Overal l Query No. NAME OF THE BIDDER QUERY NO. TENDER SECTION NO. REFERENCE CLAUSE NO. REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No. DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL 1 2 3 4 5 6 7 8 1 Kirloskar Oil Engines Limited 1 C -1 1.2.1 1 (b) Directly coupled alternator with terminal arrangement suitable for Purchaser’s external cable connections, 1. The alternator will be coupled to diesel engine through flexible coupling. 2. Purchaser to provide cables along with its termination kit and cable glands. Please confirm 1. Acceptable. 2. As clearly mentioned in clause 1.2.1 -16 of C1, Termination of the cable including supply of required termination kits (inlcuding gland, lugs, etc.) at the DG end is included in the Contractor's scope. In general, philosophy being followed is such that even where the cable is being supplied by the Purchaser, termination on DG sets and its related items under this tender is in Contractor's scope. 2 Kirloskar Oil Engines Limited 2 C-1 1.2.1 (6) Air intake system complete with filter, silencer (as envisaged) Air intake system complete with filter, silencer (if envisaged). Please confirm Air intake system complete with filter, silencer shall be provided. 3 Kirloskar Oil Engines Limited 3 C -1 1.2.1 (10) Engine controller: In case of being software based, it shall comply with the requirements of IEC 60880 and AERB D-25 guide. Please provide AERB D-25 guide for review Contractor is advised to download such documents for their review from AERB website or purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of a different make in two of the four EDGs in one unit for both the units. The bidder shall review this requirement and give his proposal in the part I bid, for further review by the Purchaser Proposed engine controller will be software based, proven design and as per OEM's standard. Same engine controller will be provided for all DG sets. Please confirm As clearly mentioned in clause 1.2.1 (10) either different make enginer controller or any other method/ arrangement to cater to the requirement of diversity. Bidder has not mentioned anything about how he wishes to accomplish this requirement. Tender conditions shall prevails. 5 Kirloskar Oil Engines Limited 5 C -1 1.2.1 (13) Local Control Panels with hardwired contactor/ relay based logics for control and operation associated with each DG set, Programmable Logic Controllers (complete with required software for logic programming and PLC fault diagnosis and software loading equipment) for monitoring and annunciation For monitoring and annunciation scanners and annunciators will be provide. Please confirm Please refer reply under query no. 112 (Overall Query No. 112) 6 Kirloskar Oil Engines Limited 6 C -1 1.2.1 (14) All relays including DG protection numerical relay (IEC61850 communication protocol compatible with latest features), annunciation relays. We propose multi function combined and comprehensive numerical protection relays. It is software based but IV & V qualification to be excluded for relays. Please confirm Kindly explain multi function combined and comprehensive relay and how is it different from what Purchaser has specified in Tender Document. Regarding IV&V, tender clause shall prevail. 7 Kirloskar Oil Engines Limited 7 C -1 1.2.1 (15) 0.38/0.415kV auxiliary transformer (dry type) complying with all technical requirements stipulated by the Purchaser) shall be included in the scope of the Contractor Specification of Auxiliary transformer is to be provided. Incoming and outgoing cables to the transformer with its termination (lugs and glands) will be in Purchaser's scope. Please confirm A typical specification for a different rating of dry type transformer is provided with this clarification, based on which the Bidder shall develop his own specification for procurement of this transformer, for review and approval by the Purchaser during execution. In such a case Purchaser shall supply LT cables till this transformer. LT cables of similar specification beyond this transformer to DG equipment/ panels in this Contractor's scope shall be supplied and installed by the Bidder. In general, supply and installation of all termination (glands, lugs, etc.) at the Bidder's equipment/ panel is included in the scope of this Contractor (including termination of the Purchaser's cable at the transformer end if used or directly at the Contractor's MCC if no transformer is used). M/S. KIRLOSKAR OIL ENGINES LIMITED NUCLEAR POWER CORPORATION OF INDIA LIMITED TENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4 TECHNICAL CLARIFICATION RESPONSE-1 1 OF 47

Upload: others

Post on 11-Jul-2020

22 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

1 2 3 4 5 6 7 8

1 Kirloskar Oil Engines Limited

1 C -1 1.2.1 1 (b) Directly coupled alternator with terminal arrangementsuitable for Purchaser’s external cable connections,

1. The alternator will be coupled to diesel engine throughflexible coupling. 2. Purchaser to provide cables along with its termination kitand cable glands. Please confirm

1. Acceptable.2. As clearly mentioned in clause 1.2.1 -16 of C1, Termination of the cable including supply ofrequired termination kits (inlcuding gland, lugs, etc.) at the DG end is included in theContractor's scope.In general, philosophy being followed is such that even where the cable is being supplied bythe Purchaser, termination on DG sets and its related items under this tender is in Contractor'sscope.

2 Kirloskar Oil Engines Limited

2 C-1 1.2.1 (6) Air intake system complete with filter, silencer (asenvisaged)

Air intake system complete with filter, silencer (if envisaged).Please confirm

Air intake system complete with filter, silencer shall be provided.

3 Kirloskar Oil Engines Limited

3 C -1 1.2.1 (10) Engine controller: In case of being software based, it shallcomply with the requirements of IEC 60880 and AERB D-25guide.

Please provide AERB D-25 guide for review Contractor is advised to download such documents for their review from AERB website orpurchase hard copies from AERB..

4 Kirloskar Oil Engines Limited

4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of adifferent make in two of the four EDGs in one unit for boththe units. The bidder shall review this requirement and givehis proposal in the part I bid, for further review by thePurchaser

Proposed engine controller will be software based, provendesign and as per OEM's standard. Same engine controllerwill be provided for all DG sets. Please confirm

As clearly mentioned in clause 1.2.1 (10) either different make enginer controller or any othermethod/ arrangement to cater to the requirement of diversity.

Bidder has not mentioned anything about how he wishes to accomplish this requirement. Tender conditions shall prevails.

5 Kirloskar Oil Engines Limited

5 C -1 1.2.1 (13) Local Control Panels with hardwired contactor/ relay basedlogics for control and operation associated with each DGset, Programmable Logic Controllers (complete withrequired software for logic programming and PLC faultdiagnosis and software loading equipment) for monitoringand annunciation

For monitoring and annunciation scanners and annunciatorswill be provide. Please confirm

Please refer reply under query no. 112 (Overall Query No. 112)

6 Kirloskar Oil Engines Limited

6 C -1 1.2.1 (14) All relays including DG protection numerical relay (IEC61850communication protocol compatible with latest features),annunciation relays.

We propose multi function combined and comprehensivenumerical protection relays. It is software based but IV & Vqualification to be excluded for relays. Please confirm

Kindly explain multi function combined and comprehensive relay and how is it different fromwhat Purchaser has specified in Tender Document.

Regarding IV&V, tender clause shall prevail.

7 Kirloskar Oil Engines Limited

7 C -1 1.2.1 (15) 0.38/0.415kV auxiliary transformer (dry type) complyingwith all technical requirements stipulated by the Purchaser)shall be included in the scope of the Contractor

Specification of Auxiliary transformer is to be provided.Incoming and outgoing cables to the transformer with itstermination (lugs and glands) will be in Purchaser's scope.Please confirm

A typical specification for a different rating of dry type transformer is provided with thisclarification, based on which the Bidder shall develop his own specification for procurement ofthis transformer, for review and approval by the Purchaser during execution.

In such a case Purchaser shall supply LT cables till this transformer. LT cables of similarspecification beyond this transformer to DG equipment/ panels in this Contractor's scope shallbe supplied and installed by the Bidder.

In general, supply and installation of all termination (glands, lugs, etc.) at the Bidder'sequipment/ panel is included in the scope of this Contractor (including termination of thePurchaser's cable at the transformer end if used or directly at the Contractor's MCC if notransformer is used).

M/S. KIRLOSKAR OIL ENGINES LIMITED

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

1 OF 47

Page 2: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

8 Kirloskar Oil Engines Limited

8 C -1 1.2.1 (16) Supply and installation of all light channels / field routing /branch trays, etc. forthe DG Set and its auxiliaries / LCPs are included in thescope of the Contractor,including design, engineering of the routing as well assupply & installation ofhardware accessories, anchor fasteners, welding,fabrication, etc. required tocomplete the work in all respects.

All cable trays and its supports is in Purchaser's scope. Detailsfor cable routing will be provided by contractor. Pleaseconfirm

Tender Conditions shall Prevail.

The main cable trunk route alone will be provided by the Purchaser. The brach routings / fieldrouting trays / light channels etc.. are all kept in the Contractor's scope as he would be in abetter position to decide the same based on the layout of DG Auxiliaries as well as based oncapacity of the DG Auxiliaries, no. of cables to be used etc.. details of which are to beengineered and developed by the DG Vendor only.

9 Kirloskar Oil Engines Limited

9 C -1 1.2.1 (16) Supply and installation of all the LT power & control cables(fire survival type) required for the DG Set and its Auxiliariesfrom its own MCCs / LCPs are all included in the scope of DGContractor

We propose FR insulated XLPE cables. Technicalspecifications of fire survival type document to be providedbefore bid submission. Please confirm.

Tender clause shall prevail.

Typical specification for Fire Survival type of cable is provided along with this clarification.

10 Kirloskar Oil Engines Limited

10 C-1 1.2.1 (18) 0.4kV distribution board(s) Please confirm purpose and provide required specifications. Purchaser will only provide the specified number of feeders (for power and control supply).Further distribution for DG loads shall be done by the Contractor. A specification documentbringing out the type of devices to be used, construction, etc. is provided along with thisclarification. However, the ratings and types of feeders applicable for the subject tender shallbe worked out by the successful bidder, detailed specifications prepared by the successfulbidder for review and approval by the Purchaser.

11 Kirloskar Oil Engines Limited

11 C-1 1.2.1 (19) Storage batteries and rectifiers Storage batteries and rectifiers are not envisaged since weare providing AC DC convertor 220 V AC to 24 VDC convertorin LCP and 220 VAC supply from purchaser. Please confirm

Tender clause shall prevail.

12 Kirloskar Oil Engines Limited

12 C-1 1.2.1 (20) For those items where detailed specifications/requirementsare not given in the tender, like junction boxes, terminationkits, fasteners, etc. the OEMmanufacturer shall prepare detailed specifications duringdetailed engineering for review and approval by thePurchaser.

Standard catalogues will be provided for all bought out items. Tender clause shall prevail.

13 Kirloskar Oil Engines Limited

13 C -1 1.2.1 (34) The bid documentation shall include, for Purchaser’s reviewof the following:1. Engine and other mechanical parts2. Electrical part3. C&I part

The required documentation mentioned will be providedduring detailed engineering. The bid document will includePreliminary P&Ids, Basic electrical block diagram and Layout.

Apart from "Preliminary P&IDs, Basic electrical block diagram and Layout" basic details ofEngine and other mechanical parts shall also be provided.

14 Kirloskar Oil Engines Limited

14 C - 1 1.2.6 Whether called for specifically or not, all accessoriesrequired for normal operation of equipment are deemed tobe considered as a part of Tender’s scope of supply.

All accessories required for normal operation ofequipment will be considered as per terminal points specifiedin tender document.

Tender clause shall prevail.

15 Kirloskar Oil Engines Limited

15 C -2 2.1.8 Design ambient temperature for electrical equipment 45C,Minimum design ambienttemperature 45°C

Maximum and Minimum design temperatures are givensame. i.e. 45°C. Please confirm minimum designtemperature.

Minimum design temperature may be taken as 10°C, as already mentioned in the "Data Sheetfor Diesel Engine" in clause 1.5.b of section C-6 part of the subject tender.

16 Kirloskar Oil Engines Limited

16 C -2 3.1.1 Conversion of all drawings/documents (shall include alldrawings/documents originated by Purchaser and alsodrawings originated by Contractor)

Conversion of all drawings/documents originated byPurchaser will be in Purchaser's scope only. Please confirm

As clearly mentioned in clause 3.1.1 of section C-2 it is under this scope of Contract, theContractor shall convert all drawings including those provided by Purchaser into "as built"drawings. Therefore, tender clause shall prevail.

2 OF 47

Page 3: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

17 Kirloskar Oil Engines Limited

17 C -2 3.1.3 Wherever data or information communication connectivitybetween different computer based systems included withinthe scope of tender.

Communication port will be provided at respective device,further connectivity to other system including software,cable will be in Purchaser's scope.

As clearly mentioned in clause 3.1.3 of section C-3 all data or information communicationconnectivity between different computer based systems included WITHIN THE SCOPE OFTENDER shall be responsibility of the Contractor as a whole. However trunk cable and traywould be responsibility of Purchaser and Tender clause shall prevail in this regard.

18 Kirloskar Oil Engines Limited

18 C -2 3.1.4 Even though drawings/documents are approved by thePurchaser, if during commissioning or operation at sitecertain deficiencies are observed which would call forsupply and installation of materials and or carrying outmodifications to software and or hardware etc. as requiredat site so as to ensure that the equipment offered compliesto the functional intent of the specification, all suchmodification shall be carried out and documents updatedtill systems are handed over to the Purchaser at no extracost.

Testing and qualifications after modifications at site are notenvisaged. Please confirm.

Tender clause is clear, self explanatory and shall prevail.

19 Kirloskar Oil Engines Limited

19 C -2 3.1.6 Computer/PLC based system/equipment used in DG Setsand Auxiliaries package system shall be subjected toindependent verification and validation (IV & V) byPurchaser.Details of activities to be completed as part of IV & V isenclosed as Appendix F to this tender.

If the component / equipment are already qualified for IVand V, only reports will be submitted for purchaser's review.Separate qualification is not envisaged. Please confirm.

Tender clause shall prevail. Third party IV&V reports are acceptable subject to the compliance to AERB - SG D25requirements.

20 Kirloskar Oil Engines Limited

20 C-2 3.3.3 Seismic and ASW qualification ASW qualification is a new qualification requirement. Pleaselet us know available test facilities in India as well as agencieswho are approved by NPCIL for said qualification.

ASW qualification is similar to seismic qualification but for different frequency and acceleration requirements. The frequency acceleration requirements are brought out in the document"General requirements and methods of qualification for seismic resistance and stability foraircraft crash air shock wave". A copy of the same is attached along with the pre-bidclarification. It has already been brought out in the tender that qualification shall be done onthe basis of the final document to be provided to the sucessful bidder during execution of thecontract, at no extra cost & time to the Purchaser.

21 Kirloskar Oil Engines Limited

21 C-2 5.1.4 Design, supply and installation of DG building lighting,ventilation, earthing conductorembedded in concrete.

Including Earthing conductor up to equipment will be inPurchaser's scope. Please confirm.

Incorrect interpreation. Earthing arrangement from the equipement to the nearest point onthe earthing ring( Purcahser's Scope) for connection to the system grid is in the scope of thisContractor. Please read the subject clause in conjuction with clause 20.13 of section C-2.Therefore, tender clause shall prevail.

22 Kirloskar Oil Engines Limited

22 C-2 5.1.8 Civil works of DG building. Civil works of DG building including grout material forfoundation pockets of DG set and other equipment.

Grouting is in the scope of the Contractor. Tender clause shall prevail.

23 Kirloskar Oil Engines Limited

23 C -2 3.2.8.4 The scope includes adjustments, tuning, re-setting, re-working, etc. of the required part of DGs and theirauxiliaries

It will be considered limiting to agreed warranty period ofDGP. Please confirm

Kindly refer to our requirement regarding O&M support for better clairification.

3 OF 47

Page 4: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

24 Kirloskar Oil Engines Limited

24 C-2 3.1.4 Even though drawings/documents are approved by thePurchaser, if during commissioning or operation at sitecertain deficiencies are observed which would call forsupply and installation of materials and or carrying outmodifications to software and or hardware etc. as requiredat site so as to ensure that the equipment offered compliesto the functional intent of the specification, all suchmodification shall be carried out and documents updatedtill systems are handed over to the Purchaser at no extracost.

It will be considered limited to scope of supply of KOEL only.Please confirm

25 Kirloskar Oil Engines Limited

25 C - 2 13.3 The nameplates shall be screwed to the body of theequipment.

Instead of screwed; we propose pesting of the nameplateson available space on the equipment.

Tender clause shall prevail.

26 Kirloskar Oil Engines Limited

26 C-2 13.4 Each item of plant shall be provided with name plate andlabel designating the service of that particular equipment.The shape, size and contents of this name plates shall besubmitted by the bidder for approval by Purchaser and onlysuch name plates as are duly approved by Purchaser shallbe used. The contents of this name plate shall be in linewith that specified in relevant IS and shall include as aminimum:i. Manufacturer’s nameii. Sl. No. of the DG Setiii. Type designationiv. Voltage current ratingv. Frequencyvi. Short time ratingvii. Degree of protectionviii. Country of manufactureix. Year of manufacturex. Applicable IS/IEC

Name plate on each equipment will be provided as perOEM's standard practice.

Acceptable and shall be in line with standard practices.

27 Kirloskar Oil Engines Limited

27 C-2 23.1.13 One reproducible of finally approved drawing shall be sentto the Purchaser along with three (3) prints and soft copies.

Three (3) prints and soft copies of approved drawing will besent to the purchaser.

Confirmed

28 Kirloskar Oil Engines Limited

28 C -2 27.1 (v) For seismic and ASW qualification of DG system as per therequirement of this tender specification, the Tenderer shallhave qualified manpower or shall use services of qualifiedapproved sub vender approved by NPCIL

Please let us know available test facilities in India as well asagencies who are approved by NPCIL for ASW qualification.

Same as NPCIL reposnse to query no. 20 (Overall Query No. 20)

29 Kirloskar Oil Engines Limited

29 C -3 1.11 The terminal for connection of current transformer forPurchaser’s use willbe current transformer terminal box on alternator/ LCP

Current transformers are in the scope of Purchaser. Current transformers at the neutral end are in the scope of this Contractor. Kindly see clauseno. 4.00 of section C6.

30 Kirloskar Oil Engines Limited

30 C - 3 1.12 Terminals for connecting equipment earthing fromgenerator and associated control panels will be earthingpads provided in DG room / DG auxiliary room & DG controlroom floor.

Earthing conductor up to equipment will be in Purchaser'sscope. Please confirm.

Kindly refer to NPCIL respnse to query no. 21 (Overall Query No. 21)

4 OF 47

Page 5: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

31 Kirloskar Oil Engines Limited

31 C -4 1.2.2.2 Cold, hot restarts and operation without secondary coolingwater for specified time period during cold and hotrestarting

We presume "cold" means "warm stand by" condition.Please confirm

Bidder to clarify if "warm standby" is a minimum requirement for start of the engine or if it canstart from cold condition.

32 Kirloskar Oil Engines Limited

32 C -4 1.2.2.3 Reliability analysis of the DG and Auxiliaries Please elaborate more on requirement of reliability analysisof the DG and Auxiliaries.

Reliability Analysis of the DG Sets along with its Auxiliaries shall include analysis on effect offailure of its major auxiliary components (case by case) on the reliability / continuousoperation of the DG Set.

33 Kirloskar Oil Engines Limited

33 C -4 1.2.2.4 Capability of DG set to operate with ungrounded neutral Loading on the genset should be balanced. i.e. equal loadingon each phase. Please confirm

Extent of unbalance shall be as per generator unbalance capacity (rating). The DG set shallcomply with the same for the specified ungrounded neutral condition.

34 Kirloskar Oil Engines Limited

34 C -4 1.2.2.8 Operation under fault and abnormal conditions includingasynchronous closure of diesel generator circuit breakerwith grid

Fault / abnormal condition to be specified. Asynchronousclosure of dieselgenerator circuit breaker with grid is not envisaged. Pleaseconfirm.

As per IEEE 387 requirement, EDGs when called upon to perform their intended funtion shallbe devoid of most of the fault protections except for 3-4 protection. Therefore thisrequirement is specified, which shall prevail.

For asynchronous closure of DGCB with the grid Tender clause shall prevail.

35 Kirloskar Oil Engines Limited

35 C -4 1.2.3.0 The final required floor response spectra and air shock wavespectra shall be made available to the successful bidder.

We presume that the final required floor responsespectra and air shock wave spectra will not be higher thangiven spectra in the tender. If it is higher it will call for priceimplication. Please confirm.

There shall be no price implication whatsoever on account of the final floor response spectra.The final response spectra shall be made available to the successful bidder upon selection andtender conditions, as specified, shall prevail at no extra cost and time to the Purchaser. ThePurchaser shall adhere to its policy of early dissemination of inputs/ information to the Bidderat the earliert so that same can be taken up for further analysis.

36 Kirloskar Oil Engines Limited

36 C -4 1.2.5.0 Detailed loading on DG foundation including loading duringnormal operation, loading during abnormal (short circuit &out of synchronization) and seismic and ASW conditionsshall be furnished immediately after placement of purchaseorder for facilitating the design of DG foundation.

