    S.NO PAGE

    AA LIST OF PROTOCOLS 2-3

    1 OH MILE STONES 4-5

    BB

    1 CONDENSER TMD+RECOMMISSIONING+FQA+CHEM 6

    2 HOT WELL TMD+RECOMMISSIONING+FQA 7

    3 DEAERATER TMD+RECOMMISSIONING+FQA+CHEM 8

    4 MAIL OIL TANK TMD+RECOMMISSIONING+FQA+CHEM 9

    5 DAMPER TANK TMD+RECOMMISSIONING+FQA 10

    6 LPH TMD+FQA 11-13

    7 HPH TMD+FQA 14-15

    8 LUB OIL COOLER TMD+FQA 16-17

    9 SEAL OIL COOLER TMD+FQA 18-19

    10 H2 COOLER TMD+FQA 20-23

    11 BFP MOTOR TMD+FQA 24-25

    12 MAIN TURBINE TMD+FQA 26-3013 CEP TMD+FQA 31-32

    14 BFP MOTOR TMD+FQA 33-34

    15 ECONOMISER BMD+FQA 35

    16 CONVECTIVE SUPER HEATER BMD+FQA 36

    17 END SUPER HEATER BMD+FQA 37

    18 PLATEN SUPER HEATER BMD+FQA 38

    19 COAL BURNER BMD+FQA 39

    20 OIL BURNER BMD+FQA 40

    21 BOILER EXPANSION MONITORING BMD+RECOMMISSIONING 41

    22 BOILER DRUM INTERNALS BMD+RECOMMISSIONING+FQA+CHEM 42

    23 APH CLEANLINESS BMD+RECOMMISSIONING 43-44

    24 FD FAN BMD+OPRN+C&I+FQA 45-46

    25 ID FAN BMD+OPRN+C&I+FQA 47-48

    CC

    1 GT MULSIFIER TMD+RECOMMISSIONING 49

    2 UAT MULSIFIER TMD+RECOMMISSIONING 50

    DD BOILER TUBE THICKNESS BMD+FQA 51

    EE AIR/FLUE GAS DAMPERS BMD+RECOMMISSIONING+C&I 52-55

    FF

    1 TURBINE SIDE TMD+RECOMMISSIONING+EMD+C&I 56-75

    2 BOILER SIDE BMD+RECOMMISSIONING+EMD+C&I 76-90

    GG HT MOTORS EMD+CONTRACTOR 91-124

    VALVES

    LIST OF OH PROTOCOLS

    DESCRIPTION

    JOINT INSPECTIONS

    MULSIFIERS

    INDEX

  • 7/31/2019 Nspcl Durg Protocol

    2/125

    NSPCL - DURGAPUR

    Page 1 of 1

    LIST OF PROTOCOLS

    UNIT- OVERHAUL

    NSPCL DURGAPUR

  • 7/31/2019 Nspcl Durg Protocol

    3/125

    NSPCL - DURGAPUR

    Page 2 of 2

    LIST OF OH PROTOCOLSINDEX

    S.NO DESCRIPTION PAGE

    AA LIST OF PROTOCOLS 2-3

    1 OH MILE STONES 4-5

    BB JOINT INSPECTIONS

    1 CONDENSER TMD+RECOMMISSIONING+FQA+CHEM 6

    2 HOT WELL TMD+RECOMMISSIONING+FQA 7

    3 DEAERATER TMD+RECOMMISSIONING+FQA+CHEM 8

    4 MAIL OIL TANK TMD+RECOMMISSIONING+FQA+CHEM 9

    5 DAMPER TANK TMD+RECOMMISSIONING+FQA 10

    6 LPH TMD+FQA 11-13

    7 HPH TMD+FQA 14-15

    8 LUB OIL COOLER TMD+FQA 16-17

    9 SEAL OIL COOLER TMD+FQA 18-19

    10 H2 COOLER TMD+FQA 20-23

    11 BFP MOTOR TMD+FQA 24-25

    12 MAIN TURBINE TMD+FQA 26-30

    13 CEP TMD+FQA 31-32

    14 BFP MOTOR TMD+FQA 33-34

    15 ECONOMISER BMD+FQA 35

    16 CONVECTIVE SUPER HEATER BMD+FQA 36

    17 END SUPER HEATER BMD+FQA 37

    18 PLATEN SUPER HEATER BMD+FQA 38

    19 COAL BURNER BMD+FQA 3920 OIL BURNER BMD+FQA 40

    21 BOILER EXPANSION MONITORING BMD+RECOMMISSIONING 41

    22 BOILER DRUM INTERNALS BMD+RECOMMISSIONING+FQA+CHEM 42

    23 APH CLEANLINESS BMD+RECOMMISSIONING 43-44

    24 FD FAN BMD+OPRN+C&I+FQA 45-46

    25 ID FAN BMD+OPRN+C&I+FQA 47-48

    CC MULSIFIERS

    1 GT MULSIFIER TMD+RECOMMISSIONING 49

    2 UAT MULSIFIER TMD+RECOMMISSIONING 50

    DD BOILER TUBE THICKNESS BMD+FQA 51

    EE AIR/FLUE GAS DAMPERS BMD+RECOMMISSIONING+C&I 52-55

  • 7/31/2019 Nspcl Durg Protocol

    4/125

    NSPCL - DURGAPUR

    Page 3 of 3

    FF VALVES

    1 TURBINE SIDE TMD+RECOMMISSIONING+EMD+C&I 56-75

    2 BOILER SIDE BMD+RECOMMISSIONING+EMD+C&I 76-90

    GG HT MOTORS EMD+CONTRACTOR 91-124

  • 7/31/2019 Nspcl Durg Protocol

    5/125

    NSPCL - DURGAPUR

    Page 4 of 4

    UNIT- OVERHAUL MILESTONES ( ACTUAL)

    SN ACTIVITY ACTUAL DATE/TIME REMARKS IF ANY

    1 UNIT STOPPED

    2 BOILER AIR LEAK DETECTION TEST

    3 H2 PURGE OUT

    4 STOPPAGE OF BARRING GEAR

    5 SEAL OIL SYSTEM STOPPED

    6 GENERATOR ROTOR THREAD OUT

    7 BOILER HYDRO TEST-1

    8BOILER HYDRO TEST-2 IN PRESENCE OFBOILER INSPECTOR

    9 ESP AIR CHARGING PASS-A,& B

    10 CONDENSER FLOOD TEST-1

    11 GENERATOR ROTOR THREAD IN

    12 FURNACE AIR TIGHTNESS TEST-1

    13 TSI CALIBRATION COMPLETED

    14 CONDENSER FLOOD TEST-2

    15 FURNACE AIR TIGHTNESS TEST-2

    16 TG LUB OIL FLUSHING

    17 SEAL OIL SYS CHARGING

    18 TG ON BARRING GEAR

    19 GENERATOR AIR TIGHTNESS TEST-1

    20 BOILER LIGHT UP

    21 TG ROLLING

    22 SAFETY VALVES SETTING

  • 7/31/2019 Nspcl Durg Protocol

    6/125

    NSPCL - DURGAPUR

    Page 5 of 5

    23 TURBINE ROLLING COMPLETED

    24 OVERSPEED TEST

    25 ELECTRICAL TESTING

    26 UNIT SYNCHRONIZATION

    27

    28

    29

    30

    31

    32

    33

    34

    35

    36

  • 7/31/2019 Nspcl Durg Protocol

    7/125

    NSPCL - DURGAPUR

    Page 6 of 6

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: DATE-

    Equipment: CONDENSER

    Nature of inspection:

    Remarks:

    Status:

    Total Nos of tube Plugged (after O/H) = _____ Nos.

    Total Nos of tube replaced with New Tubes = _____ Nos

    After replacing the tubes cleanliness Checked and found ( OK / NOT OK )

    Clearance given to Box up. ( Yes / No )

    Inspected By:

    _______________ ________________ _______________MM OPN FQA

  • 7/31/2019 Nspcl Durg Protocol

    8/125

    NSPCL - DURGAPUR

    Page 7 of 7

    PROTOCOL

    HOTWELL CLEANLINESS INSPECTION

    UNIT# DATE: TIME:

    OBSERVATIONS:

    ACTION TO BE TAKEN:

    DEPT RECOMMISSIONING TMD CHEMISTRY

    SIGN

    NAME

    DESIGN

  • 7/31/2019 Nspcl Durg Protocol

    9/125

    NSPCL - DURGAPUR

    Page 8 of 8

    PROTOCOL

    DEARATOR INTERNAL INSPECTION

    UNIT # DATE: TIME:

    OBSERVATIONS:

    CONDITION OF TRAYS:

    INSPECTION OF WELDING JOINT BY NDT TEST AFTER EVERY 5 YEAR

    ACTION TO BE TAKEN:

    DEPT NAME DESGN SIGN

    RECOMMISSIONING

    TMD

    C&I

    CHEMISTRY

    FQA

  • 7/31/2019 Nspcl Durg Protocol

    10/125

    NSPCL - DURGAPUR

    Page 9 of 9

    PROTOCOL

    MAIN OIL TANK INSPECTION (IF APPLICABLE)

    UNIT # DATE: TIME:

    OBSERVATION:

    ACTION TAKEN:

    DEPT NAME DESGN SIGN

    RECOMMISSIONING

    C&I

    CHEMISTRY

    TMD

    FQA

  • 7/31/2019 Nspcl Durg Protocol

    11/125

    NSPCL - DURGAPUR

    Page 10 of 10

    PROTOCOL

    DAMPER TANK INTERNAL INSPECTION ONLY WHENENTIRE OIL IS DRAINED

    UNIT# DATE: TIME:

    OBSERVATIONS:

    ACTION TO BE TAKEN:

    DEPT RECOMMISSIONING TMD CHEMISTRY

    SIGN

    NAME

    DESIGN

  • 7/31/2019 Nspcl Durg Protocol

    12/125

    NSPCL - DURGAPUR

    Page 11 of 11

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: Date:

