NOT PROTECTIVELY MARKED BEG/SPEC/OPSV/EPG/002/002 Revision 003 Page 1 of 21 edfenergy.com NOT PROTECTIVELY MARKED Nuclear Generation Limited Company Specification Generic Emergency Handbook (Nuclear Generation) Section 2 Actions for Emergency Control Centre Staff Originated by: John Babb Emergency Planning Group Date: January 2013 Reviewed by: EP Peer Group Date: January 2013 Approved by: John Skegg Head of Emergency Planning Group Date: January 2013 Revision Amendment Impact level Date 003 Document converted to new EDF NG template Changes include company name and organisational updates Minor January 2013 © 2013 Published in the United Kingdom by EDF Energy Nuclear Generation Ltd. All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, including photocopying and recording, without the written permission of the copyright holder, EDF Energy Nuclear Generation Ltd, application for which should be addressed to the publisher. Such written permission must also be obtained before any part of this publication is stored in a retrieval system of any nature. Requests for copies of this document should be referred to Barnwood Document Centre, Location 12, EDF Energy Nuclear Generation Ltd, Barnett Way, Barnwood, Gloucester GL4 3RS (Tel: 01452-652791). The electronic copy is the current issue and printing renders this document uncontrolled. Controlled copy-holders will continue to receive updates as usual. LIMITATION OF LIABILITY – Whilst EDF Energy Nuclear Generation Ltd believes that the information given in this document is correct at the date of publication it does not guarantee that this is so, nor that the information is suitable for any particular purpose. Users must therefore satisfy themselves as to the suitability of the information for the purpose for which they require it and must make all checks they deem necessary to verify the accuracy thereof. EDF Energy Nuclear Generation Ltd shall not be liable for any loss or damage (except for death or personal injury caused by negligence) arising from any use to which the information is put.

Upload: doannhan

Post on 06-May-2018

215 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Nuclear Generation Limited - EDF Energy · Nuclear Generation Limited Company Specification ... 3.9 When the ECC is fully manned and prepared for operation, formally take overall

NOT PROTECTIVELY MARKED BEG/SPEC/OPSV/EPG/002/002 Revision 003 Page 1 of 21

edfenergy.com

NOT PROTECTIVELY MARKED

Nuclear Generation Limited

Company Specification

Generic Emergency Handbook (Nuclear Generation) Section 2 Actions for Emergency Control Centre Staff Originated by: John Babb

Emergency Planning Group Date: January 2013

Reviewed by: EP Peer Group Date: January 2013

Approved by: John Skegg Head of Emergency Planning Group

Date: January 2013

Revision Amendment Impact level Date

003 Document converted to new EDF NG template Changes include company name and organisational updates

Minor January 2013

© 2013 Published in the United Kingdom by EDF Energy Nuclear Generation Ltd. All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, including photocopying and recording, without the written permission of the copyright holder, EDF Energy Nuclear Generation Ltd, application for which should be addressed to the publisher. Such written permission must also be obtained before any part of this publication is stored in a retrieval system of any nature. Requests for copies of this document should be referred to Barnwood Document Centre, Location 12, EDF Energy Nuclear Generation Ltd, Barnett Way, Barnwood, Gloucester GL4 3RS (Tel: 01452-652791). The electronic copy is the current issue and printing renders this document uncontrolled. Controlled copy-holders will continue to receive updates as usual. LIMITATION OF LIABILITY – Whilst EDF Energy Nuclear Generation Ltd believes that the information given in this document is correct at the date of publication it does not guarantee that this is so, nor that the information is suitable for any particular purpose. Users must therefore satisfy themselves as to the suitability of the information for the purpose for which they require it and must make all checks they deem necessary to verify the accuracy thereof. EDF Energy Nuclear Generation Ltd shall not be liable for any loss or damage (except for death or personal injury caused by negligence) arising from any use to which the information is put.

