Page 1: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

Nuclear Power Plants – Design and Safe Operation

- August 2018 -

Dr.- Ing. L. Mohrbach

Page 2: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 2

Contents

Nuclear Energy and Climate

Generation I – III Evolutionary: European Pressurized Water Reactor (EPR)

Revolutionary: Advanced Pressurized Water Reactor (AP-1000)

Generation IV Liquid Metal Cooled Reactors (LMR)

High-Temperature Reactor (HTR)

Advanced Concepts

Small Modular Reactors (SMR)

Nuclear Energy in the World Switzerland, Canada, USA, Japan, Finland, China, India

Page 3: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 3

1970 1980 1990 2000 2010 2016

Coal

HydroRenewablesNuclear

www.bp.com/.../energy...2017/bp-statistical-review-of-world-energy-2017-full-re...

Breakdown of Primary Energy Sources Worldwide

%

30

20

10

4%

Gas

Oil

Page 4: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 4

45,000

40,000

30,000

20,000

10,000

0 2014 2040

12%

18%

8%

2 K

Wind, Biomass, Solar

HydroNuclear EnergyFossil Energies

TWh / a

Power Generation Worldwide: Climate Agreement of Paris in 2017

12%

4 – 5 K Global

Warming

+ 2.3 % p. a.

+ 1.5 % p. a.

Page 5: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 5

• 450 nuclear power plants provide about 12% of the worldwide electricenergy supply.

• They save around 2 Gt CO2 emissions p. a.

• This corresponds to approx. 6% of all anthropogenic CO2 emissions

Nuclear Energy Effectively Reduces CO2 Emissions

Page 6: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 6

Russia

4 +6 UAE4 Thailand

4 Poland2 Morocco

1 Libya1 Algeria

8 Egypt7 Indonesia

2 Kazakhstan4 Jordan

1 Cambodia1 North Korea

2 Bolivia1 Sri Lanka

2 Sudan3 Kenya

2 Belarus1 The Philippines

2+2 Bangladesh1 Croatia1 Mongolia2 Malaysia 4 Chile

4+8 Turkey16 Saudi Arabia4 Nigeria1 Ghana1 Thailand

98 - 6 + 2 + 1758 - 2 + 1 + 2

36 + 9 + 297 (+35) - 2 + 2

15 + 2 + 1219 + 7

7 - 724 + 524 + 8 + 63

15 + 2 + 68 - 2 + 3

776 - 2 + 22 + 14 + 2 + 25 - 1

6 + 44 + 2 + 1

39 + 40 + 2284 + 2

2 + 3

3 + 2 + 22 + 1 + 4

2 + 65 + 3 + 3

1 - 1 + 11 + 2

2 + 2 + 21 + 1

1 + 1 + 7 Iran

+ 1

USAFrance

CanadaGermany

Switzerland

South Korea KoreaIndia

SwedenSpain

Belgium

BulgariaSlovaki

a

Taiwan

Japan

Ukraine

Czech RepublicFinlandHungaryChinaArgentinaBrazilLithuaniauenMexico

IranSloveniaRumaniaThe NetherlandsArmeniaSouth Africa

Pakistan

Decommissioning Planned: 21 Under Construction: 89 (IAEA: 57) Projects: 414 + 90

450 Nuclear Power Plants in 31 Countries (4/2018)

United Kingdom

Page 7: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 7

35

30

25

20

15

10

5

0

€ct/kWh

Source: Eurostat, EdP

EU 28

EU 19 (Euro)

Den

mark

Germany

Ireland

Italy

Spain

Belgium

Portugal UK

Austria

Swed

enCyprus

Nethe

rland

sGreece

Luxembo

urg

Fran

ceLatvia

Sloven

iaFinlan

dSlovakia

Poland

Roman

iaCroa

tiaCzech Re

p.Estonia

Malta 

Lithua

nia

Hun

gary

Bulgaria

Liechten

stein

Norway

Icelan

dTurkey

Mon

tene

gro

Moldo

vaFYRO

MBo

snia‐Herzeg.