    Equipment: LP HEATER # 1

    Nature of inspection: VISUAL

    Remarks:

    1) Leakage detection test done:

    2) Leakage was found in LP HEATER # 1: YES / NO

    3) Cleaning done and gasket replaced:

    4) No of Tubes plugged :

    5) Total No of tubes :

    6) % of tubes of plugged

    Inspected By:

    _______________ _______________TMD FQA

  • 7/31/2019 Nspcl Durg Protocol

    13/125

    NSPCL - DURGAPUR

    Page 12 of 12

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: Date:

    Equipment: LP HEATER # 2

    Nature of inspection: VISUAL

    Remarks:

    1) Leakage detection test done:

    2) Leakage was found in LP HEATER # 2: YES / NO

    3) Cleaning done and gasket replaced:

    4) No of Tubes plugged :

    5) Total No of tubes :

    6) % of tubes of plugged

    Inspected By:

    _______________ _______________TMD FQA

  • 7/31/2019 Nspcl Durg Protocol

    14/125

    NSPCL - DURGAPUR

    Page 13 of 13

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: Date:

    Equipment: LP HEATER # 3

    Nature of inspection: VISUAL

    Remarks:

    1) Leakage detection test done:

    2) Leakage was found in LP HEATER # 3: YES / NO

    3) Cleaning done and gasket replaced:

    4) No of Tubes plugged :

    5) Total No of tubes :

    6) % of tubes of plugged

    Inspected By:

    _______________ _______________TMD FQA

  • 7/31/2019 Nspcl Durg Protocol

    15/125

    NSPCL - DURGAPUR

    Page 14 of 14

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: Date:

    Equipment: HP HEATER 1 IF OPENED

    Nature of inspection: VISUAL

    Remarks:

    1) Leakage detection test done:

    2) Leakage was found in HP HEATER 1: YES / NO

    3) No of Leaking tubes :

    4) Total No of tubes :

    5) Total % of tubes of plugged

    6) Partition Plate condition after repair : YES /NOChecked and found ok

    7) Blue matching of the threaded ring: YES /NOChecked ok

    Inspected By:

    _______________ _______________TMD FQA

  • 7/31/2019 Nspcl Durg Protocol

    16/125

    NSPCL - DURGAPUR

    Page 15 of 15

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: Date:

    Equipment: HP HEATER 2 IF OPENED

    Nature of inspection: VISUAL

    Remarks:

    1. Leakage detection test done:

    2. Leakage was found in HP HEATER 1: YES / NO

    3. No of Leaking tubes :

    4. Total No of tubes :

    5. Total % of tubes of plugged

    6. Partition Plate condition after repair : YES /NOa. Checked and found ok

    7. Blue matching of the threaded ring: YES /NOChecked ok

    Inspected By:

    _______________ _______________

    TMD FQA

  • 7/31/2019 Nspcl Durg Protocol

    17/125

    NSPCL - DURGAPUR

    Page 16 of 16

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: Date:

    Equipment: LUB OIL COOLER 1

    Nature of inspection: VISUAL

    Remarks:

    1) Leakage detection test done:

    2) Leakage was found in COOLER 1: YES / NO

    3) No of Leaking tubes :

    4) Total No of tubes :

    5) Total % of tubes of plugged

    6) Through cleaning done checked : YES/NO

    Inspected By:

    _______________ _______________TMD FQA

  • 7/31/2019 Nspcl Durg Protocol

    18/125

    NSPCL - DURGAPUR

    Page 17 of 17

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: Date:

    Equipment: LUB OIL COOLER 2

    Nature of inspection: VISUAL

    Remarks:

    1) Leakage detection test done:

    2) Leakage was found in COOLER 2: YES / NO

    3) No of Leaking tubes :

    4) Total No of tubes :

    5) Total % of tubes of plugged

    6) Through cleaning done checked : YES/NO

    Inspected By:

    _______________ _______________TMD FQA

  • 7/31/2019 Nspcl Durg Protocol

    19/125

    NSPCL - DURGAPUR

    Page 18 of 18

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: Date:

    Equipment: SEAL OIL COOLER 1

    Nature of inspection: VISUAL

    Remarks:

    1) Leakage detection test done:

    2) Hydro Test Carried Out at Pressure : ____________

    3) Leakage was found in COOLER 1: YES / NO

    4) No of leakage tubes :

    5) Final Hydro Test carried Out at Pressure :____________

    6) Any leakages observed : YES/NO

    7) Total No of tubes :

    8) Total % of tubes of plugged

    9) Through cleaning done checked : YES/NO

    Inspected By:

    _______________ _______________TMD FQA

  • 7/31/2019 Nspcl Durg Protocol

    20/125

    NSPCL - DURGAPUR

    Page 19 of 19

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: Date:

    Equipment: SEAL OIL COOLER 2

    Nature of inspection: VISUAL

    Remarks:

    1) Leakage detection test done:

    2) Hydro Test Carried Out at Pressure : ____________

    3) Leakage was found in COOLER 2: YES / NO

    4) No of leakage tubes :

    5) Final Hydro Test carried Out at Pressure :____________

    6) Any leakages observed : YES/NO

    7) Total No of tubes :

    8) Total % of tubes of plugged

    9) Through cleaning done checked : YES/NO

    Inspected By:

    _______________ _______________TMD FQA

  • 7/31/2019 Nspcl Durg Protocol

    21/125

    NSPCL - DURGAPUR

    Page 20 of 20

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: Date:

    Equipment: HYDROGEN COOLER 1

    Nature of inspection: VISUAL

    Remarks:

    1) Leakage detection test done:

    2) Hydro Test Carried Out at Pressure : ____________

    3) Leakage was found in COOLER 1: YES / NO

    4) No of leakage tubes :

    5) Final Hydro Test carried Out at Pressure :____________

    6) Any leakages observed : YES/NO

    7) Total No of tubes :

    8) Total % of tubes of plugged

    9) Through cleaning done checked : YES/NO

    Inspected By:

    _______________ _______________TMD FQA

  • 7/31/2019 Nspcl Durg Protocol

    22/125

    NSPCL - DURGAPUR

    Page 21 of 21

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: Date:

    Equipment: HYDROGEN COOLER 2

    Nature of inspection: VISUAL

    Remarks:

    1) Leakage detection test done:

    2) Hydro Test Carried Out at Pressure : ____________

    3) Leakage was found in COOLER 2: YES / NO

    4) No of leakage tubes :

    5) Final Hydro Test carried Out at Pressure :____________

    6) Any leakages observed : YES/NO

    7) Total No of tubes :

    8) Total % of tubes of plugged

    9) Through cleaning done checked : YES/NO

    Inspected By:

    _______________ _______________TMD FQA

  • 7/31/2019 Nspcl Durg Protocol

    23/125

    NSPCL - DURGAPUR

    Page 22 of 22

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: Date:

    Equipment: HYDROGEN COOLER 3

    Nature of inspection: VISUAL

    Remarks:

    1) Leakage detection test done:

    2) Hydro Test Carried Out at Pressure : ____________

    3) Leakage was found in COOLER 3: YES / NO

    4) No of leakage tubes :

    5) Final Hydro Test carried Out at Pressure :____________

    6) Any leakages observed : YES/NO

    7) Total No of tubes :

    8) Total % of tubes of plugged

    9) Through cleaning done checked : YES/NO

    Inspected By:

    _______________ _______________TMD FQA

  • 7/31/2019 Nspcl Durg Protocol

    24/125

    NSPCL - DURGAPUR

    Page 23 of 23

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: Date:

    Equipment: HYDROGEN COOLER 4

    Nature of inspection: VISUAL

    Remarks:

    1) Leakage detection test done:

    2) Hydro Test Carried Out at Pressure : ____________

    3) Leakage was found in COOLER 4: YES / NO

    4) No of leakage tubes :

    5) Final Hydro Test carried Out at Pressure :____________

    6) Any leakages observed : YES/NO

    7) Total No of tubes :

    8) Total % of tubes of plugged

    9) Through cleaning done checked : YES/NO

    Inspected By:

    _______________ _______________TMD FQA

  • 7/31/2019 Nspcl Durg Protocol

    25/125

    NSPCL - DURGAPUR

    Page 24 of 24

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: Date:

    Equipment: BFP 1 MOTOR COOLERS

    Nature of inspection: VISUAL

    Remarks:

    1) Leakage detection test done:

    2) Hydro Test Carried Out at Pressure : ____________

    3) Leakage was found in COOLER 4: YES / NO

    4) No of leakage tubes :

    5) Final Hydro Test carried Out at Pressure :____________

    6) Any leakages observed : YES/NO

    7) Total No of tubes :

    8) Total % of tubes of plugged

    9) Through cleaning done checked : YES/NO

    Inspected By:

    _______________ _______________TMD FQA

  • 7/31/2019 Nspcl Durg Protocol

    26/125

    NSPCL - DURGAPUR

    Page 25 of 25

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: Date:

    Equipment: BFP 2 MOTOR COOLERS

    Nature of inspection: VISUAL

    Remarks:

    1) Leakage detection test done:

    2) Hydro Test Carried Out at Pressure : ____________

    3) Leakage was found in COOLER 4: YES / NO

    4) No of leakage tubes :

    5) Final Hydro Test carried Out at Pressure :____________

    6) Any leakages observed : YES/NO

    7) Total No of tubes :

    8) Total % of tubes of plugged

    9) Through cleaning done checked : YES/NO

    Inspected By:

    _______________ _______________TMD FQA

  • 7/31/2019 Nspcl Durg Protocol

    27/125

    NSPCL - DURGAPUR

    Page 26 of 26

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: DATE:

    Equipment: MAIN TURBINE

    Nature of inspection: ALIGNMENT READINGS IF APPLICABLE

    Remarks:

    POSITION LEFT RIGHT TOP BOTTOM

    0

    90

    180

    270

    TOTAL

    AVERAGE

    Inspected By:

    _______________ _______________TMD FQA

  • 7/31/2019 Nspcl Durg Protocol

    28/125

    NSPCL - DURGAPUR

    Page 27 of 27

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: DATE:

    Equipment: MAIN TURBINE

    Nature of inspection: COUPLED RUN OUT READINGS

    Remarks:

    HOLE NO GEN COUP TURBCOUP

    JOUR 2 JOUR 3 JOUR 1

    Inspected By:

    _______________ _______________TMD FQA

  • 7/31/2019 Nspcl Durg Protocol

    29/125

    NSPCL - DURGAPUR

    Page 28 of 28

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: DATE:

    Equipment: MAIN TURBINE

    Nature of inspection: BUMP CHECK READINGS

    Remarks:

    DURING DISMANTLING

    TOWARDS MOP

    TOWARDS GEN

    TOTAL

    AFTER BOX UP

    TOWARDS MOP

    TOWARDS GEN

    TOTAL

    Inspected By:

    _______________ _______________TMD FQA

  • 7/31/2019 Nspcl Durg Protocol

    30/125

    NSPCL - DURGAPUR

    Page 29 of 29

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: DATE:

    Equipment: MAIN TURBINE

    Nature of inspection: AXIAL FLOAT READINGS

    Remarks:

    DURING DISMANTLING

    TOWARDS MOP

    TOWARDS GEN

    TOTAL

    AFTER BOX UP

    TOWARDS MOP

    TOWARDS GEN

    TOTAL

    Inspected By:

    _______________ _______________TMD FQA

  • 7/31/2019 Nspcl Durg Protocol

    31/125

    NSPCL - DURGAPUR

    Page 30 of 30

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: DATE:

    Equipment: MAIN TURBINE

    Nature of inspection: BEARING CLEARANCES

    Remarks:

    BRG NO SOC TOC INTERFERENCE

    L R BRG TOYOKE

    YOKE T0COVER

    123

    DP TEST OF BEARINGS OBSERVATION:

    UT TEST OF BEARINGS OBSERVATION:

    Inspected By:

    _______________ _______________TMD FQA

  • 7/31/2019 Nspcl Durg Protocol

    32/125

    NSPCL - DURGAPUR

    Page 31 of 31

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: DATE:

    Equipment: CEP # 1

    Nature of inspection: VISUAL

    Remarks:

    Before dismantling (Initial Reading)

    AXIAL RADIAL

    After Alignment (Final Reading)

    AXIAL RADIAL

    TOTAL FLOAT OF THE PUMP:

    COUPLING GAP:

    Inspected By:

    _______________ ________________ _____________TMD OPN FQA

  • 7/31/2019 Nspcl Durg Protocol

    33/125

  • 7/31/2019 Nspcl Durg Protocol

    34/125

    NSPCL - DURGAPUR

    Page 33 of 33

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: DATE:

    Equipment: BFP # 1 (IF APPLICABLE)

    Nature of inspection: VISUAL

    Remarks:

    Before dismantling (Initial Reading)

    AXIAL RADIAL

    After Alignment (Final Reading)

    AXIAL RADIAL

    BRG NO SOC TOCL R

    PUMP DE

    PUMP NDEMOTOR DEMOTOR NDE

    1. CLEARANCE OF THE BALANCING DISC:

    2. TOTAL FLOAT OF THE PUMP WITHOUT THRUST BEARING:

    3. TOTAL FLOAT OF THE PUMP WITH THRUST BEARING:

    Inspected By:

    _______________ ________________ _____________TMD OPN FQA

  • 7/31/2019 Nspcl Durg Protocol

    35/125

    NSPCL - DURGAPUR

    Page 34 of 34

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: DATE:

    Equipment: BFP # 2 (IF APPLICABLE)

    Nature of inspection: VISUAL

    Remarks:

    Before dismantling (Initial Reading)

    AXIAL RADIAL

    After Alignment (Final Reading)

    AXIAL RADIAL

    BRG NO SOC TOCL R

    PUMP DEPUMP NDEMOTOR DEMOTOR NDE

    4. CLEARANCE OF THE BALANCING DISC:

    5. TOTAL FLOAT OF THE PUMP WITHOUT THRUST BEARING:

    6. TOTAL FLOAT OF THE PUMP WITH THRUST BEARING:

    Inspected By:

    _______________ ________________ _____________TMD OPN FQA

  • 7/31/2019 Nspcl Durg Protocol

    36/125

    NSPCL - DURGAPUR

    Page 35 of 35

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: DATE:

    Equipment: ECONOMISER

    Nature of inspection:

    Remarks:

    Observations (IF Any)

    Joint Tube thickness survey carried out with BMD/FQA ( Y / N )

    Tube thickness survey :

    Total Joints cut = _____ Nos

    Total Joints prepared = _____ Nos

    Radiography done on = _____ Tubes

    Inspected By:

    _______________ ________________ _____________BMD OPN FQA

  • 7/31/2019 Nspcl Durg Protocol

    37/125

    NSPCL - DURGAPUR

    Page 36 of 36

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: DATE

    Equipment: CONVECTIVE SUPER HEATER

    Nature of inspection:

    Remarks:

    After cleaning of second pass, following observations done

    (I) some of the coils were interfering on its lateralmovement (II) in some of the coils slight impression ofclits was observed.(III) Some of the coils were found misaligned(IV) Lot of clits was found in damage condition.(V) Bowing was observed in few coils.

    Joint Tube thickness survey carried out with BMD/FQA:

    Tube thickness survey of all approachable bends:towards front wall(swayed side) carried out and try to cut which thickness were < 20 %.

    Total No of Joints cut = _______ Nos Total No of Joints prepared = _______ Nos

    Radiography done = _______ Tubes

    Checking the report of radiography by BMD:

    Clearance is given for Hydro test.

    Inspected By:

    _______________ ________________ _____________BMD OPN FQA

  • 7/31/2019 Nspcl Durg Protocol

    38/125

    NSPCL - DURGAPUR

    Page 37 of 37

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: DATE:

    Equipment: END SUPER HEATER

    Nature of inspection:

    Remarks:

    After cleaning of second pass, following observations done

    (I) Over heating were observed in some of the coils.(II) Some of the coils were twisted condition.(IV) Lot of clits was found in damage condition.(V) Bowing was observed in few coils.

    Joint Tube thickness survey carried out with BMD/FQA:

    Tube thickness survey of all approachable bends:towards front wall(swayed side) carried out and try to cut which thickness were < 20 %.

    Total No of Joints cut = _______ Nos

    Total No of Joints prepared = _______ Nos

    Radiography done = _______ Tubes

    Checking the report of radiography by BMD:

    Clearance is given for Hydro test.

    Inspected By:

    _______________ ________________ _____________MM OPN FQA

  • 7/31/2019 Nspcl Durg Protocol

    39/125

    NSPCL - DURGAPUR

    Page 38 of 38

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: DATE

    Equipment: PLATEN SUPER HEATER

    Nature of inspection:

    Remarks:

    After cleaning of second pass, following observations done(I) Over heating were observed in some of the coils.(II) Some of the coils were interfering on its lateral

    movement (II) in some of the coils slight impression ofclits was observed.(III) Some of the coils were found misaligned and one ofthem was twisted condition.(IV) Lot of clits was found in damage condition.(V) Bowing was observed in few coils.

    Joint Tube thickness survey carried out with BMD/FQA:

    Tube thickness survey of all approachable bends:towards front wall(swayed side) carried out and try to cut which thickness were < 20 %.

    Total No of Joints cut = _______ Nos

    Total No of Joints prepared = _______ Nos

    Radiography done = _______ Tubes

    Checking the report of radiography by BMD:

    Clearance is given for Hydro test.

    Inspected By:

    _______________ ________________ _____________MM OPN FQA

  • 7/31/2019 Nspcl Durg Protocol

    40/125

    NSPCL - DURGAPUR

    Page 39 of 39

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: DATE

    Equipment: COAL BURNER

    Nature of inspection: TILTING OF COAL BURNERS

    After cleaning of second pass, following observations done

    SN Description CORNER-1 CORNER-2 CORNER-3 CORNER-4

    TILT OF BURNER

    MILL 1

    MILL 2

    MILL 31

    MILL 4

    CONDITION OF BURNERS

    MILL 1

    MILL 2

    MILL 32

    MILL 4

    Remarks (if any) :

    DEPT NAME SIGNATURE DESIGNATION

    FQA

    BMD

  • 7/31/2019 Nspcl Durg Protocol

    41/125

    NSPCL - DURGAPUR

    Page 40 of 40

    PROTOCOL OF JOINT INSPECTION DURING OVERHAULING

    UNIT NO: DATE

    Equipment: OIL BURNER

    Nature of inspection: CONDITION OF OIL BURNER

    After cleaning of second pass, following observations done

    SN Description

    OIL BURNER 1

    OIL BURNER 2

    OIL BURNER 3

    OIL BURNER 4

    OIL BURNER 5

    OIL BURNER 6

    OIL BURNER 7

    OIL BURNER 8

    Other Remarks (If Any) :

    DEPT NAME SIGNATURE DESIGNATION

    FQA

    BMD

  • 7/31/2019 Nspcl Durg Protocol

    42/125

    NSPCL - DURGAPUR

    Page 41 of 41

    PROTOCOL BOILER EXPANSION MONITORING:

    UNIT# DATE: TIME:

    ACTIVITY:BOILER EXPNSION CONSTRAINTS REMOVED & EXPANSION INDICATORS PROVIDED

    AT ALL LOCATIONS

    SCOPE : FURNACE 1st & 2nd PASS

    S.NO DESCRIPTION REMARKS

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    DEPT NAME DESIGN SIGNATURE

    OPERATION

    BMD

    EEMG

  • 7/31/2019 Nspcl Durg Protocol

    43/125

    NSPCL - DURGAPUR

    Page 42 of 42

    PROTOCOL

    BOILER DRUM INTERNAL INSPECTION

    UNIT: DATE:

    ACTIVITY: DRUM CLEANLINESS CHECKING

    SCOPE: DRUM INTERNALS

    SN DESCRIPTION REMARKS

    1 INTERNAL CLEANLINESS

    2PROPER FIXINGOF INTERNALS

    3WELD CRACK OR ANY OTHER

    DAMAGES

    4ANY POSSIBILITY OF WATERCARRY OVER

    DEPT NAME DESGN SIGN

    OPNBMD

    CHEMISTRY

    FQA

  • 7/31/2019 Nspcl Durg Protocol

    44/125

    NSPCL - DURGAPUR

    Page 43 of 43

    PROTOCOL

    AIR HEATER CLEANLINESS

    UNIT: DATE:

    AIR HEATER: 1

    ACTIVITY: APHS INTERNAL INSPECTION

    SCOPE: ALL AIR PREHEATERS

    SN DESCRIPTION STATUS REMARKS

    1. ALL FOREIGN MATERIALS ARE

    REMOVED FROM THE AIR

    HEATER AND THE BASKETS

    2. AIRHEATER BASKETS ARE FREE

    FROM ASH PARTICLES

    3. AIRHEATER BASKETS ARE FREE

    FROM OIL TRACES AND OTHER

    COMBUSTIBLE MATERIAL.