Loading on DG foundation will be submitted only afterreceipt of final response spectra of Seismic condition andASW qualification from NPCIL and completion of analysis onfinal configuration of DG set.

Unacceptable. The bidder shall start his analysis with the inputs that he possesses. However,to save unwanted repetitive works, Bidder if he feels so, may request the Purchaser toconfirm that the inputs available with him for analysis are latest.

Having said so, the Purchaser reserves the righ to alter the inputs based on the informationthat he recieves from his prime designer at no extra cost to the Purchaser.

It is also clarified that, such occasions, where an analysis have to be repeated because ofchanged inputs (which are not encompassed within umbrella of inputs taken already foranalysis) are envisaged to be rare, but cannot be ruled out.

37 Kirloskar Oil Engines Limited

37 C -4 1.2.5.0 KKNPP 3,4 DG building drawings available with thePurchaser and can be provided to the bidders on beingspecifically requested for, during the pre- bid stage.

We request NPCIL to provide KKNPP 3,4 DG building drawings for our reference and study.

KK-1&2 layout drawings provided with tender are applicable for KK-3&4. And a similar layoutshall be followed by the Bidder for KKNPP 3,4.

38 Kirloskar Oil Engines Limited

38 C -4 1.2.5.0 Based on the final foundation details, the DG vendor shallprepare the final seismic, ASW & other spectra andaccordingly design & qualify the DG sets.

NPCIL has to provide final response spectra for Seismic andASW qualification. Bidder will only provide input loadings forfoundation design. Please confirm.

Please refer to Purchaser's response to query no. 36 (Overall Query No. 36)

5 OF 47

Page 6: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

39 Kirloskar Oil Engines Limited

39 C -4 1.2.7.0 Design of the mounting should however ensure easyremoval of DG Auxiliaries for over hauling, maintenance,etc. For this purpose, the Contractor shall furnish the detailsof embedded plates (EP) required for mounting DGauxiliaries along with loading on them as soon as purchaseorder is placed.

The details of embedded plates (EP) required for mountingDG auxiliaries will be provided after finalization and approvalof power house and equipment layout drawings. The loadingon EPs will be furnished after completion of analysis ofequipment. However, static loading of each equipment canbe provided after finalization of layout and receipt ofapproval on equipment GA drawings.

Purchaser would like to clarify here that inputs required for designing of mountingarrangement for DG auxiliaries shall be provided on top most priority by the Bidder. In case the Bidder is not able to furnish such details in time, Purchaser's prime designer shall design withthe inputs available with him or taking any typical set of inputs wihch he deems fit. However,in any such case where the mountings require any modification to suit the Bidder'srequirement, then the same shall be done by him at no extra cost to the Purchaser.

40 Kirloskar Oil Engines Limited

40 C-4 1.2.10.0 Layout drawings, cable carrier system layout, cabling layout,piping general arrangement drawings, piping isometricdrawings, fabrication drawings for tanks & pressure vessels,piping support drawing, equipment support drawings, baseframe drawings etc. shall be submitted for review andapproval of Purchaser.

Cable carrier system layout / cable tray layout, cabling layoutis in Purchaser's scope. Please confirm.

Tender conditions shall prevail.

41 Kirloskar Oil Engines Limited

41 C -4 1.2.15.0 As a part of verification and validation of computer basedsystems used for diesel generator sets (safety and non-safety inclusive), following documents shall be prepared bythe Contractor and submitted for the review and approvalof the Purchaser:

If the component / equipment are already qualified for IVand V, only reports will be submitted for purchaser's review.Separate qualification is not envisaged. Please confirm.

Pl. refer reply against query no.19 (Overall Query No. 19)

42 Kirloskar Oil Engines Limited

42 C -4 1.2.15.12 Any other relevant document if required by NPCILverification and validation team

Requirement of additional documents as requested to bespecified before bid submission.

Not acceptable. NPCIL may request any additional documents during execution of theContract.

43 Kirloskar Oil Engines Limited

43 C-6 1.5 (d) Secondary cooling water supply temperature and inletpressure : 32°C (Maximum), not more than 5.0 Kg/cm²

Please confirm that supply temperature and inlet pressure ofsecondary cooling water will be at inlet port of PHE inside DGroom for each DG set.

Shall be provided at defined battery limit of the Purchaser scope with respect to secondarycooling water supply.

44 Kirloskar Oil Engines Limited

44 C-6 1.5 (e) Permissible pressure drop across the secondary water sideof jacket water heat exchanger: Will be provided to thesuccessful bidder

Please confirm permissible pressure drop across thesecondary water side of jacket water heat exchanger toselect appropriate heat exchanger and its costing in bidsubmission.

600 m3 / hour is the total water to be provided for each DG set. This total water can bedevided by the DG bidder based on its design. (like HT water HX, LT water HX). Total pressuredrop across the secondary water side i.e after combination of water (600 m3/hour) shall notbe more than 7m.

45 Kirloskar Oil Engines Limited

45 C-6 1.5 (f) Flow rate of secondary cooling water provided : 600 cubicmeter/hour including all circuits

Please clarify that flow rate of secondary Cooling water 600cubic meter/hour will be available for each DG set. Pleaseconfirm.

Confirmed.

46 Kirloskar Oil Engines Limited

46 C -6 1.13 The DGP shall be capable of operating without constantattendance by operating personnel. The duration of suchunattended operation shall not be less than 300 h.

There is no need for constant attendance by operatingpersonal. The DG set operation couldn’t be unmanned sincethere is need to check lubricating oil level, fuel oil level andother operating parameters periodically to ensurehealthiness of DG set operating systems.

Tender conditions shall prevail.

6 OF 47

Page 7: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

47 Kirloskar Oil Engines Limited

47 C-6 2.9 Governor: Wood ward - Electro hydraulic type EGB P orequivalent.

Governor make and type will be as per Engine OEM’srecommendation.The proposed Governor on engine will be Electro-mechanicalfuel rack actuator with hydraulic amplifier. It will fulfils the requirements of IEC60880, IEC61513 CAT Aas well the requirements.

As specified, the governor shall be of Electro hydraulic type. With respect to make of thegovernor, if it is different from that specified in the tender, the successful bidder duringexecution of the contract shall propose their makes with due assessment and justification forreview and approval by the Purchaser. This is in line with the "Approved vendor list" documentincluded in the tender, terms and conditions of which shall prevail in this regard.

48 Kirloskar Oil Engines Limited

48 C-6 2.9.1 Transient response:(a) Drop of transient frequencyin case of applying stepped balanced load and 50% of ratedpower (the load can be active), not more : 6%

We propose Transient response:(a) Drop of transient frequencyin case of applying stepped balanced load and 50% of ratedpower (the load can be active), not more : 4%

The lower limit is provided by the Purchaser, the Bidder at his discretion may provide anythingsatisfyng the laid out requirements.

49 Kirloskar Oil Engines Limited

49 C -6 2.9.4 Required droop variation : 0 to 6% We propose, required droop variation: 0 or 4% as per OEM’srecommendation.

The lower limit is provided by the Purchaser, the Bidder at his discretion may provide anythingsatisfyng the laid out requirements. Therefore tender clause shall prevail.

50 Kirloskar Oil Engines Limited

50 C -6 2.9.2 Steady state response:(a) from 25 to 100% rated power : ± 0.3% of set speed(b) up to 25% of rated power : ± 0.4% of set speed

We propose, Steady state response:(a) from 25 to 100% rated power : ± 0.5% of set speed(b) up to 25% of rated power : ± 0.5 % of set speed

The lower limit is provided by the Purchaser, the Bidder at his discretion may provide anythingsatisfyng the laid out requirements and Tender clauses shall prevail in this regard.

51 Kirloskar Oil Engines Limited

51 C -6 2.1 Fuel rate at rated power and at a generator efficiency of notless than 0.95 and under the conditions of Note 1, g/(kWh),not more than : 202+10.1

1. Specific fuel consumption of Diesel engine at crank shaftflange @ 100% power will be : 232 g/kWh + 5% toleranceand considering net calorific value of fuel 42800 KJ/Kg

2. Specific fuel consumption of DG set at alternator terminal@ 100% power considering alternator efficiency not lessthan 97% will be : 240 g/kWh + 5% tolerance andconsidering net calorific value of fuel 42800 KJ/Kg

Acceptable.

The application is for standby purpose related to nuclear safety. Reliability requirements are ofprimary importance. The manufacturer can provide an optimum specific fuel consumptionwithout compromising the reliable operation and performance of the DG Set. No credit ordebit shall be given for this aspect.

52 Kirloskar Oil Engines Limited

52 C -6 2.11 Fuel rate at the standard power output of the dieselaccording to ISO 3046/I and at a generator efficiency of notless than 0.95 (calculated, g/(kWh) : 199+9.95

1. Specific fuel consumption of Diesel engine at the standardpower output i,e, @ 100% power as per ISO 3046-1 at crankshaft end will be : 225 g/kWh + 5% tolerance andconsidering net calorific value of 42800 KJ/Kg

2. Specific fuel consumption of DG set at alternator terminal@ 100% power as per ISO 3046-1 and considering alternatorefficiency not less than 97% will be : 232 g/kWh + 5%tolerance and considering net calorific value of 42800 KJ/Kg

Please see Purchaser's clarification for serial no. 51 (Overall Query No. 51)

53 Kirloskar Oil Engines Limited

53 C -6 2.12 Specific consumption of oil for burn-off at rated power andat the generator efficiency not less than 0.95 (averageduring operation), g/(kWh), not more than: 1.1 g/kWh

Specific consumption of oil at rated power and at thegenerator efficiency not less than 0.97 (average duringoperation), g/(kWh), not more than: 1.76 g/kWh

Acceptable.

The application is for standby purpose related to nuclear safety. Reliability requirements are ofprimary importance. The manufacturer can provide an optimum specific fuel consumptionwithout compromising the reliable operation and performance of the DG Set. No credit ordebit shall be given for this aspect.

54 Kirloskar Oil Engines Limited

54 C -6 2.13 Specific consumption of oil for burn-off at standard poweroutput of diesel according to ISO 3046/I (reference),g/(kWh), not more than: 1.0 g/kWh

Specific consumption of oil at standard power output ofdiesel engine according to ISO 3046/I (reference), g/(kWh),not more than: : 1.7 g/kWh

Please refer to serial no. 53 for clarification (Overall Query No. 53)

7 OF 47

Page 8: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

55 55 Note 1- The fuel rates are given for the power output at:- the external conditions specified in ISO 3046/I:a) Outdoor air temperature (at inlet), к (°с) 298 (25);b) Atmospheric pressure, kpa (mm hg) 100 (750);c) Relative air humidity (at the inlet), % 60;d)Temperature of service cooling water of the external 305(32);cooling circuit (at the inlet to the system), k (°c)

-and under the working conditions:a) Pressure at the inlet (air for combustion, at the inlet 2.94(300);to the diesel’s compressor), kpa (mm H2O)b) Backpressure at the exhaust (of spent gases) at theoutlet from the diesel’s turbine), kpa (mm H2O) 4.9 (500);c) Minimum calorific value of fuel, kJ/kg 42700

Note 1- The fuel rates are given for the power output at:- the external conditions specified in ISO 3046/I:a) Outdoor air temperature (at inlet), к (°с) 298 (25);b) Atmospheric pressure, kpa (mm hg) 100 (750);c) Relative air humidity (at the inlet), % 60;d)Temperature of service cooling water of the external 305(32);cooling circuit (at the inlet to the system), k (°c)

-and under the working conditions:a) Pressure at the inlet (air for combustion, at the inlet to the diesel’s compressor), ≥ 98.5 kPa(738.81 mm Hg);b) Backpressure at the exhaust (of spent gases) at theoutlet from the diesel’s turbine), kpa (mm H2O) 3(306);c) Minimum calorific value of fuel, kJ/kg 42800

Noted.

56 Kirloskar Oil Engines Limited

56 C -6 3.5 Max. rated voltage : 6.3 kV We read as, "Max. voltage : 6.3 kV"Please confirm

Rated voltage : 6.3 kV

57 Kirloskar Oil Engines Limited

57 C -6 3.16 Permissible frequency variation(a) from 25% to 100% of ratedpower : ± 0.3(b) up to 25% of rated power : ± 0.4

We propose,Permissible frequency variation(a) from 25% to 100% of ratedpower : ± 0.5(b) up to 25% of rated power : ± 0.5

Tender conditions shall prevail.

58 Kirloskar Oil Engines Limited

58 C -6 3.2 Method of Neutral Grounding : Partially or InsulatedGrounding

Cables for grounding including termination kit is inPurchaser's scope. Please confirm.

Tender conditions shall prevail.

59 Kirloskar Oil Engines Limited

59 C -6 3.23 Size of earthing conductor for DG set: To (material and size)be finalized during detail engineering subject to approval byPurchaser.

Earthing conductor up to equipment will be in Purchaser'sscope. Please confirm.

Please refer to Purchaser's response to query no. 21 (Overall Query No. 21)

60 Kirloskar Oil Engines Limited

60 C -6 3.36 Terminal Boxa) 1 No. for line side, phase segregated suitable forwithstanding 50 kA for 0.25 sec and suitable for receiving2x1Cx150 sq. mm. (Cu) 6.0 kV (UE) grade XLPE insulatedcable. The design of TB shall be such that it providesadequate space for termination of cable with adequateclearances.b) 1 No. for neutral side adequate to locate CTs specifiedc) 1 No for RTDs, BTDs, CT leads etc.

a) Line side terminal box will be non phase segregated.(b)& (c) Metering and Protection CTs are in Purchaser'sscope. Please confirm

a) Tender condtions shall prevail.

(b) & c) Please refer to Purchaser's response to query no. 29 (Overall Query No. 29)

61 Kirloskar Oil Engines Limited

61 C -6 3.37 Temperature Detectorsa) Type : NSH Pt100c) No.of detectors on stator : Minimum 3 nos./phase

a) Type of temperature detectors will be RTD Pt 100.c) No.of detectors on stator : Minimum 2 nos./phasePlease confirm

a) Acceptable.C) Tender conditions shall prevail.

62 Kirloskar Oil Engines Limited

62 C -6 4 Current Transformers All CTs are in Purchaser's scope Please refer to Purchaser's response to query no.29 (Overall Query No. 29)

63 Kirloskar Oil Engines Limited

63 C -6 7 Control Panels/Junction Boxa) Degree of protection for control panels : IP54

a) Degree of protection for control panels will be IP52Please confirm

Tender conditions shall prevail.

64 Kirloskar Oil Engines Limited

64 C -6 Data Sheet B 9.1.1 : Electro hydraulic Governor, complete9.1.2: Remote speed control motor for the governor

Complete governor cum controller as a single unit as perOEM's standard design will be supplied as spares.

Spares shall be the same as supplied with the DG set

8 OF 47

Page 9: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

65 Kirloskar Oil Engines Limited

65 C -6 9.9.9 Set of Temperature transducers consisting of one of eachtype

Set of Temperature transmitters / RTDs consisting of one ofeach type will be supplied.

Tender condtions shall prevail.

66 Kirloskar Oil Engines Limited

66 C - 6 9.9.10 Set of Pressure transducers consisting of one of each type Set of Pressure transmitters consisting of one of each typewill be supplied.

Tender condtions shall prevail.

67 Kirloskar Oil Engines Limited

67 C -6 9.9.12 Electronic speed monitoring system, complete includingspeed sensors

As per OEM's design speed monitoring system is nothing butit is a Governor cum controller. We will supply the same withsensors.

Noted.

68 Kirloskar Oil Engines Limited

68 C -6 9.9.15 PLC used for DG control, monitoring and alarms, completeincluding power supply modules

PLC in DGLCP is not used, hence will not be supplied asspares.

Please refer to Purchaser's response to query no. 112.

69 Kirloskar Oil Engines Limited

69 C -6 9.10.5 Set of Current transformers consisting of one of each type All CTs are in Purchaser's scope. Hence will not be supplied asspares.

Please refer to Puchaser's response to query no. 29 (Overall Query No. 29). Hence tenderconditions shall pervail.

70 Kirloskar Oil Engines Limited

70 C -7 1.2 The DGP would have to operate without constantattendance by operating personnel. The time of unattendedoperation shall not less than 300 hrs.

There is no need for constant attendance by operatingpersonal. The DG set operation couldn’t be unmanned sincethere is need to check lubricating oil level, fuel oil level andother operating parameters periodically to ensurehealthiness of DG set operating systems.

Please refer to Puchaser's response to query no. 46 (Overall Query No. 46). Hence tenderconditions shall pervail.

71 Kirloskar Oil Engines Limited

71 C -7 1.2 The total operating time of DGP in the power-generatingmode till maintenance must be not less than 1500 h.The average time of operation to the first overhaul (with fullDGP reassembling) shall not be less than 6000 h.

The maintenance schedule for emergency set will be basedon time (i.e. number of days) or running hours whichever iscompleted earlier this is because the running hours per yearof emergency DG set remains very less . The maintenanceschedule will always be as per engine OEM’srecommendations.

We agree that the maintenance schedule shall also be time based due to number hours ofoperations expected to be very less for any standyby DGP. However, the bidder needs to bringout the criterion based on which such timely maintenance schedules are required keeping inmind that such standby DGP are requiered to be in standby for the entire duration of plantoperation even the number of hours of operation may be very less. Bidder shall refer thetender conditions in this regard, which shall prevail.

72 Kirloskar Oil Engines Limited

72 C -7 1.11 The DG unit shall be designed to draw air from outdoors. Airrequirements of the engine shall be supplied through a setof filters, silencers, associated ducting etc.

Silencer in Air intake system is not envisaged. The list of equipment brought out in the tender document for any system is only typical. Someof the equipment in each design differs from manufacturer to manufacuterer. To providesome degree of freedom to the manufacturer, some equipment are not indicated in thetender. However, as pointed out else where in the document it is the sole responsibility of theBidder to ensure that the DGP system is complete in all respect.

Silencer in Air intake system shall be provided.

73 Kirloskar Oil Engines Limited

73 C -7 1.15 & 1,16 Missing data These clauses are seems to be missing in the tenderdocument.

Query is not clear. However, the referred clauses are related to acceptance/pre-operationaltests which are to be performed on all DG Sets in accordance with test procedure andacceptance norms.

74 Kirloskar Oil Engines Limited

74 C -7 1.13 The control panels for the engine and the alternator shall beinstalled in separate enclosed room adjacent to the dieselengine with dedicated batteries in the control panel

Batteries are not envisaged since we are providing AC - DCconvertor 220 V AC to 24 VDC convertor in LCP and 220 VACsupply from purchaser. Please confirm

Please refer to our response to query no. 11 (Overall Query No. 11)

9 OF 47

Page 10: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

75 Kirloskar Oil Engines Limited

75 C -7 1.17 DG Set shall be capable of starting even if pre lubecirculation pump is not operating for 24 hours prior to startcommand

A standby hand driven lube oil priming pump for lube oil willbe provided in addition to EMD pump to ensure adequatepriming in emergency situation. This is as per tenderrequirement.

In the referred clause 1.17 of C-7, it is clearly mentioned that, in addition to the hand drivenlubricating pump, a separate solution is to be provided to cater to the situation of non-availability of pre-lubricating oil pump (which in your case is EMD pump).

Is EMD pump pneumatic pump? Pneumatic pump in addition to hand driven pump isacceptable. Electric driven is not acceptable.

Bidder shall propose accordingly for review and acceptance of the Purchaser during theexecution of the contract.

76 Kirloskar Oil Engines Limited

76 C -7 1.19 The tentative loading sequence is given in Appendix G. Final loading sequence needs to be provided before bidsubmission for proper sizing of DG set. Please confirm

Purchaser expects Bidder to take this tentative loading sequence while sizing the DG set aswell as satisfying all other requirements laid out in the Tender document. Purchaser alsoexpects Bidder to keep sufficient margin while deciding the size of the DG set proposed so thatsome minor changes, if any, in the final loading sequence can be accomodated.

77 Kirloskar Oil Engines Limited

77 C -7 1.27 The complete DG system shall be designed such that annualoutage time due to planned and unplanned maintenance &post maintenance testing of DG system which calls forremoval of DG set from service shall not be more than 70hours.

Outage time will be dependent on nature of maintenanceand associated activities.

Kindly consider the limit for the worst possible reason which can lead to this planned and/orunplanned outage of the DG set. Since it is an emergency DG set, certain parameters includingthis cannot be compromised with and accordingly, Tender conditions, as specified shall prevail.

78 Kirloskar Oil Engines Limited

78 C -7 1.28.1 DG and its auxiliaries are categorized for seismic category Ias per NP-031-01

Please provide NP-031-01 document, it seems to be missingin attachment of tender document

This is the Regulatory Reference.

NP-031-01 “Norms of Design of Seismic-Resistant NPPs and the same can be provided toSuccessful Bidder.

