION NUMBER: ML12150A036 • SUNSI REVIEW COMPLETE
OFFICE RII:DCP RII:DCP RII:DCP RII:DCP RII:DCP RII:DCP RII:DCISIGNATURE
RCH CJE via E-MailNAME RHaag CEven
-
DATE 05/25/2012 05/24/2012
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
OFFICIAL RECORD COPY DOCUMENT NAME: G:\CCI\DCP\CPB3\WATTS BAR 2\PUBLIC MEETINGS\MAY201 2\MEETING SUMMARY.DOCX
![Page 6: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/6.jpg)
Letter to Michael D. Skaggs from Robert C. Haag dated May 25, 2012.
SUBJECT: MEETING SUMMARY - PUBLIC MEETING WATTS BAR NUCLEAR PLANTUNIT 2
Distribution w/encl:L. Raghavan, NRRS. Campbell, NRRP. Milano, NRRJ. Poole, NRRF. Lyon, NRRM. Kotzalas, OEDOC. Evans, RIlL. Douglas, Rh EICSS. Shaeffer, Rll DRPR. Monk, RIl WBN Unit 1 SRIS. Dubose, RII Administrative AssistantRegion II State Liaison OfficerRegion II Public Affairs OfficerOE Mail (email address if applicable)ConE [email protected]
![Page 7: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/7.jpg)
AGENDA FOR PUBLIC MEETING
WITH
NRC AND TVA
May 22, 2012
1 :OOp Start of Meeting NRCPurpose of MeetingIntroductions
Status of Watts Bar Unit 2 Construction Project TVA
Updates to the Unit 2 Construction Schedule TVA
Update on Construction Inspection Activities NRC
Licensing Status NRC
Results of the Root Cause and Associated Corrective Actions TVAfor the Recent Human Performance Event
Assessment Results Regarding Work Order Quality Concerns TVA
Corrective Actions to Address Commercial Grade Dedication TVAViolations
Changes to Corrective Action Program TVA
Preventative Maintenance and Equipment Layup Program Changes TVA
Public Comments and Questions NRC
3:OOp Meeting Adjourned
Enclosure 1
![Page 8: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/8.jpg)
SIGN-IN SHEETWATTS BAR UNIT 2 PUBLIC MEETING
Date: 05/22/2012 Location: Spring City Municipal Building
Name CompanyBetty Hamby Public
Tom Trotter Public
Bob Crane Public
Woody Evans Public
Tomy Finnell Public
Gary Humphrey Public
Pt .Irhne.rn Piihli’
Linda Ellis TVA
Jim Hopson TVA
Kay Whittenburg TVA
Ann Harris Public
Annette Gould Public
Frederick Brown NRC
Terrance Reis NRC
Robert Haag NRC
Mark Lesser NRC
Kathleen O’Donohue NRC
Jaime Heisserer NRC
William Burton NRC
Gordon Arent TVA
Tom Wallace TVA
Ike Zeringue TVA
Ray Hruby TVA
Ric Wiggall TVA
Enclosure 2
![Page 9: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/9.jpg)
(1)
![Page 10: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/10.jpg)
Age
nda
•E
stim
ate
toC
ompl
ete
•C
onst
ruct
ion
Sch
edul
e&
Mile
ston
es
•Q
ualit
yof
Wor
kO
rder
s
•A
sset
Pre
serv
atio
n
•U
nit
1/
Uni
t2
Inte
rfac
e
•M
ater
ial
Con
trol
•C
orre
ctiv
eA
ctio
nPr
ogra
mC
hang
es
•C
oncl
usio
n
•Q
uest
ions
Ray
Hru
by
Ike
Zer
ingu
e
Ike
Zer
ingu
e
Ike
Zer
ingu
e
Tom
Wal
lace
Ric
Wig
gall
Ray
Hru
by
2E
nclo
sure
3
![Page 11: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/11.jpg)
Wat
tsB
arU
nit
2E
stim
ate
ToC
ompl
ete
WA
Boa
rdau
thor
ized
com
plet
ion
ofth
eW
atts
Bar
2Pr
ojec
tin
acco
rdan
cew
ithth
ere
vise
dE
stim
ate
toC
ompl
ete
(ETC
)on
Apr
il26
,20
12.
•T
hepr
ojec
tis
sche
dule
dto
com
plet
eby
Dec
embe
rof
2015
.
>C
onst
ruct
ion
perm
itex
tens
ion
requ
est
was
subm
itte
don
May
17,
2012
.
•Pr
ojec
tle
ader
ship
has
ahi
ghde
gree
ofco
nfid
ence
inth
ere
vise
dET
C.
•T
houg
hse
vera
lpr
ojec
tri
sks
and
oppo
rtun
itie
sre
mai
n,th
ese
are
man
agea
ble.