    4. APH HOPPER &

    FLUSHING

    CHECKED AND CERTIFIED BY

    NAME DESIGNATION SIGNATURERECOMMISSIONING

    BOILER MAINT

  • 7/31/2019 Nspcl Durg Protocol

    45/125

  • 7/31/2019 Nspcl Durg Protocol

    46/125

    NSPCL - DURGAPUR

    Page 45 of 45

    PROTOCOL FOR FD FAN #1

    SN DescriptionSubDescription

    STATUS BEFORE O/H Description of Job done

    Inlet Duct1 DUCTSOutlet DuctInlet Damper

    2 Dampers OutletDamperInlet

    3ExpansionJoints Outlet

    4 INSULATION5 CASING6 IMPELLER

    Fan DE Brg7 Bearings

    Fan NDE Brg8 Suction Cone9 OIL COOLER

    DE bearing10

    BearingClearanceIn mm

    NDE bearing

    11 Coupling Coupling gap12 Oil

    13

    Alignment

    reading

    Axial Radial

    Inspected By

    M/M OPN CONTRACTOR FQA

    NAMESIGNATURE

    DATE

  • 7/31/2019 Nspcl Durg Protocol

    47/125

    NSPCL - DURGAPUR

    Page 46 of 46

    PROTOCOL FOR FD FAN #2

    SN DescriptionSubDescription

    STATUS BEFORE O/H Description of Job done

    Inlet Duct1 DUCTSOutlet DuctInlet Damper

    2 Dampers OutletDamperInlet

    3ExpansionJoints Outlet

    4 INSULATION5 CASING6 IMPELLER

    Fan DE Brg7 Bearings

    Fan NDE Brg8 Suction Cone9 OIL COOLER

    DE bearing10

    BearingClearanceIn mm

    NDE bearing

    11 Coupling Coupling gap12 Oil

    13Alignment

    reading

    Axial Radial

    Inspected By

    M/M OPN CONTRACTOR FQA

    NAMESIGNATURE

    DATE

  • 7/31/2019 Nspcl Durg Protocol

    48/125

  • 7/31/2019 Nspcl Durg Protocol

    49/125

    NSPCL - DURGAPUR

    Page 48 of 48

    PROTOCOL FOR ID FAN # 2

    SN DescriptionSub

    DescriptionSTATUS BEFORE O/H Description of Job done

    Inlet Duct1 DUCTS

    Outlet DuctInletDamper

    2 DampersOutletDamperInlet

    3ExpansionJoints Outlet

    4 INSULATION

    5 CASING

    6 IMPELLERFan DEBrg

    7 BearingsFan NDEBrg

    8 Suction Cone9 OIL COOLER

    DE bearing10

    BearingClearanceIn mm

    NDEbearing

    11 CouplingCouplinggap

    12 Oil

    13Alignmentreading

    Axial Radial

    Inspected By

    M/M OPN CONTRACTOR FQA

    NAME

    SIGNATURE

    DATE

  • 7/31/2019 Nspcl Durg Protocol

    50/125

  • 7/31/2019 Nspcl Durg Protocol

    51/125

  • 7/31/2019 Nspcl Durg Protocol

    52/125

    PROTOCOL OF BOILER TUBE THICKNESS SURVEY OF UNIT #

    Period of O/H:

    BMD FQA

    SUMMARY OF TUBE-THICKNESS SURVEY REPORT

    S NO AREATubes / Points

    measured[NOS]

    Tubes / Bendsreplaced [NOS]

    1 HANGER TUBES

    2 CONVECTIVE SUPER HEATER COILS

    3 PLATEN SUPER HEATER COILS

    4 END SUPER HEATER COILS

    5 ECONOMISER COILS

    6 STEAM COOLED WALL

    7 S-PANNEL

    8 OIL BURNERS

    9 COAL BURNERS

    10 SPRAY LINES

    11 PEEP HOLES

    12 MAN HOLES

    13 GOOSE NECK

    14 WATER WALL

    TOTAL

  • 7/31/2019 Nspcl Durg Protocol

    53/125

  • 7/31/2019 Nspcl Durg Protocol

    54/125

    NSPCL - DURGAPUR

    Page 53 of 53

    1) Internal InspectionSADC MILL 1 CORENER C

    2) Freeness Checking

    1) Internal InspectionSADC MILL 1 CORENER D

    2) Freeness Checking

    1) Internal InspectionSADC MILL 2 CORENER A

    2) Freeness Checking

    1) Internal InspectionSADC MILL 2 CORENER B2) Freeness Checking

    1) Internal InspectionSADC MILL 2 CORENER C

    2) Freeness Checking

    1) Internal InspectionSADC MILL 2 CORENER D

    2) Freeness Checking

    1) Internal InspectionSADC MILL 2 CORENER D

    2) Freeness Checking

    1) Internal InspectionSADC MILL 3 CORENER A

    2) Freeness Checking

    1) Internal InspectionSADC MILL 3 CORENER B 2) Freeness Checking

    1) Internal InspectionSADC MILL 3 CORENER C

    2) Freeness Checking

    1) Internal InspectionSADC MILL 3 CORENER D

    2) Freeness Checking

    1) Internal InspectionSADC MILL 4 CORENER A

    2) Freeness Checking

    1) Internal InspectionSADC MILL 4 CORENER B

    2) Freeness Checking

    1) Internal InspectionSADC MILL 4 CORENER C 2) Freeness Checking

    1) Internal InspectionSADC MILL 4 CORENER D

    2) Freeness Checking

    1) Internal InspectionDAMPER OF OB 1

    2) Freeness Checking

    1) Internal InspectionDAMPER OF OB 2

    2) Freeness Checking

    1) Internal InspectionDAMPER OF OB 3

    2) Freeness Checking

    1) Internal InspectionDAMPER OF OB 4 2) Freeness Checking

    1) Internal InspectionDAMPER OF OB 5

    2) Freeness Checking

    1) Internal InspectionDAMPER OF OB 6

    2) Freeness Checking

    1) Internal InspectionDAMPER OF OB 7

    2) Freeness Checking

    1) Internal InspectionDAMPER OF OB 8

    2) Freeness Checking

  • 7/31/2019 Nspcl Durg Protocol

    55/125

    NSPCL - DURGAPUR

    Page 54 of 54

    1) Internal Inspection

    2) Freeness CheckingIGV PAFAN 1

    3) Limit switch adjustment

    1) Internal Inspection

    2) Freeness CheckingIGV PAFAN 2

    3) Limit switch adjustment

    1) Internal Inspection

    2) Freeness CheckingIGV PAFAN 3

    3) Limit switch adjustment

    1) Internal Inspection

    2) Freeness CheckingIGV PAFAN 4

    3) Limit switch adjustment

    1) Internal Inspection

    2) Freeness CheckingCOLD AIR DAMP PAF 1

    3) Limit switch adjustment

    1) Internal Inspection2) Freeness CheckingCOLD AIR DAMP PAF 2

    3) Limit switch adjustment

    1) Internal Inspection

    2) Freeness CheckingCOLD AIR DAMP PAF 3

    3) Limit switch adjustment

    1) Internal Inspection

    2) Freeness CheckingCOLD AIR DAMP PAF 4

    3) Limit switch adjustment

    1) Internal InspectionHOT AIR DAMP PAF 1

    2) Freeness Checking1) Internal Inspection

    HOT AIR DAMP PAF 22) Freeness Checking

    1) Internal InspectionHOT AIR DAMP PAF 3

    2) Freeness Checking

    1) Internal InspectionHOT AIR DAMP PAF 4

    2) Freeness Checking

    1) Internal InspectionECO OUTLET DAMPERPASS A

    2) Freeness Checking

    1) Internal InspectionECO OUTLET DAMPERPASS B 2) Freeness Checking

    1) Internal InspectionAIR PREHEATER FGOUTLET DAMPER PASS A 2) Freeness Checking

    1) Internal InspectionAIR PREHEATER FGOUTLET DAMPER PASS B 2) Freeness Checking

    1) Internal InspectionESP INLET FG DAMPERPASS A 2) Freeness Checking

    1) Internal InspectionESP INLET FG DAMPERPASS B 2) Freeness Checking

  • 7/31/2019 Nspcl Durg Protocol

    56/125

    NSPCL - DURGAPUR

    Page 55 of 55

    1) Internal InspectionESP OUTLET FG DAMPERPASS A 2) Freeness Checking

    1) Internal InspectionESP OUTLET FG DAMPER

    PASS B 2) Freeness Checking1) Internal Inspection

    ID FAN 1 INLET DAMPER2) Freeness Checking

    1) Internal InspectionID FAN 2 INLET DAMPER

    2) Freeness Checking

    1) Internal Inspection

    2) Freeness CheckingID FAN 1 OUTLET DAMPER

    3) Limit switch adjustment

    1) Internal Inspection

    2) Freeness CheckingID FAN 2 OUTLET DAMPER

    3) Limit switch adjustment

    Dept. OPRN MM C&I

    Name

    Sign.