79 Kirloskar Oil Engines Limited

79 C -7 2.3.1 Lubricating oil system of the engine can also supplylubricating oil to the bearings of the alternator.

Lubricating oil system of alternator will be either separate orconnected to the diesel engine lubricating oil system. It willget finalized during detailed engineering.

It is up to Bidder to decide the arrangement of lubrication of alternator bearings.

80 Kirloskar Oil Engines Limited

80 C -7 2.3.4 DG shall be capable of starting under emergency conditions,even if pre-lubrication is not available for a period of 24hours.

A standby hand driven lube oil priming pump for lube oil willbe provided in addition to EMD pump to ensure adequatepriming in emergency situation. This is as per tenderrequirement.

Please refer to Purchaser's response to query No 75.(Overall Query No. 75)

81 Kirloskar Oil Engines Limited

81 C -7 2.3.7 Heaters with temperature control switch shall be providedfor keeping the lube oil warm when engine is not inoperation

As per OEM Design Pre heating of Lubricating oil is notenvisaged. Pre heating to Cooling water is sufficient to keepengine in warm stand-by condition.

Heating of both pre-lub and cooling water system is required. Heating of lub-oil can be donewith heated water.

82 Kirloskar Oil Engines Limited

82 C-7 2.4.1 Fuel injector shall be cooled by cooling water. As per OEM’s design there is no cooling is required to fuelinjectors.

Noted.

10 OF 47

Page 11: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

83 Kirloskar Oil Engines Limited

83 C-7 2.2.5 Differential pressure indicating switch across the filters shallbe provided to monitor the cleanliness of filter and foralarm in LCP.

Differential pressure indicating transmitters across the filterswill be provided.

Clarification on the intent of the proposed pressure transmitter switch:

We expect the Bidder to provide either 1x100% capacity duplex filters or 2x100% capacityindividual filters in the fuel line to the engine from day tank. During the events of choking ofthese filter (which can be known by measuring differential pressure across the filter) either thebooster pump is to be switched ON or the choked filter is to be isolated and supply is to becontinued through the other filter (in case of 2x100% individual filters). We believe this intentas well as providing an alarm can be met with a pressure switch. If the bidder feels that thiscan be done with pressure transmitter (which we feel will also call for some read out softwarein addition) also, he may follow the same.

84 Kirloskar Oil Engines Limited

84 C-7 2.6.11 The silencer should provide noise reduction in the workingarea on the territory of SDPP up to the level of 75 dB.

The design of silencer will be residential type with achievablenoise attenuation of 25 dB than originating source.

ISO 8528 requirements regarding vibration and noise measurement shall be complied. Bidderto confirm provision of soot collector and flame arrestor in the silencer.

85 Kirloskar Oil Engines Limited

85 C-7 2.7.2.22 Speed droop mode is required when the DG Set is operatingin parallel with similar DG set or with the grid. The droopshall be adjustable from 0 to 6 % at the engine.

As per OEM design speed droop will be fixed type andswitchable 0% or 4% will be available. This will cater alloperation and loading requirements.

Please refer to Purchaser's response to query no. 49 (Overall Query No. 49)

86 Kirloskar Oil Engines Limited

86 C-7 2.7.3 The governing system shall be Woodward electronic &hydraulic governor type EGB P or equivalent.

Governor make and type will be as per Engine OEM’srecommendation.The proposed Governor on engine will be Electro-mechanicalfuel rack actuator with hydraulic amplifier. It will fulfils the requirements of IEC60880, IEC61513 CAT Astandards.

Please refer to Purchaser's response to query no. 47 (Overall Query No. 47)

87 Kirloskar Oil Engines Limited

87 C -7 2.7.4 A load-limiting device, adjustable at engine, shall beprovided.

Engine load limit will be set / fixed through software insidethe governor cum controller.

Tender conditions shall prevail.

88 Kirloskar Oil Engines Limited

88 C-7 2.7.5 A mechanical over speed trip shall be provided as a back upto electronic over speed trip to automatically shut off fuel,in case the DG set speed reaches pre-set speed. Alarm shallbe provided for over speed trip.

Mechanical trip function is realized through fast acting valvesin air intake train on engine – these fast acting valves areoperated by solenoid valves.

The Purchaser understands that, the Bidder, though answeed differently, has agreed to thetender conditions. Tender claused shall, in any case, prevail as specified.

89 Kirloskar Oil Engines Limited

89 C-7 2.7.6 A booster servo-motor and rack booster shall be providedto facilitate quick engine starting

The proposed Governor on engine will be Electro-mechanicalfuel rack actuator with hydraulic amplifier.

Please refer to Purchaser's response to query no. 47 (Overall Query No. 47).

11 OF 47

Page 12: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

90 Kirloskar Oil Engines Limited

90 C-7 2.7.7 Speed Changer shall be provided with following features.a) A speed changer shall be provided with the speedgoverning system. It shall be arranged so that the speed ofthe engine can be adjusted or the power output can beadjusted when operating in parallel with other unit(s). Itshall be arranged for manual adjustment at, or near, thespeed governing system while the engine is in operation.(b) By means of the speed changer, it shall be possible toadjust the speed of the engine generator unit to requiredspeed during its functioning.(c) A motor actuated mechanism suitable for 24V DC shallalso be provided so that the speed changer can be adjustedby remote control while the engine is in operation (fromLCP or MCR).

Speed adjustment facility will be available for local andremote speed adjustment through governor controller. Noseparate speed changer device will be provided

Tender conditions shall prevail.

91 Kirloskar Oil Engines Limited

91 C-7 2.7.8 Speed Monitoring systemTypically speed monitoring system shall detect (i) Zero

speed (ii) Ignition speed (iii) Speed for closure of excitation(iv) Rated speed (v) Over speed and (vi) Any other speed asrequired by the logic.

Electronic Speed monitoring system shall be based onproven latestelectronics but shall not be software based.

Speed monitoring devices will be provided as per OEM'sstandard requirements similar to earlier executed project ofKAPP 3&4 and RAPP 7&8.

NPCIL does not take cognisance of any previously executed project by the Bidder. Tenderconditions & specifications laid out in this tender shall prevail and shall be complied by theBidder accordingly.

92 Kirloskar Oil Engines Limited

92 C-7 2.6.6 The exhaust gas system shall be complete with COR-TENsteel/ weathering steel exhaust piping, silencer, supportstructures and all the accessories and shall ensure safedisposal of the exhaust gases at a suitable point outside theDG set room.

The exhaust gas system will be complete with COR-TEN steel/weathering steel for exhaust piping and silencer.The material of construction for support structures and allthe accessories will be IS 2062 Gr. A or B.

Grade B is accepatble.

93 Kirloskar Oil Engines Limited

93 C - 7 3.1 Generator Construction We propose generator construction will be of salient/cylindrical pole. Please confirm

The Purchaser believes at the offered speed level, it can be only salient pole. Cylindrical maynot find application here.

94 Kirloskar Oil Engines Limited

94 C - 7 3.1.6.1 The line and neutral ends of stator winding of generatorshall be brought into two separate terminal boxes

The line and neutral ends of stator winding of generator shallbe brought into two separate or common terminal boxes.Please confirm

Tender conditions shall prevail.

95 Kirloskar Oil Engines Limited

95 C - 7 3.1.6.2 The phase side terminal box if required shall be suitable formounting CTs required for AVR connections and shall be ofphase segregated type

All CTs are in Purchaser's scope and the terminal box will benon phase segregated type. Please confirm

Please refer to Purchaser's response to query no. 29 (Overall Query No.29). Tender conditionsshall prevail.

96 Kirloskar Oil Engines Limited

96 C - 7 3.1.6.3 Neutral side terminal box shall have sufficient space toaccommodate 9 Nos. CTs before neutral formation (and 1no. CT after neutral formation, if required). The secondariesof CTs shall be brought to a separate terminal box mountedon neutral side terminal box. If required, this terminal boxshould also accommodate AVR CTs.

Neutral side terminal box if provided will be only for cabletermination. All CTs are in Purchaser's scope. Please confirm

Tender conditions shall prevail for neutral side terminal box.

For CTs please refer to Purchaser's response to query no.-29 (Overall Query No. 29)

12 OF 47

Page 13: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

97 Kirloskar Oil Engines Limited

97 C - 7 3.1.6.4 The scope of supply of phase side CTs, AVR CTs and neutralside CTs, as required is included in this tender.Specifications for CTs indicated in tender are tentative andshall be finalised after placement of order, Bidder shallsupply required CTs at no extra cost.

All CTs are in Purchaser's scope. Please confirm Please refer to Purchaser's response to query no.- 29 (Overall Query No. 29)

98 Kirloskar Oil Engines Limited

98 C - 7 3.2.1 Three Temperature detectors of resistance type shall beprovided in each phase winding. One RTD shall beembedded in each bearing.

Two Temperature detectors of resistance type will beprovided in each phase winding. One RTD shall be embeddedin each bearing. Please confirm

Tender conditions shall prevail.

99 Kirloskar Oil Engines Limited

99 C - 7 3.2.3 The detector coil of the RTD shall be of NSH Pt100 type asspecified earlier.

The detector coil of the RTD will be OEM's standard type ofPT 100.

Please refer to Purchaser's response to query no. 61 (Overall Query No. 61)

100 Kirloskar Oil Engines Limited

100 C - 7 3.2.6 Protective device shall be provided in the RTD terminal boxto protect the Purchaser's external circuits in the event ofshort circuit between winding and RTD.

Protective device for RTD terminal box will not be provided. Tender conditions shall prevail.

101 Kirloskar Oil Engines Limited

101 C - 7 3.3.1 Provision shall be made on generator frame at twolocations for connectingPurchaser's grounding conductors of appropriate size oftinned Copper stranded conductor - 2 leads. A non-corrodible metal pad shall be welded or brazed at these twolocations on the frame and shall have two threadedholes/studs for connecting cable lugs by means ofhexagonal head bolts and spring washers The groundingarrangement is such that the Purchaser provides equipmentearthing strip 40x4 mm GI flat running along the wall about0.5m above the floor in the entire length of the room. It isunder the scope of this Tender to provide properequipment grounding by connecting all equipment (atappropriate places) with these running strips, throughappropriate size of tinned Copper conductors. It is alsoinformed to the Tenderer to make necessary connectionsbetween these earthing strip and the equipment to beearthed with all the required accessories needed for thispurpose

Earthing conductor up to equipment will be in Purchaser'sscope. Please confirm.

Please refer to Purchaser's response to query no. 21 (Overall Query No. 21)

102 Kirloskar Oil Engines Limited

102 C - 7 3.5 Current Transformers All CTs are in Purchaser's scope. Please confirm Please refer to Purchaser's response to query no.- 29 ( (Overall Query No. 29)

103 Kirloskar Oil Engines Limited

103 C - 7 3.6 Power to the measurement, excitation, and control circuitsmust be supplied from voltage and current transformerswith secondary parameters 100 V and 5 or 1 А.

Power to measurement with secondary parameters will befinalized during detailed engineering. Required all CT and PTare in Purchaser's scope. Please confirm

Please refer to Purchaser's response to query no.- 29 (Overall Query No. 29).

13 OF 47

Page 14: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

104 Kirloskar Oil Engines Limited

104 C - 7 4.1.1 ( h ) The exciter system components rating shall not be less than110 percent ofmaximum excitation requirements of the Generator, when(i) operating at rated kVA at 0.8 pf lag and at any voltagebetween 5% below and 5% above rated voltage or (ii)during the starting of maximum kW motor with theremaining load operating on the generator or (iii) at anypoint during the specified load sequence.As a part of the technical proposal the Contractor shallsubmit details ofrequirements on the excitation system during the specifiedoperating conditions and justify the adequacy of thecomponents/systems provided

The required details will be submitted after receipt of orderduring detailed engineering.

Acceptable subject to confirming that the Bidder shall abide by all the requirements laid out inthe Tender documents.

105 Kirloskar Oil Engines Limited

105 C - 7 5.1.0 ( d ) Technical facilities of control and monitoring of DGP shouldbe related to class 2С as per NP-001-97, I seismic categoryas per NP-031-01.

Please provide NP-001-97 and NP-031-01 standards beforebid submission. Please confirm

Shall be provided to the successful bidder.

106 Kirloskar Oil Engines Limited

106 C - 7 5.1.0 ( e ) According to electromagnetic compatibility in accordancewith international standard (IEC 61000) the facilities shouldconform to IV execution group.Criteria of operation quality are related to Group A

Electromagnetic compatibility is not envisaged for DGPpanels / control schemes.

Tender conditions shall prevail.

107 Kirloskar Oil Engines Limited

107 C - 7 5.1.3 All remote controls should be designed for 24V DC and localcontrols for 220V 1 phase AC so that it should be possible tooperate DG from local panels even if control room is notavailable. Required interposing relays shall be included inthe scope of control panels for interposing Purchaser'sremote control commands with Diesel generator controllogics and schemes. Control panels shall be provided with220V AC to 24V DC rectifier and 24V DC batteries to startthe DG, monitoring and diagnosis, in case external controlpower supply to panels is not available.

Local controls will be operated on 24 VDC which will beconverted from 220 VAC supply provided by purchaser.

Batteries will not be required for starting the DG set hencenot provided.

Regarding local controls being operated at 24VDC is acceptable to the Purchaser subject to theunderstanding that the Bidder will provide everthing required for the conversion of 220V AC to24VDC.

Regarding batteries, Tender conditions shall prevail.

108 Kirloskar Oil Engines Limited

108 C - 7 5.1.4 A selector switch with locking arrangement installed on theDG control panel shall select whether the set is to be onlocal or remote control. In the local position both automaticand manual starting shall be possible. In the "remote"position automatic or manual starting shall be possible asselected by Auto/Manual selector switch in the local controlpanel.

Please elaborate the requirement in details. Please confirm. Elaboration and development of control scheme shall be done during detail engineering.

109 Kirloskar Oil Engines Limited

109 C - 7 5.1.4 The diesel-generator must be switched for operation inparallel with the grid from (LCP) of the DGP using themethod of precise manual and/or automaticsynchronization.

Manual Synchronizing of DG and respective bus only will beconsidered. Please confirm

Tender condtions shall prevail.

110 Kirloskar Oil Engines Limited

110 C - 7 5.1.7 Synchronizing of the set with the bus bar will be done fromthe local control panel.

Manual Syncronizing of DG and respective bus only will beconsidered. Please confirm

Please see Purchaser's reponse to query no. 109 (Overall Query No. 109)

14 OF 47

Page 15: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

111 Kirloskar Oil Engines Limited

111 C - 7 5.1.16 Electromagnetic compatibility as per IEC 61000-4-30:2015 –I group withfunctioning quality criterion “А”.

Electromagnetic compatibility is not envisaged for DGPpanels / control schemes.

Please see Purchaser's reponse to query no. 106 (Overall Query No. 106)

112 Kirloskar Oil Engines Limited

112 C - 7 5.1.19 Requirements of Programmable Logic Controllers: PLC is not being used hence specs mentioned are notapplicable.

It could be PLC based or otherwise but the following minimum major requirements reiteratedfrom the tender are to be complied for diagonostics: 1. For analong monitoring:a. permament monitoring of the channels by thresholds. (min. 2 adjustable thresholds perchannels). If these thresholds are exceeded, an alarm is activated.b. Balance: Modification of the zero setting of each channel.c. Average: Calculation of 4 different averages of n channels each. (n should not be less than32)d. Deviation:Supervision of channels of an averagae in relation to this average by comparisonwith a variable devatione. Trend: Calculation of the gradient of each channel and monitoring of the channel in reationto a threshold.f. Inhibition: The inhibitions (min. 4) can be assigned to any threshold of any channel.g. Alarm grouping: The alarms can be assigned to one of the 6 logic outputs.h. Remote acknowledgement of faults.i. Insulation of analog inputs should be periodically checked.j. suitable communication link via min of two RS485 port.2. For logic monitoring:a. Memorisation of a logic state change (zero potential contact) plus the time of the change.b. Generation of a singla (dry contact) for activating the external alarm.c.Generation of the alarm groups on: i. minimum of 6 relays always on the back plane. ii. min. 2 outputs cards with min. 16 channels (buffered 40mA/24V outputs).

15 OF 47

Page 16: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

d. Indication of the changes of state without alarm.E. Generation of a log of faults and state changes without alarm.F. The alarms can be inhibited by min. 4 external inhibition contactsg. Min. number of channels:643. Integrated supervision station:a. Outstanding alarms permanently displayed along with their states (eg. Not ACK, ACK, etc.)b. Alarm list. This should display all outstanding alarms with their states, dates, addresses,types of alarm and values.c. History of alarms recorded.d. State of all channels by group refreshed in real time. By list or histograph mimic diagrams.Recording of channel data and displaying under curves form.e. inhibited channels list.f. overall configuration/ architecture of all devices in the system.g. Minimum of 120GB hard disk.h. Suitable CPU cardi. Embedded track ball or other suitable arrangement.In addition to the above mentioned minimum specific function the following shall also beprovided for each interface:a. Internal testing (sensor breakdown, watchdog), which in the case of a fault triggers a systemalarm.b. Parameter changing arrangement.c.External keyboardd. Suitable arrangement for transfer of data to the Purcasher's device (eg. laptop, tab, etc.)e. necessary software and hardware to be used along with Purchaser's device for data transfercompatibility.

113 Kirloskar Oil Engines Limited

113 C - 7 5.1.20 Earthing of the panel shall be done with appropriate size oftinned copper conductor.

Earthing conductor up to equipment will be in Purchaser'sscope. Please confirm.

Please refer to Purchaser's response to query no.-21 (Overall Query No. 21)

114 Kirloskar Oil Engines Limited

114 C-7 5.1.22.1 F (iii) Failure of changeover of drier Failure of changeover of drier tower will be provided for eachair drier.

Noted.

115 Kirloskar Oil Engines Limited

115 C-7 5.1.23.4 ( C ) Alarm for failure of changeover of drier shall be provided Alarm for failure of changeover of drier tower will beprovided for each drier.

Noted.

116 Kirloskar Oil Engines Limited

116 C-8 2.2 (n) Alternator bearing and winding inspection. Only visual inspection will be done for alternator bearing andwinding without carrying out any dismantling activities.

Tests shall be as per TS, DS and QAP requirements

117 Kirloskar Oil Engines Limited

117 C-7 5.1.22.2 Control Switches Requirement of control switches will be finalized duringdetailed engineering and will be provided as applicable.

Tender conditions shall prevail.

118 Kirloskar Oil Engines Limited

118 C-7 5.1.22 & 5.1.22.1

Alarms on Local control panels Requirement of Alarms on local control panels will befinalized during detailed engineering and will be provided asapplicable.

Tender conditions shall prevail.

119 Kirloskar Oil Engines Limited

119 C-7 5.1.22.3 Clause is missing. Kindly consider it a typographical error.

120 Kirloskar Oil Engines Limited

120 C-7 5.1. 22.4 Local lamp indication on DG control panel LED Indicator type Indicating facia will be used instead ofindividual lamps for various indications on control panel.

Tender conditions shall prevail. However lamp can be LED type

16 OF 47

Page 17: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

121 Kirloskar Oil Engines Limited

121 C-7 5.1. 23.1 ( a ) Differential pressure indicating switch shall be providedacross each filter for alarm on engine control panel( b ) 3 nos. of Pressure switches shall be provided at theengine inlet for lowpressure alarm on the engine control panel and trip the DGset when pressure is below minimum safe pressure after90% speed.

a. Pressure transmitters will be provided across fuel oil filtersfor indicating pressure across fuel filter.

b. Pressure transmitters will be provided for indicationinstead of pressure switches. Engine alarm / trip at low fuelpressure not required hence pressure switches are not as perOEM standard.

a) Please refer to the Purchaser's response to query no. 83 (Overall Query No. 83)b) Please refer to clause no. 2.2 of section C-7 of tender document which evisages a step uppump. Therefore, the pressure monitoring is required.

122 Kirloskar Oil Engines Limited

122 C-7 5.1. 23.2 ( a) Differential pressure indicating switch shall be providedfor each lube oil filter for alarm on engine control panel.( b) 3 nos. of Pressure switches shall be provided to give lowlube oil pressure alarm if the pressure falls below a pre-setvalue. Subsequently trip the DG set when the pressure isbelow the minimum safe pressure.

a. Pressure transmitters will be provided across lube oilfilters for indicating pressure across fuel filter.

b. Pressure transmitters will be provided for indicationinstead of pressure switches.

a) and b) Tender conditions shall prevail.

123 Kirloskar Oil Engines Limited

123 C-7 5.1. 23.2 ( g ) A temperature switch shall be provided at the engine inletfor high oiltemperature alarm.

Temperature transmitter / RTD will be provided. If the Bidder feels, he can use transmitters instead of switches for the functionality requiredfrom the subject switch, he may, at his discretion use the same.