Alba

nia

Serbia

Kosovo

VATTaxes and Duties (VAT excl.)Generation and Distribution

Household Electricity Prices in Europe in 2015 (2nd Half)

Page 8: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 8

12

10

8

6

4

2

0

1990 1994 1998 2002 2006 2010 2014

CO2 Emissions from Combustion plus Cement Production

China

China <2015

USA

EU 28

India

Russia

Japan

Gt CO2 /a

„Carbon Leakage?“

Page 9: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 9

Mio t/a„Wall Fall Profit“

1,200

1,000

800

600

400

200

0

Financial Crisis

Kyoto Budget

CO2

CH4,N2O,

FCKW…

Source: Umweltbundesamt Emissionssituation 2016, Energie-Infodienst 2017

1990 2000 2005 2007 2009 2011 2013 2015 2016 2020

Target:- 40%

17NPPs917

750?

Greenhouse Gas Emissions (CO2 Equivalents)

Page 10: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 10

Contents

Nuclear Energy and Climate

Generation I – III Evolutionary: European Pressurized Water Reactor (EPR)

Revolutionary: Advanced Pressurized Water Reactor (AP-1000)

Generation IV Liquid Metal Cooled Reactors (LMR)

High-Temperature Reactor (HTR)

Advanced Concepts

Small Modular Reactors (SMR)

Nuclear Energy in the World Switzerland, Canada, USA, Japan, Finland, China, India

Page 11: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 11

Generation I

Early Prototypes

(~100 MW)PWR,BWR,

Magnox

1965

Generation II

CommercialPower Reactors

(600 –1200 MW)CANDU,

AGR,RBMK

1995

Generation III

EvolutionaryPlants

(<1300 MW)

2010

Generation III+

FurtherIncrease ofEfficiency

(1150 –1650 MW)

2030Generation IV

Improvement ofefficiency,

safety,waste economics

Breeders,High-Temperature Reactors,

Liquid Fuel Reactors,Steam Superheating

Small Modular Reactors („SMR“)

Westinghouse4-Loop

Siemens-KWUPre- Convoy

FramatomeEPR

INVAP (Arg)CAREM

Classification of Advanced Developments

Page 12: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 12

Name MWel Developer In Oper. U. Con. Planned

PWR

EPR 1650 Framatome/ EdF - 6 10Atmea 1 1150 Framatome/ Mitsubishi - - 4AP-1000 1100 Brookfield (CAN)/ Westinghouse - 2 -

CAP-1000 1100 CNNC (China)/ Westinghouse - 8 18CAP-1400 1300 CNNC - - 2

ACPR-1000 1000 China GN/ CNPC 24 6 -Hualong- 1 1150 China GN/ CNNC - 6 4

WWER- 1000 1000 Atomenergoprojekt, OKB Gidropress 36 5 -

MIR- 1200 1200 Atomenergoprojekt, OKB Gidropress 2 13 13

TOI 1300 1300 Atomenergoprojekt, OKB Gidropress - 2 -

APR 1400 Korea Electric 1 9 3

BWRABWR 1380 General Electric, Hitachi (Toshiba) 5 2 4

ESBWR 1600 General Electric - - 2

CANDUE-CANDU-6 600 SNC Lavalin/ China GN 2 - 1IPHWR-700 700 Nuclear Power India - 6 8

GEN IVHTR-PM200 200 China NEC - 2 2

CFR-600 600 TerraPower/ CNNC - - 2

SMR

CAREM 27-100 CNEA (Arg.)/ INVAP - 1 1KLT-40 35 Atomenergoprojekt - 1x2 4

Linglong 1 100 CNNC-CNEC New Energy/ NPIC - - 2

Reactors for the World Market in 2018 (Predecessor Types)

Page 13: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 13

8 Pressurised Water Reactors (5 Manufacturers)2 Boiled Water Reactors (1 Manufacturer)2 Heavy Water Reactors (2 Manufacturers)

GENERATION- IV- Programme GIF (US Ministry of Energy 2002)

Six advanced reactor types with improved- safety,- efficiency,- risk of proliferation

Small Modular Reactors:

About 20 pressurised water reactorsAbout 5 light water reactors with supercritical steam parametersAbout 10 high-temperature reactorsAbout 10 liquid metal cooled (fast) reactors (incl. breeders)About 10 molten salt reactors

Summary: World Market for Nuclear Power Plants

Page 14: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 14

Nuclear Power Plant Projects in Europe

„Nuclear“ Country „Newcomer“

CommissionedUnder ConstructionPlanned

Page 15: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 15

Nuclear Power Worldwide

1. AREVA EPR

DWR • 1.650 MW DWR • 950 MW

DWR • 1.117 MW

Page 16: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 16

2 x 1650 MWe AREVA- EPR (4th-of-a-Kind)

First privately financed nuclear project in UK2012: EPR Design Certification („GDA“)2012: „Contract for Difference“:

• Strike Price: 92.50 £/MWh (35a)(less expensive than gas, wind, coal...)