    Desgn.

  • 7/31/2019 Nspcl Durg Protocol

    57/125

    NSPCL - DURGAPUR

    Page 56 of 56

    PROTOCAL FOR MECHANICAL /ELECTRICAL MAINTENANCETURBINE SIDE VALVE STATUS OF UNIT #

    STATUS AFTER OVERHAULING

    LOCATION DESCRIPTION NUMBER JOB DONE STATUS REMARKS

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.

    3. Local andRemote operation

    4 Indications

    21 Mtr

    Pegging steamisolating valve.[Steam isolatingvalve before FW

    tank.]

    1 2 9

    5. Auto operation

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OL

    Setting2. Limit switchsetting.3. Local andRemote operation

    4 Indications

    21 MtrDeaerator over-flow

    isolating valve.1 3 2

    5. Auto operation

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnet

    condition1. O/H OFActuator/ OLSetting2. Limit switchsetting.3. Local andRemote operation

    4 Indications

    21 Mtr

    M.S. to 12 ata. 20T/ hr [SHUTDOWNGENERALLY NOTAVAILABLE DUE

    TO PASSING]

    1 3 9

    5. Auto operation

    OPERATION TMD EMD

  • 7/31/2019 Nspcl Durg Protocol

    58/125

  • 7/31/2019 Nspcl Durg Protocol

    59/125

  • 7/31/2019 Nspcl Durg Protocol

    60/125

    NSPCL - DURGAPUR

    Page 59 of 59

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OF

    Actuator/ OLSetting2. Limit switchsetting.3. Local andRemoteoperation

    4 Indications

    0 MtrHPH 2 Extraction

    valve1 2 7

    5. Auto operation

    1) Lapping,

    2) Blue matching

    3) Gland packing 4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.3. Local andRemoteoperation

    4 Indications

    0 MtrHPH 1 Extraction

    valve1 2 8

    5. Auto operation

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switch

    setting.3. Local andRemoteoperation

    4 Indications

    Ejector floorLPH 1 Extraction

    valve9 1 2

    5. Auto operation

    OPERATION TMD EMD

  • 7/31/2019 Nspcl Durg Protocol

    61/125

  • 7/31/2019 Nspcl Durg Protocol

    62/125

  • 7/31/2019 Nspcl Durg Protocol

    63/125

  • 7/31/2019 Nspcl Durg Protocol

    64/125

  • 7/31/2019 Nspcl Durg Protocol

    65/125

    NSPCL - DURGAPUR

    Page 64 of 64

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnet

    condition1. O/H OFActuator/ OLSetting2. Limit switchsetting.3. Local andRemoteoperation

    4 Indications

    BFP 2 dischargeValve

    122

    5. Auto operation

    1) Lapping,2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.3. Local andRemoteoperation

    4 Indications

    Isolating Valve of30% feed line

    125

    5. Auto operation

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OL

    Setting2. Limit switchsetting.3. Local andRemoteoperation

    4 Indications

    Economizer inlet

    valve124

    5. Auto operation

    OPERATION TMD EMD

  • 7/31/2019 Nspcl Durg Protocol

    66/125

  • 7/31/2019 Nspcl Durg Protocol

    67/125

    NSPCL - DURGAPUR

    Page 66 of 66

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnet

    condition1. O/H OFActuator/ OLSetting2. Limit switchsetting.3. Local andRemoteoperation

    4 Indications

    0 MtrHot well levelcontrol valve

    5 0 1. 1

    5. Auto operation

    1) Lapping,2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.3. Local andRemoteoperation

    4 Indications

    0 MtrCEP recirculation

    valve.5 0 1. 2

    5. Auto operation

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OL

    Setting2. Limit switchsetting.3. Local andRemoteoperation

    4 Indications

    MOT floorExtraction 1

    check valve9 2 3

    5. Auto operation

    OPERATION TMD EMD

  • 7/31/2019 Nspcl Durg Protocol

    68/125

    NSPCL - DURGAPUR

    Page 67 of 67

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnet

    condition1. O/H OFActuator/ OLSetting2. Limit switchsetting.3. Local andRemoteoperation

    4 Indications

    MOT floorExtraction 2check valve

    9 2 4

    5. Auto operation

    1) Lapping,2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.3. Local andRemoteoperation

    4 Indications

    MOT floorExtraction 3check valve

    9 2 5

    5. Auto operation

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OL

    Setting2. Limit switchsetting.3. Local andRemoteoperation

    4 Indications

    Ejector floorExtraction 4

    check valve9 2 6

    5. Auto operation

    OPERATION TMD EMD

  • 7/31/2019 Nspcl Durg Protocol

    69/125

  • 7/31/2019 Nspcl Durg Protocol

    70/125

    NSPCL - DURGAPUR

    Page 69 of 69

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition

    1. O/H OFActuator/ OLSetting2. Limit switchsetting.3. Local andRemoteoperation

    4 Indications

    13 Mtr12 ata to 6 ata

    hdr.5 1 2

    5. Auto operation

    1) Lapping,

    2) Blue matching3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.3. Local andRemoteoperation

    4 Indications

    (-) MtrLPH- 2 drip to

    condensate line5 0 3

    5. Auto operation

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting

    2. Limit switchsetting.3. Local andRemoteoperation

    4 Indications

    (-) MtrLPH 3 to LPH -

    2 drip5 0 4

    5. Auto operation

    OPERATION TMD EMD

  • 7/31/2019 Nspcl Durg Protocol

    71/125

  • 7/31/2019 Nspcl Durg Protocol

    72/125

    NSPCL - DURGAPUR

    Page 71 of 71

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnet

    condition1. O/H OFActuator/ OLSetting2. Limit switchsetting.3. Local andRemoteoperation

    4 Indications

    BFP suction valve BFP 1

    5. Auto operation

    1) Lapping,2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.3. Local andRemoteoperation

    4 Indications

    BFP 2

    5. Auto operation

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OL

    Setting2. Limit switchsetting.3. Local andRemoteoperation

    4 Indications

    BFP 1 discharge

    Valve121

    5. Auto operation

    OPERATION TMD EMD

  • 7/31/2019 Nspcl Durg Protocol

    73/125

  • 7/31/2019 Nspcl Durg Protocol

    74/125

  • 7/31/2019 Nspcl Durg Protocol

    75/125

  • 7/31/2019 Nspcl Durg Protocol

    76/125

  • 7/31/2019 Nspcl Durg Protocol

    77/125

    NSPCL - DURGAPUR

    Page 76 of 76

    PROTOCAL FOR MECHANICAL MAINTENANCEBOILER SIDE VALVE STATUS OF UNIT #

    STATUS AFTER OVERHAULINGLOCATION DESCRIPTION NUMBER JOB DONE STATUS REMARKS

    1) Lapping,

    2) Blue matching3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.

    3. Local andRemote operation

    4 Indications

    Start upoverflow v/v

    105

    5. Auto operation

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switch

    setting.3. Local andRemote operation

    4 Indications

    IBD valve 106

    5. Auto operation

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OF

    Actuator/ OLSetting2. Limit switchsetting.

    3. Local andRemote operation

    4 Indications

    IBD valve 107

    5. Auto operation

    OPERATION BMD EMD

  • 7/31/2019 Nspcl Durg Protocol

    78/125

    NSPCL - DURGAPUR

    Page 77 of 77

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnet

    condition1. O/H OFActuator/ OLSetting2. Limit switchsetting.

    3. Local andRemote operation

    4 Indications

    Bottom drainheader valves (

    From LHS )1

    5. Auto operation

    1) Lapping,

    2) Blue matching3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.

    3. Local andRemote operation

    4 Indications

    Bottom drainheader valves (

    From LHS )2

    5. Auto operation

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switch

    setting.3. Local andRemote operation

    4 Indications

    Bottom drainheader valves (

    From LHS )3

    5. Auto operation

    OPERATION BMD EMD

  • 7/31/2019 Nspcl Durg Protocol

    79/125

  • 7/31/2019 Nspcl Durg Protocol

    80/125

  • 7/31/2019 Nspcl Durg Protocol

    81/125

    NSPCL - DURGAPUR

    Page 80 of 80

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnet

    condition1. O/H OFActuator/ OLSetting2. Limit switchsetting.

    3. Local andRemote operation

    4 Indications

    Drain Header ToIBD tank Valves

    2

    5. Auto operation

    1) Lapping,

    2) Blue matching3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.

    3. Local andRemote operation

    4 Indications

    Boiler FillingValves

    1

    5. Auto operation

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switch

    setting.3. Local andRemote operation

    4 Indications

    Boiler FillingValves

    2

    5. Auto operation

    OPERATION BMD EMD

  • 7/31/2019 Nspcl Durg Protocol

    82/125

    NSPCL - DURGAPUR

    Page 81 of 81

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnet

    condition1. O/H OFActuator/ OLSetting2. Limit switchsetting.

    3. Local andRemote operation

    4 Indications

    Super heaterdrain valves

    (From BOILERside) Total

    number of valves 14

    1 T/B

    5. Auto operation

    1) Lapping,

    2) Blue matching3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.

    3. Local andRemote operation

    4 Indications

    Super heaterdrain valves

    (From BOILERside) Total

    number of valves 15

    2 T/B

    5. Auto operation

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switch

    setting.3. Local andRemote operation

    4 Indications

    Super heaterdrain valves

    (From BOILERside) Total

    number of valves

    16

    3 T/B

    5. Auto operation

    OPERATION BMD EMD

  • 7/31/2019 Nspcl Durg Protocol

    83/125

  • 7/31/2019 Nspcl Durg Protocol

    84/125

    NSPCL - DURGAPUR

    Page 83 of 83

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnet

    condition1. O/H OFActuator/ OLSetting2. Limit switchsetting.