124 Kirloskar Oil Engines Limited

124 C-7 5.1. 23.3 3 nos. of Temperature switches shall be provided for jacketwater temperature to give jacket water temperature highalarm and trip the DG set.

Temperature transmitter / RTD will be provided. If the Bidder feels, he can use transmitters instead of switches for the functionality requiredfrom the subject switch, he may at his discretion use the same.

125 Kirloskar Oil Engines Limited

125 C - 7 5.2 All transmitters and switches will be mounted on the floormounted instrument rack near the engine. All gauges can bemounted directly on the pipeline or on the rack.

An isolation/root valve shall be provided for alltransmitters/switches/gauges to facilitate in-situcalibration. A junction box for field cables shall be providedon the same rack.

Instruments for diesel engine will be mounted on Dieselengine as per OEM's design and field instruments if any willbe mounted on instrument rack.

Noted, however, if the Bidder feels temperaure transmitters/ switches are better off on theengine / point of measurement even after taking into account possible vibrations andmaintanence during DG operation, then it is also acceptable.

126 Kirloskar Oil Engines Limited

126 C - 7 5.4.2 (Xii) Protection: Protection reply is in Purchaser's scope and protections willbe finalized during detail engineering.

Protection relays for the switchgear are within the scope of the Purchaser. But protectionrelays for the DG set are within the scope of the Contractor.

Finalization of protections during detailed engineering is acceptable subject to the Bidderagreeing to provide the minimum protections as mentioned in the tender documents, whichshall prevail.

127 Kirloskar Oil Engines Limited

127 C - 7 6.0 Requirement to power supply Power supply during running after starting DGP should berestored within 15 seconds.Batteries are not envisaged in the scope as continuouscontrol supply for DG operation will be provided bypurchaser.

Tender clause shall prevail.

17 OF 47

Page 18: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

128 Kirloskar Oil Engines Limited

128 C -7 3.7 In unloaded condition DGP should provide start-up ofasynchronous squirrel-cage motor of capacity specified inschedule of permissible power rate (see figure) and withstarting current not less than 7.0 times of motor ratedcurrent. In this case the voltage in the generator leadsshould not drop down 80% from nominal value. Loading ofthe generator is in steps. DGP should provide a short-termoverload of active power to 30% over the nominal value for5 seconds at all steps of load set.

We understood that maximum motor rating considered forall the calculations will be , the 1400 kW with rated powerfactor 0.9, efficiency 0.95, starting current 7pu, and startingpower factor 0.2, Please confirm

Please refer to the sequential loading tables for emergency (included in tender) and reliable(being provided with this clarification set) DG sets.

The DG set should also be capable of taking the start of a 1.4 MW (continuous rating) motorover a base load of 4.4 MW, without exceeding permissible limitations.

The DG set shall be capable of satisfying the loading requirements as per the figure included inclause 3.7 of section C-7 of the tender.

129 Kirloskar Oil Engines Limited

129 C -6 3.34 of datasheet of

main accessories

X’’d not less than 12.3% (Generator transient reactance) X’’d (Generator transient reactance) less than 12.3% to caterthe loading requirement. Please clarify.

Please consider it as a typographical error. X’’d not less than 7.2% (Generator transientreactance) shall be considered.

130 Kirloskar Oil Engines Limited

129 Section C APPENDIX H APPENDIX H: - R01.KK34.0.0.AP.PZ.WD001=e1 - Generalrequirements and methods of qualification for seismicresistance and stability for aircraft crash air shock wave.

Please clarify following points:

• Software to be used for this analysis.• Approved firms for such analysis.• Given Spectra would be treated as final in the tender andbased on which we will ask for quotations from vendors.Please confirm.• Please let us know NPCIL team / Dept. for approving theASW analysis.• There are number of standards mentioned in thespecification. Please let us know the specific standardacceptable to NPCIL for ASW qualification.• Is there any additional safety factor needs to be consideredover and above the spectra for ASW qualification?• Whether x,y,z axis spctras are with respect to northdirction? Is there any reduction in intensity of spectrumapplicable for qualification.• Whether DGP Building integrity & doors arrangements isconsidered as rigid and non affecting during Air craft crashand its percentage of filteration of wave form.If this analysis is to be completed through overseas agencies(cost effective) How NPCIL will approve such agencies.

Bullet wise clarification is as follows:

• Standard software shall be used for this analysis. Contractor to propose the software to beused for this purpose for concurrence by the Purchaser• Contractor during execution should propose the firm with their assessment, for review andapproval of the Purchaser• Please refer response at serial no. 20 (Overall Query No. 20)• Purchaser himself or his authorised agency will review and approve the seismic/ASWanalysis.•Please refer the response on the query at serial no. 20. • The approach shall be similar to seismic qualification.•X, Y, Z inputs are included in the said document which are to read along with the layoutrequirements

• ASW inputs shall be considered for qualification.

The approach would remain more or less similar to that adopted for indegenous agencies.

131 M/s. POWERICA LIMITED

1 Section C-1, Section C-1,Sheet 1 of 10,

1.2.11,a

Diesel engine with coupling, Automatic frequency controlsystem(AFCS) Automatic temperature control system forwater and oil (ATCS);

Engine will equip with Governor for Automatic frequencycontrol, and Temperature control valve for Water and LOrespectively for Automatic temperature control of water andLO.Is there any special system have to include on Diesel enginefor AFCS and ATCS?

As clearly mentioned in the tender document the DG set shall be provided with ATCS andAFCS. The method/ system / arrangement of how this is achieved is left for Bidder to decide.

M/s. POWERICA LIMITED

18 OF 47

Page 19: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

132 M/s. POWERICA LIMITED

2 Section C-1 Section C-1Page No. 11

of 589Clause 1.0

Safe & Site storage please clarify with detailed description If DG Set / Sets arrive site, before the readiness of the DG Building, then only land at nominalcost for safe storage will be provided by the Purchaser, but all other arrangements for the safesite storage shall all be made by the Contractor at no extra cost.

133 M/s. POWERICA LIMITED

3 Section-C2 Section C-2,Sheet 4 of 38,

3.2.5

The scope also includes preservation / re-preservation ofDG sets after erection / testing / commissioning till handingover.

The preservation / re-preservation of DG sets shalll becarried out till site testing / commissioning.

Tender Specifications shall prevail.

134 M/s. POWERICA LIMITED

4 Section C-1 Section C-1Page No. 11

of 589Clause 3

lube oil preheater, Not Required Heating of both pre-lub and cooling water system is required. Heating of lub-oil can be donewith heated water.

135 M/s. POWERICA LIMITED

5 Section C-1 Section C-1Page No. 11

of 589Clause 4

Two motor driven jacket water recirculation pumps ifcontinuous operation of pump is required

There is engine shaft driven pump, Hence motor driven/stand by pump is not required

This motor driven jacket water recirculation pumps are required to keep the DG set in thewarm condition during which time engine shaft driven pump are not operative. Therefore,tender conditions shall prevail.

136 M/s. POWERICA LIMITED

6 Section C-1 Section C-1Page No. 11

of 589Clause 6

Air intake system complete with filter, silencer (asenvisaged),

Silencer in air intake is not required as per manufacturerdesign standared.

Acceptable.

137 M/s. POWERICA LIMITED

7 Section C-1 Section C-1Page No. 12

of 589Clause 10

Engine controller: Engine controller is generally provided tocontrol the various sub systems of the engine. TheContractor shalll mention the type of controller beingproposed for the subject DG and also mention if it issoftware/hardware based. In case of being software based,it shalll comply with the requirements of IEC 60880 andAERB D-25 guide.The Purchaser intends providing a diversity by means of adifferent make in two of the four EDGs in one unit for boththe units. The bidder shalll review this requirement and givehis proposal in the part I bid, for further review by thePurchaser.

Specifications shalll be provided during detail engineering. Acceptable subject to the understanding that the Bidder shall comply to all the requirementslaid out in the tender documents.

138 M/s. POWERICA LIMITED

8 Section C-1 Section C-1Page No. 15

of 589Clause 25

Piping, fittings, valves, supports and SS braided metallicflexible joints etc., to connect the engine to all auxiliaryequipment/systems.

Except water & Lube oil flexible joints. Purchaser feels that the Bidder wants to clarify here about the type of connection betweenthe engine and water & Lub oil system. However, this clause broadly discusses the scope andall such connections irrespective of the type of connections agreed within the scope of theContractor.

139 M/s. POWERICA LIMITED

9 Section C-1 Section C-1Page No. 27

of 589Clause 5.1.8

Civil works of DG building. While making DG building accoustic treatment to beconsidered in purchaser's scope.

No specific Acoustic Treatment is envisaged in the Civil Design of the Building and tenderspecifications, as specified, shall prevail. However, if felt necessary by the Bidder for meetingthe dB requirements laid out in the tender, he should take it up without any time delay andextra cost to the purchaser.

19 OF 47

Page 20: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

140 M/s. POWERICA LIMITED

10 Section C-2 Section C-2,Sheet 5 of 38,

3.3.4

Contractor shalll offer type tested equipment as per codesand standard mentioned in this tender specification. Typetest certificate shalll be submitted to this effect. Unlessotherwise agreed by the Purchaser in writing, only typetests performed at independent laboratories, in accordancewith the approved standards and within five years from thedate of tender shalll be considered as as valid.

HHI has done the type test at HHI factory, and have a typetest certificates issued by Lloyd's Register dated on 12 August2011.

Tender conditions shall prevail. However type tests performed within 7 years prior to the duedate of tender submission is acceptable for main equipment like engine and generator.

141 M/s. POWERICA LIMITED

11 Section C-2 Section C-2, Sheet 38 of

38, Clause27.1.i

The engine offered against this tender shalll be from aproven series and minimum of 15 nos. of the same seriesengines shalll be in operation for a minimum cumulative7500 operating hours where two of the engines shalllaccount for at least 2000 operating hours each. At least oneengine offered from this series shalll have been type testqualified in accordance with IEEE 387.

HHI has performed the type test in accordance with IEEE 387on the same series Engine1. HHI HiMSEN 16H32/40V ; 20112. HHI HiMSEN 20H32/40V ; 2014

Tender conditions shall prevail. However type tests performed within 7 years prior to the duedate of tender submission is acceptable for main equipment like engine and generator.

142 M/s. POWERICA LIMITED

12 Section-C4 Section C-4Page No. 69

Clause 1.2.2.4

Capability of DG set to operate with ungrounded neutral Not applicable, at least one gen set shall be ground in theparallel operation.

DG sets are not operated in parellel with each other. Tender conditions shall prevail.

143 M/s. POWERICA LIMITED

13 Section C-6 Section C-6, Sheet 2 of 46,

Clause1.7

10% Overload capacity for 2 hr. in 24 consecutive hours ofoperation

10% Overload capacity for 1 hr. in 12 consecutive hours ofoperation

Tender conditions shall prevail.

144 M/s. POWERICA LIMITED

14 Section C-6 Section C-6, Sheet 2 of 46,

Clause1.12

Over speed of DG Set :Engine : Minimum of 120% of rated speedAlternator, exciter, PMG and flywheel : 120% of rated speed

As per manufacture standard design the over speed settingshall be 113% & 115% of rated speed,

These shall be designed for 120% as per tender conditions. Settings can be as suggested.

145 M/s. POWERICA LIMITED

15 Section C-9 Section C-9Page No172

Clause 1.3 (d)

Rated load tests: Comprising of operating the DG Set at100% load for 2hr., 110% load for 2hr., 100% load for 24hrs. and no load for 2 hrs followed by 50% load for .5 hr.and 25% load for 1 hr.

Rated load tests: Comprising of operating the DG Set at 100%load for 2hr., 110% load for 1hr., 100% load for 24 hrs. andno load for 2 hrs followed by 50% load for .5 hr. and 25%load for 1 hr only for first DG Set. Thereafter , the other DGsets to be tested as per manufacturers standards with 50%load and 75 % load for 30 Min each and 100 and 110 % loadfor 60 Min each.

Tender conditions shall prevail.

146 M/s. POWERICA LIMITED

16 SECTION C-7 SECTION : C-7SHEET 4 OF

44

The complete DG system shalll be designed such thatannual outage time due to planned and unplannedmaintenance & post maintenance testing of DG systemwhich calls for removal of DG set from service shalll not bemore than 70 hours.

Please clarify with detailed description The clause is self explanatory and same shall prevail.

20 OF 47

Page 21: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

147 M/s. POWERICA LIMITED

17 Section C-7 Section C-7page No. 125Clause 1.17

DG Set shalll be capable of starting even if pre lubecirculation pump is not operating for 24 hours prior to startcommand. Contractor may offer solutions to circumvent theabove requirement of non- availability of pre-lube oil pumpsubject to Purchaser’s review. Apart from this 24 hoursrequirement, DG set shalll be provided with a hand drivenlubricating pump (with all required manual isolation valves)to develop required parameters such as pressure, flow etc.to start the DG set under emergency conditions i.e. nonavailability of pre lub pump for more than 24 hours. DG Setmust be able to start and develop required voltage byactivating solenoid valve manually without any controlsupplies during emergencies.

The prelubrication is mandatory during stand still. If pre lubecirculation pump is not operating for 24 hours prior to startcommand, optional pneumatic pump shall be suppliedalongwith the gen set.

Providing pneumatic pump to cater to 24hr requirement is acceptable. Also the requirementsof providing hand driven lubricating pump shall be adhered to.

148 M/s. POWERICA LIMITED

18 Section C-7 Section C-7Page 139

Clause 3.1.6.3

Neutral side terminal box shalll have sufficient space toaccommodate 9 Nos. CTs before neutral formation (and 1no. CT after neutral formation, if required). The secondariesof CTs shalll be brought to a separate terminal box mountedon neutral side terminal box. If required, this terminal boxshall also accommodate AVR CTs.

For trouble free operation CTs shall be mounted in theseparate panel.

Acceptable. However, shall be detailed during execution of the work, for review and approvalby the Purchaser.

149 M/s. POWERICA LIMITED

19 Section C-7 Section C-7Page 143Clause 4.0

Generator excitation system of capacity 5.5MW and highershalll have 100% backup by voltage automatic controller.Excitation forcing multiplicity shalll not be lower than 2.0.

Please clarify with detailed description The Bidder shall select the excitation system based on the requirements specified in theTender document.

150 M/s. POWERICA LIMITED

20 Section C-9 Section C-9Page 172

Clause 1.3 ©

Test to demonstrate starting of 1400 KW motor over thebase load of 4900 KW

When 1400 Kw load is applied with 700% FLC @ 0.2 pf withbase load 4900 kw. The Voltage dip will be 26 %. Howeverwith the same load applied with VFD the TVD shall be limitedlass then 20%.

Please refer to the sequential loading tables for emergency (included in tender) and reliable(being provided with this clarification set) DG sets.

The DG set should also be capable of taking the start of a 1.4 MW (continuous rating) motorover a base load of 4.4 MW, without exceeding permissible limitations.

The DG set shall be capable of satisfying the loading requirements as per the figure included inclause 3.7 of section C-7 of the tender.

151 M/s. POWERICA LIMITED

21 Section C-10 SECTION : C-10

SHEET 1 OF 6

Required Mechanical Special Tools for overhauling of KKNPP1&2 10 nos. of Diesel Engine

Cylinder liner honing tool & lapping Machine are not a part ofstandard tool as per manufactur & cylinder liner honing cannot be done at site during the maintenance.

Tender conditions shall prevail.

152 M/s. POWERICA LIMITED

22 Section D Section D-2.3Page No. 229

Clause 9

In addition to the above mentioned drawings, details ofinstrumentationtypes and manufacturers name etc. shall be enclosed.(i) Control panel details - General arrangement drawing. (ii)Simple control scheme.(iii) Functional diagrams of different logics.

Later, shall be provide during detail engineering. Acceptable subject to the understanding that the Bidder shall comply to all the requirementslaid out in the tender documents.

M/s. POWERICA LIMITED

VENDOR LIST FOR ELECTRICAL ITEMS

M/s. POWERICA LIMITED

GENERATOR - 6300 KW, 6.0 KV, 50 Hz, 0.8pf 1. HYUNDAI 2. JEUMONT

Manufacturer other than approved vendor list is not acceptable. However for such cases,approved vendor list (appendix-I) clauses shall be applicable.

Page No 346 of 589

Section -C23153

21 OF 47

Page 22: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

M/s. POWERICA LIMITED

415/380 V MOTOR CONTROL CENTRES & PMCCS POWERICA LIMITED Manufacturer other than approved vendor list is not acceptable. However for such cases,approved vendor list (appendix-I) clauses shall be applicable.

M/s. POWERICA LIMITED

SYNCHRONIZING PANELS POWERICA LIMITED Manufacturer other than approved vendor list is not acceptable. However for such cases,approved vendor list (appendix-I) clauses shall be applicable.

M/s. POWERICA LIMITED

SYSTEM PROTECTION PANELS, STATION METERING PANELS

POWERICA LIMITED Manufacturer other than approved vendor list is not acceptable. However for such cases,approved vendor list (appendix-I) clauses shall be applicable.

154 M/s. POWERICA LIMITED

1 Sec. C-1, Pg. 1/10, Cl.

No. 1

Scope of Job Following is in purchaser's Scope : 1.Design, Engineering &execution of All Civil work like DG room, Foundations,Trenches, insert plates etc, 2. Storage & Security at site 3.Outgoing cabling/ busducting with Cable Trays 4. Earthing for the equipments supplied by DG Vendor 5. Secondary CoolingWater system with pumps, valves, water piping upto HeatExcahnger, Aux MCC panel for Secondary Circuit etc. 6. BulkFuel tank, pumps, switches & electrical controls, fuel pipingupto day tank. 7. Complete Ventillation system for the DGroom 8. Complete lighting system for the DG room. 9. Allapprovals . 10. Load , Diesel, aux, supply, water for the Sitetesting 11. Pro-rata basis payment for the material quoted.12. Seismic Qualification other than Analysis & Codal method13. Fire Fighting systems. 14. Support structure for exhaustpipe other than external wall support. 15. Testing methods ,procedures requirement other than manufacturer's standardTest procedure. 16. SCADA, HMI & BMS System in toto. 17.HT cabling between DG SET & HT DG Breaker & outgoingfrom there. 18. Room Acoustic Treatment

Clarification item wise is as follows:1. Design, engineering & execution of all civil works of UKD building is in Purchaser's scope.However, since the design is based on KKNPP1,2 any minor changes that are needed to suitthe Bidder's layout is within the scope of this Contractor. Also refer clause no. 1.2.5.0 ofsection C-4 of the tender, Grouting, etc. for DG and auxiliaries are also included in the scope ofsubject Contractor. Regarding cable trenches/ trays, kindly refer to clause 16 of section C1. Ifthe bidder means embedded parts for 'insert plates', then please refer to section C of thetender regarding embedded parts..2. Storage and security until handing over of the complete DG set is within the scope of thisContractor.3. Please refer to clause 16 of section C1.4. Earthing arrangement from the equipement to the nearest point on the earthing ring (Purcahser's Scope) for connection to the system grid is in the scope of this Contractor. Pleaseread the clause 5.1.4 of section C2 in conjuction with clause 20.13 of section C-2 and Tenderclause, in this regard, shall prevail.5. Please refer clause 1.3 of section C3.6. Please refer clause 1.5 of section C3.7. Ventilation is in Purchaser's scope.8. Permanent Lighting system in the UKD building is in Purchaser's scope. However anytemporary lighting required during the erection works, in case of non-readiness of permanentlighting system, shall also be arranged by the Contractor. 9. All approvals/ clearances are within the scope of this Contractor.10. Load, diesel, auxiliary power supply, water for site testing are in Purchaser's scope.

11. Tender conditions shall prevail.12. Seismic qualification is within the scope of this Contractor.13. Fire fighting is in Purchaser's scope.14. Support structure for exhaust pipe is within the scope of this Contractor.15. All testing methods, procedures requirements are within the scope of this Contractor.16. Please refer clause 1.9 of section C3. 17. Purchaser's scope.18. No acoustic treatment of the UKD building is in Purchaser's scope. Only if the Bidder fails tomeet the requirement of clause 2.6.11 of section C7, he may go for acoustic treatment of theDG room after due approval of the Purchaser.

155 M/s. POWERICA LIMITED

2 Section C-1,Sheet 1 of

10,1.2.11,a

Diesel engine with coupling, Automatic frequency controlsystem(AFCS) Automatic temperature control system forwater and oil (ATCS);

Engine is equipped with Governor for Automatic frequencycontrol. Temperature control valve for Water and LOrespectively for Automatic temperature control of water andLO.Is there any special system have to include on Diesel enginefor AFCS and ATCS?

Please refer to Purchaser's response to query no. 1 (Overall Query No. 154) of M/s Powericafirst set of queries.

