nsa capstone project iii final pp
TRANSCRIPT
![Page 1: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/1.jpg)
NSA Capstone Project III
CNUSD COMPUTER LABS
![Page 2: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/2.jpg)
Team Members
Chaz Parada Alfonso Zamorano Robert Cortez
![Page 3: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/3.jpg)
Summary Project Description Project Objectives Project Scope Deliverables Project Schedule Project Risk Management Server Configurations Client Configurations Quality Management Plan Stakeholders Requirements
![Page 4: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/4.jpg)
Summary Cont. Acceptance Criteria Project Estimated Effort/Cost/Duration Project Assumptions Project Risk Management Project Constraints Project Dependencies Project Approach Communication Plan Project Guidelines Project Approvals Total Cost
![Page 5: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/5.jpg)
Project Description
The Technology director of CNUSD wants three new fully functional computer labs for various groups of students.
These labs will give students the means to thrive in a growing technological world by providing the infrastructure and technology with the will to learn basic computer literacy.
![Page 6: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/6.jpg)
Project Objectives
The objective of this project is to be able to design and implement a network infrastructure for three functional computer labs in the Corona Norco Unified School District.
These labs will provide students and teachers will e-mail capability on both client and mobile devices, as well as secure authentication.
There will be basic productivity software installed to provide students the means to complete all assigned classwork and labs.
Web access will be provided within a secure network infrastructure so that students, teachers, and guests can navigate the web safely.
A user guide web page will be designed and will be used for and type of training and documentation purposes.
![Page 7: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/7.jpg)
Project Scope In Scope:
Procurement of all necessary software/hardware to meet client requirements
Installation and configuration of hardware and devices Providing wireless access for only the approves mobile devices Configuring a secure network environment for the safe storage of
sensitive data Testing of all hardware devices or software installed by TSM Production of any applicable documentation for the project Warranty replacement or rework off any defective devices for 30
calendar days after successful completion
![Page 8: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/8.jpg)
Project Scope Cont. Out of Scope
No technical support will be provided after the successful completion of the project
Any installation or modification of any electrical wiring is not a concern for TSM
Laboratory furniture will not be procured or installed by TSM
Any installation of any hardware or software, outside of what is stated in the project requirements will not be completed by TSM
![Page 9: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/9.jpg)
Deliverables Active Directory Schema Physical Network Diagram Logical Network Diagram Disaster Recovery Plan Detailed Bill of Materials89 Quality Management Plan
![Page 10: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/10.jpg)
Deliverable Cont. Gantt Chart Network Activity Diagram Work Breakdown Structure Risk Management Plan Change Management Plan Project Agendas
![Page 11: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/11.jpg)
Project Schedule
Week 1: Site inspection then Brainstorm to make a rough outline of needed phases we will need to go thoughWeek 2: Write up a charter to cover what we found we needed in week 1 Week 3: Write up all needs for the severest upWeek 4: Write up all needs for the labs setupWeek 5: Design a network layout (i.e IP address, wiring ect.)
![Page 12: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/12.jpg)
Project Schedule Cont.Week 6: Find pricing for needed components Week 7: Confirm components work with each other and programs will run smoothly Week 8: Do install and server set ups Week 9: Configure labs make sure all programs are runningWeek 10: Have random users test the computers in labs to make sure they work for different users Week 11: Present to stakeholders the finished outcome
![Page 13: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/13.jpg)
Project Risk Management Risk Planning Process This project followed a systematic, proactive approach to risk planning,
which involved as many stakeholders as feasible. The process for risk planning was:
1. Risk identification – identified possible risk events that could occur on the project, the triggers that could precipitate the risk, and the symptoms that would indicate that the risk occurred.2. Risk qualification – determined the qualitative probability and impact of the risks, based on stakeholders’ input, to prioritize the risks for further planning actions.
