Page 1: NTPC mee(ng its Coal requirement-Road Aheadindiaenergyforum.org/7th-rtc-on-coal/presentaions...NTPC’s Coal Mining Projects 7 Sl Name of Coal Blocks Est. Mine Capacity (MTPA) EUP

Copyright©2016YourCompanyAllRightsReserved. 1

7th Roundtable Conference on Coal

24.09.2019 New Delhi

NTPCmee(ngitsCoalrequirement-RoadAhead

Page 2: NTPC mee(ng its Coal requirement-Road Aheadindiaenergyforum.org/7th-rtc-on-coal/presentaions...NTPC’s Coal Mining Projects 7 Sl Name of Coal Blocks Est. Mine Capacity (MTPA) EUP

Copyright©2016YourCompanyAllRightsReserved. 2

FOREWORD

• NTPCcatersto1/4thofIndia’sPowerrequirement• 10thlargestpoweru(lity,Globally,intermsofcapacity• Currentlyopera(ng55GWofcapacity(48GWThermal)• 130GWCapacityTargetby2032• 512inForbesGlobal2000list• 1IPPinPlaOsGlobalRanking2018.• Ranked14th“GreatPlacetoWork”in2019

Page 3: NTPC mee(ng its Coal requirement-Road Aheadindiaenergyforum.org/7th-rtc-on-coal/presentaions...NTPC’s Coal Mining Projects 7 Sl Name of Coal Blocks Est. Mine Capacity (MTPA) EUP

Copyright©2016YourCompanyAllRightsReserved. 3

NTPC at Glance

v Present installed capacity 55,786 MW •  including 7,801 MW through JVs/Subsidiaries

v Comprising of 53 NTPC Stations •  22 Coal based stations, •  7 combined cycle gas/liquid fuel based stations, •  2 Hydro based station, •  1 Wind based Station

v 10 Joint Venture stations •  9 coal based •  1 gas based

v 11 renewable energy projects v  Target 130 GW by 2032 with diversified fuel mix

Page 4: NTPC mee(ng its Coal requirement-Road Aheadindiaenergyforum.org/7th-rtc-on-coal/presentaions...NTPC’s Coal Mining Projects 7 Sl Name of Coal Blocks Est. Mine Capacity (MTPA) EUP

Copyright©2016YourCompanyAllRightsReserved. 4

NTPC Capacity at a Glance

86%

11%2%1%

Coal Gas

Fuel Capacity(inMW)

Coal 48074(31Plants)

Gas 5984.31(8Plants)

RES 928(11SolarProjects)

Hydro 800(1Project)

Total 55786.31

Page 5: NTPC mee(ng its Coal requirement-Road Aheadindiaenergyforum.org/7th-rtc-on-coal/presentaions...NTPC’s Coal Mining Projects 7 Sl Name of Coal Blocks Est. Mine Capacity (MTPA) EUP

Copyright©2016YourCompanyAllRightsReserved. 5

Coal Sourcing(2018-19) Sta(onCapacity 47,414MW

CoalConsump(on 188.23MMT

Coalreceipt 176.74MMT–ACQ7.7MMT–MOU1.76MMT–E-Auc(on6.3MMT–Cap(veMine1.16MMT–ImportCoalTotal-193.66

Coal Requirement at 85% PLF

229 MMT

Page 6: NTPC mee(ng its Coal requirement-Road Aheadindiaenergyforum.org/7th-rtc-on-coal/presentaions...NTPC’s Coal Mining Projects 7 Sl Name of Coal Blocks Est. Mine Capacity (MTPA) EUP

NTPCCoalMiningProjects

Page 7: NTPC mee(ng its Coal requirement-Road Aheadindiaenergyforum.org/7th-rtc-on-coal/presentaions...NTPC’s Coal Mining Projects 7 Sl Name of Coal Blocks Est. Mine Capacity (MTPA) EUP

Copyright©2016YourCompanyAllRightsReserved. 7

Our Objectives

v TohavefuelSecurity

v TosecureassuredQualityandQuan(tyofcoalsupply

v ToaOainpricecompe((venessonthedeliveredcoal

Page 8: NTPC mee(ng its Coal requirement-Road Aheadindiaenergyforum.org/7th-rtc-on-coal/presentaions...NTPC’s Coal Mining Projects 7 Sl Name of Coal Blocks Est. Mine Capacity (MTPA) EUP

Copyright©2016YourCompanyAllRightsReserved. 8

Foray into Coal Mining

• Re-allocaNonofCoalblockstoNTPC-2015.• MiningcommencedinPakri-BarwadihCMP–May,2016.• DulangaCMPoperaNonalized–Feb,2018• FuncNoningof“CoalMiningHeadQuarters,Ranchi”–Aug,2018.• “NTPCMiningLtd”awhollyownedsubsidiary,launchedinAug,19• Tallaipali(South)commencementscheduledinNov’19• KerendariCMPscheduledinNov’19(LimitedOutsourcing)• Tallaipali(W)&Chae-Bariatu(S)scheduledinDec,2019

Page 9: NTPC mee(ng its Coal requirement-Road Aheadindiaenergyforum.org/7th-rtc-on-coal/presentaions...NTPC’s Coal Mining Projects 7 Sl Name of Coal Blocks Est. Mine Capacity (MTPA) EUP

Copyright©2016YourCompanyAllRightsReserved. 9

NTPC’s Coal Mining Projects

Sl Name of Coal Blocks Est. Mine Capacity (MTPA)

EUP (End use Plant)