22 OF 47

Page 23: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

156 M/s. POWERICA LIMITED

3 Only 1 no. Lube oil Priming Pump will be provided & notStandby Priming pump.

The bidder is bound to fulfill the requirements laid out in clause 3 of section C1. Tender clauseshall prevail.

157 M/s. POWERICA LIMITED

4 Jacket water recirculation by engine driven water pump only.Hence no AC Pump / standby AC Pump will be supplied.

Engine driven water pump can only work when the DG is running. To cater to therequirements of the standby conditions, Tender clause shall prevail.

158 M/s. POWERICA LIMITED

5 Starting Air system will be as per our System design standard,hence may not have dryers, distributer etc.

Tender clause shall prevail.

159 M/s. POWERICA LIMITED

6 exhaust Silencers will have 15dBA Insertion loss. ISO 8528 requirements regarding vibration and noise measurement shall be complied. Bidderto confirm provision of soot collector and flame arrestor in the silencer.

160 M/s. POWERICA LIMITED

7 Engine Controller is HHI make 1no. Per Engine & standarddesign Controller of the manufacturer. It will not have anyother substitute make.

As clearly mentioned in clause 1.2.1 (10) either different make engine controller or any othermethod / arrangement to cater to the requirement of diversity is specified, which shall prevail.

Bidder has not mentioned anything about how he wishes to accomplish this requirement. Inany case, Tender conditions shall prevail.

161 M/s. POWERICA LIMITED

8 pg 5 of 10. Cl. No. 19

Storage batteries & rectifier Since DG is Air start type, Storage batteries will not required. Tender clause shall prevail. Please refer to clause 5.1.3 & 6.0 of section C7.

162 M/s. POWERICA LIMITED

9 pg 5 of 10. Cl. No. 21

Bolts / Vibration isolators In case AVM pads are used, Foundation bolts will not reuire,hence not be provided.

Acceptable subject to meeting all tender requirements including seismic and ASWqualifications..

163 M/s. POWERICA LIMITED

10 pg 10 of 10. Cl. No. 1.2.3

Aging Analysis / ASW This is not applicable since it is presumptin basis & not anytheoratical calculation for the same. Product Age will bepresumed as 15 years subject to regular O&M services as permanufacturer's recommendation. ASW details will be sharedsubsequently.

Tender clause shall prevail.

164 M/s. POWERICA LIMITED

11 Section C-1Page No. 11

of 589Clause 1.0

Safe & Site storage Safe Site storage to be provided by the purchaser Please refer to Puchaser's response to point no. 2 of query no. 1 (Overall Query No. 154)above.

165 M/s. POWERICA LIMITED

12 Section C-1Page No. 11

of 589Clause 4

Two motor driven jacket water recirculation pumps ifcontinuous operation of pump is required

There is engine shaft driven pump, Hence motor driven/stand by pump is not required

Please refer to Purchaser's response to query no. 4 (Overall Query No. 157) above.

166 M/s. POWERICA LIMITED

13 Section C-1Page No. 11

of 589Clause 6

Air intake system complete with filter, silencer (asenvisaged),

Silencer in air intake is not required as per manufacturerdesign standared.

Air intake system complete with filter, silencer shall be provided.

23 OF 47

Page 24: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

167 M/s. POWERICA LIMITED

14 Section C-1Page No. 12

of 589Clause 10

Engine controller: Engine controller is generally provided tocontrol the various sub systems of the engine. TheContractor shalll mention the type of controller beingproposed for the subject DG and also mention if it issoftware/hardware based. In case of being software based,it shalll comply with the requirements of IEC 60880 andAERB D-25 guide.The Purchaser intends providing a diversity by means of adifferent make in two of the four EDGs in one unit for boththe units. The bidder shalll review this requirement and givehis proposal in the part I bid, for further review by thePurchaser.

Specifications shall be provided during detail engineering. Acceptable subject to meeting of all tender requirements, which shall prevail.

168 M/s. POWERICA LIMITED

Section C-1Page No. 15

of 589Clause 25

Piping, fittings, valves, supports and SS braided metallicflexible joints etc., to connect the engine to all auxiliaryequipment/systems.

Except water & Lube oil flexible joints. Tender clause shall prevail.

169 M/s. POWERICA LIMITED

Section C-1Page No. 27

of 589Clause 5.1.8

Civil works of DG building. While making DG building accoustic treatment to beconsidered in purchaser's scope.

Please refer to Puchaser's response to point no. 18 of query no. 1 (Overall Query No. 154)above.

170 M/s. POWERICA LIMITED

Section C-2,Sheet 4 of

38,3.2.5

The scope also includes preservation / re-preservation ofDG sets after erection / testing / commissioning till handingover.

The preservation / re-preservation of DG sets shall be carriedout till site testing / commissioning.. Please note, we will notdevelop infrastructure for Storage. Purchaser will provide usduly covered storage shade with proper accesibiliy for safehandling & re-shifting to DG room.

As explained in the Tender Documents, Purchaser shall only provide land for storage atnominal price to the Bidder. All infrastructure development as well as security of the of thematerial is within the scope of this Contractor, as specified in the tender document, whichshall prevail.

171 M/s. POWERICA LIMITED

15 Section C-2,Sheet 4 of

38,3.2.8

O&M services If O&M Services require for 1 year period, it will beexclusively counted on each DG set & not sequentially oneafter next. Uptime of DG has nothing to do ith its sequence.

Query is not clear. However, tender clause shall prevail.

172 M/s. POWERICA LIMITED

16 Section C-2,Sheet 4 of

38,3.2.8.2

Uptime Our Technician will visit by 48 hours after reportingcomplaints.

Query is not clear. However, tender clause shall prevail.

173 M/s. POWERICA LIMITED

17 Section C-2,Sheet 4 of

38,3.2.8.5

Remote analysis of Data The scope is : fault details emailed by you will be reviewed atour end & corrective action will be sugested to your egineerthrough email / phone.

The scope includes, but is not limited to any fault or abnormal condition experienced by thePurhcaser with the equipment under the subject Contract. The mode of solution maybemutually agreed between the Purchaser and the Bidder. Since the payment for such conditionsis based on man-day, deployement of man power, if requested by the Purchaser, shall becomplied with, as per the terms and conditions of the tender document, which shall prevail.

24 OF 47

Page 25: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

174 M/s. POWERICA LIMITED

18 Section C-2,Sheet 5 of

38,3.3.4

Contractor shall offer type tested equipment as per codesand standard mentioned in this tender specification. Typetest certificate shalll be submitted to this effect. Unlessotherwise agreed by the Purchaser in writing, only typetests performed at independent laboratories, in accordancewith the approved standards and within five years from thedate of tender shalll be considered as as valid.

HHI has done the type test at HHI factory, and have a typetest certificates issued by Lloyd's Register dated on 12 August2011.

Tender conditions shall prevail. However type tests performed within 7 years prior to the dateof tender bid submission is acceptable for main equipment like engine and generator..

175 M/s. POWERICA LIMITED

19 Section C-2,Sheet 5 of

38,3.3.4

Type Test Type Test clause will be applicable for Engine & Alternatoronly. All other equipments will be subject to itsmanufacturer's standrad Test report / certification. For IEEEplease refer to Section A, Appendix "X" B.1.vi explaination byus in pre-bid query.

Tender conditions shall prevail.

176 M/s. POWERICA LIMITED

20 Section C-2,Sheet 6 of

38,3.3.8

Warranty period This will be 12 months from date of comissioing OR 18months from date of Supply which ever is earlier. Anyextention thereafter will be at an extra cost.

Technical specifications & requirements given in Section - C - 2 of the Tender Document shallprevail.

177 M/s. POWERICA LIMITED

21 Section C-2,Sheet 6 of

38,4

Progress Report If Hindrance register at NPC NUB & at Site not maintained,then email communications will be taken as "Record Notes ofRegister " of Activity progress in Hindrance Register. Further,Unforeseens Hindrances beyond Purchaser Or Vendorsperview will qualified for auto time extension without leveyof LD / payment deduction.

Tender conditions shall prevail.

178 M/s. POWERICA LIMITED

22 Section C-2,Sheet 7 of

38,5

Exclusions as listed above. Please refer to Purchaser's response to query no. 1 (Overall Query No. 154) above.

179 M/s. POWERICA LIMITED

23 Section C-2,Sheet 9 of

38,8.2

Instruments / relays/ meters/ transducers for SeismicQualification

Components which are part of DG subsystems like coolingsystem, air system, oil system, fuel , starting system, all suchcomponents / instruments will be qualified by Analysis ofsystem as a whole & not as discrete components.

Tender conditions shall prevail.

180 M/s. POWERICA LIMITED

24 Seismic qualification / ASW qualification of followingequipments by Analysis only : Control Panels, Valves,Solonoid valves, pumps, HE, motors, Day Tank, piping,Compressors, Air Bottle etc.

Tender conditions shall prevail.

181 M/s. POWERICA LIMITED

25 Section C-2,Sheet 9 of

38,9.0

Pollution Control Board approval & other approvals PCB approval is to be taken by the purchaser as part of PlantLayout approval & inturn operation approval. We will providenecessary documents of Engine Test Certificate for the same.All other statutory approval is to be taken by the Purchaser.Government approvals are not required for equipmentdesign, manufacturing , Testing & Inspection. It is everyequipment manufacturer's design standard.

Please refer to Purchaser's response to point no. 9 of query no. 1 (Overall Query No. 154)above.

25 OF 47

Page 26: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

182 M/s. POWERICA LIMITED

26 Section C-2,Sheet 10 of

38,10.0

Welding, Radiograpgy & NDT This will be offered only for Site fabricated items. NDT willnot be applicable.

Requirements of clause 10.0 of Section C - 2 shall prevail.

183 M/s. POWERICA LIMITED

27 Section C-2,Sheet 11 of

38,12.0

Spares Spares having shelf life less than 12 months will not beQuoted by us. And the same need to be purchased separatelyby the NPCIL on scheduled requirement basis. Since thespares are of same specs & design of Original components,hence no Test qualification will be carried out on the same.These will be accepted based on Vendors certification only.

Tender clause shall prevail.

184 M/s. POWERICA LIMITED

28 Section C-2,Sheet 13 of

38,15.0

Painting a. Equipment painting is as per the manufacturer standardprocedure. Structure will be painted with red oxide primerupon wire brush cleaning & epoxy paint thereafter. d. Termalinsulation will be provided on exhaust pipe only. This will beminearl wool 50mm thick of 64kg/sq.mtr density with 24SWG aluminium cladding. The pipe will be supported fromthe building wall only & not from ground.

Tender clause shall prevail.

185 M/s. POWERICA LIMITED

29 Section C-2,Sheet 13 of

38,15.2.6 & 15.2.7

paint test Paint thickness will be 70-80 microns. Salt fog test will not beoffered.

For painting thickness, tender clause shall prevail.

186 M/s. POWERICA LIMITED

30 Section C-2,Sheet 20 of

38,16.0

Packing Please note, DG Set will be despatched in open condition.Control panel, battery will be packed in wooden crate.Erection material will be in open condition.

Items dispatched in open condition are not acceptable. Tender clause shall prevail.

187 M/s. POWERICA LIMITED

31 Section C-2,Sheet 23 of

38,18.0

Storage & preservation Equipment delivered at site will be treated for 12 monthsstorage maximum. Retreatment cost for delay beyond 12months will be borne by Purchaser time to time. Purchaserwill provide safe covered shade for storage free from theft,damage due to fire, water & natural incidences, riots etc.

Please refer to Purchaser's response as well as tender clause related to storage & security aswell as represervation. Tender conditions shall prevail.

188 M/s. POWERICA LIMITED

32 Section C-2,Sheet 27 of

38,20.0

Erection Purchaser shall handover stored material in same conditionas at the time of delivered. Damages in Purchaser Custodywill be made good by the purchaser from their account tomake it suitable for erection & operation & performancecondition.

As detailed in the Technical specification and Purchaser's response related to storage andsecurity, the material until the final handing over the DG set is the responsibility of the Bidder/Contractor. Purchaser shall not be held responsible for damage / theft of material at sitewhatsoever.

189 M/s. POWERICA LIMITED

33 Section C-2,Sheet 34 of

38,22.8 , 22.9

& 22.10

Gurantee Test & Operational acceptance In case Load is not available, it will be taken over at availableLoad only. Load, diesel, Water, aux power will be free issuedby the purchaser for site Testing.

Tender condtions shall prevail.

26 OF 47

Page 27: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

190 M/s. POWERICA LIMITED

34 Section C-2,Sheet 35 of

38,23.0

Co-ordination procedures Drawing submitted may please be returned with commentswithin 2 weeks of submission. Approval of Vendor shall bedone within 1 to 2 weeks of documents submission. Anydelays in approval of the new proposed vendor will add intotime extension by the same period.

Tender requirements shall prevail.

191 M/s. POWERICA LIMITED

35 Section C-2, Sheet 38 of

38, Clause27.1.i

The engine offered against this tender shalll be from aproven series and minimum of 15 nos. of the same seriesengines shalll be in operation for a minimum cumulative7500 operating hours where two of the engines shalllaccount for at least 2000 operating hours each. At least oneengine offered from this series shalll have been type testqualified in accordance with IEEE 387.

HHI has performed the type test in accordance with IEEE 387on the same series Engine1. HHI HiMSEN 16H32/40V ; 20112. HHI HiMSEN 20H32/40V ; 2014

Tender conditions shall prevail. However type tests performed within 7 years prior to the dateof tender bid submission is acceptable for main equipment like engine and generator..

192 M/s. POWERICA LIMITED

36 Annex 1 to Section C-2,

Sheet 1, Clause no.

4.0

Non Readiness of the Site Preservation will be done till CDD period less 1 year. Anydelays beyond CDD period, Presrvation charges will beadditional payable by NPCIL at actual..

Please refer to our tender requirements related to Preservation and Re-preservation videclause 18.0 of section C2.

193 M/s. POWERICA LIMITED

37 Section C-4Page No. 69

Clause 1.2.2.4

Capability of DG set to operate with ungrounded neutral Not applicable, at least one gen set shall be ground in theparallel operation.

The DGs are supposed to operate in parellel with the grid only. No two DGs shall be parelledsimultaneously. When parelled with the grid, NGR of UAT comes into circuit for DG.

194 M/s. POWERICA LIMITED

38 Section C-6, Sheet 2 of

46, Clause1.7

10% Overload capacity for 2 hr. in 24 consecutive hours ofoperation

10% Overload capacity for 1 hr. in 12 consecutive hours ofoperation

Tender conditions shall prevail.

195 M/s. POWERICA LIMITED

39 Section C-6, Sheet 2 of

46, Clause1.12

Over speed of DG Set :Engine : Minimum of 120% of rated speedAlternator, exciter, PMG and flywheel : 120% of rated speed

As per manufacture standard design the over speed settingshall be 113% & 115% of rated speed,

These shall be designed for 120% as per tender conditions. Settings can be as suggested.

196 M/s. POWERICA LIMITED

40 Section C-9Page No172Clause 1.3

(d)

Rated load tests: Comprising of operating the DG Set at100% load for 2hr., 110%load for 2hr., 100% load for 24 hrs. and no load for 2 hrsfollowed by 50% load for.5 hr. and 25% load for 1 hr.

Rated load tests: Comprising of operating the DG Set at 100%load for 2hr., 110% load for 1hr., 100% load for 24 hrs. andno load for 2 hrs followed by 50% load for .5 hr. and 25%load for 1 hr only for first DG Set. Thereafter , the other DGsets to be tested as per manufacturers standards with 50%load and 75 % load for 30 Min each and 100 and 110 % loadfor 60 Min each.

Tender conditions shall prevail.

197 M/s. POWERICA LIMITED

41 SECTION : C-7

SHEET 4 OF 44

The complete DG system shalll be designed such thatannual outage time due to planned and unplannedmaintenance & post maintenance testing of DG systemwhich calls for removal of DG set from service shalll not bemore than 70 hours.

Please clarify with detailed description The clause is self explanatory and same shall prevail.

27 OF 47

Page 28: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

198 M/s. POWERICA LIMITED

42 Section C-7page No.

125Clause 1.17

DG Set shalll be capable of starting even if pre lubecirculation pump is not operating for 24 hours prior to startcommand. Contractor may offer solutions to circumvent theabove requirement of non- availability of pre-lube oil pumpsubject to Purchaser’s review. Apart from this 24 hoursrequirement, DG set shalll be provided with a hand drivenlubricating pump (with all required manual isolation valves)to develop required parameters such as pressure, flow etc.to start the DG set under emergency conditions i.e. nonavailability of pre lub pump for more than 24 hours. DG Setmust be able to start and develop required voltage byactivating solenoid valve manually without any controlsupplies during emergencies.

The prelubrication is mandatory during stand still. If pre lubecirculation pump is not operating for 24 hours prior to startcommand, optional pneumatic pump shall be suppliedalongwith the gen set.

Providing pneumatic pump to cater to 24hr requirement is acceptable. Also the requirementsof providing hand driven lubricating pump shall be adhered to.

199 M/s. POWERICA LIMITED

43 Section C-7Page 139

Clause 3.1.6.3

Neutral side terminal box shalll have sufficient space toaccommodate 9 Nos. CTsbefore neutral formation (and 1 no. CT after neutralformation, if required). Thesecondaries of CTs shalll be brought to a separate terminalbox mounted on neutralside terminal box. If required, this terminal box shall alsoaccommodate AVRCTs.

For trouble free operation CTs shall be mounted in theseparate panel.

Noted. However shall be detailed during execution of the work, for review and approval by thePurchaser.

200 M/s. POWERICA LIMITED

44 Section C-7Page 143Clause 4.0

Generator excitation system of capacity 5.5MW and highershalll have 100% backup by voltage automatic controller.Excitation forcing multiplicity shalll not be lower than 2.0.

Please clarify with detailed description Please read the subject clause in conjunction with clause 4.1 of section C7.

201 M/s. POWERICA LIMITED

45 Section C-9Page 172Clause 1.3

©

Test to demonstrate starting of 1400 KW motor over thebase load of 4900 KW

When 1400 Kw load is applied with 700% FLC @ 0.2 pf withbase load 4900 kw. The Voltage dip will be 26 %. Howeverwith the same load applied with VFD the TVD shall be limitedlass then 20%.

Please refer to the sequential loading tables for emergency (included in tender) and reliable(being provided with this clarification set) DG sets.

The DG set should also be capable of taking the start of a 1.4 MW (continuous rating) motorover a base load of 4.4 MW, without exceeding permissible limitations.

The DG set shall be capable of satisfying the loading requirements as per the figure included inclause 3.7 of section C-7 of the tender.

202 M/s. POWERICA LIMITED

46 SECTION : C-10

SHEET 1 OF 6

Required Mechanical Special Tools for overhauling of KKNPP1&2 10 nos. of Diesel Engine

Cylinder liner honing tool & lapping Machine are not a part ofstandard tool as per manufactur & cylinder liner honing cannot be done at site during the maintenance.

Tender conditions shall prevail.

203 M/s. POWERICA LIMITED

47 Section D-2.3

Page No. 229

Clause 9

In addition to the above mentioned drawings, details ofinstrumentationtypes and manufacturers name etc. shall be enclosed.(i) Control panel details - General arrangement drawing. (ii)Simple control scheme.(iii) Functional diagrams of different logics.

Later,shall be provide during detail engineering.

Submission during detailed engineering is acceptable subject to compliance with all tenderrequirements, which shall prevail.

M/s. POWERICA LIMITED

VENDOR LIST FOR ELECTRICAL ITEMSPage No 346 of 589

48204

28 OF 47

Page 29: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

M/s. POWERICA LIMITED

GENERATOR - 6300 KW, 6.0 KV, 50 Hz, 0.8pf 1. HYUNDAI 2. JEUMONT INDIA 3. TDPS INDIA

Manufacturer other than approved vendor list is not acceptable. However for such cases ,approved vendor list (appendix-I) clauses shall be applicable.

M/s. POWERICA LIMITED

415/380 V MOTOR CONTROL CENTRES & PMCCS POWERICA LIMITED Please refer to Purchaser's response to Overall Query No. 153 of M/s Powerica's first set ofprebid queries.

M/s. POWERICA LIMITED

SYNCHRONIZING PANELS POWERICA LIMITED Please refer to Purchaser's response to query no. 23 (Overall Query No. 153) of M/sPowerica's first set of prebid queries.

M/s. POWERICA LIMITED

SYSTEM PROTECTION PANELS, STATION METERING PANELS

POWERICA LIMITED Please refer to Purchaser's response to query no. 23 (Overall Query No. 153) of M/sPowerica's first set of prebid queries.

205 M/s. POWERICA LIMITED

49 SECTION : C-1

SHEET 3 OF 10

8

Passive crank case ejector system if required for engine. Kindly provide exact detail of the requirement.Is it exlosive relief valve / Breather pipe / Oil mist separator.Kindly Clarify.