•C
ompl
etin
gth
eW
atts
Bar
Uni
t2
proj
ect
help
sW
Aba
lanc
eits
gene
rati
ngm
ixan
dac
hiev
eits
visi
onto
bea
lead
erof
low
-cos
tcl
eane
ren
ergy
.
3E
ncbs
ure
3
![Page 12: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/12.jpg)
Inde
pend
ent
Ass
essm
ents
Sev
eral
root
and
contr
ibu
ting
cause
so
fp
roje
ctper
form
ance
hav
ebee
nid
enti
fied
Lea
der
ship
:O
rgan
izat
ion
and
man
agem
ent
capa
bilit
ies
mis
alig
ned
with
uniq
uepr
ojec
tch
arac
teri
stic
sE
stim
ate:
Inad
equa
teun
ders
tand
ing
ofth
ew
ork
tobe
done
led
tolo
win
itial
esti
mat
esan
dim
pede
dpl
anni
ngE
xec
uti
on:
Man
agem
ent
did
not
exec
ute
aro
bust
exec
utio
npl
anor
fully
utili
zeav
aila
ble
capa
bilit
ies
Ov
ersi
ght:
Inad
equa
teN
ucle
arG
ener
atio
nD
evel
opm
ent
and
Con
stru
ctio
n/W
Aov
ersi
ght
and
proj
ect
assu
ranc
e
Indep
enden
tas
sess
men
tsal
igne
dw
ith
TVA
Roo
tC
ause
Ana
lysi
s(R
CA
)
McK
inse
yan
dA
ssoci
ates
Insi
ghts
are
inco
rpor
ated
dire
ctly
into
the
body
ofth
eRC
A
Hig
hB
ridg
eA
ssoci
ates
Alig
ned
wit
hET
Cm
etho
dolo
gyan
dpr
ovid
edsu
gges
ted
corr
ecti
veac
tion
sco
nsis
tent
wit
hRC
A
TVA
Insp
ecto
rG
ener
alA
ligne
dw
ith
RCA
and
prov
ided
insi
ght
into
addi
tion
alpr
ogra
mm
atic
impr
ovem
ents
Enc
losu
re3
4
![Page 13: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/13.jpg)
Cor
rect
ive
Act
ions
Com
preh
ensi
vere
visi
onof
ETC
Ens
ured
buy-
inof
revi
sed
cost
/sch
edul
e
Res
truc
ture
dpr
ojec
tor
gani
zati
on
-E
stab
lishe
din
depe
nden
t,in
tegr
ated
sche
dule
and
cost
mon
itori
ngto
ols
totr
ack
prog
ress
Impr
ove
qual
ityan
dtim
ing
ofPl
anni
ngdo
cum
ents
Impr
ove
effe
ctiv
enes
sof
fiel
den
gine
erin
g
Util
ize
inde
pend
ent,
inte
grat
edsc
hedu
lean
dco
stm
onito
ring
tool
sto
trac
kpr
ogre
ss
Est
ablis
hpr
oces
san
dov
ersi
ght
impr
ovem
ents
Incr
ease
tran
spar
ency
,bu
ildtr
ust
Init
iate
regu
lar
exec
utiv
esp
onso
rm
eeti
ngs
Str
eam
line
wor
kpa
ckag
ere
build
s
•Su
rfac
epr
oduc
tivity
mea
sure
s
Est
ablis
ha
proc
ess
toco
ntro
lpr
ojec
tsc
ope
•Pr
ovid
ere
gula
rpr
ojec
tup
date
sE
mpo
wer
empl
oyee
s
•Im
prov
ecr
aft
mor
ale
5
Com
ple
ted
Pro
ject
Exec
uti
on
Impro
vem
ents
Ongoin
gP
lanned Enc
losu
re3
![Page 14: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/14.jpg)
Organization
Chart
rcA
TA
Mec
hanr
onlM
grSe
eFie
Idon
gine
orin
g—
Bob
John
sOn
(0)
Ode
Mor
gan
(0)
WA
WA
FAC
/Sup
porl
Elo
ctni
cal
Mgr
J.L
oog
(0)
R.W
.H
arri
rrqt
on
Supe
r.rsO
rS
upar
v.no
rC
onst
ruct
ion
Con
erni
coon
Oeo
soor
enW
oorr
ingr
ooR
icha
rdB
aile
y
rS
enio
rM
anag
erSe
nior
Man
ager
Seni
orM
anag
erW
BNU
2Sy
stem
Eng
inee
nog
—-
WBN
U2
Ope
ratio
nsC
ompl
etio
nR
icht
erE.
