42A08NE0818 2 .5312 M ICHAUD 010

r

REPORT ON GEOLOGICAL MAPPING

SURVEY

MICHAUD TOWNSHIP

LARDER LAKE MINING DIVISION

N.T.S. 42A/8 NW

NAHANNI MINES LIMITED

TORONTO, ONTARIO

Rtotc

December, 1982 W. MacRae Geologist

42A06NE8818 2.5312 MICHAUD O10C

TABLE OF CONTENTS

SUMMARY AND CONCLUSIONS

INTRODUCTION

LOCATION AND ACCESS

PREVIOUS EXPLORATION SURVEY PROCEDURE

TOPOGRAPHY

REGIONAL GEOLOGY

PROPERTY GEOLOGY

RECOMMENDATIONS

CERTIFICATE

l

l

6

6

7789

10

Figure l:

Figure 2:

Figure 3:

LIST OF FIGURES

Location Map

Claim Location Map

Detailed Claim Map

2

3

LIST OF MAPS

Map l Geology - Western Portion (1:2500).......back pocket

Map 2 Geology - Central Portion (1:2500).......back pocket

Map 3 Geology - Eastern Portion (1:2500).......back pocket

1.

SUMMARY AND CONCLUSIONS

A geological mapping survey was completed on the entire Michaud claim group. Outcrop exposures were restricted to the southeast corner of the property and consisted of pillowed and massive mafic flows with later diabasic intrusives.

Further drilling is recommended in order to evaluate the potential of these claims.

INTRODUCTION

This is a report on a geological survey completed on fifty-three (53) claims in southern Michaud Township forming part of the Michaud group held by Nahanni Mines Limited (T-951). The claims covered in this survey areas follows:

Claims No. Location Recording Date

L-521393 NW4, Ni, L2, CII November 3, 1978L-521394 NEi, N|, L2, CII "

L-521395 SWi, Ni, L2, CII "L-521396 SEi, Ni, L2, CII "L-521397 SW4, Ni, L5, CII "L-521398 SE4, Ni, L5, CII "L-521403 NW4, Si, Li, CII "L-521404 NE4, Si, Li, CII "

L-521106 SE4, Si, L1, CII "L-52110? NW4, Si, L3, CII "L-521^08 NE4, Si, L3, CII "L-521412 SE4, Ni, L9, CII "

Michaud Township^'-•^^z''''^'^'^''

IEGEND

PROTEROZOIC

L-'^iLJ H UKONIAN bUJIMlNlS AND DlABASl

ARCHtAN

l, ,','l GUAM IK HIM.K:,L --J I.UM,..,,,,,,,,,, ,,,,n,, li ,on le

j j TIMlSKAMINi, t-IDIMINIb' -——' Clill.jl./llu'I.iU illiryw.ii.kc

l" " j OllUH SMJIMI MISl.-. ..-.J 1.111'^ iVili ^ i i! nitJ-ituin; itinir i;unijl. n

t l l '.ill VUl l .\lju ;,

[l.,, il,

bVMBOI b

Figure 1: Property Location, Michaud Township

(JO

Figure 2: Claim Location Map (Scale 1:250,000)

Figure 3: Detailed Claim Map (Michaud Township, Scale l" - 1/2 mile)

Claim No. Location Recording Date

L-521418

L-521420

L-521421

L-521422

L-521423

L-521^127

L-521428

L-586i}85 L-586486

L-586488 L-586489 L-586i}90 L-586491 L-586^92 L-586^93

L-586496 L-586^97 L-591305 L-591306L-591307

NEi

SEi

SWi

SEi

NWi

NEi

swiSEi

SWi

SEi

NWi

NEi

swiSEi

swiSEi

swiNWi

NEi

SEi

SWi

SEi

NEi

NWi

NEi

SEi

swiSEi

swiNWi

NEi

)

j

j

t

t

t

t

ti

t

t

tt

t

t

j

i

j

t

j

y

t

y

t

i

9

*

j

j

*

)

sisiNi

Ni

sisisisiNi

Ni

sisiNi

Ni

sisisisisiNi

Ni

Ni

Ni

Ni

Ni

sisisisiNi

Ni

ttt

ttttti

j

j

*

j

*

t>

ttttttt

tttt

*

i

t

t

L9,

L9,L8,

L8.,

L8,L8,L8,L8,L7,L7,L7,L7,L6,

L6,L9,L10

L10

L10

L10

L10

L10

Lil

Lil

L10

L10

L10

L10

L10

L4,

LI,L^},

CII

CII

CII

CII

CII

CII

CII

CII

CII

CII

CII

CII

CII

CII

CII

, CII

, CII

, CII

, CII

, CII

, CII

, CII

, CII

, CII, CII

, CIII

, CIII

, CIII

CII

CI

CI

November 3 t 1978n

"

ti

n

it

"

it

it

n

it

n

n

D

November 3, 1980ntiti"nH11""nH

tl

II

July 22, 1981M

it

6.