Page 2: Nuclear Generation Limited - EDF Energy · Nuclear Generation Limited Company Specification ... 3.9 When the ECC is fully manned and prepared for operation, formally take overall

NOT PROTECTIVELY MARKED BEG/SPEC/OPSV/EPG/002/002 Revision 003 Page 2 of 21

edfenergy.com

NOT PROTECTIVELY MARKED

Contents

2.1 Emergency Controller .......................................................................................... 3

1. Personnel Responsible To:......................................................................................... 3

2. Personnel Responsible For:........................................................................................ 3

3. Actions ....................................................................................................................... 3

2.2 Assistant Emergency Controller........................................................................... 7

1. Personnel Responsible To:......................................................................................... 7

2. Personnel Responsible For:........................................................................................ 7

3. Actions ....................................................................................................................... 7

2.3 Emergency Health Physicist ................................................................................ 9

1. Personnel Responsible To:......................................................................................... 9

2. Personnel Responsible For:........................................................................................ 9

3. Actions ....................................................................................................................... 9

2.4 Emergency Reactor Physicist ............................................................................ 12

1. Personnel Responsible To:....................................................................................... 12

2. Personnel Responsible For:...................................................................................... 12

3. Actions ..................................................................................................................... 12

2.5 Emergency Chemist .......................................................................................... 14

1. Personnel Responsible To:....................................................................................... 14

2. Personnel Responsible For:...................................................................................... 14

3. Actions ..................................................................................................................... 14

2.6 Emergency Administration Officer...................................................................... 15

1. Personnel Responsible To:....................................................................................... 15

2. Personnel Responsible For:...................................................................................... 15

3. Actions ..................................................................................................................... 15

2.7 ECC Support Officer .......................................................................................... 17

1. Personnel Responsible To:....................................................................................... 17

2. Personnel Responsible For:...................................................................................... 17

3. Actions [A] Radio Operator ....................................................................................... 17

4. Actions [B] Plotter ..................................................................................................... 18

5. Actions [C] Logger.................................................................................................... 18

6. Actions [D] Telephonist............................................................................................. 19

2.8 Emergency Communications Coordinator.......................................................... 20

1. Personnel Responsible To:....................................................................................... 20

2. Personnel Responsible For:...................................................................................... 20

3. Actions ..................................................................................................................... 20

Page 3: Nuclear Generation Limited - EDF Energy · Nuclear Generation Limited Company Specification ... 3.9 When the ECC is fully manned and prepared for operation, formally take overall

NOT PROTECTIVELY MARKED BEG/SPEC/OPSV/EPG/002/002 Revision 003 Page 3 of 21

edfenergy.com

NOT PROTECTIVELY MARKED

2.1 Emergency Controller

1. Personnel Responsible To:

� Station Director

2. Personnel Responsible For:

� Personnel on Site

� All members of Station Emergency Organisation and Emergency Services when on site.

3. Actions

3.1 On being notified of an incident, if a declaration has not been made discuss the need to declare a Site Incident or an Offsite Nuclear Emergency with the Shift Manger. (Section 8)

❏ 3.2 Confirm with the Shift Manager that all standby personnel have been notified and attempt to

contact the Station Director.

3.3 Notify the Shift Manager on arrival at the ECC. (Section 11)

3.4 Commence an Emergency Log. (Section 15)

3.5 Brief the ECC staff, instruct them to ensure Action and Status Boards are updated as necessary and set the focus of making the ECC operational.

3.6 Utilise the Assistant Emergency Controller to assist in developing focus points, liasing with all other ECC staff on completion and assignment of actions to allow a state of ‘hands on’ detachment.

3.7 Check the CCR/MCR progress with the following actions and if possible hand them over to the Duty Administration officer:

� The off site notification process (Section 8)

� Liaison with Security over the state of the site muster (Section 11)

� Provision to the BE Emergency Services Liaison Officer (ESLO) of information on safe routes, safe vehicle assembly points and identifying any precautions to be adopted. (Section 11)

Page 4: Nuclear Generation Limited - EDF Energy · Nuclear Generation Limited Company Specification ... 3.9 When the ECC is fully manned and prepared for operation, formally take overall

NOT PROTECTIVELY MARKED BEG/SPEC/OPSV/EPG/002/002 Revision 003 Page 4 of 21

edfenergy.com

NOT PROTECTIVELY MARKED

3.8 Liaise with the Shift Manager on the state of the plant, the deployment of emergency teams, identification of the suspected cause of the accident and the focuses required for the recovery strategy.

