NPDgamma Liquid Hydrogen Target Safety Review
Project and Safety
At LANL
November 29-30, 2005
NPDgamma Experiment:
Precision measurement of parity-violating directional gamma-ray asymmetry A in polarized cold neutron capture on proton.The goal is to measure Awith the accuracy of 10-8. The measurement will unambiguously determine the weak NN coupling constant.
NPDGamma Experiment Setup in FP12 at ER2
FP12 Cave
The NPD Collaboration
About NPDgamma Project
• Scientific proposal was written in 1997 • Management Plan “The n+pD+ Project Management Plan for Experiment and Beam Line Construction” was signed in 2001. • Sponsors: DoE Nuclear Physics, NSF, NSERC, LANL, collaborating institutes• Capital cost of the project is roughly $2.5mil + $2.5 mil• Beamline construction project completed 02/04• Experiment construction project has:
11 work packages responsibilities by collaborators and LANLcompleted except of the LH2 target work packageproject completion forecast 6/03
Status and plans
• Status– Beamline completed in 2004– Experiment completed in 2004 except of the LH2 target
• Our goal is to – have the LH2 target ready for beam and for
production at the end of March 2006 when beam is assumed to be again available at the Lujan Center after the facility maintenance break.
– For this we need to complete• Testing in shed• Install the target on FP12• Test the target again on FP12• And pass the reviews
€
rn + p → d +γ
• Scientific proposal was written in 1997• Pendlebury Committee’s physics review in 1997• Spinka I Committee’ technical review in 1998• In 1999 the 1st Target Review “Preliminary
Conceptual Design Review of the NPDGamma Experiment Hydrogen Target”
• Spinka II Committee’s technical review in 2000• In 2001 the 2nd Target Review “10% design
review” set “ a baseline” for further design. • Spinka III technical review in November 2002• DOE technical progress review on October 2004• In 2004 the vent line review
• In 2005 the 3rd Target Review
• Preliminary plan for the DOE closeout review of the construction project agreed to be on August 2006.
Project’s review history and futureProject’s review history and future
DOEDOEJohn McClellandLANL NPPJohn McClellandLANL NPPPhysics andLANSCE Council
Susan SeestromPhysics DivisionSusan SeestromPhysics DivisionPaul LisowskiLANSCE Division(Facility Owner)Paul LisowskiLANSCE Division(Facility Owner)Mary HockadayP-23 Group LeaderMary HockadayP-23 Group LeaderJ. David BowmanSpokespersonJ. David BowmanSpokespersonManagement Team:•Bowman / LANL•Penttila / LANL•Wilburn / LANLSeppo PenttilaProject ManagerSeppo PenttilaProject ManagerJeff SchinkelProject SafetyProject Construction(See Fig. 3.2)
Executive Committee:•Bowman / LANL•Penttila / LANL•Coulter / Michigan•Leuschner / UNH•Page / Manitoba•Snow / Indiana
DOEDOEJohn McClellandLANL NPPJohn McClellandLANL NPPPhysics andLANSCE Council
Susan SeestromPhysics DivisionSusan SeestromPhysics DivisionPaul LisowskiLANSCE Division(Facility Owner)Paul LisowskiLANSCE Division(Facility Owner)Mary HockadayP-23 Group LeaderMary HockadayP-23 Group LeaderJ. David BowmanSpokespersonJ. David BowmanSpokespersonManagement Team:•Bowman / LANL•Penttila / LANL•Wilburn / LANLSeppo PenttilaProject ManagerSeppo PenttilaProject ManagerJeff SchinkelProject SafetyProject Construction(See Fig. 3.2)
Executive Committee:•Bowman / LANL•Penttila / LANL•Coulter / Michigan•Leuschner / UNH•Page / Manitoba•Snow / IndianaExecutive Committee:•Bowman / LANL•Penttila / LANL•Coulter / Michigan•Leuschner / UNH•Page / Manitoba•Snow / Indiana
Organizational Chart for the NPDGamma Project in Nuclear Physics ProgramOrganizational Chart for the NPDGamma Project in Nuclear Physics Program
Bill Louis
Jack Shlachter
Doug Fulton
TBA
Hersman/UNHGentile/NIST
Safety Hierarchy in the LH2 Target Project
• DOE is involved through the Facility Authorization Basis. – We need to perform USI(=Unreviewed Safety Issue) against the
ISAD(=InterimSafety Assessment Document) in addition to the USQs (=unresolved/unreviewed safety questions) that have already been done.
• At Lab the highest level signature is coming from LANSCE Division leader; Paul Lisowski. He signs the Authorization Basis, and he is the RDL=responsible Division Leader who signs IWD=Integrated Work Document.
• Next level of signature is coming from RGL=responsible Group Leader D. Fulton, P-23) who signs IWD to authorize the work and personnel.
• Readiness Review by facility - signed by Alan Hurd, Director of Lujan Center.
IWD
• IDW JHA ID 3501 “Testing of the NPDGamma Liquid Hydrogen Target” – Tasks and steps– Hazard analysis– Controls and requirements– Responsibilities - RDL, RGL, Preparer, SMEs, workers– Target personnel - training, authorization process
• Target IWD refers to– Lab documents– Engineering Document– Target Operating Procedures
• IWD can also give steps for safe performance of a task. If we identify an important task with a higher safety risk we can have a separate IWD for that task.
Value of this review
• Independent review of the target by experts– Improves overall target safety
• Will create the final design baseline for the target. After this review
• drawings• engineering document
will be under the change control
• The review result will effect on – authorization in different management levels
Flow chart for the shed and ER2 LH2 target effort
Flow chart for the shed and ER2 LH2 target effort Start July '04
Develop reqm'ts
for Shed relief line
(Penttila)
Shed Relief Line
review by Internal
Committee
(10% design)
Build Shed relief
Convene H
Committee ASAP
(internal/external)
Finish Shed setup
Readiness Review
(Shed operations)
by Lujan EAM
Operate in Shed
Review of FP12
relief line and GHS
vent 10% design by
Internal Committee
Build & Install
Design review of
system at 10-20%
point by H
Committee
Finish ER2 setup
Readiness Review
(ER2 operations)
by Lujan EAM
Experiment runs
with LH target
2
2
2
J. Knudson, chairP. Kelley
D. HillJ. LatailleP. LewisB. Etuk,
….
Hydrogen Target in Shed
30 cm
30 c
m
The goal is to review safety of: • as built the LH2 Target cryostat and relief system. They will be almost same for the shed and ER2 operation.• as built the gas handling system in shed• a plan for the gas handling system for ER2• plans for controls and operations
LH2 Target Vessel and Isolation Vacuum