Claim No. Location Recording Date

L-591308 NW4, Ni, L3, CI July 22, 1981L-591309 SW4, Si, L3, Gil "L-591310 SEj, Si, L3, Gil "L-591311 . NE4, Ni, L3, CI "L-591312 NW4, Ni, L2, CI "L-591313 SWi, Si, L2, CII . "L-591310 NW4, Si, L2, CII "L-591315 NE4, Si, L2, CII "L-591316 SE4, Si, L2, CII "L-591317 NE4, Ni, L2, CI . "

LOCATION AND ACCESS

The claim group is located approximately 18 miles east southeast of the village of Matheson and 22 miles north of the town of Kirkland Lake in Michaud Township (Figures l and 2). Access to the western portion of the property is via old mining/logging roads south from Highway 101 at Perry Lake. The eastern portion of the property is accessible via forestry access roads for lumbering.

PREVIOUS EXPLORATION

The first reported work performed on this property was in 19^7/48 with Wright-Hargraves Mines Limited drilling two holes in the SWi, Si, L10, Con. II. They reported assays in hole 2 of 0.1 oz./ton Au over 3.5 feet as well as several lower assays over similar widths in syenitic rock.

7.

In 196? Amax Exploration Inc. drilled two holes in the Si, lot 4, Con. II with hole KX-26 returning an assay of 0.01 oz./ton Au over five feet in altered grey wacke.

In 197-8 Nahanni Mines Limited acquired thecentral portion of the property with cut line and geophysical surveys performed in late 1979 and early 1980. The western portion of the property was acquired in November 1980, with line cutting and geophysical surveys completed by July, 1981. Parts of the eastern portion were restaked in late 1981 with linecutting and geophysics completed by December, 1981,

Nahanni Mines Limited completed four drill holes on the property in February and March, 1982. Holes M-82-1, M-82-2 and M-82-3 were drilled in the SWi, Si, Lot 2, Con. II. Hole M-82--4 was drilled in the NE4, Si, Lot 9, Con. II. Only low gold values were encountered.

SURVEY PROCEDURE

Detailed mapping was completed by Nahanni Mines Limited personnel in September, October and November, 1982. The property is covered by a grid system consisting of a 7.6 kilometre baseline at an azmith of 90 0 and 84.6 kilometres of cross lines at 100 metre intervals.

TOPOGRAPHY

The property is covered by flat spruce, alder and poplar swamps with occasional sand rises forming

8.

the only relief along the north boundary of the group. The sand ridges are glacial outwash sand and gravel deposits reworked by wind and water action. The sand rises roughly trend east-west and are sparsely covered with spruce, poplar and Jackpine.

The Pike River (2 to 3 metres wide) traverses the eastern portion of the property and flows from north east to southwest.

The only outcrop on the property occurs in the southeast corner of the eastern sheet (Map 3) in the area of claims L-591312, L-591313, L-591316 and L-591317.

REGIONAL GEOLOGY

The Township of Michaud was mapped in 19^6 by J. Satterly (Map No. 19*17-3) for the Ontario Department of Mines. Satterly shows a series of felsic, mafic and ultramafic flows and sediments intruded by syenite and granite.

The Destor-Porcupine fault zone traverses the township from the east near the north half of concession III to the west somewhere near the north half of concession I. The exact location of the fault zone can only be estimated west of lot 4, concession III due to the lack of outcrop and drill information.

North of the Destor-Porcupine fault zone the mafic flows are intruded by syenite and granite. The syenite hosting the Garrison Creek Mines Ludgate Lake deposit contains porphyritic feldspars and is strongly hematized in the area of gold mineralization.

9.

PROPERTY GEOLOGY

The southeast portion of the property (Map 3) is underlain by southeast facing mafic flows. The flows are massive to pillowed, light green in colour, and trend roughly northeast - southwest. North of this outcrop area and underlying the mafic volcanics are sediments composed of conglomerate, argillite, chemical sediments of chert and graphite.

The only other information available on the property is from Nahanni drilling on claim L-521^13. This hole (M-82-JJ) was entirely within syenite. The contact between the mafic volcanics and the syenite (Map 2) was .interpreted from the magnetometer data.