3.9 When the ECC is fully manned and prepared for operation, formally take overall control of the accident from the Shift Manager and then make an announcement over the Public Address System to confirm this event has taken place.

3.10 In conjunction with feedback from the Shift Manager and ECC team, use command and control techniques to set focuses for the site emergency organisation to limit the consequences of any incident and to protect in order of priority:

� the public

� site personnel

� the environment

� the plant

� site security

� emergency organisation

3.11 Liaise with the Emergency Health Physicist on actions on and off site with particular reference to:

� Radiological conditions off-site and the need to advise the Police on countermeasures.

� On site radiological conditions, tenability of muster points and safe routes on to and through the site.

� Need for emergency exposures limits

3.12 Liaise with the Emergency Reactor Physicist with particular reference to the state of plant and mitigating actions required.

� Entry into SBERGs or SAGs

3.13 Liaise with the Emergency Administrative Officer with particular reference to:

� Locating all personnel on site.

� Completion of the notification process in conjunction with the Central (Main) Control Room.

� Casualties and their treatment

� Status of the Emergency Services.

Page 5: Nuclear Generation Limited - EDF Energy · Nuclear Generation Limited Company Specification ... 3.9 When the ECC is fully manned and prepared for operation, formally take overall

NOT PROTECTIVELY MARKED BEG/SPEC/OPSV/EPG/002/002 Revision 003 Page 5 of 21

edfenergy.com

NOT PROTECTIVELY MARKED

3.14 Consider utilising additional staff at muster points to bolster station emergency response.

3.15 Prepare for the ONR Call Back. (Section 8)

3.16 Ensure Emergency Services Officers attending the ECC and ensure they are greeted, briefed and kept up to date on all pertinent developments.

3.17 Provide advice to the Police in liaison with the Emergency Health Physicist on the need for any off site countermeasures even if this is to assure that none are required.

3.18 In the event of the ECC becoming untenable, inform the Shift Manager to take control of the site emergency response and make a tannoy to that effect. Order the evacuation of ECC staff to the alternative ECC. (Section 8)

3.19 If incident status is revised to an Off site Nuclear Emergency order the sounding of the Site Alarms and broadcast the appropriate warnings over the public address system.

3.20 Liaise with Shift Manager on the progress to locate, rescue and treat any casualties and the requirements for any additional medical attendance.

3.21 Prepare regular information statements to be relayed to staff to alleviate concerns and advise them of the progress of the incident. Arrange for senior members of staff to visit muster points and brief staff. (Do not use the PA system for non-urgent information).

3.22 Instruct the ECC Administrative Officer to prepare a statement for issue to the CESC. Ensure this statement is accurate in detail. (All press enquiries should be directed to the Duty Press Officer and subsequently the Media Briefing Centre once it has been established).

3.23 When the CESC is manned, maintain liaison with the CESC Controller and advise them of the incident details; progress in its control; all off-site actions and all statements issued.

Page 6: Nuclear Generation Limited - EDF Energy · Nuclear Generation Limited Company Specification ... 3.9 When the ECC is fully manned and prepared for operation, formally take overall

NOT PROTECTIVELY MARKED BEG/SPEC/OPSV/EPG/002/002 Revision 003 Page 6 of 21

edfenergy.com

NOT PROTECTIVELY MARKED

3.24 When the CESC is declared operational by the CESC Controller, consider the transfer of:

� Offsite survey

� Interface with Media

� Providing technical support

� Communication with external agencies

� Liaison with company Executive Team

� Agree handover is complete and inform ECC staff.

3.25 Consider longer term arrangements such as: (Section 20)

� Relief of duty staff on site and control and information to in-coming staff.

� Evacuation of non-essential staff.

� Contacting and informing non-essential staff to remain off-site.

� Ordering and provision of essential stocks.

� The continued safety and welfare of all persons on site.