• ( -3 £/MWh if Sizewell C follows )• Inflation-indexed• Incl. fuel, disposal, demolition• Plant lifetime 60a +• Costs of construction 16 G£ (in 2016)• Calculated payback time (24 TWh/a): 7.2 a• Investors: EdF (66.5%) + CGN China General Nuclear (33.5%) • 900 permanent jobs, + 5,600 during construction (57% UK)

Oct. 2014: Approval by European Commission (today: Brexit?)Oct. 2015: Site licence28 July 2016: EdF decision for investment (delayed by French worker councils, start of construction)15 Sept. 2016: Re- evaluation by new government Theresa May („Brain Drain to China?“)2023 - 25: In Operation (7% of UK´s power generation)

10 in Planning: 2 APR Moorside, 2 EPR Sizewell, 4 ABWR Wylfa+Oldbury, 2 Hualong Bradwell

Hinkley Point C (EdF Energy)

Page 17: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 17

Evolutionary development of a German convoy and the French N4 construction line

Design philosophy:

Further improvement of failureavoidance

Incident rates for meltdowns<1·10-7/a

Designed for severe, extremelyimprobable incidents. Limitation of impacts on the plant itself

Economically competitive

Gen III+: EPR

Page 18: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 18

Core catcher concept

Transfer of corium into a safecondition

Multilayerspreading area

Long-term coolingfrom below and

flooding from abovefrom the IRWST.

Gen III+: EPR

Page 19: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 19

2

Unit 2: Control Rod Drive Mechanism Room (below the reactor) in 2017

Finely fragmented corium (failure of the reactor pressure vessel under overpressure?)

Crashed floor grating

Page 20: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 20

Source: Asahi Shimbun

Page 21: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 21

Unit 2: Control Rod Drive Mechanism Room (floor) in 2018

Undamaged fuel assembly head

Page 22: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 22

IAEA: International Atomic Energy Agency Sources: IAEA, VGB

Cor

e M

elt F

requ

ency

per

Yea

r

KWB-A

DWR (Konvoi)

KCB

KCB

KCB

DRS-A

DRS-B

German Units

EPR

AP1000

KERENA

KWB-A

IAEA Recommendation for existing Units

“Residual Risk”

Probability for a Mega Tsunami(higher than 10 m) in Fukushima Daiichi

Insufficient Design against a known Site- specific Risk

IAEA Standard for new Units

Results of Probabilistic Safety Analyses

Page 23: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 23

Westinghouse, USA

Westinghouse: Manufacturer of about ¾ of all PWRs worldwide. Evolutionary Consequent simplification Expanded passive systems

- (e.g. no „nuclear“ diesel necessary) 1999: AP-600 certified by US-NRC

- Operators: Capacity too low 2005: AP-1000 certified (UK: 2011)

- Licence for China, 4 units 2012: 4 units in USA 2016: USA: Delays 2017: Insolvency of Westinghouse,

abandonment of VC Summer 2-3 2018: Commissioning of Sanmen-1 2023: Commissioning of Vogtle-3

Gen III+: Light Water- (PWR) Concepts: AP-600/ AP-1000

Page 24: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 24

Nuclear Energy and Climate

Generation I – III Evolutionary: European Pressurized Water Reactor (EPR)

Revolutionary: Advanced Pressurized Water Reactor (AP-1000)

Generation IV Liquid Metal Cooled Reactors (LMR)

High-Temperature Reactor (HTR)

Advanced Concepts

Small Modular Reactors (SMR)

Nuclear Energy in the World Switzerland, Canada, USA, Japan, Finland, China, India

Contents

Page 25: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 25

Generation III („Evolutionary“):

PWR – Pressurized Water Reactor

BWR – Boiling Water Reactor

CANDU – Heavy Water Reactor

Generation IV (Revolutionary“):

VHTR

GFR

SFR

LFR

SCWR

MSR

Co-Chair im Steering Committee Roland Schenkel,EC, 23.11.2005, Berlin

VHTR – Very-High-Temperature ReactorGFR – Gas-Cooled Fast ReactorSFR – Sodium-Cooled Fast ReactorLFR – Lead-Cooled Fast ReactorSCWR – Supercritical Water-Cooled ReactorMSR – Molten Salt Reactor