The location of the Destor-Porcupine fault zone on the property is assumed from geophysics to enter the property at the north boundary at 7W and trend southwest to leave the property in the area of line 33W on the southboundary.

From previous work there appears to be a band of sediments thickening to the east and lying Just south of the Destor-Porcupine fault zone.

10.

RECOMMENDATIONS

Further work on this property should consist of drilling of geophysical but more importantly geological target areas. First priority should be to locate the Destor-Porcupine. fault zone, a regional structure associated with economic gold mineralization. Secondly, more drilling should be carried out in the area of the syenite body as the syenite intersected in hold M-82-4 appears identical with gold mineralization syenite at Ludgate Lake.

CERTIFICATE

I, William Edgar MacRae, of the City of Timmins,

in the District of Cochrane and Province of Ontario, hereby

certify that:

1. I am a geologist residing at Kamiskotia Lake, P.O.

Box 417, Timmins, Ontario.

2. I have graduated from Lakehead University with the

degree of Bachelor of Science (Honours) in 1975 and

have obtained the degree of Master of Science from McMaster University in 1982.

3. I have worked as a geologist for both the federal and

provincial governments and several exploration companies.

4. I have, not now or in the past, had any interest, direct

or indirect, in the mineral claims reported on in the

preceeding pages or in the shares of the company which

holds the said claims.

Timmins, Ontario W. MacRae

Ministry ofNaturalResource;.

Ontario

MiViritjtftMiSCldwtt'H .Report of Work(Geophysical, Geological, Geochemical and Expenditures)

1JT35T

^^ f 'k, 0 i. 52/393 The Mi 12 A08NEeei0 3,5312 MICHAUD 900Type of SurveyU)

Claim HolderU)

/O aAddress

O t*-*Survey Company

(~

tr f- o {{'t?•^f

- * ^Vfc l "X K\. i

~fe //C7,

r o -Cw t\\. J ^\

W : .1 ^ ^Tv/1 ^ O j1 ^ ** i" y "^^j o f-^ ^ '*"V J J ' ̂ '" cjr*^ t ^ i

^ Oat* of Survey (fro

/-/rt . Day | Mo. | Yr.Name and Address of Auth/br (of Geo-Technical report)

' 'tiu'UuJProspector'1 Licence No.

T- ?sY

^LDivTtxr i o t i-5 H 3 - S fim 6 to) Total Miles of lin* Cut

1 Day | Mo. | Yr.

Py/J 7^3Credits Requested per Each Claim in Columns at rightSpecial Provisions

For first survey:

Enter 40 days. (This includes line cutting)

For each additional survey: using the same grid:

Enter 20 days (for each)

Man Days

Complete reverse side and enter total (s) here

Airborne Credits

Note: Special provisions credits do not apply to Airborne Surveys.

Geophysical

- Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Geochemical

Geophysical

- Electromagnetic

- Magnetometer

- Radiometric

- Other

Geological

Geochemical .

A

Electromagnetic *

Magnetometer

Radiometric

Days perClaim

*P-o-

Days per Claim

Days per Claim

Mining Claims Traversed (List in numerical sequence)

Expenditures (excludes power stripping)Type of Work Performed

Performed on Claim(s)

Calculation of Expenditure Days Credits

Total Expenditures

S -i- 1Instructions

Totel Days Credits may be apportioned i choice. Enter number of days credits per in columns at right.

Total Days Creditss -m

t the claim holder's claim selected

Date Recorded tHoldef or AgenvOignelure)

Certification Verifying Report of work

For Office Use OnlyTotal Day* Cr. Recorded

loto

Date Recorded

bEGS 1 1982Data Approved at Recorded

Mining/Aaifcrder

Branjfn QirHMdr

l hereby certify that l have a personal and intimate knowledge of the facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the annexed report if true. ,

Name and Postal Addressed Person Certifying

00. H^Kx-^e P-0. B ^* W J "7Oat* Certified Certified

1362 ( 81/9)

ccU

-.

lA00

' e^r

,c z

: -c

•o .

.S

-0

*0

-0^

(T-

*V-t

V*

OD C

o co

co

5s r-

r- r*

4i -

C -C

-c

-o -o

to

jp-

O ^

oo

^

U|

V)

00

co C

O,

LA, P i

if v

V •N.