Wig
gall
Tom
Wal
lace
Rob
ert
Bee
ckee
(0)
I
[::
NcIcro
r]
—
—B
roon
Con
norg
honn
Ron
Sen
Supp
oir
Proj
ect
Mar
agon
Bean
Co
pp
__
__
__
__
__
__
__
__
__
SC
n[eeeZ
enr
Rot
ubun
alM
anag
enre
rni
Dev
olop
mer
niB
rian
Bno
dy
rSen
orM
anag
erM
ecrr
anic
aOrg
ucje
arI
__
__
__
__
__
__
__
__
__
__
__
__
__
Wil
lrer
Cru
tch
Sen
ior
Spec
alni
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
__
Nuc
leon
Eng
inee
r
________
__
__
__
__
__
__
_______________________
Dou
gino
Hel
ero
Tec
hnic
alSe
r’si
ces
Seni
orM
anag
erE
ngin
eeri
ng&
Con
stru
ctio
nI
Gen
eral
Man
ager
WB
N2Q
uolit
yAns
uran
ceG
ener
atM
anag
errv
AS
ater
yT
VA
Col
TV
AP
rocu
rem
lR
ayA
.H
rnrk
yR
ant
R.B
aron
O.J
.Zen
ngrs
eG
reg
Poe
)c(
Cha
dM
ayD
arsO
liver
)c)
MonagC
orn
plr
accej
Man
Sche
dule
Proj
ect
Man
ager
Rot
atio
nal
Cos
iM
anag
emen
tM
anag
emen
tA
lison
Wig
ietn
e
__
__
__
__
__
________________________________
Nic
k_W
elch
Sen
io
rM
anager
___________________
Lice
nsin
gG
ordo
nA
reet
Proj
ect
Man
ager
__
__
__
__
__
__
__
__
__
__
__
Edw
ard
0.H
icks
Secu
nty
Man
ager
Rog
erR
eyno
lds
Proj
ect
Man
agor
Dan
idB
raeh
am
Seni
orPr
ogra
mM
anag
erK
eoin
Cas
ey
Seni
orM
anag
erR
otat
icra
lM
anag
emen
tSi
teC
ooot
nuct
icn
Dec
elnp
men
tH
owar
dL
awre
nce
EdF
reem
an
Bec
htel
____
____
____
____
___
__
__
__
__
__
__
__
__
Proj
ect
Dire
ctor
Mik
eM
cLem
ore
Bec
htel
Bec
htel
Bec
htel
Bec
htel
Bec
htel
Bec
htel
Bec
htel
Bnc
trtet
__
__
__
__
__
__
__
_
Proj
ect
Con
trols
Go/
DC
ES&
HC
onst
ruct
ino
Proc
urem
ent
Seri
nces
Proj
ect
Eng
inee
rPr
ojec
tE
ngin
eer
Mgr
IIaI
SobC
ontr
acts
Eng
hree
hng
III
caere
II
Bhtl
lii
:0er
II
ASM
ESt
artu
pI
tun.S
eonnrs
nir
oo
II5aP
P
I_I0
Mec
harh
cat
Hyd
roT
est
Gro
up
__
__
__
__
__
__
__
__
_IB
echt
etN
-5G
roap
_________________
IBec
htel
Wei
oicg
tRT
-IB
echt
elP
roje
ctFi
eld
Eog
IBec
htel
Fiet
dE
ngin
eeri
ng
Enc
losu
re3
6
![Page 15: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/15.jpg)
Con
stru
ctio
nP
hase
Map
Enc
losu
re3
7
![Page 16: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/16.jpg)
mC)0C’)
CD
LI,nCD
CDQ)(b)
CD(ri0
CD(n
![Page 17: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/17.jpg)
0.7
0.65 0.
6
0.55 0.5
0.45 0.
4
0.35 0.3
0.25 0.
2
Safe
tyP
erfo
rman
ce
Mar
-12
Oct
-li
Nov
-li
Dec
-il
Jan-
12Fe
b-12
_—
•Tar
get
Enc
losu
re3
9
![Page 18: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/18.jpg)
Pro
ject
Qua
lity
Qua
lity
Con
trolA
ccep
tanc
eR
ate
Apr
il20
11th
roug
hM
arch
2012
Apr
ilM
ayJu
neJu
lyA
ugSe
ptO
ctNo
vD
ec-r-I
97.9
%1
100.
0%
95.0
%
90.0
%
85.0
%
80.0
%
75.0
%
70.0
%
65.0
%
60.0
%
55.0
%
50.0
%Ja
nFe
bM
ar
Enc
’osu
re3
![Page 19: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/19.jpg)
Sche
dule
Perf
orm
ance
Mea
sure
sof
Suc
cess
—C
alen
dar
Yea
r20
12
•S
ched
ule
Per
form
ance
Inde
x—
Con
sist
ently
>1
•E
arne
dH
ours
vs.