Passive crank case ejector system -- Incase crank case pressure increases to the extent that itprevents Engine to start / run , in such a case passive ejector shall be provided and is enginedependent, pl check for subject engine as well.

206 M/s. POWERICA LIMITED

50 Section C-1, Sheet 3 of

1010

The Purchaser intends providing a diversity by means of adifferent make in two of the four EDGs in one unit for boththe units. The bidder shall review this requirement and givehis proposal in the part I bid, for further review by thePurchaser.

Please clarify the meaning of "diversity by means of adifferent make in two of the four EDGs".Does this meaning with Engine controller?(Electronic or Electro Hydraulic)

This is with respect to the engine controller. To avoid common cause failure, diversity is oftenemployed in equipment important to safety. Since EDGs are safety support system,incorporating diversity is essential. To achieve this, Purchaser has proposed that, out of thefour nos. of EDGs for each unit, two nos. of EDGs should have engine controller of one makeand the other two DGs should have engine controller of different make or software for othertwo DGs engine controllers shall be developed on other tool. However, this issue can bereviewed and discussed further during the detailed engineering stage.

207 M/s. POWERICA LIMITED

51 SECTION : C-1

SHEET 8 OF 10

m

Loads exerted on the slab when the DGP is rolled Anassignment for the DGP pedestal taking into accountseismic loads with intensity of up to SSE and OBE inclusively,effects from external air shock wave (ASW) and loads on theDGP pedestal in the operational and emergency modes(e.g., during short-circuit faults).

This review will be carried out during the detail engineeringstage, so the bidding stage could not be possible.

Noted.

208 M/s. POWERICA LIMITED

52 SECTION : C-2

SHEET 9 OF 38

8.2

Seismic and ASW qualification shall be as per IEEE-344 anddocument no. R01.KK34.0.0.AP.PZ.WD001. Prototypeequipment manufactured and assembled for seismic/ ASWqualification by testing shall not be supplied for use.

The engine seismic qualification will be performed byanalysis. ASW qualification review is necessary during the detailengineering stage.

Tender conditions shall prevail.

209 M/s. POWERICA LIMITED

53 SECTION : C-6

SHEET 4 OF 462.9.1

Transient response:(a) Drop of transient frequency in case of applying steppedbalanced load and 50% of rated power (the load can beactive),not more 6%(b) Restoration time, not more than 5 seconds

Specification is unreasonable (un-matching).100% load can be achieve in three steps inline with ISO 8528.In the SECTION: C-8, INSPECTION AND TESTING /QAP FOR DGSETS as follows; 2.1 (d) Reliability test: 100 times Start and accept ≥50% ofthe load without any failure.

Query is not clear. Tender conditions shall prevail.

210 M/s. POWERICA LIMITED

54 SECTION : C-6

SHEET 5 OF 462.13

Note 1-b) Backpressure at the exhaust (of spent gases) at theoutlet from the diesel’s turbine), kpa (mm H2O) 4.9 (500);

b) Backpressure at the exhaust (of spent gases) at the outletfrom the diesel’s turbine), kpa (mm H2O) 4.9 (500);

It is too much high value, normally the Backpressure is lessthan 300 mmH2O.

Noted.

29 OF 47

Page 30: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

211 M/s. POWERICA LIMITED

55 SECTION : C-6

SHEET 17 OF 46

9.8.3 Air distributor Starting air is controlled with Fuel injection pump operating,No separated air distributor is installed on Engine.

Noted.

212 M/s. POWERICA LIMITED

56 SECTION : C-7

SHEET 4 OF 441.28.1

Seismic and Air Shock Wave qualification of diesel generatorand associated auxiliaries, control panels, instruments etc.shall be carried out in accordance with theR01.KK34.0.0.AP.PZ.ED001 (Appendix H) and IEEE-344.

Kindly elaborate the requirement of Air Shock Wavequalification and what kind of qualification is required for DGsets and associated auxiliaries?

Bidder shall go through the document attached along with the Tender document-R01.KK34.0.0.AP.PZ.ED001 (Appendix H) and a revised (not final) copy of the same has alsobeen attached along with these pre-bid clarifications, which shall be referred for subjectworks.

213 M/s. POWERICA LIMITED

57 SECTION : C-7

SHEET 5 OF 442.2.2

DG shall be able to start under gravity flow of fuel oilalone as this pump shall not be operating under normalcondition.

Fuel Day Tank height shall be suitable for required gravitypressure to start the DG set. The height of the day tank willbe confirm during the detail engineering.

It is informed here to the Bidder that, height at which DG day tank is installed is alredy fixedand it is to be installed at an elevation of +4.800m, which shall be taken note off by the Bidder.

214 M/s. POWERICA LIMITED

58 SECTION : C-7

SHEET 6 OF 442.2.8

Double walled piping with leakage collection system shall beprovided for high-pressure fuel oil system.

Double walled piping is not applied (Pipeless Engine Designwhich made difference). The die forged steel block is appliedto propossed engine instead of double walled piping.

Noted. Tender clauses shall prevail.

215 M/s. POWERICA LIMITED

59 SECTION : C-7

SHEET 7 OF 442.3.5

Lube oil piping shall be of carbon steel confirming to ASTM-A-106 Gr.B (seamless).

Corbon steel pipe is to be appied only for field pipinginstrument only for lube oil system. Eengine mountedinstrument shall be as per OEM standared.

Noted.

216 M/s. POWERICA LIMITED

60 SECTION : C-7

SHEET 14 OF 442.7.3

The governing system shall be Woodward electronic &hydraulic governor type EGB P or equivalent.

Kindly confirmed weather governor is Hydraulic / Electronic. It is an electrohydraulic governing system.

217 M/s. POWERICA LIMITED

61 Section C-7,Sheet 32 of 44, 5.1.22.4

D - iv)

High lube oil temperature at engine bearing outlet It is not possible to measure the oil temperature at enginebearing outlet. We suggest to replace it with "Engine BearingTemperature". Same shall be considered for alam / safety ofthe Engine.

This aspect can be mutually discussed during detailed engineering, in compliance with tenderconditions.

218 M/s. POWERICA LIMITED

62 Section C-7,Sheet 34 of

44,5.1.23.1

(b) 3 nos. of Pressure switches shall be provided at theengine inlet for low pressure alarm on the engine controlpanel and trip the DG set when pressure is below minimumsafe pressure after 90% speed.(d) Pressure gauge at the engine inlet.

(b) It is not necessary to set trip with Low pressure of fuel oilbecause there is no damage due to low pressure of fuel oil.

(d) Fuel oil. Pressure would be displayed on the Engine Panelwith Pressure Transmitter.

b) Please refer to clause no. 2.2 of section C-7 of tender document which evisages a step uppump. Therefore, the pressure monitoring is required.

d) Tender clause shall prevail.

219 M/s. POWERICA LIMITED

63 Section C-7,Sheet 35 of

44,5.1.23.2

(d) Pressure gauge at the discharge of engine driven pumpand engine inlet shall be provided.

(d) Lube oil Pressure would be displayed on the Engine Panelwith Pressure Transmitter.

Tender conditions shall prevail.

30 OF 47

Page 31: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

220 M/s. POWERICA LIMITED

64 Section C-7,Sheet 35 of

44,5.1.23.2

(i) A flow switch/pressure switch to be provided for prelubeoil flow monitoring for alarm on engine control panel.

Alarm for oil flow can be set by Pressure transmitter andother device on the Panel ( ex. signal Converter).

Noted. If the Bidder feels, he can use transmitters instead of switches / gauges for thefunctionality required from in the subject clause, he may do so, at his discretion.

221 M/s. POWERICA LIMITED

65 Section C-7,Sheet 35 of

44,5.1.23.3

(a) Temperature gauges shall be provided for jacket watertemperature at jacket water inlet, at jacket water heatexchanger outlet and at the outlet of oil coolers.

(c) Pressure gauge shall be provided for jacket water headerinlet pressure to engine.

(a) RTDs would be installed on the Engine and Data would bedisplayed on Engine Panel.

(c) Jacket Water pressure would be displayed on the EnginePanel with Pressure Transmitter.Note- The pressure gauge & temperature gauge shall beprovided on the field equipment as required.

a) & c) If the Bidder feels, he can use transmitters instead of switches / gauges for thefunctionality required from in the subject clause, he may do so at his discretion.

Tender clause shall prevail with reference to temperature and pressure monitoring on theauxiliaries/ field equipment.

222 M/s. POWERICA LIMITED

66 Section C-7Sheet 37 of

445.2

All transmitters and switches will be mounted on the floormounted instrument rack near the engine. All gauges can bemounted directly on the pipeline or on the rack. Anisolation/root valve shall be provided for alltransmitters/switches/gauges to facilitate in-situcalibration. A junction box for filed cables shall be providedon the same rack.

It can be providing instrument rack equipped with pressuretransmitters and pressure switches connected to measuringpoint on the DG Set by pipe fitting.

Please clarify the sentence 'All transmitters and switches'means that temperature sensors including RTD,thermocouple, temperature switch shall be installed oninstrument rack not on the DG Set directly.

It is clarified that, transmitter and switches referred in the tender documents are referred tomeasuring instruments of pressure, process related (if any) and temperature transmitter andswitches etc, complete in all respects.It is recommended in the tender document that, all suchtransmitters and swtiches shall be installed in a floor mounted rack near the engine. However,if the Bidder feels that, mounting of temperaure transmitters/ switches are better off on theengine/ point of measurement even after taking into account possible vibrations andmaintanence during DG operation, then it is also acceptable.

223 M/s. POWERICA LIMITED

67 Section C-7,Sheet 38 of

44,5.4.2

iv) Fuel oil pressure low after 90% speed. (2 out of threelogic)

vii) High Jacket water temperature sensed by temperatureswitches (2 out of three logic).

iv) It is not necessary to set trip with Low pressure of fuel oilbecause there is no damage due to low pressure of fuel oil.

Vii) Can Temperature switches be replaced with RTDs andother device on the Panel ( ex. Signal Converter ) ?

iv) Please refer to clause no. 2.2 of section C-7 of tender document which evisages a step uppump. Therefore, the pressure monitoring is required.

vii) This aspect can be finalized during detailed engineering keeping in view the reliability ofthe component.

224 M/s. POWERICA LIMITED

68 Section C-8Sheet 1 of 5

2.1

(c) Margin test to prove capability of DG Set to take largesingle step load(d) Reliability test: 100 times Start and accept≥50% of theload without any failure

(c) Please clarify the large single step load. (d) Does this mean loading the gen set upto 50% but no blockloading? Kindly clarify.

These requirements have come from IEEE 387 and Bidder shall refer the same for any queryrelated to these tests.

225 M/s. POWERICA LIMITED

69 SECTION C-8

SHEET 2 OF 52.2

After the special type tests, b) All fuel injectors.c) 2 Nos of cylinder heads.d) 2 Nos of piston and connecting rod assemblies.e) 2 Nos of rocker arm assemblies.i) 2 Nos. of Fuel injection pumps for inspection of plungerand barrel assemblies.m) Turbocharger.

1. One(1) cylinder unit is our standard.As mentioned in C-8, SHEET 3 OF 5, 2.4 After routine tests...2. Turbocharger; Visual or overhaul inspection ?

1. Tender clause shall prevail.2. As per engine manufacturer recommendation.

226 M/s. POWERICA LIMITED

70 Section C-9 Sheet 1 of 3

1.3 e

Load rejection tests: Test to demonstrate the capability towithstand sudden load rejection of 110% of rated loadwithout exceeding speeds or voltage that will cause trippingor component damage. Load rejection test shall also includethe loss of largest single load test also, and verify that thevoltage and frequency requirements are met and that theunit will not trip on over speed.

Please clarify the acceptance criteria of load rejection tests.Does only no trip and no damage on DG Sets?

These requirements have come from IEEE 387 and Bidder shall refer the same for any queryrelated to these tests.

31 OF 47

Page 32: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

227 M/s. POWERICA LIMITED

71 SPECIFICATION

NO.I02.KK34.0.0.ET.TS.PR035, QUALITY

CONTROL PLAN FOR DG

SETS12 of 22

E. Complete DG Set; Strip Test Kindly elaborate on strip test, Useually it applied on the onecylinder head, one piston assembly, one main bearing, onlecylinder liner, one fuel assembly.

As per engine manufacturer's recommendation.

228 M/s. POWERICA LIMITED

72 SEC C3 : TERMINAL

POINTS

NPCIL SCOPE including sysmeic Analysis & Qualifications asper IEEE , AC & ASW requirement

In addition to the reponses given here under, please refer to Puchaser's response to queryno.1 (Overall Query No. 154) of this pre-bid query clarification set.

229 M/s. POWERICA LIMITED

73 SEC C3 : TERMINAL

POINTS

1.1 FDN FDN : All foundations with pockets for DGs, auxillarires,structures, subsystems etc by PURCHASER. Eps will besupplied by who?

Foundation pockets would be left by Purchaser for DG Sets, its Auxillarires, structures,subsystems, etc., and grouting of the same, including supply & installation of grouting mixtureetc. complete in all respects, are in Bidder's scope.

230 M/s. POWERICA LIMITED

74 SEC C3 : TERMINAL

POINTS

1.2 Mounting accessories Walls & Trenches, Wall opening, cutting, modifications,making good of the same, Acoustic Room Treatments : Epswill be supplied by who.

Walls & Trenches, Wall opening as per KK Units -1 &2 would be provided by Purchaser.However any further cutting, enlargement, modifications, making good of the same, EPs,etc.are all in the Bidder's scope.

Acoustic Room Treatments, if required, to meet the dB level requirements, will be in Bidder'sscope.

231 M/s. POWERICA LIMITED

75 SEC C3 : TERMINAL

POINTS

1.3 Cooling Water inlet / outlets All subsystems & accessories like Water pumps, filters,strainers, NRVS, Control Valves, Solonid Valves,instrumentations for the same, PB stations, Wiring, Aux. MCCpanel of the same will be in purchaser scope. SimilarlyHydrant & fire fighting systems by Purchaser.

Please refer to tender conditions which are clear & self explanatory and the same shall prevail.

232 M/s. POWERICA LIMITED

76 SEC C3 : TERMINAL

POINTS

1.4 DM water inlet / outlet DM water plant, its piping, instrumentations, valves, controlspumps, aux. MCC panel, PB station etc.

Please refer to tender conditions which are clear & self explanatory and the same shall prevail.

233 M/s. POWERICA LIMITED

77 SEC C3 : TERMINAL

POINTS

1.5 Fuel system Bulk storage Tank, intermediate Tank, spil over Tank, itspiping, heat tracing elements if any, pumps, valves, strainers,filters,flow meters, level monitoring instrumentations,instrumentations & controls within system, PB stations, aux.MCC, CCOE approval for all Tanks including Day Tank

Please refer to tender conditions which are clear & self explanatory and the same shall prevail.

234 M/s. POWERICA LIMITED

78 SEC C3 : TERMINAL

POINTS

1.6 Lube oil systems Foundation with Eps Please refer to tender conditions which are clear & self explanatory and the same shall prevail.

235 M/s. POWERICA LIMITED

79 SEC C3 : TERMINAL

POINTS

1.7 Intake Air system T.P. s at -4.4 mtr Wall opening, trenches, wall modifications, making good ofthe same,

Please refer to Purchaser's response to query no. 74 above (Overall Query No. 230)

236 M/s. POWERICA LIMITED

80 SEC C3 : TERMINAL

POINTS

1.8 Generator Side Termination HT breakers, Its synch on Bus, HT cabling, Laying, Cable Trays,Breaker side termination, Alternator protections etc. & itsrelated Testing etc.

HT breakers, HT cabling from HT breaker to alternator, trunk cable laying, trunk Cable Traysare in the Purchaser scope. Except these , all others, including HT Cables, if any fromAlternator to AVR / DG Vendor Panels etc. shall all be in the subject Tender scope.

32 OF 47

Page 33: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

237 M/s. POWERICA LIMITED

81 SEC C3 : TERMINAL

POINTS

1.9 DG Locan Panel terminals SCADA, cabling to Control Room, Control of DG auxillaries,Switchgear, 220V AC Supply upto DG panel,EMTR system,instrumentation & software validation,

SCADA, cabling to Control Room, 220V AC Supply upto DG panel, EMTR system are in thePurchaser scope. Except the above, all others shall be in the subject Tender Package scope.

238 M/s. POWERICA LIMITED

82 SEC C3 : TERMINAL

POINTS

1.1 LT Cables & Control cables From supplier equipments & Panels to our equipments Panel Please refer to tender conditions which are clear & self explanatory and the same shall prevail.

239 M/s. POWERICA LIMITED

83 SEC C3 : TERMINAL

POINTS

1.11 CTs CTs & PTs for DG metering & protection , Its cabling uptoAlternator Box & upto DG vendor Control Panel.

Please refer to tender conditions which are clear & self explanatory and the same shall prevail.

240 M/s. POWERICA LIMITED

84 SEC C3 : TERMINAL

POINTS

1.12 Earthing Erathing pits, earthing Grid & leads upto DG room, aux room,DG control room

Please refer to tender conditions which are clear & self explanatory and the same shall prevail.

241 M/s. POWERICA LIMITED

85 SEC C3 : TERMINAL

POINTS

2 Terminations to Vendor equipments Please refer to tender conditions which are clear & self explanatory and the same shall prevail.

242 M/s. POWERICA LIMITED

86 NOTE NPCIL SCOPE 1. Room acoustic Treatments Please refer to Purchaser's response to query no. 1 (Overall Query No. 154) of this set.

243 M/s. POWERICA LIMITED

87 2. Ventillation Please refer to Purchaser's response to query no. 1 (Overall Query No. 154) of this set.

244 M/s. POWERICA LIMITED

88 3. Lighting Please refer to Purchaser's response to query no. 1 (Overall Query No. 154) of this set.

245 M/s. POWERICA LIMITED

89 4. Firefighting Please refer to Purchaser's response to query no. 1 (Overall Query No. 154) of this set.

246 M/s. POWERICA LIMITED

90 5. Hoist/ cranes within DG room Please refer to clause no. 5.1.9 of section C2.

247 M/s. POWERICA LIMITED

91 6. Statutoy approval like CEIG, PCB, CCOE & AERB Licence,AERB approval of DG installation, all permissions fromStatutory bodies,

Please refer to Purchaser's response to query no. 1 (Overall Query No. 154) of this set.

248 M/s. POWERICA LIMITED

92 7. Diesel, Load, aux Power Please refer to Purchaser's response to query no. 1 (Overall Query No. 154) of this set.

249 M/s. POWERICA LIMITED

93 8. Cranes for equipments shifting Please refer to the section "Construction management requirements by Contractor" attachedalong with section C of the Tender document.

250 M/s. POWERICA LIMITED

94 9. Equipments Insurance & TP Insurances at site In contractor's scope.

251 M/s. POWERICA LIMITED

95 10. Watch & Ward In contractor's scope.

252 M/s. POWERICA LIMITED

96 11. Storage, preservation beyond CDD Please refer to Purchaser's response to storage & security as well as represervation, whichalong with tender conditions, shall prevail.

253 M/s. POWERICA LIMITED

97 SECTION C-4DESIGN &

ENGINEERING

PG. 1 of 5, cl. No. 1.1

SCOPE Scope of Interface is limited on Termination points asdescribed above. Hardware suitable for your equipment toread signal from our installed instruments will be in NPCILscope.

As described in the tender documents at various instances, it is within the scope of thiscontractor to coordinate with the supplier of equipment, which are not included in this scopeof tender. This shall be done so that seemsless & smooth integration of the system in andoutside the scope of this contract takes place. The bidder shall ensure that the hardwaresupplied by both parties are compliant with each other.

33 OF 47

Page 34: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

254 M/s. POWERICA LIMITED

98 SECTION C-4DESIGN &

ENGINEERING

Instruments & valves will be supplied as per Specificationspelt out in the Tender. No modification in the specs can bepossible as it will affect on the Cost & delivery time.

Noted. However, it does not absolve the Bidder of his responsibility to review the specificationprovided for various instruments/ valves and the need to suggest any upgradation for thebetterment of the system. This may be submitted for the review of the Purchaser. Also if thePurchaser feels at some stage that some parameter not covered in the techincal specificationis also needed to be incorporated in the instrument/ valves envisaged, Purchaser may do so athis discretion. However, any such change for improvement shall be carried out without anyadditional implication of time and cost.

255 M/s. POWERICA LIMITED

99 SECTION C-4DESIGN &

ENGINEERING

PG. 1 of 5, cl. No. 1.2.1.0

DG set Rating Engine ssupplied under IEEE387 scope has to be ContineousDuty type & not PRP/STANDBY duty application of ISO8528.Further for 1400KW motor to start at base Load of 4900KWEngine require of 7.4 MW including Auxillaries load. Hence,Though Tender Specs is 6.4MW but DG set will be of 7.4MWminimum rating.