Partly also for H2 and process heat generation

http://gen-iv.ne.doe.gov

USA 2001: Generation IV International Forum (GIF)

Page 26: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 26

Targets of the „Generation IV International Forum“ after 2030

Further development (after GEN III):

• Profitability (cost-effectivness/efficency)• Safety and reliability• Minimisation of residues (partitioning + transmutation)• Enlargement (expansion) of the fuel basis (U, Pu recycling, Th)• Safeguards (stability of proliferation)

Further applications:

• Production of electrolytic hydrogen• Seawater desalination• Process heat

Page 27: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 27

Gen IV (1): Supercritical- Water- Cooled Reactor = HPLWR

Page 28: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 28

Gen IV (2) : Gas- Cooled Fast Reactor

GFRGas-cooled fast reactor

• 600 MWth,

• efficiency of 48%• ceramic fuel,

U/ Pu (20%)

• Helium-cooled(Brayton Cycle)

• closedfuel cycle(combustion of actinides)

• 850 °C process heat (H2 production)

Page 29: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 29

Gen IV (3): Lead- Cooled Fast Reactor

LFR

50 - 1200 MWe,• Unpressurised

• Natural circulation• Metallic or nitrite

fuel, U/ Pu• Pb- or Pb/Bi-

cooling for 550 °C• Closed fuel cycle• Seawater desalination,

H2 production• Cycles of 15 – 20 years

Page 30: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 30

Gen IV (4): Very High- Temperature Reactor

Page 31: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 31

Gen IV (5): Sodium- Cooled Fast Reactor

Page 32: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 32

Gen IV (6): Molten Salt Reactor

Page 33: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 33

Nuclear Energy and Climate

Generation I – III Evolutionary: European Pressurized Water Reactor (EPR)

Revolutionary: Advanced Pressurized Water Reactor (AP-1000)

Generation IV Liquid Metal Cooled Reactors (LMR)

High-Temperature Reactor (HTR)

Advanced Concepts

Small Modular Reactors (SMR)

Nuclear Energy in the World Switzerland, Canada, USA, Japan, Finland, China, India

Contents

Page 34: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 34

Gen III: Innovative Concepts – IRIS (Westinghouse)

International Reactor Innovative and Secure

Development since 1999, Consortium under management of Westinghouse.

Review within NERI- Generation IV (US-DOE).

Modular system with 100-300 MWel.

PWR with integral pressure vessel:

core

control rods

coolant pumps (4)

steam generators (8 in pair design)

pressuriser

Page 35: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 35

International Reactor Innovative and Secure

Development since 1999, Consortium under management of Westinghouse.

Review within NERI-Generation IV (US-DOE).

Modular system with 100-300 MWel.

PWR with integral pressure vessel:

core

control rods

coolant pumps (4)

steam generator (8 in pair design)

pressuriser

Full- pressure containment.

Gen III: Innovative Concepts – IRIS (Westinghouse)

Page 36: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 36

He- cooled, graphite- moderatedhigh- temperature reactor

Underground Development since 1985 by

- General Atomics,- Framatome,- Fuji Electric, - OKBM/ MINATOM (Russia)

Helium high- temperature turbine- Brayton Cycle

Meltdown- resistant:

Residual heat removalby thermal radiation

Framatome, Frankreich

General Atomics Gas Turbine/ Modular Helium Reactor GT-MHR

Page 37: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 37

• „Fast Breeder“• Radially Migrating Breeding Zone• Multiyear cycles• Depleted U-238 –> Pu-239• Metallic fuel• No reprocessing• Improved safeguards• Open fuel rods?• Efficient coolant purification• Xiapu- 2 (Fujian, China)• 600 MWe• Operational 2023

Terrapower Travelling Wave Reactor (Bill Gates)

Source: www.terrapower.com

Page 38: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 38

Terrapower Molten Chloride Fast Reactor MCFR (Bill Gates)

Fuel Dissolved in Molten SaltJanuary 2016: 40 M$ funding (5a)U.S. Department of EnergySouthern Company,Oak Ridge National Laboratory,Electric Power Research InstituteVanderbilt UniversityUnder design: Component test rigs

Neutronreflectors

Vessel

Heatexchanger

Reactor

1966-73: Pilot project,stopped due to unmanageable corrosion

Source: www.terrapower.com

Page 39: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 39

Nuclear Energy and Climate

Generation I – III Evolutionary: European Pressurized Water Reactor (EPR)