•^

co

i F *

f-r-

* rt * M

-

i?- r

rf^ t

c, 1 5 r.

tf

U) ^ r •r e

-o

w

Si

HOntario

Ministry of Natural ResourcesGEOPHYSICAL - GEOLOGICAL - GEOCHEMICAL

TECHNICAL DATA STATEMENT

File.

TO BE ATTACHED AS AN APPENDIX TO TECHNICAL REPORTFACTS SHOWN HERE NEED NOT BE REPEATED IN REPORT

TECHNICAL REPORT MUST CONTAIN INTERPRETATION, CONCLUSIONS ETC.

Type of Survey (s) -— Township or Area —. Claim HnlHer(s) O

y

r— t, 1107.OSurvey Company.

Author of Report. Address of Ai.rhm- P. cO . A o* V ; 7 . 77,

/x).,ic

Covering Dates of Survey.

Total Miles of Line Cut —(linecutting to office) '

SPECIAL PROVISIONS CREDITS REQUESTED

ENTER 40 days (includes line cutting) for first survey.ENTER 20 days for each additional survey using same grid.

Geophysical—Electromagnetic.—Magnetometer—-Radiometric——-Other—————

DAYS per claim

AIRBORNE CREDITS (Special provi,ion crediti do not apply to airborne lurveyi)

Magnetometer. .Electromagnetic . Radiometric(enter days per claim)

DATE:. SIGNATURE:.Author of Report or Agent

Res. Geol.. .Qualifications.Previous Surveys

File No. Type Date Claim Holder

MINING CLAIMS TRAVERSED List numerically

'ipVefixj' (number)

I

l4

TOTAL CLAIMS.

837 (6/79)

GEOPHYSICAL TECHNICAL DATA

GROUND SURVEYS - If more than one survey, specify data for each type of survey

Number of Stations. Station interval —— Profile scale ————

.Number of Readings

.Line spacing ————.

Contour interval.

W

Instrument.Accuracy — Scale constant. Diurnal correction method.Base Station check-in interval (hours). Base Station location and value ———

ELECTROMAGNETKCnjl configuration

C.n\] Kpparfttinn \ ' '"^

AccuracyMethod: Q Fixed transmitter d Shoot back D In line Frequency , , , ...,.™ —— - ,, ,,..., ,, . ,,..,,,,, ,,,,,,,,, .....,

1 ^. . - i . {ipedfy V.L.F. nation)

EH Parallel line

Parameters measured.

pwq

lO

InstrumentScale constant.Corrections made.

Base station value and location

Elevation accuracy.

N K

Q z;

Instrument ,.^—————— Method CD Time Domain Parameters — On time ———

- Off time ——— Delay time ———— Integration time.

Q Frequency Domain _ Frequency ______ Range ^—————

Power.Electrode array — Electrode spacing. Type of electrode

SELF POTENTIALInstrument———-——-———-—————-——————-———-—--—.—--—.——. Range.Survey Method -^^^———-^—————————^-^————^-——^—-——————.—.

Corrections made.

RADIOMETRIC Instrument ——Values measured.Energy windows (levels) ——.—^^^—-—-.—-————-..———.————..^——.—-——^—. Height of instrument____________________________Background Count, Size of detector________________________________________taOverburden -^———^^————————^^-———-—————-.——.————.———.—————

(type, depth - include outcrop map)

OTHERS (SEISMIC, DRILL WELL LOGGING ETC.) Type of survey——————————————————————Instrument ———^—————————^^——————-^— Accuracy————^^^——^———^—————^——Parameters measured.

Additional information (for understanding results).

AIRBORNE SURVEYS Type of survey(s) ———Instrument(s) —————

(jpecify for each type of turvey) Accuracy————^^—-^———————

(specify for each type of survey) Aircraft used^——^——^———^^^^—^-——.^——..—.—....———Sensor altitude-Navigation and flight path recovery method.

Aircraft altitude——————————————————————————————Line Spacing—— Miles flown over total area——^^^-———————.—^—————Over claims only.

GEOCHEMICAL SURVEY - PROCEDURE RECORD

Numbers of claims from which samples taken.

Total Number of Samples. Type of Sample.

(Nature of Material)Average Sample Weight——————— Method of Collection————————

Soil Horizon Sampled. Horizon Development. Sample Depth———— Terrain————————

Drainage Development——————————— Estimated Range of Overburden Thickness.

ANALYTICAL METHODS

Values expressed in: per cent p. p. rri. p. p. b.

D O D

Cu, Pb,

Others—

Zn, Ni, Co, Ag, Mo, As.-(circle)

Field Analysis (.Extraction Method. Analytical Method- Reagents Used——

Field Laboratory AnalysisNo. ——————.—.