Bidder shall refer to the sequential loading tables for emergency (included in tender) andreliable (being provided with this clarification set) DG sets.

The DG set should be capable of taking the start of a 1.4 MW (continuous rating) motor over abase load of 4.4 MW, without exceeding permissible limitations.

The DG set shall be capable of satisfying the loading requirements as per the figure included inclause 3.7 of section C-7 of the tender.

Further, Engine supplied under IEEE 387 is to be used as standby and not continuous powersource.

256 M/s. POWERICA LIMITED

100 SECTION C-4DESIGN &

ENGINEERING

PG. 1 of 5, cl. No. 1.2.2.0

Engineering, Design & Rating of Subsystem Kindly note, as per CLND clause Engineering, design &Execution is as per Equipment manufacturer design standardrating & hence any sugestion, comments, insitance onaugmenation in these rating & design will not be possible toaccomodate unless any cost impact agreed payable frompurchaser.

Tender conditions shall prevail.

257 M/s. POWERICA LIMITED

101 SECTION C-4DESIGN &

ENGINEERING

PG. 1 of 5, cl. No. 1.2.2.1

Standby mode Please note, as per ISO8528, 10% overload feature is notapplicable in Standby mode. It is not suitable for Contineousduty application. It cannot run more than 70% of its ratedcapacity.

Tender conditions shall prevail.

258 M/s. POWERICA LIMITED

102 SECTION C-4DESIGN &

ENGINEERING

PG. 2 of 5, cl. No. 1.2.3.0

Seismic Analysis Please note, purchaser shall ensure the autheticated & rightFRS shall be handed over to us for analysis. Any changes /error will not be accepted & 2nd time analysis will result intocost & time implication payable by the purchaser.

There shall be no price implication whatsoever on account of the final floor response spectra.The final response spectra shall be made available to the successful bidder upon selection andtender conditions, as specified, shall prevail at no extra cost and time to the Purchaser. ThePurchaser shall adhere to its policy of early dissemination of inputs/ information to the Bidderat the earliert so that same can be taken up for further analysis.

259 M/s. POWERICA LIMITED

103 SECTION C-4DESIGN &

ENGINEERING

PG. 2 of 5, cl. No. 1.2.5.0

Engineering details A preliminary information will be submitted for your review.Project engineering details will be submitted from date ofreceipt of Adavnce. Further please note, ASW & Seismicsituationl loading are not ready stuff to exchange. Theprocess is lengthy & will take a considerable time & will havelot of data to shuttle / exchange.

Tender conditions shall prevail.

34 OF 47

Page 35: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

260 M/s. POWERICA LIMITED

104 SECTION C-4DESIGN &

ENGINEERING

PG. 3 of 5, cl. No. 1.2.6.0

Auxillary System Kindly note, as per CLND clause Engineering, design &Execution is as per Equipment manufacturer design standardrating & hence any sugestion, comments, insitance onaugmenation in these rating & design will not be possible toaccomodate unless any cost impact agreed payable frompurchaser. All EPs are to be provided by the Purchaser.

Tender conditions shall prevail.

261 M/s. POWERICA LIMITED

105 SECTION C-4DESIGN &

ENGINEERING

PG. 3 of 5, cl. No. 1.2.9.0

Control schemes & Logics Please note, Computer based systems are not provided byus. We will provide RS485 communication port to Loadmanager provided in the DG control panel. Engine panel isrelay based system, Governor is Hyduallic & AVR is Electronic. No other components / instruments in our system iscomputer based communicable.

Please refer to Purcahser's response to query no. 132 (Over all Query No. 296 ) of the presentset of pre-bid queries, which shall prevail.

262 M/s. POWERICA LIMITED

106 SECTION C-4DESIGN &

ENGINEERING

PG. 4 of 5, cl. No.

1.2.11.0

Type Test Type Test will be offered only on Alternator. All auxullarieswill go under Routine Test. Control Panel will be forFunctional Test. Instruments, valves will be qualified uponreview of Test Certificates / Report from the supplier. Boughtout items like Nut, bolts, gaskets, LT cable , Control cable,Termination kits, Terminals, cable trays , supportingstructures, anchor fastners will not be offered for anydiscrete testing. It will be considered in system qualificationby analysis & by suppliers Test Certificates/reports asavailable.

Tender conditions shall prevail.

263 M/s. POWERICA LIMITED

107 SECTION C-4DESIGN &

ENGINEERING

PG. 4 of 5, cl. No.

1.2.15.0

PLC based sytem Please note, PLC based systems are not provided by us. Wewill provide RS485 communication port to Load managerprovided in the DG control panel. Engine panel is relay basedsystem, Governor is Hyduallic & AVR is Electronic. No othercomponents / instruments in our system is computer basedcommunicable.

Please refer to Purchaser's response above.

264 M/s. POWERICA LIMITED

108 SECTION C-4DESIGN &

ENGINEERING

PG. 5 of 5, cl. No. 1.5

Interfaces & external system Please let us know, your PLC based system & data requiredfrom our plant. This needs to be clarified at pre-bid stage toenable purchaser / seller the framework of design the systemintegration as a whole.

Please refer to Appendix D of the Tender document, which are self explnatory and shallprevail.

265 M/s. POWERICA LIMITED

109 SECTION C5APPLICABLE

CODES & STANDARD

PG. 1 of 3, cl. No. 3.0

Make approval Purchaser shall support the approval process & expediatenew make of components if any sugested during engineeringapproval stage & accord approval with least possible time of2 to 3 weeks max upon submission of required Credentials.Please Let us know procedure & list of documentrequirement of New makes approval at this stage only.Submit us the details of offiecrs allocated for such jobs. Wealso expect any delays more than 2 weeks shall be accountedfor escalation to next level on approval process.

Tender conditions shall prevail. However, detailed methodologies can be worked out after theaward of work.

35 OF 47

Page 36: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

266 M/s. POWERICA LIMITED

110 SECTION C6 : DATA SHEET

PG. 1 of 46, cl. No. 1.6

Contineous output rating As per IEEE the Engine Duty required is Contienous duty i.e.base load application. Engine offered by us is as per COPduty suitable for 8000 hours of yearly operation. It canoperate 2500 hours unattended operation as per Contineousduty when called for. This is in lie with Sec. C7, pg 2 of 44, cl.no. 1.4

The engine offered shall satisfy the requirements of IEEE 387 and tender document. Theengine rating may be decided accordingly.

267 M/s. POWERICA LIMITED

111 SECTION C6 : DATA SHEET

PG. 2 of 46, cl. No.

1.12.1 & 1.12.2

Overspeed Engine overspeed is 110% & Alternator is 120%. This isfactory preset values.

Tender conditions shall prevail.

268 M/s. POWERICA LIMITED

112 SECTION C6 : DATA SHEET

PG. 2 of 46, cl. No. 1.13

Contineous output rating refer to above defination. For definintion of the same, Bidder shall refer to IEEE 387.

269 M/s. POWERICA LIMITED

113 SECTION C6 : DATA SHEET

PG. 3 of 46, cl. No. 1.15

DG set weight 155 Tons Dry weight Noted.

270 M/s. POWERICA LIMITED

114 SECTION C6 : DATA SHEET

PG. 4 of 46, cl. No. 2.9

Governor HHI make only Manufacturer other than approved vendor list is not acceptable. However for such cases,approved vendor list (appendix-I) clauses shall be applicable.

271 M/s. POWERICA LIMITED

115 SECTION C6 : DATA SHEET

PG. 4 of 46, cl. No. 2.9.1

Step Load 1st Step load of 30% & same onwards will be applied. Tender conditions shall prevail.

272 M/s. POWERICA LIMITED

116 SECTION C6 : DATA SHEET

PG. 1 of 44, cl. No. 1.4

Base Load Set COP duty suitable for 8000 hours of yearly operation. It canoperate 2500 hours unattended operation as per Contineousduty when called for

Please refer to continuous rating definition given in IEEE 387.

273 M/s. POWERICA LIMITED

117 SECTION C6 : DATA SHEET

PG. 2 of 44, cl. No. 1.15

No load Run for 2 hours Query is not clear. Tender clause shall prevail.

274 M/s. POWERICA LIMITED

118 SECTION C6 : DATA SHEET

PG. 3 of 44, cl. No. 1.16

Loading without water fro 2 minutes Query is not clear. Tender clause shall prevail.

275 M/s. POWERICA LIMITED

119 SECTION C6 : DATA SHEET

PG. 3 of 44, cl. No. 1.19

Recovery Voltage recovery will be less than 10 sec & not 0.1 Sec Tender conditions shall prevail.

276 M/s. POWERICA LIMITED

120 SECTION C6 : DATA SHEET

PG. 4 of 44, cl. No. 1.24

Idle mode operation 2 h It will be No Load operation for 2 hours & not idle mode. Noted.

277 M/s. POWERICA LIMITED

121 SECTION C6 : DATA SHEET

PG. 5 of 44, cl. No. 2.1.5

Hoses Hoses shall be braided ….. Tender conditions shall prevail.

278 M/s. POWERICA LIMITED

122 SECTION C6 : DATA SHEET

PG. 5 of 44, cl. No. 2.2.1

& 2.2.2

8 hours back up Day Tank Please note 8 hours back up required 10100liter fuel, hence15KL tank will be provided placed outside DG building as perCCOE norms. Piming in fuel line…

Tender conditions shall prevail.

279 M/s. POWERICA LIMITED

123 SECTION C6 : DATA SHEET

If Intermediate Tank is underground, leakage collection sumpto be provided in ground by purchaser. The leaked Diesel canbe collected by rotary gear pump.

Portable pump is preferable.

36 OF 47

Page 37: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

280 M/s. POWERICA LIMITED

124 SECTION C6 : DATA SHEET

PG. 10 of 44,

cl. No. 2.5

Air starter There is 1 no. Air starter per Enginer & Air will be used fromReceiver to crank Engine using this Air starter & not directlygoing to each cylinder for starting air valves per cylinder.

Tender conditions shall prevail. Duplicated system is required. Purchaser prefers to have aduplicated system of direct injection of air into the cylinders over the pnuematic motors (airstarter) proposed by the bidder.

281 M/s. POWERICA LIMITED

125 SECTION C6 : DATA SHEET

PG. 12 of 44,

cl. No. 2.6.2

Civil Air Duct ?????? Query is not clear. Tender clause shall prevail.

282 M/s. POWERICA LIMITED

126 SECTION C6 : DATA SHEET

PG. 14 of 44,

cl. No. 2.6.11

Silencer Noise reduction Noise reduction by Silencer will be 15 dBA insertion loss only. Please refer to Purchaser's response to query no. 6 (Overall Query NO. 159) above.

283 M/s. POWERICA LIMITED

127 SECTION C6 : DATA SHEET

PG. 14 of 44,

cl. No. 2.7.3

Governor as per HHI design standard. The governor offered shall meet all the requierments laid out in the Tender documents.

284 M/s. POWERICA LIMITED

128 SECTION C6 : DATA SHEET

PG. 14 of 44,

cl. No. 2.7.4

Load Limiting Device ????? Query is not clear. Tender clause shall prevail.

285 M/s. POWERICA LIMITED

129 SECTION C6 : DATA SHEET

PG. 20 of 44,

cl. No. 3.7

Short Time Overload of active power ????? Query is not clear. Tender clause shall prevail.

286 M/s. POWERICA LIMITED

130 SECTION C6 : DATA SHEET

PG. 24 of 44,

cl. No. 5.1.2

Remote Operation Required… Query is not clear. Tender clause shall prevail.

287 M/s. POWERICA LIMITED

131 SECTION C6 : DATA SHEET

PG. 25 of 44,

cl. No. 5.1.7

Synchronisation We will supply Synch logic panel for the VCB Panel Busbarswith common Bus of Main VCB for grid paralleling. Braekercontrol logic will be in VCB Panel vendors scope.

Noted.

37 OF 47

Page 38: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

288 M/s. POWERICA LIMITED

132 SECTION C6 : DATA SHEET

PG. 26 of 44,

cl. No. 5.1.19.1

PLC use Please reconfirm that PLC shall be used for Alarms &Annunciation only. Therefore all logic & control schemes willbe br relay based system.

It could be PLC based or otherwise but the following minimum major requirements reiteratedfrom the tender are to be complied for diagonostics: 1. For analong monitoring:a. permament monitoring of the channels by thresholds. (min. 2 adjustable thresholds perchannels). If these thresholds are exceeded, an alarm is activated.b. Balance: Modification of the zero setting of each channel.c. Average: Calculation of 4 different averages of n channels each. (n should not be less than32)d. Deviation:Supervision of channels of an averagae in relation to this average by comparisonwith a variable devatione. Trend: Calculation of the gradient of each channel and monitoring of the channel in reationto a threshold.f. Inhibition: The inhibitions (min. 4) can be assigned to any threshold of any channel.g. Alarm grouping: The alarms can be assigned to one of the 6 logic outputs.h. Remote acknowledgement of faults.i. Insulation of analog inputs should be periodically checked.j. suitable communication link via min of two RS485 port.2. For logic monitoring:a. Memorisation of a logic state change (zero potential contact) plus the time of the change.b. Generation of a singla (dry contact) for activating the external alarm.c.Generation of the alarm groups on: i. minimum of 6 relays always on the back plane. ii. min. 2 outputs cards with min. 16 channels (buffered 40mA/24V outputs).

d. Indication of the changes of state without alarm.E. Generation of a log of faults and state changes without alarm.F. The alarms can be inhibited by min. 4 external inhibition contactsg. Min. number of channels:643. Integrated supervision station:a. Outstanding alarms permanently displayed along with their states (eg. Not ACK, ACK, etc.)b. Alarm list. This should display all outstanding alarms with their states, dates, addresses,types of alarm and values.c. History of alarms recorded.d. State of all channels by group refreshed in real time. By list or histograph mimic diagrams.Recording of channel data and displaying under curves form.e. inhibited channels list.f. overall configuration/ architecture of all devices in the system.g. Minimum of 120GB hard disk.h. Suitable CPU cardi. Embedded track ball or other suitable arrangement.In addition to the above mentioned minimum specific function the following shall also beprovided for each interface:a. Internal testing (sensor breakdown, watchdog), which in the case of a fault triggers a systemalarm.b. Parameter changing arrangement.c.External keyboardd. Suitable arrangement for transfer of data to the Purcasher's device (eg. laptop, tab, etc.)e. Necessary software and hardware to be used along with Purchaser's device for data transfercompatibility.

38 OF 47

Page 39: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

289 M/s. POWERICA LIMITED

133 SECTION C6 : DATA SHEET

PG. 40 of 44,

cl. No. 6.0

Lead Acid Storage Battery for Panel 10 years Life is not possible. Batteries are suitable for 2 yearsLife. Battery Charger life of 40 yrs not possible. Service life for1st Capital repair of 12 yrs ????

It is clarified that, 10 years life for lead acid storage batteries is easliy available, and Biddermay explore the same / its availability in case of plante type batteries. As brought out in thesubject tender, serviceable life of static rectifier shall be 40 years.

Tender conditions shall prevail.

290 M/s. POWERICA LIMITED

134 SECTION C6 : DATA SHEET

PG. 41 of 44,

cl. No. 7.0

DGP Automation Engine Panel is an ACS which controls DGP. Governor &Engine Panel plays a role in AFCS. AVR is AVCS system. ATCSis regulated by Engine panel.

Noted.

291 M/s. POWERICA LIMITED

135 SECTION C6 : DATA SHEET

PG. 41 of 44,

cl. No. 8.0

ACS Engine Panel is IP54 & mounted on the Engine. Engine mounting of the control panel can be discussed and mutually agreed during detailedengineering.

292 M/s. POWERICA LIMITED

136 SECTION : 8INSPECTION/TESTING/QAP FOR DG S

PG. 1 of 5, cl. No. 2.0

Test Testing will be done using water Load Bank / Resitive load atunity Power factor as per Engine / Alternator/DGmanufacturer's Test standard procedure. Engine will eboffered for Load Test alongwith Alternator i.e as DG setassembly at HHI factory. Hence Tyep Test on 1 no. DG set asper IEEE387 will be performed on 1 DG set & rest will beoffered for routine Test of 3 hours Load duration.

Tender conditions shall prevail.

293 M/s. POWERICA LIMITED

137 SECTION : 8INSPECTION/TESTING/QAP FOR DG S

Throw in will be 30% & Throw off will be 100%. Noise &Vibration Test is under factory condition.

Tender condtions shall prevail.

294 M/s. POWERICA LIMITED

138 SECTION : 8INSPECTION/TESTING/QAP FOR DG S

Seismic & ASW qualification is by Analysis only. The Purchaser feels that, the main DG set be may be qualified by analysis due to practicaldiffifculties of actual testing.. However for other smaller components, for which shake tablefacilities are available, and modelling may not be possible - the same shall all be tested insteadof just being analysed.

295 M/s. POWERICA LIMITED

139 SECTION : 8INSPECTION/TESTING/QAP FOR DG S

2.2 Post inspection Components inspection This is time consuming activities & any abnormalitiesdeveloped will be noticed by LLOP, HWT, OS parameters, Oilsample analysis. 24 hours Load Test is very small est for BaseLoad Engine & will not have any effect, hence thecomponents wise inspection will not be offered.

Tender conditions shall prevail.

296 M/s. POWERICA LIMITED

140 SECTION : 8INSPECTION/TESTING/QAP FOR DG S

3 Alternator Test Sudden Short circuit Test will not be offered as the same isdestructive test.

Tender conditions shall prevail.

297 M/s. POWERICA LIMITED

141 SECTION : 8INSPECTION/TESTING/QAP FOR DG S

5 Electronic assemblies This will be manufacturer's Test Certificate only & not by anyactual Test methods / procedures.

Type test reports including the tests listed in the subject clause may be submitted for reviewand acceptance. However, functional tests shall have to be carried out as per tenderconditions.

298 M/s. POWERICA LIMITED

142 SECTION C : 9

SITE TEST Please note, in case purchaser unable to provide Load within15 days of Erection completion, then DG sets is deemed tobe taken over for financial closure.

Tender conditions shall prevail.

39 OF 47

Page 40: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

299 M/s. POWERICA LIMITED

143 Noise limit DG set supplied is without acoustic enclsoure, hencegenerate noise 115dBA. Acoustic enclosures is not asked inthe Tender specs, hence not quoted at this stage. If required,the same will be in Purchaser's scope now.

Please refer to Purchaser's response to query no. 6 (Overall Query NO. 159) above.

300 M/s. POWERICA LIMITED

144 40 years life DG set comprised of Engine / Alternator is design for 15/20years product life, except for the components which haswear & tear and operational/maintainance parts like filters,gaskets, o rings etc. All other accesories are designed forstandard life condition & due for periodic replacement as perthe manufacturer's design recommendation e.g. battery,piping, cables, steel structures etc. DG set is Base Load duty.We will offer the 100 starts capability Test at site only sincefactory do not have air start arrangement. Test at our workswill be using Electric starter with 2x12V Battery of test bedonly.

Tender conditions shall prevail.

301 M/s. POWERICA LIMITED

145 No Load Test DG set is not recommended to run on No load for more than2 minutes, hence, No Load Test will be offered for 5 minutesonly.

Tender conditions shall prevail.

302 M/s. POWERICA LIMITED

146 Current rating Alternator shall withstand 200% current for less than 1 sec. Minimum overload requirements are brought out in clause no. 3.30 of section C-6

303 M/s. POWERICA LIMITED

147 3 pahse SC This will be as per the Alternator manufactuere's designstandard.

Tender conditions shall prevail.

304 M/s. POWERICA LIMITED

148 Air system Air receivers are made out of MS material grade SA516Gr.70. No Air drayers provided.. Air piping is MS class B.Intercooler is not provided for Air compreossor

Tender conditions shall prevail.

305 M/s. POWERICA LIMITED

149 Governing System Momentory over speed shall be 10% max. Recover time shallbe 8 secs. Governing characteristics is as per hhi designStandard.

Tender conditions shall prevail.

306 M/s. POWERICA LIMITED

150 Base Frame Made out of ASTM A 36 grade ISMC sections. Visualinspection will be offered. No MPI / DP Test offered.

Tender conditions shall prevail.

307 M/s. POWERICA LIMITED

151 There is no provision for standby Lube oil pump by designstandard of the engine manufacturer. Hence the same willnot be provided.

All the requirements laid out in the clause 1.17 of section C17 shall be met and Tenderconditions shall prevail in this regard.

308 M/s. POWERICA LIMITED

152 Short Time overload 150% overload is for 3 secs. 200% is for <1secs. Tender conditions laid out in clause 3.30 of section C6.