3.26 Review and agree plant repair strategy and techniques.

3.27 Cancel the declaration if permissible (Section 15.4).

Page 7: Nuclear Generation Limited - EDF Energy · Nuclear Generation Limited Company Specification ... 3.9 When the ECC is fully manned and prepared for operation, formally take overall

NOT PROTECTIVELY MARKED BEG/SPEC/OPSV/EPG/002/002 Revision 003 Page 7 of 21

edfenergy.com

NOT PROTECTIVELY MARKED

2.2 Assistant Emergency Controller

1. Personnel Responsible To:

� Emergency Controller

2. Personnel Responsible For:

� None

3. Actions

3.1 Report to the Duty Emergency Controller in the ECC

3.2 Ensure all ECC staff and any persons entering the ECC have mustered and taken potassium iodate tablets if an Offsite Nuclear Emergency has been declared.

3.3 Liaise with the Emergency Health Physicist on behalf of the Emergency Controller to ensure completion of all actions, but with particular reference to:

� Declaration status

� Off site survey

� Availability of gamma spectrometry

� Provision of advice on countermeasures

� Meteorological conditions

� On site survey

� Safe routes to and onto the site

� Tenability of control centres and muster points

� Nature and magnitude of radiological conditions at the site of the incident

� Control of doses to intervention staff

3.4 Liaise with the Emergency Administration Officer on behalf of the Emergency Controller to ensure completion of actions, but with particular reference to:

� Roll-Call

� Missing persons and last known locations

� Casualties and their treatment

� Telephone notifications

Page 8: Nuclear Generation Limited - EDF Energy · Nuclear Generation Limited Company Specification ... 3.9 When the ECC is fully manned and prepared for operation, formally take overall

NOT PROTECTIVELY MARKED BEG/SPEC/OPSV/EPG/002/002 Revision 003 Page 8 of 21

edfenergy.com

NOT PROTECTIVELY MARKED

� Essential supplies

� Status of the Emergency Services

� Welfare of all personnel on the site

� Provision of a duty rota for Emergency Personnel

3.5 Liaise with the Emergency Reactor Physicist on behalf of the Emergency Controller to ensure completion of actions, but with particular reference to:

� Control rod positions

� Reactor pressure

� Reactor state generally

� Temperature and cooling capability

� Blow down routes

� Post trip cooling

� BCD information

� Essential supplies and services

� Auxiliary plant

� Criticality Safety/Fuel Storage

� Unaffected Reactor and plant status

3.6 Ensure all status and action boards are updated as information is made available and that all actions are completed in a timely fashion. Complete proformas and fax to the CESC for input on to TiiMS.

3.7 Liaise with Emergency Services Officers in the ECC and advise them of your role to provide information as it becomes available and to pass on requests for information to the EC.

3.8 Shield the Emergency Controller from all non essential information

3.9 Ensure ECC staff maintain personal logs of actions and information. (Section 15)

Page 9: Nuclear Generation Limited - EDF Energy · Nuclear Generation Limited Company Specification ... 3.9 When the ECC is fully manned and prepared for operation, formally take overall

NOT PROTECTIVELY MARKED BEG/SPEC/OPSV/EPG/002/002 Revision 003 Page 9 of 21

edfenergy.com

NOT PROTECTIVELY MARKED

2.3 Emergency Health Physicist

1. Personnel Responsible To:

� Emergency Controller.

2. Personnel Responsible For:

� Those carrying out or supporting radiological protection assessments or providing advice.

� ECC Support Officers

3. Actions

3.1 Report to the Duty Emergency Controller in the ECC

3.2 If applicable, turn ECC H&V System on and regularly check the area tenability.

3.3 Review Perimeter Fence Gamma Monitor and meteorological equipment and readings on a regular basis. Send PACRAM form to MET office. (Section 10)

3.4 Advise the Emergency Controller of those areas that might be affected especially whether or not conditions in the ACP, ECC and Gatehouse are likely to remain tenable.

3.5 Establish that the Off-Site and On-Site Survey Teams have been deployed and that a communications route is readily available.

3.6 Confirm that the Survey Teams have tested the emergency sampling equipment and taken potassium iodate tablets if necessary. Ensure that the Survey Teams have automatically deployed to the appropriate sampling locations for the particular wind direction. If necessary decide whether the standard sampling programme requires amending. (Section 10)

3.7 Liaise with the Emergency Administration Officer to call in suitable personnel to fulfil the Assistant Health Physicist roles. Brief and deploy Health Physicist, as they become available, to the prescribed emergency duties of:

� Assistant Emergency Health Physicist (ACP)

� Assistant Emergency Health Physicist (DSL)

� Allocate any additional staff to assist as necessary.