Sch
edul
e--
Con
sist
ently
>1
•C
omm
odity
Wor
kO
ff—
Mee
ting
Sch
edul
e•
Pipi
ng
•E
lect
rica
l
•In
stru
men
tati
on
•V
entil
atio
n
•H
ange
rsan
dS
uppo
rts
Enc
’osu
re3
11
![Page 20: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/20.jpg)
Wor
kO
rder
Qua
lity
Qua
lity
Ass
uran
ceId
enti
fied
Def
iden
cies
inW
ork
Ord
erP
acka
ges
Rel
ated
toD
ocum
ent
Com
plet
enes
s.
Cau
se
>C
ompl
exw
ork
pack
ages
and
inco
nsis
tent
adhe
renc
eto
proc
edur
algu
idan
ce
Cor
rect
ive
Act
ions
>R
e-w
rite
com
plex
wor
kor
der
pack
ages
tore
duce
and
elim
inat
epo
tent
ial
hum
aner
ror
trap
s>
Est
ablis
hed
aW
ork
Clo
sure
Gro
upto
revi
eww
ork
orde
rsfo
rco
mpl
eten
ess
prio
rto
clos
ure
Tra
ined
wor
kcl
osur
egr
oup
onex
pect
atio
nsan
dpr
oced
ural
guid
ance
>R
evis
edgo
vern
ing
proc
edur
eto
add
clar
ific
atio
nto
the
clos
ure
revi
ewpr
oces
s
>C
onst
ruct
ion
supe
rint
ende
ntbr
iefe
dco
nstr
uctio
ndi
scip
line
supe
rint
ende
nts
rega
rdin
gex
pect
atio
nsfo
rw
ork
orde
rco
mpl
etio
nby
the
craf
t
Enc
losu
re3
12
![Page 21: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/21.jpg)
Wor
kO
rder
Qua
lity
Wor
kIm
plem
enta
tion
Qua
lity
Con
trol
insp
ecti
ons
>Q
ualit
yA
ssur
ance
audi
ts
>W
ork
orde
rcl
osur
ere
view
>A
s-bu
iltve
rifi
catio
nsof
engi
neer
ing
docu
men
ts
•T
esti
ng
>C
ompo
nent
test
ing
>Sy
stem
test
s,pr
e-op
and
acce
ptan
cete
sts
>In
tegr
ated
plan
tte
stin
g
•V
alid
atio
n
>O
pera
tiona
lR
eadi
ness
Tur
nove
rPr
oces
s,in
clud
ing
syst
emw
alkd
owns
,re
veri
fica
tions
ofpr
oces
ses
and
com
mit
men
tsas
was
com
plet
edby
the
Syst
emPr
e-op
erab
ility
Che
cklis
tsfo
rU
nit
1lic
ensi
ngSy
stem
Plan
tA
ccep
tanc
eE
valu
atio
n,a
fina
len
gine
erin
gre
view
insu
ppor
tof
syst
emre
adin
ess
for
turn
over
and
licen
sing
Enc
losu
re3
13
![Page 22: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/22.jpg)
Ass
etP
rese
rvat
ion
•Pr
oces
s>
Str
engt
heni
ngth
epr
oces
sth
atm
anag
esan
dpr
ovid
esov
ersi
ght
ofac
tiviti
esth
aten
sure
plan
teq
uipm
ent
and
syst
emar
em
aint
aine
dan
dpr
oper
lyla
yed-
up
>R
evie
win
gpl
ant
equi
pmen
ten
suri
ngla
y-up
and
pres
erva
tion
requ
irem
ents
are
inth
epr
ogra
m
•O
vers
ight
Est
ablis
hing
perf
orm
ance
indi
cato
rsto
faci
litat
em
onito
ring
ofth
eef
fect
iven
ess
ofth
eas
set
pres
erva
tion
prog
ram
for
each
syst
em
Perf
orm
peri
odic
asse
ssm
ents
ofpr
ogra
mef
fect
iven
ess
Enc
losu
re3
![Page 23: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/23.jpg)
Uni
t1/
Uni
t2
Inte
rfac
eU
nit
1P
rese
nce
onU
nit
2Pr
ior
topl
anni
ngev
alua
tion
perf
orm
edto
dete
rmin
eim
pact
onop
erat
ing
Uni
tre
quir
esSR
Oin
put
•In
terf
ace
•C
omm
onsy
stem
com
pone
nt•
Aux
iliar
yB
uild
ing
Sec
onda
ryC
onta
inm
ent
Enc
losu
re•
Prox
imity
totr
ipor
risk
sens
itiv
eeq
uipm
ent
Act
iviti
esaf
fect
ing
Uni
t1
are
inop
erat
ing
plan
tsc
hedu
lean
dre
ceiv
eri
skre
view
>C
onst
ruct
ion
activ
ities
inco
mm
onpl
ant
area
sar
em
onit
ored
and
cont
rolle
d>
All
wor
kpl
anne