![Page 14: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/14.jpg)
Project Risk Management Cont.3. Risk quantification – high score risks were analyzed further to quantify their probability in percentage and their impacts in cost, time or quality measures. The result of quantification is the risk exposure, which is the product of the probability and impact values.4. Risk response development – proactive risk response strategies were developed reduce, transfer or eliminate unfavorable risks and exploit, enhance or share favorable risks. Some risks had contingency plans and fallback plans developed in case the risks occur.
![Page 15: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/15.jpg)
Server ConfigurationsServer 1Server Name: DC118Short description: Controls security protocols for the domainOS: Microsoft Windows Server Standard 2012 R2FQDN: DC118.CNUSD.comIP Address: 125.1.1.3/24Server Role(s): Domain controller and Schema Master
![Page 16: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/16.jpg)
Server ConfigurationsServer 2Server Name: DNS118Short description: Resolves and distributes IP addresses for devices on the networkOS: Microsoft Windows Server Standard 2012 R2FQDN: DNS118.CNUSD.comIP Address: 125.1.1.4/24Roles: DNS and DHCP
![Page 17: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/17.jpg)
Server ConfigurationsServer 3Server Name: Print118Short description: Handles print jobs from devices on the network. Also hosts the local intranet web page.OS: Microsoft Windows Server Standard 2012 R2FQDN: print118.CNUSD.comIP Address: 125.1.1.5/24Roles: Print server and IIS (web server)
![Page 18: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/18.jpg)
Server Configurations Cont.Server 4Server Name: BU118Short description: Backup server used to seize roles in the event of a server failure.OS: Microsoft Windows Server Standard 2012 R2FQDN: BU118.CNUSD.comIP Address: 125.1.1.6/24Roles: Domain controller, IIS, Print Server, DNS, and DHCP. These roles will be preconfigured but inactive. In the event of a server failure, any of these roles can be activated to minimize downtime between repairs.
![Page 19: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/19.jpg)
Client Configuration Install windows 7 OS Install KASPERSKY TOTAL SECURITY FOR BUSINESS Install Microsoft Office (word, outlook, power point, excel, note) Remove run commands Set auto power on/off
![Page 20: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/20.jpg)
Client Configuration Cont. Remove ability to open/run security program Remove control panel Remove system tools Remove preloaded games Setup Auto updates
![Page 21: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/21.jpg)
Quality Management Plan
![Page 22: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/22.jpg)
Purpose The purpose of this Quality Management Plan is to ensure that
the customer is receiving not only a quality network from TSM, but also a network described within the project documentation.
The project has certain deliverables to help in this process. This plan is one of those deliverables, and outlines what is being checked.
This plan includes two types of documentation. 1. Checklist for all documentation.2. Checklist for all hardware and software that is involved with the
end user.
![Page 23: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/23.jpg)
Objectives The objectives within the Quality Management Plan are to provide the customer with the documents that will guide their inspection of services.
Quality will meet the following objectives: Complete informative documentation Labs cabled to code Functional network Up-to-date server environment Up-to-date workstation environment
![Page 24: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/24.jpg)
StakeholdersStakeholders How are they affected?
Students Students will use the labs to learn basic computer literacy skills for use in the modern workplace. They will have the ability to email class assignments and homework to their teachers.
Teachers Teachers have the benefit of sending assignments progress reports, and reminders to all their students via email.
School District The school district will benefit from higher performing schools that utilize an effective learning environment.
School The school will benefit by having a more effective means of communication between faculty and students.