� Assistant Emergency Health Physicist (Dosimetry)

Page 10: Nuclear Generation Limited - EDF Energy · Nuclear Generation Limited Company Specification ... 3.9 When the ECC is fully manned and prepared for operation, formally take overall

NOT PROTECTIVELY MARKED BEG/SPEC/OPSV/EPG/002/002 Revision 003 Page 10 of 21

edfenergy.com

NOT PROTECTIVELY MARKED

3.8 Advise the Emergency Controller on authorising emergency exposures for intervention (REPPIR) - Section 10.5 and section 10.6

3.9 If emergency exposures are authorised then arrange for dose assessment and control of

dosemeters as section 10.6.

3.10 Ensure that all the results from the On-site and Off-site Sampling Teams are processed and plotted on the ECC maps.

3.11 Select appropriate samples and have them returned for analysis by gamma spectrometry.

3.12 Keep the Emergency Controller up-to-date with the on-site and off-site sample results and highlight any significant results or trends. Advise the Controller on the necessity of any counter-measures to protect the general public, personnel on site and the survey teams. (Section 8)

3.13 Discuss with the Emergency Controller:

� The evacuation of non-essential personnel from site; taking into account personal contamination, vehicle contamination and safe routes from site

� Safe routes for access to and onto the site and assembly points for essential staff and Emergency Service personnel and vehicles.

� Dose control for intervention staff

� Clearance for the Station’s and Essential Service’s equipment and vehicles to leave the Station, and specification of procedures for limiting the spread of contamination.

3.14 Liaise with Assistant Emergency Health Physicist (ACP), Access Controller and Emergency Controller on the conditions on site and review doses received by Emergency Teams and arrangements for the assessment of dosemeters.

Liaise with the CESC when operational, providing a complete history of off-site survey results and gamma spectrometry results. Hand over control of the Off-Site Survey Teams when agreed between the CESC and EC Controllers.Complete proformas and fax to the CESC for input on to TiiMS.

Page 11: Nuclear Generation Limited - EDF Energy · Nuclear Generation Limited Company Specification ... 3.9 When the ECC is fully manned and prepared for operation, formally take overall

NOT PROTECTIVELY MARKED BEG/SPEC/OPSV/EPG/002/002 Revision 003 Page 11 of 21

edfenergy.com

NOT PROTECTIVELY MARKED

3.15 Continue to liaise with the CESC advising of significant changes in on-site radiological conditions, Perimeter Fence Gamma Monitor and meteorological instrument readings.

3.16 Consider deployment of further HP staff to local hospitals, Police Silver command and Emergency Services deployments to give advice and perform assurance monitoring. (Section 8)

3.17 Consider the consequences of non-standard radiological events e.g. criticality, active effluent plant failures.

Page 12: Nuclear Generation Limited - EDF Energy · Nuclear Generation Limited Company Specification ... 3.9 When the ECC is fully manned and prepared for operation, formally take overall

NOT PROTECTIVELY MARKED BEG/SPEC/OPSV/EPG/002/002 Revision 003 Page 12 of 21

edfenergy.com

NOT PROTECTIVELY MARKED

2.4 Emergency Reactor Physicist

1. Personnel Responsible To:

� Emergency Controller.

2. Personnel Responsible For:

� Performance Engineers working in support of the event.

3. Actions

3.1 Report to the Emergency Controller in the ECC.

3.2 Review reactor conditions and advise the Emergency Controller on:

� The actions to restore control and limit the effects of the occurrence

� The probable course of the occurrence.

3.3 Request permission from the Emergency Controller to allow another Emergency Reactor Physicist to proceed to the CCR/MCR and liaise with the CCR/MCR through that route.

3.4 Monitor the essential reactor parameters and perform the following as considered necessary:

� Check whether or not the reactor is critical

� Assess the shutdown margin with respect to time and initiate detailed calculations if required.

� Calculate the rate of depressurisation and time to total depressurisation.

� Assess the state of reactor gas cooling from circulator availability and gas valve/inlet guide vane control

� Assess the state of boiler cooling

� Perform a temperature assessment of the core.