Revolutionary: Advanced Pressurized Water Reactor (AP-1000)

Generation IV Liquid Metal Cooled Reactors (LMR)

High-Temperature Reactor (HTR)

Advanced Concepts

Small Modular Reactors (SMR)

Nuclear Energy in the World Switzerland, Canada, USA, Japan, Finland, China, India

Contents

Page 40: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 40

SMR Project Flexblue (Sea Floor)

DCNS (Shipyard)/ Framatome/ CEA/ EdF(Direction des Constructions Navales)

PWR 160 MWel, Gd- based absorber

Page 41: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 41

Floating Nuclear Power Plant „Akademik Lomonossov“ KLT40S

1 Reactor2 Steam generator3 Reactor coolant pumps4 Control rod drives5 Emergency core cooling accumulator6 Pressuriser (1st vessel)7 Pressuriser (2nd vessel) 8 Steam lines9 Isolation valves10 Heat exchanger residual heat removal

system2x35 MWel, commissioning in 2019

Page 42: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 42

Nuclear Energy and Climate

Generation I – III Evolutionary: European Pressurized Water Reactor (EPR)

Revolutionary: Advanced Pressurized Water Reactor (AP-1000)

Generation IV Liquid Metal Cooled Reactors (LMR)

High-Temperature Reactor (HTR)

Advanced Concepts

Small Modular Reactors (SMR)

Nuclear Energy in the World Switzerland, Canada, USA, Japan, Finland, China, India

Contents

Page 43: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 43

1 € = 1.15 SFr

Costs of Generation (Example Switzerland 2017)

Hydro power*

Small hydro power

Wind power

Photovoltaics

Gas-combinedpower plants

*without pumped storage

Nuclear power

Comparison of Average Production Costs

Full Costs

ProductionCosts

ExternalCosts

SystemCosts on

GridLevel

Page 44: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 44

Electricity Prices in Canada in 2017

Source: Canada's National Electricity Board (NEB)

Nunavut Manitoba

Quebec

Source: Canada‘s National Electricty Board 2018

AlbertaNorthwestTerritory

Yukon

Newf.+Labrador

OntarioPr. Ed-WardIsland

NewBrunswick

Saskatchawan

Brit.Col.

€ct/kWh

CAN$ ct/kWh

30

20

10

35

30

25

20

15

10

5

0Nova

Scotia

Page 45: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 45

Licence Extensions in USA in Feb. 2018

Lifetime extension to 60 years:

Lifetime extension to 80 years:

Authorised for approx. 90 reactors, remaining plants will follow

Decision for submission for the first four reactors(Calvert Cliffs + …)

Page 46: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 46

First final repository worldwide for heat generating waste from NPPs *

• 2000: Government decision for a final repository for spent nuclear fuel• 2001: Decision in principle by Finnish parliament• 2012: Application of construction licence by Posiva (TVO/FORTUM) for

Olkiluoto site• 2015: STUK** Confirmation that all safety criteria are met• 12 November 2015: Construcion licence for 6,500 t of spent fuel*• Next steps: Construction until 2020• Before commissioning: Application for operation licence

Finland: Final Repository ONKALO

*: Enough for morethan 50 a operation of 5 NPPs

** STUK: Finnish Radiation andNuclear Safety Authority

Sources: STUK, 02/2015, WNA 11/2015

Page 47: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 47

Anzahl KKW- Blöcke in Japan

0

10

20

30

40

50

60

2011 2012 2013 2014 2015 2016 2017 2018

In Betrieb Vorhanden Beschädigt

Anträge für Weiterbetrieb: 25,davon genehmigt: 10

Fukushima Daiichi 1-4 Mihama 1-2Genkai-1Shimane-1

Tsuruga-1

Fukushima Daiichi 5-6

Monju Ikata-2Ohi 1-2

Sendai 1-2

Ikata-1

Ikata-3Takahama 3-4Ohi 3-4

Shimane-3

Ohi 3-4Genkai 3

Genkai 4

Page 48: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 48

India: 24 In Operation, 8 Under Construction, 63 in Planning (<2035)

