NPV Scheduler is the most complete andversatile tool for strategic open pit mine
planning on the market. Functionalityspans everything from preliminarymodeling through to building detailedlife-of-mine plans with practicalpush-backs and scheduling.
NPV SchedulerThe complete strategic mine planning system
cae.com/mining
Geological ModelImport a geological block model with grade, lithology,
topography, surfaces and mining boundaries. Digitize
plan data. Model may also contain recovery, cost and
slope information.
Economic ModelInput commodity prices, mining costs, processing
costs and recoveries to create a three-dimensional
economic model with intrinsic block values.
Nested PitsGenerate a set of nested Lerchs-Grossmann (LG) pit
shells that represent varying economic parameters
and generate an Ultimate Pit Optimal Extraction
Sequence (OES).
Practical PushbacksUse the LG shells, Optimal Extraction Sequence and
pushback targets to generate practical pushback
shapes that respect good mine design practice.
Optimized ScheduleSchedule pushbacks according to production targets
and mining constraints for maximum optimization.
Refine the schedule with blending and cut-off grade
optimization. Include haulage truck hours as an
optimization target.
Methodology
Optimized strategic mine plan with design and
schedule contained in one system
Ultimate pits are optimized for maximum cash flow
(base and precious metals) or maximum reserve
life (industrial minerals). Pits are optimally sequenced
to maximize NPV or achieve material blend
Fast, practical, mineable pushback generation
Sophisticated scheduling, blending, stockpiling, grade
optimization, process optimization, production
targeting and haulage optimization
Easy-to-use methodology with multiple layers of
sophistication, from quick studies to detailed mine
plans
From Geological
Model to Mine Plan
Benefits
-
8/11/2019 NPV_Scheduler_Email_ENG.pdf
2/2
nside NPV Scheduler
First Pushback ? Last Pushback ?
Determining Pushback
ShapesPushbacks are based on LG shells, but
ractical mining requires careful formation of thenal pushback shapes. NPV Scheduler creates
he pushbacks using LG shells and the Ultimate
Pit OES, but it also optimizes the push back
hapes for practical mining, while retaining the
maximum possible NPV.
Visualization, Animation
and ReportingNPV Scheduler has a wide variety of reporting
and visualization options, from full reports with
customizable content to 3D rendered life of mine
animations.
Material Allocation
OptimizerMAO examines the processing of each blockeach pad, mill, stockpile, waste etc.) and
eallocates it to a new method based on overall
economic value. MAO optimizes stockpiling
and multiple blended products (e.g. iron ore &
ndustrial minerals) where production targets and
varying product specifications can be blended
rom different inputs.
Mine Flow OptimizerMFO increases NPV by optimizing cut-off grades.
It adjusts the schedule to create more value by
mining a higher grade of ore earlier when that
outweighs the cost of wasting or stockpiling
lower grade ore.
Geo-Risk AssessmentGRA provides a mechanism for understanding
the risk associated with the uncertainty of grade
distribution in the resource model. It does this
by considering conditionally-simulated models in
the strategic planning process. GRA generates
a set of risk-rated pits which can be used to
limit the impact of grade uncertainty on planning
outcomes.
Capital CostsNPV Scheduler can model multiple types of
capital costs such as pushback start-up costs,
costs that occur at fixed times or are associated
with the removal of material within specified
boundaries.
Haulage OptimizationIn order to produce a schedule with practical
haulage fleet requirements NPV Scheduler
allows the inclusion of haulage truck hours as
an integral optimization target. The scheduler
will allocate blocks taking into account their
transport requirements as well as their material
types and values. This is in contrast to other
systems that typically provide tools to analyze the
haulage requirements after a schedule has been
developed.
AUSTRALIA
PerthLevel 3, 41-43 Ord StreetWest Perth WA 6005
Tel +61 8 6462 0900
BrisbaneLevel 15, 120 Edward StreetBrisbane, Queensland, 4000
Tel +61 7 3248 0000
BRAZIL
Belo HorizonteAlameda da Serra, 360 7oandarVila de Serra Nova Lima MG
34000-000Tel +55 31 3264 9377
CANADA
Montreal3200 GuenetteSaint-Laurent, QuebecH4S 2G5 Canada
Tel +1 514 341 2000 ext. 2404
Sudbury866 Newgate Avenue, Unit 2Sudbury, Ontario P3A 5J9
Toll-free: 1 800 240 6941Tel +1 705 688 0101
Vancouver2000-1066 W Hastings St
Vancouver, BC V6E 3X2Canada
Tel + 1 604 601 8233
CHILE
SantiagoSanta Magdalena, 75Oficina 903, ProvidenciaSantiago 751-0038
Tel +56 2 2334 5952
CHINA
505A, 19A West Chegongzhuang RoadBeijing, China 100048
Tel: +86-137-0122-9235
COLOMBIA
Calle 29 N 41 - 105 Of. 1206Edificio SohoMedelln, Antioquia
Tel +57 - 4 - 403 17 75
INDIA
New Delhi601, Elegance Tower
Jasola District CentreNew Delhi - 110 025India
Tel +91 11 41290000
KAZAKHSTAN
Karaganda201, 2 Lenin Street100012, KaragandaRepublic of Kazakhstan
Tel +7 7212 425138
MEXICO
Callejn del Capuln #101, esquina conAvenida Torren, centro HistricoZacatecas, Zac.C.P. 98000
Tel +52 492 22 122
PERU
Lima
Av. Manuel Olgun, 335 Oficina 503Torre Link TowerSurco, Lima - Peru
Tel +51 1 434 2727
SOUTH AFRICA
Johannesburg9 Fricker RoadIllovo Boulevard, IllovoJohannesburg, 2196Republic of South Africa
Tel +27 11 772 7960
UNITED KINGDOM
WellsUnit A, Underwood Business ParkWookey Hole Road,Wells, Somerset BA5 1AFUnited Kingdom
Tel +44 1749 683 350
UNITED STATES OF AMERICADenver10901 W. Toller Drive #205Littleton, CO 80127United States
Tel +1 303 985 7713
Global offices
2014 CAE Mining