don
oper
atin
gpl
ant
side
ofth
ein
terf
ace
ispe
rfor
med
inac
cord
ance
with
oper
atin
gpl
ant
proc
esse
san
dre
quir
emen
ts
Uni
t2
Pre
sence
onU
nit
1>
AU
nit
2W
Am
anag
erpa
rtic
ipat
esin
Uni
t1
Plan
ofth
eD
aym
eeti
ngW
ork
inop
erat
ing
spac
esis
revi
ewed
daily
with
the
plan
tm
anag
emen
t>
Uni
t2
atle
nds
daily
sche
dule
mee
ting
san
dpr
ovid
esin
put
>U
nit
2un
rest
rict
edac
cess
isco
ntro
lled
bypr
oced
ure
and
byap
prov
edac
cess
list
15E
nclo
sure
3
![Page 24: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/24.jpg)
Uni
t1/
Uni
t2
Inte
rfac
e
Uni
t1
Pre
ssur
izer
Hea
ter
Tra
nsfo
rmer
De-
ener
gize
dC
ause
>D
irec
tca
use
was
impr
oper
use
ofhu
man
perf
orm
ance
tool
s-
spec
ific
ally
,in
divi
dual
sfa
iled
tove
rify
corr
ect
com
pone
ntto
wor
kon
>R
oot
caus
eid
entif
ied
that
proc
ess
tore
star
tw
ork
that
had
been
star
ted
and
dela
yed
shou
ldbe
stre
ngth
ened
topr
otec
tpl
ant
and
wor
kers
Cor
rect
ive
acti
ons
>St
oppe
dpr
ojec
tw
ork
and
sent
craf
tho
me
toen
sure
we
unde
rsto
odw
hat
occu
rred
and
that
we
had
prop
erco
ntro
lsin
plac
eto
prot
ect
plan
tan
dw
orke
rs
>Se
nior
man
ager
sm
etw
ithsu
perv
isor
san
dcr
aft
todi
scus
sev
ent
and
wha
tm
ust
happ
ento
mov
efo
rwar
d>
Ver
ific
atio
npr
actic
esar
eno
wob
serv
edin
the
field
bysu
perv
isor
sIn
volv
edpl
ant
oper
ator
sto
activ
ely
chal
leng
ew
orke
rsin
oper
atin
gsp
aces
Inje
cted
addi
tiona
lle
vels
ofap
prov
alto
wor
kin
com
mon
area
sIn
volv
edth
etr
ade
unio
nsin
root
caus
ean
dde
velo
ping
mea
sure
sto
prev
ent
reoc
curr
ence
16E
nc’o
sure
3
![Page 25: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/25.jpg)
Uni
t1/
Uni
t2
Inte
rfac
e
Cor
rect
ive
Act
ions
(conti
nued
)
>Pl
aced
addi
tiona
lco
ntro
lson
indi
vidu
als
gran
ted
unre
stri
cted
acce
ssto
oper
atin
gsp
aces
Form
aliz
edpr
oces
sfo
rco
ntin
uing
wor
kin
the
even
tth
ew
ork
pack
age
activ
ityha
sbe
ende
laye
d>
Form
aliz
edre
quir
emen
tsfo
rPr
e-Jo
bB
rief
and
STA
RR
Tca
rdB
rief
ings
>R
equi
red
tech
nica
lda
tafi
elds
onda
tash
eets
tobe
popu
late
dpr
ior
togo
ing
toth
efi
eld.
>S
uper
viso
ror
Ope
rati
ons
appr
oval
requ
ired
prio
rto
wor
kin
com
mon
area
s
>U
nion
repr
esen
tati
ves
revi
ewed
even
tan
dim
port
ance
ofus
ing
hum
anpe
rfor
man
ceto
ols
duri
ngm
eeti
ngs
with
the
craf
t
>A
cces
sto
indi
vidu
als
inU
nit
1ar
eas
limite
d,w
ithup
per
man
agem
ent
appr
oval
requ
ired
for
acce
ssau
thor
izat
ion
17E
nclo
sure
3
![Page 26: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/26.jpg)
Uni
t1/
Uni
t2
Inte
rfac
e
Cor
rect
ive
Act
ions
(con
tinu
ed)
>E
vent
Scen
ario
inco
rpor
ated
into
Dyn
amic
Lear
ning
Cen
ter
trai
ning
>St
reng
then
edre
quir
emen
ts-
Pre-
job
and
STA
RRT
Car
dB
riefin
gs
>D
evel
oped
proc
ess
for
cont
inui
ngw
ork
afte
rw
ork
pack
age
has
been
dela
yed
Req
uire
dun
itid
entif
icat
ions
onda
tash
eets
for
field
wor
k
Con
clus
ions
>C
ontr
ols
are
inpl
ace
topr
otec
tpe
rson
nel
and
equi
pmen
tan
das
sure
the
safe
oper
atio
nof
Uni
t1.