    3. Local andRemote operation

    4 Indications

    Drum / SH vents(From UNIT 3

    side) Totalnumber ofvalves 20

    5. Auto operation

    1) Lapping,

    2) Blue matching3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.

    3. Local andRemote operation

    4 Indications

    Drum / SH vents(From UNIT 3

    side) Totalnumber ofvalves 21

    5. Auto operation

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switch

    setting.3. Local andRemote operation

    4 Indications

    108 A

    5. Auto operation

    OPERATION BMD EMD

  • 7/31/2019 Nspcl Durg Protocol

    85/125

    NSPCL - DURGAPUR

    Page 84 of 84

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnet

    condition1. O/H OFActuator/ OLSetting2. Limit switchsetting.

    3. Local andRemote operation

    4 Indications

    108 B

    5. Auto operation

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.

    3. Local and

    Remote operation4 Indications

    Boiler Start upvent

    110

    5. Auto operation

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.

    3. Local andRemote operation

    4 Indications

    Economizer inlet

    valve

    124

    5. Auto operation

    OPERATION BMD EMD

  • 7/31/2019 Nspcl Durg Protocol

    86/125

    NSPCL - DURGAPUR

    Page 85 of 85

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.

    3. Local andRemote operation

    4 Indications

    SH spray mainiso v/v ( near

    RCF)144

    5. Auto operation

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.

    3. Local andRemote operation

    4 Indications

    SP0 spraycontrol valve

    LHS

    Spraystation

    5. Auto operation

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition

    1. O/H OFActuator/ OLSetting2. Limit switchsetting.

    3. Local andRemote operation

    4 Indications

    SP0 spraycontrol valveRHS

    5. Auto operation

    OPERATION BMD EMD

  • 7/31/2019 Nspcl Durg Protocol

    87/125

    NSPCL - DURGAPUR

    Page 86 of 86

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.

    3. Local andRemote operation

    4 Indications

    SP1 spraycontrol valve

    LHS

    5. Auto operation

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.

    3. Local andRemote operation

    4 Indications

    SP1 spraycontrol valve

    RHS

    5. Auto operation

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.

    3. Local andRemote operation

    4 Indications

    SP2 spraycontrol valve

    LHS

    5. Auto operation

    OPERATION BMD EMD

  • 7/31/2019 Nspcl Durg Protocol

    88/125

  • 7/31/2019 Nspcl Durg Protocol

    89/125

    NSPCL - DURGAPUR

    Page 88 of 88

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.

    3. Local andRemote operation

    4 Indications

    Oil burner 3Steam / oil valve

    5. Auto operation

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.

    3. Local andRemote operation

    4 Indications

    Oil burner 4Steam / oil valve

    5. Auto operation

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.

    3. Local andRemote operation

    4 Indications

    Oil burner 5Steam / oil valve

    5. Auto operation

    OPERATION BMD EMD

  • 7/31/2019 Nspcl Durg Protocol

    90/125

  • 7/31/2019 Nspcl Durg Protocol

    91/125

    NSPCL - DURGAPUR

    Page 90 of 90

    1) Lapping,

    2) Blue matching

    3) Gland packing4) Bonnetcondition1. O/H OFActuator/ OLSetting2. Limit switchsetting.

    3. Local andRemote operation

    4 Indications

    Soot blowingsteam isolating

    valve

    5. Auto operation

    1) Lapping,

    2) Blue matching

    3) Gland packing

    4) Bonnetcondition1. O/H OFActuator/ OLSetting

    2. Limit switchsetting.

    3. Local andRemote operation

    4 Indications

    Soot blowingmanual isolating

    valve

    5. Auto operation

    OPERATION BMD EMD

  • 7/31/2019 Nspcl Durg Protocol

    92/125

  • 7/31/2019 Nspcl Durg Protocol

    93/125

  • 7/31/2019 Nspcl Durg Protocol

    94/125

    NSPCL - DURGAPUR

    Page 93 of 93

    CHECKLIST FOR O/H OF BFP 2 MOTOR

    FRAMESIZE:

    A NAME OF DRIVE :-

    B SL.NO. OF MOTOR:BEARINGNO.

    OLD BRGNEWBRG

    a. DESIDE

    C PTW NO.b.NDESIDE

    BEARING

    D START DATE :- CHANGEa. DESIDE

    YES/NO.

    E COMPLETION DATE:-b.NDESIDE

    YES/NO.

    SL.No.

    JOB DESCRIPTION ACTIVITY REMARKS

    1Disconnecting of Oil & Cooling water line

    safely.YES / NO

    2 Cooler removing from motor. YES / NO

    3 Dismantling of motor & cooler . YES / NO4 Motor lowering & threaded-out the rotor. YES / NO

    5 Cleaning of cooler tubes. YES / NO

    6Replacement of end shield gaskets and

    painting of coolerYES / NO

    7*Cooler boxed-up & hydro test at 4.0 Kg.

    Pr.YES / NO

    8*Cleaning & Checking of stator winding and

    rotor.YES / NO

    9*Checking of rotor bars/ end rings / rubbing

    /any defects etc.YES / NO

    10 Heating of stator / rotor. YES / NO

    11 *IR / PI checking. YES / NO

    12 Varnishing of stator / rotor. YES / NO

    13Rotor threaded-in & placement on

    foundation.YES / NO

    14*Cleaning & Servicing of both brgs.(DE

    &NDE).YES / NO

    15 *Replacement of bearings (if required). YES / NO

  • 7/31/2019 Nspcl Durg Protocol

    95/125

  • 7/31/2019 Nspcl Durg Protocol

    96/125

  • 7/31/2019 Nspcl Durg Protocol

    97/125

  • 7/31/2019 Nspcl Durg Protocol

    98/125

    NSPCL - DURGAPUR

    Page 97 of 97

    CHECKLIST FOR O/H OF HT MOTORS [CEP-2]FRAMESIZE:

    A NAME OF DRIVE :-

    B SL.NO. OF MOTOR: BEARINGNO. OLD BRG NEWBRGa. DESIDE

    C PTW NO.b.NDESIDE

    BEARING

    D START DATE :- CHANGEa. DESIDE

    YES/NO.

    E COMPLETION DATE:-b.NDESIDE

    YES/NO.

    SL.No.

    JOB DESCRIPTION ACTIVITY REMARKS

    1 Motor Sl. No. YES / NO

    2 Dismantling of motor. YES / NO

    3 Checking of all fasteners threads YES / NO

    4 Cleaning of rotor & stator. YES / NO

    5 *Checking of rotor bars / end rings / any YES / NOrubbing / defects etc. YES / NO

    6 Cleaning of stator. YES / NO

    7 *Checking of stator winding. YES / NO

    8 Heating of stator / rotor. YES / NO

    9 *IR / PI checking. YES / NO

    10 Varnishing of stator / rotor. YES / NO

    11Cleaning / servicing of bearings (DE &

    NDE).YES / NO

    12 *Bearing clearance checking & replacement. YES / NO

    13 Space heater checking. YES / NO

    14 End covers are proper fixed. YES / NO

    15 Greasing of bearings. YES / NO

    16 Sealing of stator by (sealing) compound. YES / NO

    17 Tightness of fasteners with proper washers. YES / NO

    18 Fitting of grease cup/check nuts/ coupling / YES / NO

    Sleeve etc.

    19 Phase / neutral motor TB gaskets fixing. YES / NO

    20 Fitting of cooling fan / cooling fan cover. YES / NO

    21 Space heater cable connection. YES / NO

  • 7/31/2019 Nspcl Durg Protocol

    99/125

    NSPCL - DURGAPUR

    Page 98 of 98

    22 Cable & earthling plates connection. YES / NO

    23 PI / IR measuring. YES / NO

    24Fitting/sealing of motor TB/ winding RTD /

    Heater boxes covers (cable entry / holes).YES / NO

    25Vibration of motor (decouple & couple). YES / NO

    26 If any defect/ surprise inform to EIC. YES / NO

    NOTE: Star (*) marks points to be checked by NSPCL representative.

    Name of agency:- Signature of agency rep. :-

    Name of NSPCL rep. :- Signature of NSPCL rep. :-

  • 7/31/2019 Nspcl Durg Protocol

    100/125

    NSPCL - DURGAPUR

    Page 99 of 99

    CHECKLIST FOR O/H OF HT MOTORS [FD FAN -1]FRAMESIZE:

    A NAME OF DRIVE :-

    B SL.NO. OF MOTOR:BEARINGNO.

    OLD BRGNEWBRG

    a. DESIDE

    C PTW NO.b.NDESIDE

    BEARING

    D START DATE :- CHANGEa. DESIDE

    YES/NO.

    E COMPLETION DATE:-b.NDESIDE

    YES/NO.

    SL.No.

    JOB DESCRIPTION ACTIVITY REMARKS

    1 Motor Sl. No. YES / NO

    2 Dismantling of motor. YES / NO

    3 Checking of all fasteners threads YES / NO

    4Cleaning of rotor & stator.

    YES / NO

    5 *Checking of rotor bars / end rings / any YES / NO

    rubbing / defects etc. YES / NO

    6 Cleaning of stator. YES / NO

    7 *Checking of stator winding. YES / NO

    8 Heating of stator / rotor. YES / NO

    9 *IR / PI checking. YES / NO

    10 Varnishing of stator / rotor. YES / NO

    11Cleaning / servicing of bearings (DE &

    NDE).YES / NO

    12 *Bearing clearance checking & replacement. YES / NO

    13 Space heater checking. YES / NO

    14 End covers are proper fixed. YES / NO

    15 Greasing of bearings. YES / NO

    16 Sealing of stator by (sealing) compound. YES / NO

    17 Tightness of fasteners with proper washers. YES / NO

    18 Fitting of grease cup/check nuts/ coupling / YES / NO

    Sleeve etc.

