nsw sg 19 nov 2014 19 nov 2014 s. zimmermann, nsw sg 1

10
NSW SG 19 Nov 2014 19 Nov 2014 S. Zimmermann, NSW SG 1

Upload: clemence-goodwin

Post on 29-Dec-2015

224 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: NSW SG 19 Nov 2014 19 Nov 2014 S. Zimmermann, NSW SG 1

S. Zimmermann, NSW SG 1

NSW SG 19 Nov 2014

19 Nov 2014

Page 2: NSW SG 19 Nov 2014 19 Nov 2014 S. Zimmermann, NSW SG 1

S. Zimmermann, NSW SG 2

Miscelleanous: Upgrade Physics Grouphttps://twiki.cern.ch/twiki/bin/view/AtlasProtected/ContactPeople

19 Nov 2014

Update:• Stephanie contacted Gerald Oakham to ask whether a volunteer from the

Canadian groups (strong on simulations) can be found• Your suggestions are welcome as well

Page 3: NSW SG 19 Nov 2014 19 Nov 2014 S. Zimmermann, NSW SG 1

S. Zimmermann, NSW SG 3

Miscelleanous: ELTX Prel. Design ReviewNow frozen and communicated to ATLAS Review office as 3 day reviewhttps://indico.cern.ch/event/354058/

• Monday/Tuesday Feb 9 and 10 2015 – On-detector electronics• Friday Feb 13 2015 – Trigger processors

19 Nov 2014

Week after is ATLAS week.

Page 4: NSW SG 19 Nov 2014 19 Nov 2014 S. Zimmermann, NSW SG 1

S. Zimmermann, NSW SG 4

MiscelleaneousAction Item for Dec Muon Week: Conclude on module positioning/orientation precision requirements (WG chaired by Sotiris)• Tentative next meeting next week Friday

– New results from MM trigger – Re-discuss alignment input in view of going back from 4 to 6 lines for MM – Patrick and colleagues looked into technical implementations of MM fixation trade

offs to be made between level arms, directions to be controlled etc. https://indico.cern.ch/event/330512/contribution/2/material/slides/0.pdf from slide 14

19 Nov 2014

Page 5: NSW SG 19 Nov 2014 19 Nov 2014 S. Zimmermann, NSW SG 1

S. Zimmermann, NSW SG 5

LHCC Phase-1 Review on Monday Presentationhttps://indico.cern.ch/event/346705/contribution/1/material/slides/1.pdfMechanics/Layout. Alignment. Chamber Construction. Electronics. Testbeam.

19 Nov 2014

Specific Topics:• Frequency of a LHCC review of Phase-1 project progress: Yearly from now on• From 2015 RRB scrutiny group will yearly check into financial aspects as well

• New JD and engineering change, Layout: Accepted without further (relevant) questions. Questions on present SW dismantle schedule, if it impacts NSW one

• Alignment: No questions• Chamber construction: Some discussion on schedule slip next slide• Electronics: Repeat questions on whether we can say VMM2 works. • Testbeam: fine

Page 6: NSW SG 19 Nov 2014 19 Nov 2014 S. Zimmermann, NSW SG 1

LHCC Review: Chamber Construction ISchedule (LHCC Upgrade Cost Group, Feb 2014)

Similar/same for MicroMegas

• Production Site setup – until end 2014: on track• Module -1 production: 1st half 2014: completed• Test beam (module -1): done• Design Review for sTGC/MM detector construction: passed successfully in July green light for module-0 • Module 0 construction: autumn 2014: component procurement/ production ongoing, quadruplets to be completed in spring • Qualification in GIF++: moved by ~3 months to spring 2015• Start of mass production: Mid 2015, unchanged

sTGC

sche

dule

Revi

ews/

M

ilest

ones

Page 7: NSW SG 19 Nov 2014 19 Nov 2014 S. Zimmermann, NSW SG 1

S. Zimmermann, NSW SG 7

LHCC Phase-1 Review on Monday General comments:

• Request for a list of milestones – should be break points with actions defined if not met.

• Complaint of not having a updated detailed schedule up to NSW installation

• LHCC wants to be able to cross off next year which milestones and schedule dates have been met, and where there were things not achieved or delayed

19 Nov 2014

Work to do for us !

Page 8: NSW SG 19 Nov 2014 19 Nov 2014 S. Zimmermann, NSW SG 1

S. Zimmermann, NSW SG 8

Upcoming Muon Week (Dec 15-19)• Christoph and me decided to have a 4 day week, skipping the Friday since it’s

the day CERN closes for Xmas• Muon IB will be on Thursday, Nov 18 afternoon• 1-1.5 days Present Muons + Phase-2 Upgrade, 2 – 2.5 days NSW• Rooms: Salle Dirac full week. Sall Curie for possible parallel meetings Mon (full

day) and Tue morning.

19 Nov 2014

Mon Tue Wed Thur

Phase-2 Upgrade

Muon IB

ATLAS Weekly

Operations & Performance M7 and next

months

NSW Performance

Testbeam

Plenary NSW

Plenary non-NSW

NSW ELTX

NSW Requirements

WG

MM Construction Plenary

sTGC Construction Plenary

MM Construction Parallel

sTGC Construction Parallel

M7 feedback (experts)

Software

NSW Electronics

Experts

Page 9: NSW SG 19 Nov 2014 19 Nov 2014 S. Zimmermann, NSW SG 1

S. Zimmermann, NSW SG 9

Upcoming Steering Groups3 more NSW SG meeting before the Muon Week – they will both take place• Next week, Nov 26:

– Budget and financial needs for Vertical Slice Test– Budget and financial needs for 2015 test beam

• Dec 4 or 11:– Schedule– Integration Facilities and Preparation. More precisely get what CERN Muon group

will do– Break down of expected cost in Mechanics & Integration MoU category.– Budget/financial needs for Integration facilities @ CERN– VMM2 additional wafers order, additional mini-2 boards production

19 Nov 2014

Page 10: NSW SG 19 Nov 2014 19 Nov 2014 S. Zimmermann, NSW SG 1

S. Zimmermann, NSW SG 10

VMM2 Tests, 2014 remaining test beamFrom next week we have 2 possibly “conflicting” test beam activities discussed• MicroMegas in magnetic field in H4, in context of the RD51 test beam time. planned with APV.• Parasitic use in H6 kept for VMM2 testing (sTGC, MM)

VMM2 mini-2 SRS board status: Lorne, George(side remark: Board assembly Weizmann and assembly work of Hans Muller workshop was paid from NSW “common” budget …..)

SRS readout systems available: Michele, Paolo, Yan

19 Nov 2014

Discussion and agreement on priorities/programme …