>W
eto
okag
gres
sive
acti
onan
dfi
xed
this
prob
lem
.
>If
chal
leng
esar
een
coun
tere
d,th
ete
amre
spon
dsqu
ickl
yan
dac
tion
sar
epu
tin
topl
ace
toad
dre
ssth
epr
oble
man
dto
prec
lude
itfr
omha
ppen
ing
agai
n.
18E
nclo
sure
3
![Page 27: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/27.jpg)
Mat
eria
lC
ontr
ol
Prog
ram
Issu
es
•Pr
ogra
mim
plem
enta
tion
wea
knes
ses
wer
eid
entif
ied
insp
ecif
ying
failu
rem
odes
,sa
fety
func
tion
san
dcr
itica
lch
arac
teri
stic
sw
hen
perf
orm
ing
com
mer
cial
grad
ede
dica
tion
s.
•C
omm
erci
algr
ade
dedi
cati
onis
the
proc
ess
whe
reE
ngin
eeri
ngev
alua
tes
aco
mm
erci
ally
avai
labl
eco
mpo
nent
toen
sure
itca
npe
rfor
ma
desi
gnsa
fety
func
tion
prio
rto
appr
ovin
gth
eco
mpo
nent
for
use.
•C
ause
>M
etho
dsus
edby
Uni
t2
tope
rfor
mco
mm
erci
algr
ade
dedi
cati
ons
wer
eno
tin
acco
rdan
cew
ithcu
rren
tin
dust
rygu
idan
cean
dst
anda
rds.
•C
orre
ctiv
eA
ctio
ns
Inde
pend
ent
indu
stry
expe
rts
perf
orm
ed100
%re
view
ofco
mm
erci
algr
ade
dedi
cati
onpa
ckag
esut
ilize
dby
Uni
t2
Com
plet
ion
Proj
ect.
•N
ote
chni
cal
issu
esid
entif
ied
that
wou
ldch
alle
nge
the
com
pone
nt’s
abili
tyto
perf
orm
itssa
fety
func
tion
19E
nclo
sure
3
![Page 28: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/28.jpg)
Mat
erEa
lC
ontr
olC
orre
ctiv
eA
ctio
ns(c
onti
nued
)
>R
evis
epr
ogra
mpr
oced
ures
toin
corp
orat
ela
test
regu
lato
ryan
din
dust
ryst
anda
rds
Prov
ided
EPR
Itr
aini
ngon
com
mer
cial
grad
ede
dica
tion
toun
it2,
proc
urem
ent
engi
neer
ing
grou
ppe
rson
nel
>U
nit
2’s
com
mer
cial
grad
ede
dica
tion
sid
entif
ied
with
wea
knes
ses
will
bere
vise
d/up
date
d
>R
e-re
view
the
Uni
t2,
Rep
lace
men
tIt
ems
Proj
ect
(RIP
)C
orre
ctiv
eA
ctio
nPr
ogra
mfo
ran
ypo
tent
ial
impa
ct
.•C
oncl
usio
ns
>A
ctio
nsha
vebe
enta
ken
toad
dres
sth
ew
eakn
esse
sid
entif
ied
inth
eC
omm
erci
alG
rade
Ded
icat
ion
prog
ram
.
>C
omm
erci
alG
rade
Ded
icat
ion
pack
ages
used
insu
ppor
tof
Uni
t2
have
been
eval
uate
d.
>N
ote
chni
cal
issu
esha
vebe
enid
entif
ied
that
wou
ldch
alle
nge
the
com
pone
nt’s
abili
tyto
perf
orm
itssa
fety
func
tion.
20E
nclo
sure
3
![Page 29: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/29.jpg)
Cor
rect
ive
Act
ion
Prog
ram
Cha
nges
Eff
ecti
veuse
ofC
AP
and
wor
kpro
cess
esto
driv
eti
mel
yco
rrec
tion
ofid
enti
fied
prob
lem
sor
issu
es
•C
ause
>In
suff
icie
ntlin
em
anag
emen
tin
volv
emen
tan
dfo
cus
com
bine
dw
ithla
rge
influ
xof
low
thre
shol
dite
ms
into
the
CAP
—in
suff
icie
ntpr
ojec
tin
tegr
atio
n
•C
orre
ctiv
eA
ctio
ns
>In
crea
selin
em
anag
emen
tin
volv
emen
t(v
s.su
ppor
tst
aff)
atke
ypr
oces
spo
ints
—in
itiat
ion,
scre
enin
gre
view
s,co
rrec
tive
actio
npl
anap
prov
al>
Cla
rify
thro
ugh
com
mun
icat
ion,
trai
ning
and
proc
ess
chan
ges
the
mos
tap
prop
riat
eco
rrec
tion
proc
esse
sto
expe
dite
hand
ling
and
com
plet
ion
>R
e-re
view
back
log
for
impa
ctpo
tent
ial,
prio
rity,
sche
dule
inte
grat
ion
—
elim
inat
edu
plic
ativ
etr
acki
ngan
dhe
ight
enm
onito
ring
ofw
ork-
off
plan
s>
Res
truc
ture
CAP
alig
nmen
t,m
onito
ring
,an
dov
ersi
ght
toim
prov
eef
fect
iven
ess
Enc
losu
re3
21
![Page 30: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/30.jpg)
Con
cIus
ons
•C
ompl
ete
Wat
tsB
arU
nit
2in
asa
fean
dqu
ality
man
ner
•Fo
cus
onsa
fean
dun
inte
rrup
ted
oper
atio
nof
Uni
t1
•C
ompl
etin
gth
epr
ojec
tco
ntin
ues
tobe
aco
st-c
ompe
titi
vein
vest
men
tin
pow
erge
nera
tion
capa
city
•In
depe
nden
t,in
tegr
ated
sche
dule
and
cost
perf
orm
ance
indi
cato
rsan
dto
ols
inpl
ace
tom
onito
rpr
ogre
ssan
dve
rify
resu
lts.