    19 Phase / neutral motor TB gaskets fixing. YES / NO

    20 Fitting of cooling fan / cooling fan cover. YES / NO

  • 7/31/2019 Nspcl Durg Protocol

    101/125

    NSPCL - DURGAPUR

    Page 100 of 100

    21 Space heater cable connection. YES / NO

    22 Cable & earthling plates connection. YES / NO

    23 PI / IR measuring. YES / NO

    24Fitting/sealing of motor TB/ winding RTD /

    Heater boxes covers (cable entry / holes).YES / NO

    25 Vibration of motor (decouple & couple). YES / NO26 If any defect/ surprise inform to EIC. YES / NO

    NOTE: Star (*) marks points to be checked by NSPCL representative.

    Name of agency:- Signature of agency rep. :-

    Name of NSPCL rep. :- Signature of NSPCL rep. :-

  • 7/31/2019 Nspcl Durg Protocol

    102/125

    NSPCL - DURGAPUR

    Page 101 of 101

    CHECKLIST FOR O/H OF HT MOTORS [FD FAN 2]FRAMESIZE:

    A NAME OF DRIVE :-

    B SL.NO. OF MOTOR:BEARINGNO.

    OLD BRGNEWBRG

    a. DESIDE

    C PTW NO.b.NDESIDE

    BEARING

    D START DATE :- CHANGEa. DESIDE

    YES/NO.

    E COMPLETION DATE:-b.NDESIDE

    YES/NO.

    SL.No.

    JOB DESCRIPTION ACTIVITY REMARKS

    1 Motor Sl. No. YES / NO

    2 Dismantling of motor. YES / NO

    3 Checking of all fasteners threads YES / NO

    4Cleaning of rotor & stator.

    YES / NO

    5 *Checking of rotor bars / end rings / any YES / NO

    rubbing / defects etc. YES / NO

    6 Cleaning of stator. YES / NO

    7 *Checking of stator winding. YES / NO

    8 Heating of stator / rotor. YES / NO

    9 *IR / PI checking. YES / NO

    10 Varnishing of stator / rotor. YES / NO

    11Cleaning / servicing of bearings (DE &

    NDE).YES / NO

    12 *Bearing clearance checking & replacement. YES / NO

    13 Space heater checking. YES / NO

    14 End covers are proper fixed. YES / NO

    15 Greasing of bearings. YES / NO

    16 Sealing of stator by (sealing) compound. YES / NO

    17 Tightness of fasteners with proper washers. YES / NO

    18 Fitting of grease cup/check nuts/ coupling / YES / NO

    Sleeve etc.

    19 Phase / neutral motor TB gaskets fixing. YES / NO

    20 Fitting of cooling fan / cooling fan cover. YES / NO

  • 7/31/2019 Nspcl Durg Protocol

    103/125

    NSPCL - DURGAPUR

    Page 102 of 102

    21 Space heater cable connection. YES / NO

    22 Cable & earthling plates connection. YES / NO

    23 PI / IR measuring. YES / NO

    24Fitting/sealing of motor TB/ winding RTD /

    Heater boxes covers (cable entry / holes).YES / NO

    25 Vibration of motor (decouple & couple). YES / NO26 If any defect/ surprise inform to EIC. YES / NO

    NOTE: Star (*) marks points to be checked by NSPCL representative.

    Name of agency:- Signature of agency rep. :-

    Name of NSPCL rep. :- Signature of NSPCL rep. :-

  • 7/31/2019 Nspcl Durg Protocol

    104/125

    NSPCL - DURGAPUR

    Page 103 of 103

    CHECKLIST FOR O/H OF HT MOTORS [ID FAN - 1]FRAMESIZE:

    A NAME OF DRIVE :-

    B SL.NO. OF MOTOR: BEARINGNO. OLD BRG NEWBRGa. DESIDE

    C PTW NO.b.NDESIDE

    BEARING

    D START DATE :- CHANGEa. DESIDE

    YES/NO.

    E COMPLETION DATE:-b.NDESIDE

    YES/NO.

    SL.No.

    JOB DESCRIPTION ACTIVITY REMARKS

    1 Motor Sl. No. YES / NO

    2 Dismantling of motor. YES / NO

    3 Checking of all fasteners threads YES / NO

    4 Cleaning of rotor & stator. YES / NO

    5 *Checking of rotor bars / end rings / any YES / NOrubbing / defects etc. YES / NO

    6 Cleaning of stator. YES / NO

    7 *Checking of stator winding. YES / NO

    8 Heating of stator / rotor. YES / NO

    9 *IR / PI checking. YES / NO

    10 Varnishing of stator / rotor. YES / NO

    11Cleaning / servicing of bearings (DE &

    NDE).YES / NO

    12 *Bearing clearance checking & replacement. YES / NO

    13 Space heater checking. YES / NO

    14 End covers are proper fixed. YES / NO

    15 Greasing of bearings. YES / NO

    16 Sealing of stator by (sealing) compound. YES / NO

    17 Tightness of fasteners with proper washers. YES / NO

    18 Fitting of grease cup/check nuts/ coupling / YES / NO

    Sleeve etc.

    19 Phase / neutral motor TB gaskets fixing. YES / NO

    20 Fitting of cooling fan / cooling fan cover. YES / NO

    21 Space heater cable connection. YES / NO

  • 7/31/2019 Nspcl Durg Protocol

    105/125

    NSPCL - DURGAPUR

    Page 104 of 104

    22 Cable & earthling plates connection. YES / NO

    23 PI / IR measuring. YES / NO

    24Fitting/sealing of motor TB/ winding RTD /

    Heater boxes covers (cable entry / holes).YES / NO

    25 Vibration of motor (decouple & couple). YES / NO

    26 If any defect/ surprise inform to EIC. YES / NO

    NOTE: Star (*) marks points to be checked by NSPCL representative.

    Name of agency:- Signature of agency rep. :-

    Name of NSPCL rep. :- Signature of NSPCL rep. :-

  • 7/31/2019 Nspcl Durg Protocol

    106/125

  • 7/31/2019 Nspcl Durg Protocol

    107/125

  • 7/31/2019 Nspcl Durg Protocol

    108/125

    NSPCL - DURGAPUR

    Page 107 of 107

    CHECKLIST FOR O/H OF HT MOTORS [PA FAN - 1]FRAMESIZE:

    A NAME OF DRIVE :-

    B SL.NO. OF MOTOR:BEARINGNO.

    OLD BRGNEWBRG

    a. DESIDE

    C PTW NO.b.NDESIDE

    BEARING

    D START DATE :- CHANGEa. DESIDE

    YES/NO.

    E COMPLETION DATE:-b.NDESIDE

    YES/NO.

    SL.No.

    JOB DESCRIPTION ACTIVITY REMARKS

    1 Motor Sl. No. YES / NO

    2 Dismantling of motor. YES / NO

    3 Checking of all fasteners threads YES / NO

    4Cleaning of rotor & stator.

    YES / NO

    5 *Checking of rotor bars / end rings / any YES / NO

    rubbing / defects etc. YES / NO

    6 Cleaning of stator. YES / NO

    7 *Checking of stator winding. YES / NO

    8 Heating of stator / rotor. YES / NO

    9 *IR / PI checking. YES / NO

    10 Varnishing of stator / rotor. YES / NO

    11Cleaning / servicing of bearings (DE &

    NDE).YES / NO

    12 *Bearing clearance checking & replacement. YES / NO

    13 Space heater checking. YES / NO

    14 End covers are proper fixed. YES / NO

    15 Greasing of bearings. YES / NO

    16 Sealing of stator by (sealing) compound. YES / NO

    17 Tightness of fasteners with proper washers. YES / NO

    18 Fitting of grease cup/check nuts/ coupling / YES / NO

    Sleeve etc.

    19 Phase / neutral motor TB gaskets fixing. YES / NO

    20 Fitting of cooling fan / cooling fan cover. YES / NO

  • 7/31/2019 Nspcl Durg Protocol

    109/125

    NSPCL - DURGAPUR

    Page 108 of 108

    21 Space heater cable connection. YES / NO

    22 Cable & earthling plates connection. YES / NO

    23 PI / IR measuring. YES / NO

    24Fitting/sealing of motor TB/ winding RTD /

    Heater boxes covers (cable entry / holes).YES / NO

    25 Vibration of motor (decouple & couple). YES / NO26 If any defect/ surprise inform to EIC. YES / NO

    NOTE: Star (*) marks points to be checked by NSPCL representative.

    Name of agency:- Signature of agency rep. :-

    Name of NSPCL rep. :- Signature of NSPCL rep. :-

  • 7/31/2019 Nspcl Durg Protocol

    110/125

    NSPCL - DURGAPUR

    Page 109 of 109

    CHECKLIST FOR O/H OF HT MOTORS [PA FAN - 2]FRAMESIZE:

    A NAME OF DRIVE :-

    B SL.NO. OF MOTOR: BEARINGNO. OLD BRG NEWBRGa. DESIDE

    C PTW NO.b.NDESIDE

    BEARING

    D START DATE :- CHANGEa. DESIDE

    YES/NO.

    E COMPLETION DATE:-b.NDESIDE

    YES/NO.

    SL.No.

    JOB DESCRIPTION ACTIVITY REMARKS

    1 Motor Sl. No. YES / NO

    2 Dismantling of motor. YES / NO

    3 Checking of all fasteners threads YES / NO

    4 Cleaning of rotor & stator. YES / NO

    5 *Checking of rotor bars / end rings / any YES / NOrubbing / defects etc. YES / NO

    6 Cleaning of stator. YES / NO

    7 *Checking of stator winding. YES / NO

    8 Heating of stator / rotor. YES / NO

    9 *IR / PI checking. YES / NO

    10 Varnishing of stator / rotor. YES / NO

    11Cleaning / servicing of bearings (DE &

    NDE).YES / NO

    12 *Bearing clearance checking & replacement. YES / NO

    13 Space heater checking. YES / NO

    14 End covers are proper fixed. YES / NO

    15 Greasing of bearings. YES / NO

    16 Sealing of stator by (sealing) compound. YES / NO

    17 Tightness of fasteners with proper washers. YES / NO

    18 Fitting of grease cup/check nuts/ coupling / YES / NO

    Sleeve etc.