SAMPLE PREPARATION(Includes drying, screening, crushing, ashing)

Mesh size of fraction used for analysis————

Extraction Method. Analytical Method . Reagents Used——

Commercial Laboratory (. Name of Laboratory— Extraction Method——Analytical Method Reagents Used -.—

.tests)

.tests)

.tests)

GeneraL General.

L r- S2

5 31 X

1/ o

IB

a- x

- y t/ J? 03"57/30^

5-9/3

5-J

3B9OO l-———l—-L

..^ i ^.

- - J - .

c -j; -r -

ctrnet

HI

12 M800OO'43"oppf(

1983 09 09

#459

2.5312

Mr. George J. KoleszarMining RecorderMinistry of Natural Resources4 Government Road EastP.O. Box 984Kirkland Lake, OntarioP2N 1A2

Dear Sir:

RE: Geological Survey on Mining Claims L 521393 et al 1n the Township of Michaud

The Geological Survey assessment work credits as listed with my Notice of Intent dated August 10, 1983, have been approved as of the above date.

Please Inform the recorded holder of these mining claims and so Indicate on your records.

Yours very truly,

E.F. AndersonDirectorLand Managment Branch

Whitney Block, Room 6450 Queen's Park Toronto, Ontario M7A 1W3 Phone:(416)965-1380

D. K1nv1g:mc

cc: Nahannl Mines Ltd Suite 1107 330 Bay Street Toronto, Ontario M5H 2S8

cc: Resident Geologist Kirkland Lake, Ontario

Ministry ofNaturalResources

Technical Assessment Work Credits Date

1983 08 10

File

2.5312Mining Recorder's Report of Work No.

459

Recorded Holder

NAHANNI MINES LIMITEDTownship or Area

MICHAUD

Type of survey and number of Assessment days credit per claim

Geophysical

Magnetometer , riayc

Ririinmetrir rUyt

Other ,. rlayi

Section 77 (19) See "Mining Claims Assessed" column

Gcnlngiral -Q dayt

Genrhemiral rtays

Man days D Airborne D

Special provision Ejj Ground [g]

Cjj Credits have been reduced because of partial coverage of claims.

O Credits have been reduced because of corrections to work dates and figures of applicant.

Mining Claims Assessed

L 521396 to 98 521403-04 521406 to 08 521412 to 24 521427-28 586487 to 90 586492 to 97 591309-10 591312 to 17

1ncl

1ncl 1nc1

1ncl 1ncl

Incl

Special credits under section 77 (16) for the following mining claims

15 days Geological

L 521394-95 591305

10 days Geological

L 521393

586484 to 66 Incl 591311

5 days Geological

L 586491 591306 to 08 Incl

No credits have been allowed for the following mining claims

l—l not sufficiently covered by the survey l—I Insufficient technical data filed

The Mining Recorder may reduce the above credits if necessary In order that the total number of approved assessment days recorded on each claim does not exceed the maximum allowed as follows: Geophysical — BO; Geological — 40; Geochemical — 40; Section 77(19)—60:828 (83/6)

Ontario

Ministry ofNaturalResources 31

Your file:

19830810 2-5312

Mining RecorderMinistry of Natural Resources4 Government Road EastP.O. Box 984Kirkland Lake, OntarioP2N 1A2

Dear Sir:

Enclosed are two copies of a Notice of Intent with statements

listing a reduced rate of assessment work credits to be allowed

for a technical survey. Please forward one copy to the recorded

holder of the claims and retain the other. In approximately

fifteen days from the above date, a final letter of approval of

these credits will be sent to you. On receipt of the approval

letter, you may then change the work entries on the claim record

sheets.

For further information, if required, please contact

Mr. F. W. Matthews at 416/965-1380.

Yours very truly,

E.F. AndersonDirectorLand Management Branch

Whitney Block, Room 6450Queen's ParkToronto, OntarioM7A 1W3Phone: 416/965-1316D. K1nv1g:sc

cc: Nahannl Mines Limited Toronto, Ontario

cc: W. MacRae P.O. Box 411 Timmins, Ontario

cc: Mr. G.H. FergusonMining A Lands Commissioner Toronto, Ontario

EncIs:

Ministry ofNaturalResources

Notice of Intent

for Technical ReportsOntario

1983 08 10

2.5312

An examination of your survey report indicates that the requirements of The Ontario Mining Act have not been fully met to warrant maximum assessment work credits. This notice is merely a warning that you will not be allowed the number of assessment work days credits that you expected and also that in approximately 15 days from the above date, the mining recorder will be authorized to change the entries on his record sheets to agree with the enclosed statement. Please note that until such time as the recorder actually changes the entry on the record sheet, the status of the claim remains unchanged.