Gorakhpur/Kumharia

Rawatbhata

Mahi Banswara

Kakrapar

Mithi Virdi

Jaitapur

Kudankulam

Kovvada

Narora

Tarapur

Madras/Kalpakkam

1: CANDU-1002: CANDU-2205: CANDU-4507: CANDU-700H: AHWR- 300

A: AP-1000B: BWR-180G: ESBWRW: WWER-1000E: EPR-1600F: Fast Breeder

7 7

7 7

7 7 7

7

5

7

7 7 7 7

2 2 2 22

22

2 22222

22

1

5BA A A A A A

W W W W

7

E E E E E E

G G G G G G

W

7 77

7 7

KaigaKudgi/ Bijapur

NizampatnamKavaliPulivendula

Bhimpur

FFFF F

BH

WW W W

Chutka

Rajouli/ Nawada

7

7 7

7 7

Markandi

W W

7

777777 W W WW

Page 49: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 49

Fangjiashan

JiyangTianwanHaiyang

Wuhu Bamaoshan

SanmenPengzeNingde

Sanming

LufengLingao

TaishanChangjiang

Fuqing

Hongshiding

DonggangXudapu/ Xudabao

Hongyanhe

Nanyang, Luoyang, Xinyang

Lanzhou

Putian; Zhangzhou- Gulei

Xiaomoshan

Tongren

Changjiang

XiapuSichuan

Jiangxi

Guangdong

Fujian

Zhejiang

JiangsuAnhuiHenan

Hunan

Chongqing

Shandong

Shanghai

Hebei

Guangxi

Taiwan

Beijing

Ganshu

Xinjiang

Tibet

Qinghai

Yunnan

Guizhu

Shaanxi

Tianjin

ShanxiNingxia

Inner Mongolia

Heilongjiang

Fangchenggang (Bailong)Pingnan (Baishan)

Daya BayHuizu/Huangbu

Yangjiang

Changde

Xiantan

Xianning (Dafan)Zhingxian Guangshui

Yangxin

Liangjiashan

Songjiang

Shaoguan Zhanjiang Haifeng

Longyu, Cangnan

HengrenPulandian

FulingShizu

Haixing-CangzhuQiaofushan,

Heyuan (Jieyang) Hebaodao

Shangrao,Ganzhou,

Yibin/ PenganNanchong-Sanba,

Jingyu

Jiamusi

Wan‘an-Yanjiashan

Rongcheng/Shidaowan

HH

HH

H

HH HH

HH

H

HHH

H

H H

H H

H

H H

H

H H H

HH

H

H

H

H

W W W

EEEE

U

W

FT

G

U

C

C

CCCC

CCCC C

CC

CC

C

CCCCC

C

C C

C CCC C

3

C C

66

6666

6 6

111

11 1

1414

CC

C C

F

G

G

HH H

Zhangzhou

C

Hainan

Jilin

BLiaoning

Taohuajiang

Hongkong H H HHH

G6Jingtan

Hubei

1

C C

F

G6Ruijin

AnqingG6

G6

G6

G6Bai‘An

H H H

H

H

1 1 1

China: 46 Units ( 2018), 41 under Construction, 189 Planned (<2035)

Jiutai4: DHP-400th Yanlong1: ACP-100 Linglong-1G: HTR-200/6006: ACP-600F: C(D)FR-600U: CANDU-600C: (A)CPR-1000H: Hualong-1

: CAP-100014: CPR-1400

W: WWER-1000E : EPR-1600T: Travelling WaveS: Floating (+21)

W

W W4 4

11 1

Quinshan

Bohai Sea

W

Page 50: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 50

Concluding Remarks:

1. Highly developed technology, exportable

2. Operation-proven with more than 17,000 (reactor) years

3. Acceptance: 90 % of the Europeans live in countries with nuclear energy

4. Fukushima was not a residual risk incident, no radiation damages

5. Nuclear power plants do not age as other power plants,early shutdown means an enormous destruction of financial assets

6. Highly profitable if technical lifetime can be reached

7. Quasi-domestic

8. Carbon neutral

Résumé

9

Page 51: Nuclear Power Plants – Design and Safe Operation · Nuclear Power Plants – Design and Safe Operation - August 2018 - Dr.- Ing. L. Mohrbach. ... 1990 2000 2005 2007 2009 2011 2013

VGB PowerTech e.V.| Version 1.0 | 8/16/2012 | FOLIE/SLIDE 51

Thank you very much for your attention!

Dr- Ing. L. MohrbachVGB PowerTech e.V.

Deilbachtal 173D-45257 Essen

[email protected].: xx49 201 8128 221Fax: xx49 201 8128 345

www.vgb.org