Davis Besse Shield Building CracksJanuary 5, 2012
8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012
http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 2/24
Welcome
2
yn a e ersonActing Regional Administrator
NRC Region III
8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012
http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 3/24
NRC Safety Mission
• The Nuclear Regulatory Commission (NRC)is an independent federal agency created
y . . ongress.• The mission of the NRC is to license and
regulate the Nation’s civilian use of
nuclear materials in order to protect publichealth and safety, promote the commondefense and security, and protect theenvironment.
3
8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012
http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 4/24
8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012
http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 5/24
Meeting Purpose
• Inform the public about the safety of the
Davis Besse shield building through:
- A presentation by the licensee on theresults of their tests and analysis.
- A presentation by the NRC on the NRC’s
inspection of the shield building and
actions taken to ensure safety.
5
8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012
http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 6/24
Meeting Information
Kenneth O’Brien
6
epu y rec or, v s on oReactor Safety
NRC Region III
8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012
http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 7/24
Meeting Agenda
• Introductions
• Background
7
• Licensee Presentation
• NRC Inspection & Conclusion
• Additional NRC Safety Actions
• Summary
• Public Questions and Comments
8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012
http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 8/24
Introductions - NRC
• Cynthia Pederson, Acting Regional Administrator,Region III
• Kenneth O’Brien, Deputy Director, Division of Reactor Safet
8
• Patrick Hiland, Director, Division of Engineering, Officeof Nuclear Reactor Regulation
• David Hills, Chief, Engineering Branch 1
• Jamnes Cameron, Chief, Reactor Projects Branch 6
• Daniel Kimble, Senior Resident Inspector
• Adam Wilson, Resident Inspector
• Jared Heck, Meeting Facilitator
8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012
http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 9/24
Meeting Contacts
• Followup Questions - Contact the
NRC Region III Office of Public
Affairs / Viktoria Mitlyng / PremaChandrathil 630-829-9500
9
8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012
http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 10/24
First Energy Nuclear
10
(FENOC) Introductions
and Presentation
8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012
http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 11/24
NRC Inspection &Conclusions
11
David Hills
Engineering Branch Chief NRC Region III
8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012
http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 12/24
NRC Safety Focused Inspection
• At discovery of cracking, NRCinspectors already onsite inspecting
12
replacement.
• Added extra NRC structural expertise.
• Approximately 10 NRC engineersinvolved during the almost 8 weektime period.
12
8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012
http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 13/24
NRC Safety Focused Inspection
• NRC inspectors onsite independentlyobserved and evaluated licensee’s
13
ac v es o e erm ne e ex en ocracking.
• NRC structural engineers performedextensive, independent, & rigorousreview of the licensee’s analysisincluding structural calculations.
8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012
http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 14/24
NRC Safety Focused Inspection
• The NRC team engaged the licensee’sengineers and consultants in intense
14
licensee’s actions and analysis.
• Numerous technical questions were
posed and answered – some inwriting/many verbally.
14
8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012
http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 15/24
NRC Safety Focused Inspection
• NRC questions resulted in additionallicensee actions to determine the
15
of more extensive/detailed structuralcalculations.
15
8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012
http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 16/24
• The licensee performed impulseresponse mapping and confirmatory
NRC Conclusion Basis
16
cracking.
• Structural calculations reflected extent
of cracking that was verified throughtesting.
16
8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012
http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 17/24
• Licensee calculation assumptions andengineering judgments were
NRC Conclusion Basis
17
.• Calculation modeling adequately
reflected the building condition
including structural load path.
17
8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012
http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 18/24
• The licensee evaluated the shield building’s
ability to withstand the design basis
NRC Conclusion Basis
18
, ,
missiles.
• The licensee’s calculations confirmed that
building stresses remained within limits setin the original licensing basis.
18
8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012
http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 19/24
Shield building remains capable of
NRC Safety Conclusion
19
per orm ng s sa e y unc on esp e e
cracking and therefore licensee could safely
restart plant.
19
8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012
http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 20/24
• NRC structural engineers continue in their evaluation of whether the shield building
meets licensin commitments. If NRC
NRC Safety Conclusion
20
concludes commitments are not met, thenlicensee will need to correct.
• NRC inspection team is evaluating licensee’s
ongoing root cause activities and
determination of longer term corrective
actions.
20
8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012
http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 21/24
Additional NRC Safety
Actions
21
amnes ameronChief, Reactor Projects Branch 6
NRC Region III
8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012
http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 22/24
Additional NRC Actions to Ensure Continued
Safety of the Shield Building
Confirmatory Action Letter issued on December 2, 2011 –
22
,
and implement corrective actions, including a long-term monitoring program.
• Licensee to implement a short-term monitoringprogram.
NRC will conduct a followup inspection of root cause
evaluation and proposed corrective actions.
8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012
http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 23/24
Summary
23
ynt a e ersonActing Regional Administrator
NRC Region III
8/3/2019 NRC Public Meeting Public Meeting Davis Besse Shield Building Cracks January 5, 2012
http://slidepdf.com/reader/full/nrc-public-meeting-public-meeting-davis-besse-shield-building-cracks-january 24/24
• NRC structural engineers conducted an
extensive, independent, and rigorousevaluation.
•
Summary
24
capable of performing its safety function.
• NRC determined that plant safety was notcompromised. NRC has taken actions to
ensure the plant remains safe going forward.
• NRC has continued to communicate to themedia, public officials, and members of thepublic.