If you are of the opinion that these changes by the mining recorder will jeopardize your claims, you may during the next fifteen days apply to the Mining and Lands Commissioner for an extension of time. Abstracts should be sent with your application.

If the reduced rate of credits does not jeopardize the status of the claims then you need not seek relief from the Mining and Lands Commissioner and this Notice of Intent may be disregarded.

If your survey was submitted and assessed under the "Special Provision-Performance and Coverage" method and you are of the opinion that a re-appraisal under the "Man-days" method would result in the approval of a greater number of days credit per claim, you may, within the said fifteen day period, submit assessment work breakdowns listing the employees names, addresses and the dates and hours they worked. The new work breakdowns should be submitted direct to the Lands Management Branch, Toronto. The report will be re-assessed and a new statement of credits based on actual days worked will be issued.

646 (BZfSI

Ministry ofNaturalResources

Ontario

GeotechnicalReportApproval

File

Mining Lands Comments

f

To: Geophysics

Comments

[^Approved Q W ish to see again with correctionsDate Signature

To: Geology - Expenditures

Comments

Approved [~] Wish to see again with corrections

To: Geochemistry

Comments

f~| Approved PH Wish to see agai n with correctionsDate signature

l [To: Mining Lands Section, Room 6462, Whitney Block. (Tel: 5-1380)

1893(81/10)

1983 01 14 2.5312

Mining RecorderMinistry of Natural Resources4 Government Road EastP.O. Box 984Kirkland Lake, OntarioP2N 1A2

Dear Sir:

We have received reports and maps for a Geological Suryey submitted under Special Provlsons (credit for Performance and Coverage) on Mining Claims L 521393 et al 1n the Township of Michaud.

This material will be examined and assessed and astatement of assessment work credits will be Issued.

We do not have a copy of the report of work which 1s normally filed with you prior to the submission of this technical data. Please forward a copy as soon as possible.

Yours very truly.

E.F. AndersonDirectorLand Management Branch

Whitney Block, Room 6450Queen's ParkToronto, OntarioM7A 1W3Phone: 416/965-1380

OW:sc

cc: Nahannl Mines Limited Ifronto, Ontario

cc: W. MacRaeTimmins, Ontario

42A08N6e8l0 2.5312 MICHAUD

12N

-

l +O

ON

IO+O

ON

-

9+O

ON

-

8+O

ON

-

7tO

ON

-

6 +

OO

5 + O

ON

1-

4-1-

OO

N

BASE

Lf

NE

3+O

O S

-

4tO

O S

-

51

00

S -

S -

7*0

0 S

-

L-5

8649

3f

5864

"'' j

' "ffi

".,,

L-58

6491

L-5

86496

OPE

N BE

AV

ER

h

DA

M

'"tint " '\i '' "'" "

'"'

,-BE

AV

ER

DA

M

l f

\

SP

\

L-5

2I4

I3

5864

86

48

8

5214

14

5864

8

L-58

6486

- 12

+00

N

+00

N

- 9t

OO

N

LE

GE

ND

- 7+

00 N

- 6+

00N

- 5t

OO

N

TRE

E

TYP

ES

:

aid

bi JP pop

SP

tarn

alde

r

birc

h ja

ckpi

ne

popl

ar

spru

ce

tam

erac

k

- 4t

OO

N

SYM

BOLS

/

- 3t

OO

N

- 2+

OO

N

+ O

O N

Swam

p

Sand

Ris

e

Roo

d

Cla

im L

ine

Loca

ted

Cla

im

Pos

t

Dril

l Ho

le

- BA

SE L

INE

rOO

S

- 21

-00

S

- 3+

00 S

CON

III

GU

IBO

RD

TW

P.

;ON n

CO

N l

MA

P 2

MA

P 3

GAR

RIS

ON

TW

P.

12

l (l

l 10

l

9 j

8 l

7 l

6 l

5 l

4 I

6 \

2 \

l

BA

RN

ET

TW

P.