![Page 25: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/25.jpg)
RequirementsHardware Severs
One Domain Controller for Active Directory Schema and LDAP authentication
One DNS/DHCP Server for client IP addressing and domain name resolution
One IIS Server for hosting user intranet web page and documentation and a secondary role as a print server
One file server for backing up critical data
![Page 26: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/26.jpg)
Requirements Cont. Clients
90 desktop computers for students’ use (30 per lab) 3 desktop computers for teachers’ use (1 per lab)
Printers 3 high capacity printers (1 per lab), for students and teachers to print
assignments and other school related documents Wi-Fi
3 wireless access points (1 per lab), for teachers and students to gain network access on approved mobile devices
![Page 27: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/27.jpg)
Requirements Cont. Functionality
Logins for three specific groups Students Instructors Guests
Mail Mail for both students and instructors Mobile mail for both students and instructors Microsoft Exchange Online for 1500 users
Login LDAP authentication
![Page 28: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/28.jpg)
Requirements Cont. Software
Microsoft Windows Server 2012 R2 Licensing for 4 Servers CAL licensing for 200 devices Microsoft Windows 7 SP 1 Licensing for 105 workstations Microsoft Office 2013 Licensing for 105 workstations Kaspersky Total Security for Business
![Page 29: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/29.jpg)
Requirements Cont. Network Infrastructure
Copper UTP cabling from the labs to the server room Copper UTP patch cabling from wall drops to workstations Copper UTP patch cabling patch panels to servers 3 Cisco 48 port managed switches 3 Cisco standalone wireless access points 1 Cisco 8 port managed switch 1 Cisco integrated services router 1 Cisco firewall
Server Room Locking racks for server security and integrity
![Page 30: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/30.jpg)
Acceptance CriteriaHardwareAll hardware will be new, and neither used nor refurbished Servers
Will have a minimum of 8GB RAM Will have a minimum of 4 processor cores Will have a minimum of 500GB Storage Will be rack-mounted
Wi-Fi Will support up to 20 concurrently connected devices per access
point Will support wireless 802.11n technology
![Page 31: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/31.jpg)
Acceptance Criteria Cont. Clients
Will have a minimum of 8GB RAM Will have a minimum of 1TB hard drive storage Will have Ethernet 10/100/1000 network adapters Will have a minimum of 25” LED monitors Will have wired keyboards and mice Will have lockable cases with locks in place for workstation security
and integrity Printers
Will have a minimum of 50 PPM printing capacity Will print both color and B&W
![Page 32: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/32.jpg)
Acceptable Criteria Cont.SoftwareAll software will have current licensing and not violate any copyright or antipiracy laws Workstations
All workstations will have Microsoft’s Windows 7 SP1 operating system All workstations will have Microsoft’s Outlook, Word, Excel, and PowerPoint All workstations will have antivirus and antimalware software
Servers All servers will have Microsoft’s Windows Server 2012 R2 operating
system All servers will have antivirus software Email servers will use Microsoft’s Exchange 2013 software
![Page 33: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/33.jpg)
Acceptable Criteria Cont.Functionality Teachers, students, and guests will be able to authenticate to the domain
from any workstation in any of the labs All users will have access to the local intranet documentation website All users will have internet access Users with mobile devices will be able to gain access to the network
wirelesslyNetwork Infrastructure Only Cisco brand networking devices will be used: routers, switches, etc. Routers will have VPN capability to communicate with other district
laboratories Traffic from site to site will use a minimum of 128 bit encryption
![Page 34: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/34.jpg)
Project Estimated Effort/Cost/DurationMilestone Projected
Completion Date
Deliverable(s) completed
Planning Phrase
10/2/15 Project CharterProject ScopeProject Schedule
Design Phrase
!0/30/15 Bill of MaterialsRisk Management
Implementation Phrase
11/5/15 Workstation /Server Configurations
Closing Phrase
11/21/15 Project Manager SignoffClient Signoff
Estimated Cost: $295,496.45Estimated Effort Hours: 150 – 250 hoursEstimated Duration: 8-10 weeks
![Page 35: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/35.jpg)
Project Assumptions
It is assumed that: This is validated by:The existing lab rooms will have adequate space and cooling capacity for the new lab equipment
Conducting a site inspection
The existing server room will have adequate space and cooling capacity for the new lab equipment
Conducting a site inspection
The electrical infrastructure is in place and meets the wattage and usage requirements of the new equipment in both the labs and server room.