� Check the BCD information and obtain any available information on circuit activity.

� Consider the state of the other reactor.

3.5 Deploy additional staff to continue the above assessments, monitoring duties, and calculations as necessary.

Page 13: Nuclear Generation Limited - EDF Energy · Nuclear Generation Limited Company Specification ... 3.9 When the ECC is fully manned and prepared for operation, formally take overall

NOT PROTECTIVELY MARKED BEG/SPEC/OPSV/EPG/002/002 Revision 003 Page 13 of 21

edfenergy.com

NOT PROTECTIVELY MARKED

3.6 Liaise with the Emergency Health Physicist to determine extent and duration of any release.

3.7 Advise the Emergency Controller and the Shift Manager and his staff of the assessment of the course of the occurrence, the essential tasks to be undertaken and any limitations recommended.

3.8 Provide advice to the Emergency Controller and the Shift Manager on the application of both the SAGs and SBERGs

3.9 Assist the Emergency Controller in liasing with the ONR Site Inspector and CESC. Complete proformas and fax to the CESC for input on to TiiMS.

Page 14: Nuclear Generation Limited - EDF Energy · Nuclear Generation Limited Company Specification ... 3.9 When the ECC is fully manned and prepared for operation, formally take overall

NOT PROTECTIVELY MARKED BEG/SPEC/OPSV/EPG/002/002 Revision 003 Page 14 of 21

edfenergy.com

NOT PROTECTIVELY MARKED

2.5 Emergency Chemist

1. Personnel Responsible To:

� Emergency Controller

2. Personnel Responsible For:

� None

3. Actions

3.1 Report to the Emergency Controller in the ECC.

3.2 Advise the Emergency Controller on:

� the actions to restore control and limit the effects of the occurrence, and

� the probable course of the occurrence.

3.3 Liaise with the CCR/MCR staff to Monitor the essential reactor parameters and perform analysis of reactor gas, steam and water system, and samples as necessary. If resources allow, send another Emergency Chemist to the CCR/MCR and liaise through that route.

3.4 Deploy staff to the above analysis and calculations as necessary.

3.5 Advise the Emergency Controller and the Shift Manager and his staff of the assessment of the course of the occurrence, the essential tasks to be undertaken and any limitations recommended.

3.6 Assist the Emergency Controller in liasing with the ONR and CESC.

Page 15: Nuclear Generation Limited - EDF Energy · Nuclear Generation Limited Company Specification ... 3.9 When the ECC is fully manned and prepared for operation, formally take overall

NOT PROTECTIVELY MARKED BEG/SPEC/OPSV/EPG/002/002 Revision 003 Page 15 of 21

edfenergy.com

NOT PROTECTIVELY MARKED

2.6 Emergency Administration Officer

1. Personnel Responsible To:

� Emergency Controller.

2. Personnel Responsible For:

� Roll Call Staff

� Security Staff

� ECC Support Officers

� Other Administration Support Staff.

3. Actions

3.1 Report to the Emergency Controller in the ECC.

3.2 Check the progress made in making off-site notification calls with the Emergency Controller and if required take responsibility for the remaining calls. (Section 8)

3.3 Report all telecoms faults to the EDF Energy Network Control Centre.

3.4 Check on the state of the roll-call with the Security staff and ensure that the names and last known location of any missing persons have this reported to the Emergency Controller, this may be the Shift Manager. (Section 11)

3.5 Check that essential data has been entered onto the ECC status board and organise routine updating.

3.6 Liaise with the Emergency Services Liaison Officer to determine status of Emergency Services attending the site and their location; update this information on the ECC status board.

3.7 Check that the ECC Log has commenced and organise the routine receipt and logging of information.

Page 16: Nuclear Generation Limited - EDF Energy · Nuclear Generation Limited Company Specification ... 3.9 When the ECC is fully manned and prepared for operation, formally take overall

NOT PROTECTIVELY MARKED BEG/SPEC/OPSV/EPG/002/002 Revision 003 Page 16 of 21

edfenergy.com

NOT PROTECTIVELY MARKED

3.8 Review the number of staff available to undertake administrative functions:

� Telephonist

� Facsimile Operator

� Transport

� Canteen

� Security

� Stores

� General Services

3.9 Arrange for essential staff to be brought to site; non-essential staff to be sent or taken home, and a duty rota for all emergency roles arranged to cover the projected duration of the Site Incident or Offsite Nuclear Emergency. (Section 8)

3.10 Liaise with Police Control when they arrive at the ECC and provide accommodation and administrative assistance as far as practicable.