SC

ALE

l

s l m

i

- 4+

00 S

- 5t

QO

S

- 6+

00 S

- 7+

00 S

8+O

OS

- 8+

OO

S

MO

OSO

NEE

ON

TA

RIO

QU

EB

EC

L. A

bJtib

ii

TIM

MIN

S1 K

IRK

LA

ND

L

A*

\LO

CAT

ION

M

AP

i - 5,00

0,000

IND

EX

MA

Pi:

250,O

OO

L5IW

L50W

L49W

L48W

L43W

L42W

L4

IWL4

0WL3

9WL

38W

L37W

L3

6W

200

N AH

AN

N l

MIN

ES

LT

DM

ICH

AU

D

TOW

NSH

IP

MA

P l

(W

est

Port

ion

SC

AL

E

l" - 2

,50

0

DR

AW

N B

Y:

TR

AC

ED

ST

SU

RV

EY

A

TE:

OC

t.l9

B2

MT.

S.

42 A

/8

DATE

: 1902

DA

TE:

r

42A88NE8810 2.5312 MICHAUD

LEG

EN

D

Loca

ted

Cla

im P

ost

3+00

N '

L-52

I4I2

TRE

E

TYP

ES

L-52

1422

L-52

1427

2+O

ON

-L-

52I4

I6l

ixO

iv^

1 V

L-52

t398

I+O

ON

-N

OTE

: See

MAP

3

For

Com

plet

e Le

gend

L-52

W2I

A X

'

\

?

W;

^ 1

-^,.

ff

••:,

12 f

Il|l0|9|8|7|6|5|4|

L-52

1423

L-52

1424

Lr52

l403

l ol

d t-

tom

t S

P*

'* t

i

L-52

I4I3

3^00

5-

QU

EBEC

4tO

O S

-

LOCA

TION

MAP

INDE

X M

AP

6+O

OS-

L-52

I4I4

L-52

I4I9

7+00

S*

L-52

1420

MIC

HAU

D

TOW

NSH

IP

GEO

LOG

YM

AP 2

(Ce

ntra

l Por

tion)

L 32

WL

30

WL

28W

L3

5 W

L29

WL

26 W

L25

WL

34

WL

27W

L 36

WL

23W

L22

WL

20

WSU

RV

EY

DA

TE:

OC

T. I

M2

NOTES

400' surface rights reservation along the shores of all fakes and rivers.

SAND and GRAVEL

M.T. C. Grovel Pit No. 76 2

RESERVATIONSS.H.O. for Public Use , Sec. 39td) o f M ining Act (R.S.O.'SO! File- 42000.

AREAS WITHDRAWN FROM STAKINGR,-SURFACE RIGHTS M.R.- M II^ ING RIGHTS

Section Order No. Dot* Disposition File

42 (R.S.O.'eOJ S. R I645B6

DATE OF ISSUE

UAY-

Ministry of Natural Resources TORONTO

42AaBNE0B10 2 .5312 MICHAUD

CJ IDro

Mccool Tp. M.365

650426 J77/128650616 (649673 649676 [6496178"~ T

-50418 650425 L ^65042:7 1650432

6364)63 1 636466— *-^. —— —— — —— —— —

582^67 |582359rv/ 650540 '650/547649690 3UZDU Ib&UZBl

6496921649697

6^0348 (650Z49 TCiodon

l ' L42432 1 642433

650536 50535 l ^3r-N

Barnes\\

578723 |57^B724 l 598173 I 598|74

Greenland j i.

6|166I40 K66I3S

('[5226271522624

JJ__(. ___L IJ-rtLake

2626J52262544245 '442414

V521393 521394 65361138,653637

H586493 586494-l

V V521395 , 52 1396 65363^9 , 6 53636

5^99453 J5B649I

V i V586487 [586488599446 l 59^449

V586486 1586485599/44TI 599446 591309 i 591310

V591308 l 591 3 i

L r Li599424 , 599429 6994321599437

399460 l 599463

O)^r ro

oO)

o(D

480 27'03" approx.

800 O043 approx.

Barnet Tp. M.220

___________LEGEND

HIGHWAY AND ROUTE No.

OTHER ROADS

TRAILS

SURVEYED LINES:TOWNSHIPS. BASE LINES, ETC. LOTS, MINING CLAIMS. PARCELS, ETC.

UNSURVEYED LINES: LOT LINES PARCEL BOUNDARY MINING CLAIMS ETC.