309 M/s. POWERICA LIMITED

153 Rotor Non destructive test will not be offered. Tender conditions shall prevail.

310 M/s. POWERICA LIMITED

154 Frequency & voltage restoration This will be restored in 8-10 seconds as per G2 class ofGoverning. TVD test will be demonsatred at site.

Tender conditions shall prevail.

311 M/s. POWERICA LIMITED

155 Water pipe Pipe shall be MS type ERW conforms to IS 3589 Tender conditions shall prevail.

312 M/s. POWERICA LIMITED

156 Booster Servo motor & rack booster This is not applicable as per Engine manufacturer's design,hence not provided.

Provision for quick engine startup may please be proposed by the Bidder.

313 M/s. POWERICA LIMITED

157 Speed Changer Engine is constant speed application, hence this is notapplicable & not provided.

Tender conditions shall prevail.

314 M/s. POWERICA LIMITED

158 DP Test DP test is by chemical application only. Tender conditions shall prevail.

40 OF 47

Page 41: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

315 M/s. POWERICA LIMITED

159 Fuel injection pumps There is no pump. Injecton is through Cam actuator. Noted.

316 M/s. POWERICA LIMITED

160 Field Breaker There is no such arrangement provided in excitation systemas the PMG is mounted on the shaft of Alternator. PMG &excitation system is a sper manufacturer's design standard.

Tender conditions shall prevail.

317 M/s. POWERICA LIMITED

161 Excitation voltage & current We will provide Analogue meter on AMF Control panel forthe same.

Digital meters are preferred.

318 M/s. POWERICA LIMITED

162 Fuel pressure switch Not provided by the engine manufacturer. Please read our response to the related query elsewhere in this set of pre-bid queriesclarifiacation.

319 M/s. POWERICA LIMITED

163 Level Transmitter Level transmitter used on day tank will be magnetic floattype with 4-20mA signal taken to level indicator installed onthe Day Tank only.

Level indicator shall be provided on the enigne control panel only. Magnetic float type leveltransmitters is acceptable subject to fulfilment of the requirements laid out in the tenderdocument.

320 M/s. POWERICA LIMITED

164 DP switch, pressure transmitter, temp. switch Not provided by the engine manufacturer. Tender conditions shall prevail.

321 M/s. POWERICA LIMITED

165 Pressure transmitter There is no separate pressure transmitter provided for oilpressure, since the same is part of Engine Panel.

Tender conditions shall prevail.

322 M/s. POWERICA LIMITED

166 Tempearture switch This is not required as per Engine manufacturer's design,hence not provided.

Tender conditions shall prevail.

323 M/s. POWERICA LIMITED

167 Oil Level alarm feature is not provided by the engine manufacturer. Tender conditions shall prevail.

324 M/s. POWERICA LIMITED

168 Redundancy There is no redundancy provided as per the manufacturer'sdesign standard.

Tender conditions shall prevail.

325 M/s. POWERICA LIMITED

169 Starting, Control & protections Starting impulse will be received by PCC3.3 engine panelthrough VSR relay. No separate PLC is used for this. PCC3.3will have built-in Auto start cuircuitary. Fuel solonoid &Jacket water heater cuircuitary is through contactor/relaylogic.

Please refer to our response to query no. 132 (Overall Query No. 288) above.

326 M/s. POWERICA LIMITED

170 Protection 2 stage sensing is provided for Oil pressure & water temp i.e.1 at alarm & 2nd at shutdown. But sensors logic & quantity isas per the manufacturer's design standard. All theseprotection will be provided through PCC3.3 Engine controller.

Tender conditions shall prevail.

327 M/s. POWERICA LIMITED

171 PLC No PLC is used for the Auto start & control, hence there is nostandby arrangement applicable.

Whatever provisions is being provided shall be supported by its standby components.

328 M/s. POWERICA LIMITED

172 Test on Engine, Alternator, DG Set Engine will be tested as per QAP enclosed & for 3 hours testduration at engine works. Similarly Alternator will be testedat CGT Works for Type test as per IS4722.IEEE 387 Testingwill be done at site & not at DG set manufacturer's works .

Tender conditions shall prevail.

41 OF 47

Page 42: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

329 M/s. POWERICA LIMITED

173 Alternator Test Following test can not be offered :1.Pottier reactance, 2. Short ckt withstand & measurementsof reactance and time constants., 3. TH Factor, 4. Vibrations,5. losses 6. inertia constatns, 7. leakage reactances, 8.capacitances & Tan delta, 9. noise, 10. response ratio test,11. voltage decay, 12. AVR test

Tender conditions shall prevail.

330 M/s. POWERICA LIMITED

174 DG Qualification There is no Type test, aging test, safety classification Test forDG set.

Tender conditions shall prevail.

331 M/s. POWERICA LIMITED

175 Actual Test There is no actual test for control panel, excitation &regulating cubicles etc. Qualification is by analysis only.

Tender conditions shall prevail.

332 M/s. POWERICA LIMITED

176 Test We wish to carry out all IEEE test at site, hence at ourmanufacturing works, there will not be IEEE Testing.

Tender conditions shall prevail.

333 M/s. POWERICA LIMITED

177 Pollution clearances MPCB/CPCB approval will be obtain by the purchaser with allnecessary drgs /details submitted by the vendor.

Please refer to our response to query no. 1 (Overall Query No. 154) above.

334 M/s Sterling Generators

Pvt.ltd., Silvassa

1 scope of supply / works /service

section C1 & C2

6300 kw - 10 nos, 6 6 KV, 0.8 PF, 50 HZ. Engine controllercomply to IEC 60880 & AREB D - 25 Guide. 6.6 KV cable - fireretardant . Will be done by purchaser . Termination atswg.end - purchaser . DG end- by contractor . Siesmic requirement and ASW resistance .Ambient - 45 deg.C / 15 deg.C . Humidity - 87 / 26 %,Rainfall -700 mm , Siesmology - Zone II.

Noted .How much is the speed. Engine speed can be between 750rpm to 1500rpm.

335 M/s Sterling Generators

Pvt.ltd., Silvassa

2 equipment construction and design

details

page No. 123 to 166

Aux. power 380v provided by customer. Time un attendedopeartion 300 hrs. Min.time of DG restoration 14 hrs. Dglife 40 years , extended to 60 years. DUTY : BASE LOADcontinuous operation . Day tank - cylindriacl timee - 8 hrs .DG to operate parallel with grid , Airstarting system, class Fto B temp.rise limit. AVR - electronic type

Noted. Query is not clear / Tender Specifications shall prevail & if acceptance of the same by theBidder, is the intent of the remarks "Noted", then it is noted by the Purchaser.

336 M/s Sterling Generators

Pvt.ltd., Silvassa

3 inspection , testing /

QAPforr DG sets

page No. 167 to 171

Special type test on assembled DG set, Siesmic and ASWtest . Runin test 25% 1 hr, 50% 1 hr, 75% 1hr, 100% 22hrs, 110% 2 hrs, no lad 2 hrs , 100% 1 hr. For remaining DGsets, 25% 1hr, 50% 1hr, 755 1 hr, 100% 4 hrs, 110% 2hrs,noload 2 hrs, 100% 1hr.

Noted Query is not clear / Tender Specifications shall prevail & if acceptance of the same by theBidder, is the intent of the remarks "Noted", then it is noted by the Purchaser.

337 M/s Sterling Generators

Pvt.ltd., Silvassa

4 site test page No. 172 to 174

test to demonstrate starting of 1400 KWmotor with base laod 4900 KW . Load test :100% 2hr , 110% 2 hr, 100% 24 hr, nolaod 2 hr, 50% 0.5 hr,25% 1 hr

Noted . Load and consumable to be provided by Customer For Load testing of the DG, DG shall have to be synchronized with the grid as specified in thetechnical specifications, which shall prevail.

Query regarding consummables is not clear.

M/S. STERLING GENERATORS PVT.LIMITED

42 OF 47

Page 43: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

338 M/s Sterling Generators

Pvt.ltd., Silvassa

5 General requirement and methods ofqualification for Siesmicresistance and stabilityfor aircraftcrash and airshock wave

page No. 319 to 344

Noted Query is not clear / Tender Specifications shall prevail & if acceptance of the same by theBidder, is the intent of the remarks "Noted", then it is noted by the Purchaser.

339 M/s Sterling Generators

Pvt.ltd., Silvassa

6 vendor list page No. 344 to 362

Diesel engine : Kirloskar , Wartsila ,MTU,MAN , HUNDAI. Altaernator : BHEL , Siemens , Jenmart,Leroysomer

Noted Query is not clear / Tender Specifications shall prevail & if acceptance of the same by theBidder, is the intent of the remarks "Noted", then it is noted by the Purchaser.

340 M/s Sterling Generators

Pvt.ltd., Silvassa

7 project execution and assurance plan for EPCcontrcator

page No. 372 to 404

Noted Query is not clear / Tender Specifications shall prevail & if acceptance of the same by theBidder, is the intent of the remarks "Noted", then it is noted by the Purchaser.

341 M/s Sterling Generators

Pvt.ltd., Silvassa

8 Requirement of contractcompletion for EPCtender

page No. 445 to 452

Noted Query is not clear / Tender Specifications shall prevail & if acceptance of the same by theBidder, is the intent of the remarks "Noted", then it is noted by the Purchaser.

342 M/s Sterling Generators

Pvt.ltd., Silvassa

9 Quality manaagement systemrequirement from contractor

page No. 453 to 490

Noted. Our standard QAP will be provided for approval Ok, but the QAP is subject to our review and acceptance, in line with tender specifications andindicative QAP attached along with tender specifications.

343 M/s Sterling Generators

Pvt.ltd., Silvassa

10 construction management requirement by contractor

page No. 491 to 520

Noted. However the required constrction power forr siteactivities like welding etc., to be provoded by customer

Provision for Construction Power Supply shall be as specified in the 'Special Conditions ofContract (SCC)/General Conditions of Contract (GCC)' which shall prevail.

43 OF 47

Page 44: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

344 M/s Sterling Generators

Pvt.ltd., Silvassa

11 project execution and assurance plan procurement andsubcontracting

page No. 521 to 538

Noted Query is not clear / Tender Specifications shall prevail & if acceptance of the same by theBidder, is the intent of the remarks "Noted", then it is noted by the Purchaser.

345 M/s Sterling Generators

Pvt.ltd., Silvassa

12 Technical specification for shop andfield painting

page No. 540 to 589

Painting will be as per our factory standard Tender Condition shall Prevail.

346 M/s Sterling Generators

Pvt.ltd., Silvassa

13 Time extension Due date 19.12.2017 Considering the volume of the tender, We request you toextended the time for submitting our offer till 19.01.22018.

Bid Submission date has been rescheduled to 16.01.2018

347 M/s Posco Daewoo India Pvt.

Ltd

1 - - - As a supplier / manufacturer of EDG sets, Engine from SouthKorea:

Can we quote our price for ¡°Engine¡±/complete DGSet(Include Engine) to all bidders ( Indian DG Manufacturer)/ (Indian EPC) company?

This question is not relevant as a bidder. Only bidder queries can be clarified by the Purchaser.

348 Reliance Infrastructure Ltd

1 Qualification Requirement Appendix-X

B. Technical Qualification

1.0 :The Bidder shall be an established INDIAN firmmanufacturing large DG sets & its auxiliaries – either in fullor in part OR an Engineering, Procurement and Construction(EPC) Contractor who has carried out design, detailedengineering, project management, procurement, supply,installation, testing and commissioning of DIESELGENERATOR SETS AND ITS AUXILIARIES (along with itsassociated systems & sub-systems) of capacity 2400kW andabove in the last 10 years, as on seven days prior to the lastdate for submission of bid, and fulfilling the followingminimum qualifying requirements......

To attract participation from wider pool of EPC companies,client is requested to review the criteria of 2400 kW DGcapacity and above in the last 10 years. RInfra suggests to amend this criteria on capacity to 1500 kWand above in the last 15 years because in last 10 years nomajor captive power project have come and EDGs are mailyinstalled in coal based thermal power projects, which are inthe capacity range of 1500 to 1600 kW .

Kindly Confirm.

Tender conditions prevail.

349 Reliance Infrastructure Ltd

2 Qualification Requirement Appendix-X

B. Technical Qualification

1.0 : The Bidder shall be an established INDIAN firmmanufacturing large DG sets & its auxiliaries – either in fullor in part OR an Engineering, Procurement and Construction(EPC) Contractor who has carried out design, detailedengineering, project management, procurement, supply,installation, testing and commissioning of DIESELGENERATOR SETS AND ITS AUXILIARIES (along with itsassociated systems & sub-systems) of capacity 2400kW andabove in the last 10 years, as on seven days prior to the lastdate for submission of bid, and fulfilling the followingminimum qualifying requirements.

To attract participation from wider pool of EPC companies,client is requested to review the criteria of 2400 kW DGcapacity and above in the last 10 years. RInfra suggests to amend this criteria on capacity to 1500 kWand above in the last 15 years because in last 10 years nomajor captive power project have come and EDGs are mailyinstalled in coal based thermal power projects, which are inthe capacity range of 1500 to 1600 kW .

Kindly Confirm.

Tender conditions prevail.

M/S. POSCO DAEWOO INDIA PVT. LIMITED

M/S. RELIANCE INFRASTRUCTURE LIMITED

44 OF 47

Page 45: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

350 Reliance Infrastructure Ltd

3 Qualification Requirement Appendix-X

B. Technical Qualification

1.0 (IV)- Manufacturing:The tenderer shall preferably have complete manufacturingfacilities of DG Sets and its associated systems / subsystemsin India or part of the DG sets & its associated systems /subsystems, in India with a capability todesign the associated systems and integrate the completesystems, for execution of the project as per therequirements of this tender specifications.

To enable participation of EPC players, Rinfra requests clientto modify the given clause as follows:

The tenderer(individually or in consortium or tie up withmanufacturer) shall preferably have complete manufacturingfacilities of DG Sets and its associated systems / subsystemsin India or part of the DG sets & its associated systems /subsystems, in India with a capability to design theassociated systems and integrate the complete systems, forexecution of the project as per the requirements of thistender specifications.

Kindly confirm.

Tender conditions prevail.

351 Reliance Infrastructure Ltd

4 Qualification Requirement Appendix-X

B. Technical Qualification

1.0 (V)- Testing:The Tenderer should have necessary facilities for Testingincluding Electrical Load Testing of assembled DG Sets asper the requirement of the tender specifications

To enable participation of EPC players, Rinfra requests clientto modify the given clause as follows:

The tenderer (individually or in consortium or tie up withmanufacturer) should have necessary facilities for Testingincluding Electrical Load Testing of assembled DG Sets as perthe requirement of the tender specifications

Kindly confirm.

Acceptable.

352 Reliance Infrastructure Ltd

5 Qualification Requirement Appendix-X

B. Technical Qualification

1.0 (VII)- Erection :The Bidder shall have a proven experience in the field oferection /installation, commissioning of emergency DG Setsof capacity 2400 KW or above and shall have completederection of at least one such Emergency DG Set, which is insuccessful operation for at least one (1) year, as on 7 daysprior to the last date of bid submission.

As above in Query No- 1 Tender conditions prevail.

353 Reliance Infrastructure Ltd

6 Qualification Requirement Appendix-X

B. Technical Qualification

1.0 (VII)- Erection (a):Bidder’s organization should have trained manpowerresources having at least 7 years of past experience inDesign, Engineering, Procurement, Manufacturing, QualityControl & Assurance, Supply, Erection, Testing,Commissioning and Overall Project Management of worksassociated with DG Sets and its auxiliaries of Capacity2400KW or above.

As above in Query No- 1 Tender conditions prevail.

354 Reliance Infrastructure Ltd

7 Qualification Requirement Appendix-X

B. Technical Qualification

1.0 (VII)- Erection (c):The Bidder’s organization should have experienced andqualified manpower for carrying out erection, testing andcommissioning of DG Sets of capacity 2400kW or abovealong with its auxiliaries / subsystems.

As above in Query No- 1 Tender conditions prevail.

45 OF 47

Page 46: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

355 Reliance Infrastructure Ltd

8 Qualification Requirement Appendix-X

D. Additional Qualification

Criteria

2.0 - General Eligibility Criteria (b):In case of a consortium, a maximum of 3 partners can formthe consortium. The lead partner shall necessarily be anIndian firm with more than 51% share in the consortium &shall meet the technical qualification criteria given in clauseB of Technical Qualification above.

To enable EPC companies' participation in the bidCleint isrequested to modify the given clause as follows:

In case of a consortium, a maximum of 3 partners can formthe consortium. The lead partner shall necessarily be anIndian firm with more than 51% share in the consortium &shall meet the technical qualification criteria given in clause Bof Technical Qualification above.

ORIn case of a consortium, a maximum of 3 partners can formthe consortium. The lead partner shall necessarily be anIndian firm with more than 51% share in the consortium &shall meet the financial qualification criteria as given andother consortium partners shall meet technical qualificationcriteria given in clause B of Technical qualification above

Kindly confirm.

Tender conditions prevail.

356 Additional Clarification

1 C-7 2.6.8 Pressure rupture disc (PRD) specified for the exhaust line shall be qualified by test(s) on aprototype to prove its functioning under fall / blockage condtions specified in the tender.

357 Additional Clarification

2 C-2 8.0 Ageing analysis as per IEEE 387 of components is also included in the scope of subject tender.

358 Additional Clarification

3 C-8C-9

Section - E

2.01.1

Section - E

a) Supply prices quoted shall be inclusive of all tests i.e. type tests, routine tests, special tests.

b) Commissioning prices quoted shall be inclusive of all site tests on all DG sets.

Prices asked to be quoted under Section - E for the 'Special tests' shall be operated & payableonly if Purchaser for his own additional assurance demands repeat tests to be carried out overand above the tests mentioned in a) and b) of this clarification .

359 Additional Clarification

4 C-7 2.6.8 Sampling points for the exhaust gases at the stack shall be provided to meet the requirementsof all statutary bodies. Provision (including all nesessary arrangements such as piping, valve,etc.) shall be made to take the sample by a person standing on the DG building roof.

360 Additional Clarification

5 C-7 2.6.8 Stack can be on roof or from ground or from wall of the DG building. This will be decidedduring execution of the work. In case of stack being from the wall or roof, part of stack shall bedesigned for SSE & ASW and the other part shall be for OBE. But in case of Stack installation isfrom the ground, then the entire stack shall be designed for SSE & ASW. Loading requirementon the DG building shall be submitted to the Purchaser within 3 months from the date of PO tofacilitate building analysis.

Additional Clarifications :

46 OF 47

Page 47: NUCLEAR POWER CORPORATION OF INDIA …...purchase hard copies from AERB.. 4 Kirloskar Oil Engines Limited 4 C -1 1.2.1 (10) The Purchaser intends providing a diversity by means of

Overall

Query No.

NAME OF THEBIDDER

QUERYNO.

TENDERSECTION

NO.

REFERENCECLAUSE NO.

REFERENCE DRAWING/ TECHNICAL SPECIFICATION No/ INSTRUMENTATION SHEET No / DATA SHEET No.

DESCRIPTION OF THE QUERY RESPONSE FROM NPCIL

NUCLEAR POWER CORPORATION OF INDIA LIMITEDTENDER NO. CMM/MEQ/25-24-2-1134 EPC-Diesel Generator Sets & its Auxiliaries for KKNPP 3&4

TECHNICAL CLARIFICATION RESPONSE-1

361 Additional Clarification

6 Section - C Appendix-D Loading sequence (Appendix-G) and Appendix-D (List of signals exchanged between NPP andDGP devices in the electrical part) for reliable DGs (05 UKD) are also included along with pre-bid response.

362 Additional Clarification

7 Section - E Sl. No. 1.3.2 of Template

F

Existing clause no. 1.3.2 of template F of Section E "Lump Sum Prices including engineeringcharges for carrying out Seismic Qualification, of completely assembled Diesel generator setand its associated auxiliaries, accessories, piping, instrumentation and controls panels alongwith instruments etc by either testing or analysis or testing and analysis both whichever isapplicable, for demonstrating satisfactory operation of DG set during and after being subjectedto the specified number of OBEs and SSE, as per IEEE 344 & technical specification No.No.I02.KK34.0.0.ET.TS.PR035." shall be read as......

"Lump Sum Prices including engineering charges for carrying out Seismic Qualification & ASW, of completely assembled Diesel generator set and its associated auxiliaries, accessories, piping,instrumentation and controls panels along with instruments etc by either testing or analysis ortesting and analysis both whichever is applicable, for demonstrating satisfactory operation ofDG set during and after being subjected to the specified number of OBEs and SSE, as per IEEE344 & technical specification No. No.I02.KK34.0.0.ET.TS.PR035."

363 Additional Clarification

8 Section - C Section - C Synchrozination facility shall also be provided for closing the upstream CBs on restoration ofthe power supply, similar to the facility provided for closing of DGCB. PT at the switchgear endalone shall be provided by the Purchaser.