3.11 Liaise with Medical Centre Staff/Shift Manager/Emergency Controller and Police; and arrange that the families of any casualties are informed of the injuries and the whereabouts of the casualties.

3.12 Arrange notification of the Coroner’s Office Staff in the event of fatal casualties liasing with the doctor and Police Control.

3.13 Provide accommodation and administrative assistance for the Coroner’s Office staff when they attend site.

Page 17: Nuclear Generation Limited - EDF Energy · Nuclear Generation Limited Company Specification ... 3.9 When the ECC is fully manned and prepared for operation, formally take overall

N NOT PROTECTIVELY MARKED BEG/SPEC/OPSV/EPG/002/002 Revision 003 Page 17 of 21

edfenergy.com

NOT PROTECTIVELY MARKED

2.7 ECC Support Officer

1. Personnel Responsible To:

� Emergency Controller/nominated ECC Officer (Admin., HP)

2. Personnel Responsible For:

� None.

3. Actions [A] Radio Operator

3.1 Report to the Emergency Health Physicist in the ECC.

3.2 Obtain the wind direction from the Perimeter Fence Gamma Monitoring System; obtain the pre-determined sampling programme for the particular wind direction as specified

3.3 Acknowledge messages from the on and off site survey teams and ensure they know the standard survey for the relevant wind direction. (Section 10 & 15)

3.4 Continue to receive survey and other information as necessary.

3.5 Pass the survey information to the Plotters/Loggers and bring to the attention of the Emergency Health Physicist any additional information received (vehicle or equipment problems, abnormal dosimeter reading, etc).

3.6 Pass messages to survey team as necessary.

3.7 Log the time and content of all messages. (Section 15)

3.8 Deploy the Survey Teams in accordance with the Emergency Health Physicist’s instructions until the CESC takes control of the off site vehicles at which point only the on site vehicles will be controlled.

Page 18: Nuclear Generation Limited - EDF Energy · Nuclear Generation Limited Company Specification ... 3.9 When the ECC is fully manned and prepared for operation, formally take overall

N NOT PROTECTIVELY MARKED BEG/SPEC/OPSV/EPG/002/002 Revision 003 Page 18 of 21

edfenergy.com

NOT PROTECTIVELY MARKED

4. Actions [B] Plotter

4.1 Report to the Emergency Health Physicist in the ECC.

4.2 Liaise with the Emergency Base Radio Operator and arrange to receive survey results.

4.3 On receipt of the survey data, calculate the airborne and deposited radioactivity results, assign a colour code, and plot the results on the wall map(s). (Section 10)

4.4 Report abnormal results and relay any messages from the Survey Teams to the Emergency Health Physicist. (Section 10)

4.5 Update the wall maps, charts etc. in the ECC (Section 10).

4.6 Pass the copies of data received before the CESC becomes operational for transmission to the CESC, by FAX as instructed by the Emergency Health Physicist.

4.7 Retain copies of data in the filing trays provided.

5. Actions [C] Logger

5.1 Report to the Emergency Controller in the ECC.

5.2 Set up an emergency log using forms provided. (Section 15)

5.3 Maintain a written log of all key actions, messages and activities in the ECC.

5.4 Log any additional information as directed by the Emergency Controller.

5.5 Ensure that all paperwork is gathered together and securely stored at the end of the incident.

Page 19: Nuclear Generation Limited - EDF Energy · Nuclear Generation Limited Company Specification ... 3.9 When the ECC is fully manned and prepared for operation, formally take overall

N NOT PROTECTIVELY MARKED BEG/SPEC/OPSV/EPG/002/002 Revision 003 Page 19 of 21

edfenergy.com

NOT PROTECTIVELY MARKED

6. Actions [D] Telephonist

6.1 Report to the Emergency Administration Officer in the ECC.

6.2 Take control of the switchboard and making any notification calls required, logging the name of the person notified and the time of notification.