1 Pakri-Barwadih 18 Basket mine

2 Chatti-Bariatu & CB(South)

7 Barh-II

3 Kerandari 6 Tanda-II 4 Dulanga 7 Darlipalli 5 Talaipalli 18 Lara 6 Banai 12 Barethi-I

7 Bhalumuda 11 Kudgi

8 Mandakini - B

20 Telengana

9 Banhardih (JV)

8 Patratu

10 Badam (JV)

3 Baruni-II

TOTAL 110

Badam Coal Block

North Karanpua Jharkhand

Talaipalli

Mand-Raigarh CF, Chhattisgarh

Banai Bhalumuda

Mand-Raigarh CF, Chhattisgarh

Pakri-Barwadih Chatti-Bariatu & Chatti-Bariatu(South)

Kerandari

North Karanpura CF, Jharkhand

Mandakini-B

Talcher CF, Odisha,

Banhardih

Auranga CF, Jharkhand

Dulanga

IB Valley CF, Odisha

CoalBasedPlants 22Nos

CoalReserve 7.2BillionTonne

EsNmatedCoalProducNon 110MT

Page 10: NTPC mee(ng its Coal requirement-Road Aheadindiaenergyforum.org/7th-rtc-on-coal/presentaions...NTPC’s Coal Mining Projects 7 Sl Name of Coal Blocks Est. Mine Capacity (MTPA) EUP

Production Plan of Coal Mining Projects Fig. in million tonnes

Name of block/Year 2019-20 2020-21 2021-22 2022-23

2030-31

Pakri-Barwadih 8.63 10.0 11.0 12.0 18.0

Dulanga 2.5 4.5 7.0 7.0 8.0 Talaipalli(South) 0.5 4.0 8.0 13.0 18.0

Kerendari 0.3 2.6 3.3 6.0 6.0 Chatti-Bariatu - 1.0 3.0 5.0 7.0

Mandakini-B - 0.5 2.0 4.0 20.0

Banai& Bhalumuda -

- - - 12.0

Banhardih - - - - 8.0

Badam - - - - 3.0

Total 11.93* 22.6 34.3 47 100

Page 11: NTPC mee(ng its Coal requirement-Road Aheadindiaenergyforum.org/7th-rtc-on-coal/presentaions...NTPC’s Coal Mining Projects 7 Sl Name of Coal Blocks Est. Mine Capacity (MTPA) EUP

Copyright©2016YourCompanyAllRightsReserved. 11

Our Risks • RenewableEnergy•  LandAcquisiNon• CoalSourcing•  EnvironmentalCompliances

•  AshUNlizaNon

• MarketShare• RegulatoryChanges

MiningRisks

AdverseGeology

CoalevacuaNon

StatutoryManpower

Safety&Env.Compliances

LandAcquisiNon

Page 12: NTPC mee(ng its Coal requirement-Road Aheadindiaenergyforum.org/7th-rtc-on-coal/presentaions...NTPC’s Coal Mining Projects 7 Sl Name of Coal Blocks Est. Mine Capacity (MTPA) EUP

Copyright©2016YourCompanyAllRightsReserved. 12

Our Challenges Technological Regional Legal AdministraNve

•  SteepSeam•  AdversestrippingRaNo

•  Deepseateddeposits

•  Partlyexploredblock

•  CoalevacuaNonsystem

•  HEMMprocurement

•  Fasterrampup

•  Thicklypopulatedterrains

•  DenseForest•  VariedStateR&Rpolicies

•  Law&Order

•  ContractLabourExempNon

•  CompliantenNty•  Switchoverto

departmentalmining

•  FormaNveStage•  Statutoryframe

work•  Sustainability•  Securingbrand

imageofNTPCwithCoalMiningfootprint

Page 13: NTPC mee(ng its Coal requirement-Road Aheadindiaenergyforum.org/7th-rtc-on-coal/presentaions...NTPC’s Coal Mining Projects 7 Sl Name of Coal Blocks Est. Mine Capacity (MTPA) EUP

Copyright©2016YourCompanyAllRightsReserved. 13

Our USPs

• InnovaNon&Excellence.• Health&Safety• RigidCompliances• Employeeempowerment• Uniqueworkculture• FlexibleRoleOrientaNon• Integrity&Workethics

Page 14: NTPC mee(ng its Coal requirement-Road Aheadindiaenergyforum.org/7th-rtc-on-coal/presentaions...NTPC’s Coal Mining Projects 7 Sl Name of Coal Blocks Est. Mine Capacity (MTPA) EUP

Copyright©2016YourCompanyAllRightsReserved. 14

Inductions on the anvil ..

Establishment •  WideningCoalOrganiza(onStructure•  RegionalHeadQuarters

Technology •  Con(nuousMiningSystem•  In-pitcrushing&conveying•  Electrical-HybridHEMM(HighcapacityShovels&Dumpers)•  Geo-fencing•  MineAutoma(on

Environment •  WaterPosi(vity•  FlyashU(liza(on

Page 15: NTPC mee(ng its Coal requirement-Road Aheadindiaenergyforum.org/7th-rtc-on-coal/presentaions...NTPC’s Coal Mining Projects 7 Sl Name of Coal Blocks Est. Mine Capacity (MTPA) EUP

Copyright©2016YourCompanyAllRightsReserved. 15

Our partners..

•  ThriveniSainikMiningLtdinPakriBarwadihProject-18MTY•  SainikMiningAlliedServicesinDulangaProject-7MTY• ChatwalInfraPvtLtdinTallaipali(South)-2MTY•  Tecpro•  L&T

Page 16: NTPC mee(ng its Coal requirement-Road Aheadindiaenergyforum.org/7th-rtc-on-coal/presentaions...NTPC’s Coal Mining Projects 7 Sl Name of Coal Blocks Est. Mine Capacity (MTPA) EUP