•H
igh
degr
eeof
conf
iden
cein
the
revi
sed
sche
dule
•Se
vera
lpr
ojec
tri
sks
and
oppo
rtun
itie
sre
mai
n,ye
tth
ese
are
man
agea
ble
•T
hepr
ojec
tis
sche
dule
dto
com
plet
eby
Dec
embe
rof
2015
>C
onst
ruct
ion
perm
itex
tens
ion
requ
est
subm
itte
don
May
17,
2012
22E
nclo
sure
3
![Page 31: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/31.jpg)
QU
ES
TIO
NS
?
![Page 32: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/32.jpg)
?
U.S
.NR
CU
nite
dS
tatm
Nudar
Reg
ulat
ory
Corn
nti
sion
Prot
ectin
gPe
ople
and
the
Env
iron
men
t
Enc
losu
re4
![Page 33: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/33.jpg)
--
U.S
.NR
CC
ate
gory
IP
LIb
IiC
IVI e
etI
iig
Uni
ted
Sta
tes
Nuc
lear
Reg
ulat
ory
Com
mis
sion
Prot
ectin
gPe
ople
and
the
Env
iron
men
t
•P
lease
sig
nin
•F
eedback
form
s•
Publi
cin
vit
ed
too
bse
rve
init
ial
po
rtio
no
fm
eeti
ng
•N
RC
av
ail
ab
lefo
rq
uest
ion
slco
mm
ents
•A
genda,
slid
es,
meeti
ng
sum
mary
,an
dli
sto
fatt
endees
inA
gency
wid
eD
ocum
ents
Access
an
dM
an
ag
em
en
tS
yst
em
(AD
AM
S)
![Page 34: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/34.jpg)
cU.S
.NR
CA
ge
1d1
da
Uni
ted
Sta
tes
Nuc
lear
Reg
ulat
ory
Com
mis
sion
Prot
ectin
gPe
ople
and
the
Env
iron
men
t
I:O
Op
-In
troducti
ons
Sta
tus
of
Watt
sB
ar2
Const
ructi
on
Pro
ject
(TV
A)
Up
date
on
Const
ructi
on
Schedule
(TV
A)
Up
date
on
Const
ructi
on
Insp
ecti
on
Acti
vit
ies
(NR
C)
Lic
ensi
ng
Sta
tus
(NR
C)
Dis
cuss
ion
of
Recent
Issu
es
(TV
AIN
RC
)
Publi
cC
om
men
tsand
Quest
ions
(NR
C)
3:O
Op
-M
eeti
ng
Adjo
urn
ed
![Page 35: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/35.jpg)
2U.S
.NR
CIii
Spec
tio
iiP
rog
ra11
1U
pdate
sU
nite
dS
tate
sN
ucle
arR
egul
ator
yC
omm
issi
on
Prot
ectin
gPe
ople
anti
the
Env
iron
men
t
•R
esu
lts
of
the
End-o
f-cycle
assessm
ent
revie
wis
sued
ina
Mar
ch5,
2012
lett
er
toT
VA
•O
ver
all
accepta
ble
perf
orm
ance
•T
hre
eit
em
shig
hli
ghte
d:
-In
adequate
corr
ecti
ve
acti
on
for
new
and
his
tori
cal
item
s-
Com
merc
ial
Gra
de
Dedic
ati
on
pro
gra
mvio
lati
ons
-N
osu
bst
anti
ve
cro
ss-c
utt
ing
issu
es —
ø
L
![Page 36: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/36.jpg)
-*U
.S.N
RC
Iiis
pe
cti
oii
Pro
gra
111
Update
5U
nite
dS
tate
sN
ucle
arR
egul
ator
yC
omm
issi
on
Prot
ectin
gPe
ople
and
the
Env
iron
men
t
•N
ext
peri
od
icassessm
ent
inA
ugust
for
the
Mid
-Cycl
ere
vie
w•
Ex
pen
ded
ap
pro
xim
ate
ly4
,28
5in
specti
on
rela
ted
hours
in1st
Quart
er
of
2012
I
![Page 37: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/37.jpg)
tU.S
.NR
Cii
iipa
Ct
Of
SC
lie
dU
I eC
ha