RAILWAY AND RIGHT OF WAY

UTILITY LINES

NON-PERENNIAL STREAM

FLOODING OR FLOODING RIGHTS

SUBDIVISION

ORIGINAL SHORELINE

MARSH OR MUSKEG

MINES

-O

DISPOSITION OF CROWN LANDS

TYPE OF DOCUMENT

PATENT. SURFACE A MINING RIGHTS

SURFACE RIGHTS ONLY

MINING RIGHTS ONLY

LEASE, SURFACE S MINING RIGHTS

SURFACE RIGHTS ONLY

MINING RIGHTS ONLY

LICENCE OF OCCUPATION

CROWN LAND SALE

ORDER-IN-COUNCIL

RESERVATION

CANCELLED

SAND A GRAVEL

SYMBOL

eQmm

^ ...gV

. . c.s. oc© (7)

SCALE : 1 INCH ^ 40 CHAINSO 5OO 1000 2OOO

FEET

METRESO 200 400 BOO BOO l KM

ACRES HECTARES

TOWNSHIP

MICHAUDDISTRICT

COCHRANEMINING DIVISION

LARDER LAKE

Ontario

Ministry of Natural ResourcesSurveys and Mapping Branch

Date 28, JUNE / 74

Whitney B lock Queen's Park, Toronto

Plan No.

M.372

24tO

O E

BASE

LIN

E52

1398

4ZA08NE06J0 2.5312 MICHAUD

21+0

0 E

22tO

OE

23tO

OE

IStO

OE

IStO

OE

17^0

0 E

16+O

OE

!4tO

OE

15+O

OE

L-52

1394

L-52

1393

L-52

1395

L-52

1396

l tO

O W

l tO

O E

2*0

0 E

3*0

0 E

4tO

OE

5+

00

E6+

00 E

7+

00

E8

+0

0 E

1010

0 E

11 + 0

0 E

l2tQ

OE

IStO

OE

+00

S -

L-52

I4O

852

1403

.-521

404

5214

072tO

OS

-

L-59

I3I4

L-59

I3I5

3t(

)OS

4+O

OS

P--

52I4

06

5tO

OS

6tO

OS

L-59

1309

L-59

I3IO

L-59

I3I6

7 + O

OS

L-59

I3I3

StO

OS

L-59

I3O

5

9tO

O S

IQ+O

OS

1*59

1317

L-59

I3O

6L-

59I3

I2L-

5913

08L-

59I3

IIL-

5913

07

11*0

05-:t

—!""K

-^

^fc

^

*

^

*

- S

ta,t

S

, -

.--(^^V

--. ^S

^T

T"

1''-

.--

' V*^O

S;^

S

LE

GE

ND

6 5 3 3

2 2

Maf

ic a

nd

Ultr

amaf

ic

Intru

sion

s Fe

lsic

In

trusi

ons

Sed

imen

ts (

a) g

reyw

acke

(b)

cong

lom

erat

e (c

) che

rt (d

) gra

phite

Fels

ic

Volc

anic

s Ca

) tu

ff(b

) va

riolit

ic

Inte

rmed

iate

Vo

lcan

ics

(a)

tuff

(b)

vario

litic

(c)

pillo

wed

(d)

mas

sive

Maf

ic

Vol

cani

cs

(a)

tuff

t b)

vario

litic

(c)

pillo

wed

(d)

mas

sive

SY

MB

OLS

Sand

R

ise

Roa

d

Cla

im L

ine

Loca

ted

Cla

im P

ost

Sw

amp

Geo

logi

cal

Con

tact

(ob

serv

ed,

assu

med

)

Dril

l Ho

le w

ith P

roje

cted

Geo

logy

TRE

E T

YP

ES

aid

bi JP

SP

cd tarn

alde

r bi

rch

jack

pi n

e

spru

ce

ceda

r

tam

erac

k

GU

IBO

RD

TW

P

:ON

til

MA

P l

CON

II

;ONI 12

MAP

2M

AP

3

IO

'9I8

|7|6

|5|4

|3|2

|I

BA

RN

ET

TW

P

iAR

RlS

ON

TW

P

SC

ALE

l

s i

mi

12 + oq

s

\230

ON

TAR

IO

QUE

BEC

L. A

bitib

i

TIM

MIN

S

. .

. v

KIR

KLAN

D L

AK

E

LOC

ATIO

N

MAP

1=5,0

00,00

0IN

DEX

MAP

P25O

,OO

O

NA

HA

NN

I M

INES

LTD

MIC

HA

UD

TO

WN

SH

IP

GEO

LOG

YM

AP 3

(Eas

t Po

rtion

)

SCAL

E: 1

=2,5

00

DR

AW

N B

Y:

W. E

. M.

TRA

CE

D B

Y:

D. R

. M.

SU

RV

EY

D

ATE

:O

ct.

19

82

DATE

:No

v. 19

82

DATE

:N

ov.

1982

N.T

.S.

42

A/8

O-