    19 Phase / neutral motor TB gaskets fixing. YES / NO

    20 Fitting of cooling fan / cooling fan cover. YES / NO

    21 Space heater cable connection. YES / NO

  • 7/31/2019 Nspcl Durg Protocol

    111/125

  • 7/31/2019 Nspcl Durg Protocol

    112/125

  • 7/31/2019 Nspcl Durg Protocol

    113/125

    NSPCL - DURGAPUR

    Page 112 of 112

    22 Cable & earthling plates connection. YES / NO

    23 PI / IR measuring. YES / NO

    24Fitting/sealing of motor TB/ winding RTD /

    Heater boxes covers (cable entry / holes).YES / NO

    25 Vibration of motor (decouple & couple). YES / NO

    26 If any defect/ surprise inform to EIC. YES / NO

    NOTE: Star (*) marks points to be checked by NSPCL representative.

    Name of agency:- Signature of agency rep. :-

    Name of NSPCL rep. :- Signature of NSPCL rep. :-

  • 7/31/2019 Nspcl Durg Protocol

    114/125

  • 7/31/2019 Nspcl Durg Protocol

    115/125

    NSPCL - DURGAPUR

    Page 114 of 114

    21 Space heater cable connection. YES / NO

    22 Cable & earthling plates connection. YES / NO

    23 PI / IR measuring. YES / NO

    24Fitting/sealing of motor TB/ winding RTD /

    Heater boxes covers (cable entry / holes).YES / NO

    25 Vibration of motor (decouple & couple). YES / NO26 If any defect/ surprise inform to EIC. YES / NO

    NOTE: Star (*) marks points to be checked by NSPCL representative.

    Name of agency:- Signature of agency rep. :-

    Name of NSPCL rep. :- Signature of NSPCL rep. :-

  • 7/31/2019 Nspcl Durg Protocol

    116/125

  • 7/31/2019 Nspcl Durg Protocol

    117/125

    NSPCL - DURGAPUR

    Page 116 of 116

    21 Space heater cable connection. YES / NO

    22 Cable & earthling plates connection. YES / NO

    23 PI / IR measuring. YES / NO

    24Fitting/sealing of motor TB/ winding RTD /

    Heater boxes covers (cable entry / holes).YES / NO

    25 Vibration of motor (decouple & couple). YES / NO26 If any defect/ surprise inform to EIC. YES / NO

    NOTE: Star (*) marks points to be checked by NSPCL representative.

    Name of agency:- Signature of agency rep. :-

    Name of NSPCL rep. :- Signature of NSPCL rep. :-

  • 7/31/2019 Nspcl Durg Protocol

    118/125

    NSPCL - DURGAPUR

    Page 117 of 117

    CHECKLIST FOR O/H OF HT MOTORS [COAL MILL - 2]FRAMESIZE:

    A NAME OF DRIVE :-

    B SL.NO. OF MOTOR:BEARINGNO.

    OLD BRGNEWBRG

    a. DESIDE

    C PTW NO.b.NDESIDE

    BEARING

    D START DATE :- CHANGEa. DESIDE

    YES/NO.

    E COMPLETION DATE:-b.NDESIDE

    YES/NO.

    SL.No.

    JOB DESCRIPTION ACTIVITY REMARKS

    1 Motor Sl. No. YES / NO

    2 Dismantling of motor. YES / NO

    3 Checking of all fasteners threads YES / NO

    4Cleaning of rotor & stator.

    YES / NO

    5 *Checking of rotor bars / end rings / any YES / NO

    rubbing / defects etc. YES / NO

    6 Cleaning of stator. YES / NO

    7 *Checking of stator winding. YES / NO

    8 Heating of stator / rotor. YES / NO

    9 *IR / PI checking. YES / NO

    10 Varnishing of stator / rotor. YES / NO

    11Cleaning / servicing of bearings (DE &

    NDE).YES / NO

    12 *Bearing clearance checking & replacement. YES / NO

    13 Space heater checking. YES / NO

    14 End covers are proper fixed. YES / NO

    15 Greasing of bearings. YES / NO

    16 Sealing of stator by (sealing) compound. YES / NO

    17 Tightness of fasteners with proper washers. YES / NO

    18 Fitting of grease cup/check nuts/ coupling / YES / NO

    Sleeve etc.

    19 Phase / neutral motor TB gaskets fixing. YES / NO

    20 Fitting of cooling fan / cooling fan cover. YES / NO

  • 7/31/2019 Nspcl Durg Protocol

    119/125

    NSPCL - DURGAPUR

    Page 118 of 118

    21 Space heater cable connection. YES / NO

    22 Cable & earthling plates connection. YES / NO

    23 PI / IR measuring. YES / NO

    24Fitting/sealing of motor TB/ winding RTD /

    Heater boxes covers (cable entry / holes).YES / NO

    25 Vibration of motor (decouple & couple). YES / NO26 If any defect/ surprise inform to EIC. YES / NO

    NOTE: Star (*) marks points to be checked by NSPCL representative.

    Name of agency:- Signature of agency rep. :-

    Name of NSPCL rep. :- Signature of NSPCL rep. :-

  • 7/31/2019 Nspcl Durg Protocol

    120/125

  • 7/31/2019 Nspcl Durg Protocol

    121/125

  • 7/31/2019 Nspcl Durg Protocol

    122/125

    NSPCL - DURGAPUR

    Page 121 of 121

    CHECKLIST FOR O/H OF HT MOTORS [COAL MILL 4]FRAMESIZE:

    A NAME OF DRIVE :-

    B SL.NO. OF MOTOR:BEARINGNO.

    OLD BRGNEWBRG

    a. DESIDE

    C PTW NO.b.NDESIDE

    BEARING

    D START DATE :- CHANGEa. DESIDE

    YES/NO.

    E COMPLETION DATE:-b.NDESIDE

    YES/NO.

    SL.No.

    JOB DESCRIPTION ACTIVITY REMARKS

    1 Motor Sl. No. YES / NO

    2 Dismantling of motor. YES / NO

    3 Checking of all fasteners threads YES / NO

    4Cleaning of rotor & stator.

    YES / NO

    5 *Checking of rotor bars / end rings / any YES / NO

    rubbing / defects etc. YES / NO

    6 Cleaning of stator. YES / NO

    7 *Checking of stator winding. YES / NO

    8 Heating of stator / rotor. YES / NO

    9 *IR / PI checking. YES / NO

    10 Varnishing of stator / rotor. YES / NO

    11Cleaning / servicing of bearings (DE &

    NDE).YES / NO

    12 *Bearing clearance checking & replacement. YES / NO

    13 Space heater checking. YES / NO

    14 End covers are proper fixed. YES / NO

    15 Greasing of bearings. YES / NO

    16 Sealing of stator by (sealing) compound. YES / NO

    17 Tightness of fasteners with proper washers. YES / NO

    18 Fitting of grease cup/check nuts/ coupling / YES / NO

    Sleeve etc.

    19 Phase / neutral motor TB gaskets fixing. YES / NO

    20 Fitting of cooling fan / cooling fan cover. YES / NO

  • 7/31/2019 Nspcl Durg Protocol

    123/125

    NSPCL - DURGAPUR

    Page 122 of 122

    21 Space heater cable connection. YES / NO

    22 Cable & earthling plates connection. YES / NO

    23 PI / IR measuring. YES / NO

    24Fitting/sealing of motor TB/ winding RTD /

    Heater boxes covers (cable entry / holes).YES / NO

    25 Vibration of motor (decouple & couple). YES / NO26 If any defect/ surprise inform to EIC. YES / NO

    NOTE: Star (*) marks points to be checked by NSPCL representative.

    Name of agency:- Signature of agency rep. :-

    Name of NSPCL rep. :- Signature of NSPCL rep. :-

  • 7/31/2019 Nspcl Durg Protocol

    124/125

    NSPCL - DURGAPUR

    Page 123 of 123

    CHECKLIST FOR O/H OF HT MOTORS [CW PUMP-1]FRAMESIZE:

    A NAME OF DRIVE :-

    B SL.NO. OF MOTOR:BEARINGNO.

    OLD BRGNEWBRG

    a. DESIDE

    C PTW NO.b.NDESIDE

    BEARING

    D START DATE :- CHANGEa. DESIDE

    YES/NO.

    E COMPLETION DATE:-b.NDESIDE

    YES/NO.

    SL.No.

    JOB DESCRIPTION ACTIVITY REMARKS

    1 Motor Sl. No. YES / NO

    2 Dismantling of motor. YES / NO

    3 Checking of all fasteners threads YES / NO

    4Cleaning of rotor & stator.

    YES / NO

    5 *Checking of rotor bars / end rings / any YES / NO

    rubbing / defects etc. YES / NO

    6 Cleaning of stator. YES / NO

    7 *Checking of stator winding. YES / NO

    8 Heating of stator / rotor. YES / NO

    9 *IR / PI checking. YES / NO

    10 Varnishing of stator / rotor. YES / NO

    11Cleaning / servicing of bearings (DE &

    NDE).YES / NO

    12 *Bearing clearance checking & replacement. YES / NO

    13 Space heater checking. YES / NO

    14 End covers are proper fixed. YES / NO

    15 Greasing of bearings. YES / NO

    16 Sealing of stator by (sealing) compound. YES / NO

    17 Tightness of fasteners with proper washers. YES / NO

    18 Fitting of grease cup/check nuts/ coupling / YES / NO

    Sleeve etc.

    19 Phase / neutral motor TB gaskets fixing. YES / NO

    20 Fitting of cooling fan / cooling fan cover. YES / NO