flg
Uni
ted
Sta
tes
Nuc
lear
Reg
ulat
ory
Com
mis
sion
Prot
ectin
gPe
ople
anti
theE
nvir
onm
ent
on
Insp
ecti
on
Pro
gra
m
•R
evie
win
gT
VA
’sP
rim
avera
const
ructi
on
schedule
•A
dju
stin
gN
RC
schedule
for
rem
ain
ing
insp
ecti
on
item
s•
Pace
of
regio
nal
insp
ecti
ons
has
slow
ed
•N
um
ber
of
resi
dent
insp
ecto
rsre
duced
toth
ree
for
the
next
six
month
s•
Ass
ignin
ga
perm
anent
3rd
resi
dent
insp
ecto
rU
sero
tati
ons
for
resi
dent
posi
tion
![Page 38: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/38.jpg)
-U
S.N
RC
Sta
tLi S
Of
I us p
eC
t10
11I t
eil
lsU
nite
dS
tate
sN
ucle
arR
egul
ator
yC
omm
issi
on
Prot
ectin
gPe
ople
and
the
Env
iron
men
t
•A
pp
rox
imate
ly537
const
ructi
on
insp
ecti
on
item
sin
the
Insp
ecti
on
Pla
nn
ing
an
dS
ch
eduli
ng
(IP
&S
)data
base
•C
lose
d206
item
s•
Man
yre
main
ing
lP&
Sit
em
shave
been
insp
ecte
d,
but
req
uir
eaddit
ion
al
eff
ort
toclo
se
•C
lose
deig
ht
(8)
Co
rrecti
ve
Acti
on
Pro
gra
ms
an
dS
pecia
lP
rogra
ms,
many
sub-i
ssues
als
oclo
sed
—I
I
![Page 39: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/39.jpg)
Pro
ble
mId
enti
ficati
on
&R
eso
luti
on
Insp
ecti
on
•D
ocum
ente
din
Insp
ecti
on
Report
05000391/2
012612
(ML
12131A
231)
•Id
enti
fied
two
(2)
Severi
tyL
evel
IVvio
lati
ons
for
incom
ple
tepro
ble
mid
enti
ficati
on
and
lack
of
tim
ely
corr
ecti
ve
acti
ons
•C
onclu
ded
that
adecli
ne
inperf
orm
ance
inth
eC
orr
ecti
ve
Acti
on
Pro
gra
mhad
occurr
ed
since
2011
•F
oll
ow
-up
insp
ecti
on
bein
gpla
nnedU
.S.N
RC
Uni
ted
Sta
tes
Nuc
lear
Reg
ulat
ory
Com
mis
sion
Prot
ectin
gPe
ople
and
the
Env
iron
men
t
4!
![Page 40: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/40.jpg)
--
U.S
.NR
CI..I C
e11
SI 1
1 gS
ttLI
5U
nite
dS
tare
sN
ucle
arR
egul
ator
yC
omm
issi
on
Prot
ectin
gPe
ople
ath
eE
nvir
onm
ent
Safe
tyR
evie
ws
-96%
com
ple
te•
Resu
lts
docum
ente
din
SS
ER
s21
thro
ugh
25
•S
SE
R26
schedule
dfo
rS
epte
mber
2012
Fir
eP
rote
cti
on
and
clo
sure
of
open
item
s
•S
ecuri
tyP
rogra
mR
evie
ws
-100%
com
ple
te•
Em
erg
ency
Pre
pare
dness
Pro
gra
m-
100%
com
ple
te•
Envir
onm
enta
lR
evie
ws
•D
raft
publi
shed
for
com
ment
inN
ovem
ber2
011
•S
taff
curr
entl
yaddre
ssin
gcom
ments
•F
inal
schedule
dto
be
publi
shed
inA
u
![Page 41: NUCLEAR REGULATORYUNITED STATES · 2018-07-12 · UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May](https://reader033.vdocuments.us/reader033/viewer/2022041907/5e64ddcfb70ece6c424a37d0/html5/thumbnails/41.jpg)
JU
S.N
RC
Uni
ted
Sti
tis
Nuc
lear
Reg
ulat
ory
Co
nin
iio
n
10
Prot
ectin
gPe
ople
and
the
Env
iron
men
t
Enc
losu
re4