Conducting a site inspection
Service will be provided to demarcation point
Testing the internet connection provided for the server room
![Page 36: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/36.jpg)
Project Risk ManagementRisk Area Level (H/M/L) Risk Plan Responsibility
Backordered or factory defective hardware
Medium In the event that hardware is unavailable when it’s time for installation we have prepared an additional means of procuring hardware that meets our standards.
Robert Cortez
Team member absences or failure to meet assigned deadlines.
Medium All tasks and deliverables have second person assigned to assume responsibilities in the event of a member absence or failure to complete the given task.
Robert Cortez
![Page 37: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/37.jpg)
Project ConstraintsThe project must be completed
before the start of the school year on August 16th, 2016
![Page 38: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/38.jpg)
Project DependenciesThe successful completion of this project is dependent of the following: Building access for the duration of the installation
within the school’s specified hours of operation. This includes, but is not limited to, access to the server and laboratory rooms, as well as access to any rooms needed to properly install and route network cabling.
Any and all permits required to meet county, city, state, and federal regulations applicable to this installation before the implementation phase begins.
![Page 39: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/39.jpg)
Project ApproachPlanning Phase Site inspection: A site inspection is necessary to determine materials needed, physical
layout, and any possible project impedances. Project Charter: The project charter is the outline for the project and encompassing
elements. Scope of Work The scope of work will dictate was is to be expected, and also not
expected, as it pertains to this project. Network Activity Diagram. The network activity diagram is a visual aid to help understand the
project process and progression. Project Schedule The project schedule will dictate at when deliverables will be completed. Change Management Plan The change management plan will explain the process to request changes to be made
the project or its deliverables.
![Page 40: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/40.jpg)
Project Approach Cont.Design Phase Work Breakdown Structure Hardware Software Network Infrastructure Active Directory Schema Bill of Materials Risk Management Plan
![Page 41: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/41.jpg)
Project Approach Cont.Implementation Phase Hardware Installation Software Installation Configurations Quality Plan and TestingClosing Phase Deliverables Checklist Deliver Finished Product Project Manager Signoff Customer Signoff
![Page 42: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/42.jpg)
Communication PlanAll project related questions and concerns should be directed to the project manager, who may then use the following contact information to communicate any issues. Below is the contact information and respective titles for the persons involved in this project. It is recommended, for documentation purposes, that communication should be made primarily by email.
![Page 43: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/43.jpg)
Communication PlanMember Role Email Phone
Chaz Parada Project Manager [email protected]
(951)-252-5054
Alfonso Zamorano Team Member [email protected]
(951)-532-3575
Robert Cortez Team Member [email protected]
(951)-281-9626
Anna Coriddi CNUSD Treasurer [email protected]
(951)-736-5000
Michael H. Lin CNUSD Superintendent
[email protected] (951)- 736-5010
Brian Troudy Technology Director [email protected]
(951)- 736-5190
![Page 44: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/44.jpg)
Project Guidelines All team members must complete deliverables in a timely
manner so that a reviews and revisions can be made before the specified date of completion. All team members must follow the communication plan, as stated above, for any project related issues. All documents should be saved to the shared google drive, as well as, locally to the responsible party’s computer. All team members must notify the project manager upon completion of any tasks, deliverables, or documentation.
![Page 45: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/45.jpg)
Project ApprovalsApprover Position/Role Signature
Anna Coriddi CNUSD Treasurer
Michael H. Lin CNUSD Superintendent
Brian Troudy Technology Director
Chaz Parada Project Manager
![Page 46: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/46.jpg)
Total Cost
Total Cost: $295,496.45
![Page 47: NSA Capstone Project III final pp](https://reader035.vdocuments.us/reader035/viewer/2022062822/587f45711a28ab43318b640f/html5/thumbnails/47.jpg)
Questions or Comments?