6.3 Notify the Emergency Administrative Officer/Emergency Controller of any difficulties in making the off-site notification calls.

6.4 Assist the ECC staff in establishing contact with outside agencies and individuals.

6.5 Receive incoming calls and:

� Refer enquiries from the general public to the public information services of the Police or the Information Centre operated by the Local Authority, and advise them to watch TV, tune in to local radio news broadcasts.

� Refer enquiries from the media to the Press Office or Duty Press officer.

� DO NOT GIVE ANY INFORMATION BEYOND THAT AUTHORISED BY THE EMERGENCY CONTROLLER.

� DO NOT ELABORATE ON ANY STATEMENT PROVIDED BY THE EMERGENCY CONTROLLER.

� Connect station staff with the Emergency Administration Officer or his assistants.

� Note the name, organisation, establishment and telephone number of persons who wish to speak to a member of the station emergency organisation, and enquire whether the member of the station emergency organisation wishes to receive the call before inter-connecting the caller.

� Refer calls from the Emergency Services to the respective liaison officer on site, the Emergency Controller or Emergency Administration Officer.

6.6 Report all telecoms faults to the Emergency Administration Officer

Page 20: Nuclear Generation Limited - EDF Energy · Nuclear Generation Limited Company Specification ... 3.9 When the ECC is fully manned and prepared for operation, formally take overall

N NOT PROTECTIVELY MARKED BEG/SPEC/OPSV/EPG/002/002 Revision 003 Page 20 of 21

edfenergy.com

NOT PROTECTIVELY MARKED

2.8 Emergency Communications Coordinator

1. Personnel Responsible To:

� Emergency Controller/ Duty Press Officer

2. Personnel Responsible For:

� None

3. Actions

3.1 Report to the Duty Emergency Controller in the ECC.

3.2 Make contact with company Duty Press Officer by calling 777 2233 and leaving a message for them to call you leaving your contact details.

3.3 Liaise with the Assistant Emergency Controller to confirm:

� Declaration status

� Time of declaration

� Whether or not there has been a release of radioactive material

� Summary of site situation

� The emergency services are attending site

3.4 Verbally agree initial press statement with duty press officer (use form EP/11.4/1 initial press statement proforma as a guide.) Initial press statement needs to confirm:

� Time and date nuclear emergency/site incident declared

� Whether or not there has been a release of radioactive material

� The company emergency plan has been put into operation

� Brief details of the incident if known

� EDF Energy staff and the emergency services are dealing with the incident

� Advice to the public of “Go in, stay in, tune in”

3.5 Complete proforma and fax to the CESC Communications Coordinator for input on to TiiMS.

Page 21: Nuclear Generation Limited - EDF Energy · Nuclear Generation Limited Company Specification ... 3.9 When the ECC is fully manned and prepared for operation, formally take overall

N NOT PROTECTIVELY MARKED BEG/SPEC/OPSV/EPG/002/002 Revision 003 Page 21 of 21

edfenergy.com

NOT PROTECTIVELY MARKED

3.6 Start personal log of actions and information.

3.7 Brief Duty Press Officer with updates as they become available until the CESC is operational after which your main contact will be the CESC Communications Coordinator

3.8 Liaise with ECC personnel as appropriate in order to respond to requests for information from the Duty Press Officer/LEC via the CESC Communications Coordinator. This will typically be updates on:

� Roll call

� Missing persons

� Casualties and their treatment

� Welfare of staff on site

� State of the plant/unaffected reactor

� Details of how the accident happened

� What is being done to stop the release

� Which areas are contaminated/in the direction of the plume

3.9 Direct any media ringing the station direct to the company duty press line – 01452 652233.

3.10 Provide the Emergency Controller with an update on media interest and developing

themes/key issues. You can obtain this from the CESC Communications Coordinator

3.11 Pass any media requests for filming/interviews to the Emergency Controller for a decision. The station director should conduct any agreed media interviews after discussion with the Duty Press Officer.

❏ 3.12 If a request for a film crew to come on site is agreed, liaise with the Emergency

Administration Officer to arrange access, security and escort at all times.

❏ 3.13 Management of emerging media issues through liaison with the Emergency Controller in the

ECC and the Communications Coordinator in the CESC.