npcc regional reliability reference directory # 9 ... 9 - generator... · npcc regional reliability...
TRANSCRIPT
NPCC Reliability Reference Directory # 9 Verification of Generator
Gross and Net Real Power Capability
This document, when downloaded or printed, becomes UNCONTROLLED. Users should check the NPCC
website for the current CONTROLLED version of this document. 1
NPCC
Regional Reliability Reference Directory # 9
Verification of Generator
Gross and Net Real Power Capability
Task Force on Coordination of Operations Revision Review Record:
December 22, 2008
December 28, 2011
Adopted by the Members of the Northeast Power Coordinating Council, Inc., this December 22,
2008 based on recommendation by the Reliability Coordinating Committee, in accordance with
Section VIII of the NPCC Amended and Restated Bylaws dated July 24, 2007 as amended to
date.
NPCC Reliability Reference Directory # 9 Verification of Generator Gross and Net Real Power Capability
2 This document, when downloaded or printed, becomes UNCONTROLLED. Users should check the
NPCC website for the current CONTROLLED version of this document.
Version History
Version
Date
Action
Change Tracking (New,
Errata or Revisions)
0 12/22/2008 New
1 07/07/2009 Included FAC-008 in Section
3.0
Errata
2 12/28/2011 Phase 2 format Revisions
3 3/31/2015 Inserted Applicability of NPCC
Criteria
New
NPCC Reliability Reference Directory # 9 Verification of Generator
Gross and Net Real Power Capability
This document, when downloaded or printed, becomes UNCONTROLLED. Users should check the NPCC
website for the current CONTROLLED version of this document. 3
Table of Contents
Version History ....................................................................................................................... 2 Table of Contents .................................................................................................................... 3
Terms Defined in the Directory .............................................................................................. 4 A. Introduction ...................................................................................................................... 4
1. Title: Verification of Generator Gross and Net Real Power Capability .................... 4 2. Directory #: 9 ................................................................................................................ 4 3. Objective:...................................................................................................................... 4
4. Effective Date: December 22, 2008 ............................................................................. 4
5. Background:.................................................................................................................. 4
6. Applicability: ................................................................................................................ 4 B. NERC ERO Reliability Standard Requirements .............................................................. 5 C. NPCC Regional Reliability Standard Requirements ........................................................ 5 D. NPCC “Full Member” More Stringent Criteria Requirements ........................................ 5
1. Requirements ................................................................................................................ 5 1.1 Developing the List of Generators or Generation Facilities to be verified .................. 5
1.2 Establishing the Generator Real Power Capability Verification Program ................... 6 1.3 Implementing the Generator Real Power Capability Verification Program................. 7 1.4 Verification Criteria for Generator and Generation Facility Real Power Capability ... 8
1.5 Exemption of Generators or Generation Facilities from Verification Testing ............. 9 E. Compliance..................................................................................................................... 10
1. Compliance Monitoring Process ................................................................................ 10 2. Data Retention ............................................................................................................ 10
Responsible Entities shall keep evidence of compliance for a minimum of three years. A
Responsible Entity found non-compliant shall keep information related to the non-
compliance until found compliant. ....................................................................................... 10 Appendix A- Basic Flow Chart for Verification of Generator Gross and Net Real Power
Capability .............................................................................................................................. 12
NPCC Reliability Reference Directory # 9 Verification of Generator Gross and Net Real Power Capability
4 This document, when downloaded or printed, becomes UNCONTROLLED. Users should check the
NPCC website for the current CONTROLLED version of this document.
Terms Defined in the Directory
There are no new terms defined in this Revision. The definitions of terms found in this
Directory appearing in bold typeface, can be found in the NPCC Glossary of Terms.
A. Introduction
1. Title: Verification of Generator Gross and Net Real Power Capability
2. Directory #: 9
3. Objective:
This Directory presents the minimum criteria requirements for verifying the
Gross Real Power Capability and Net Real Power Capability of generators or
generating facilities.
Compliance to the criteria requirements set forth in this Directory by each
applicable entity assures accuracy of information used in the steady-state models
to assess the reliability of the NPCC bulk power system.
This Directory has been developed to ensure that the requirements specified in
NERC Standard MOD-024-1, “Verification of Generator Gross and Net Real
Power Capability” are met by NPCC and its applicable members responsible for
meeting the NERC Reliability Standards.
4. Effective Date: 12/22/2008
5. Background: This Directory was developed from the draft NPCC A-13 Verification of
Generator Gross and Net Real Power Capability Criteria document whose
technical content was approved by the Reliability Coordinating Committee on
March 5, 2008 for conversion into a Directory. Version 0 of the Directory became
effective on December 22, 2008.
6. Applicability:
The requirements of an NPCC Directory apply only to those facilities defined as
NPCC bulk power system elements as identified through the performance based
methodology of NPCC Document A-10, “Classification of Bulk Power System
Elements,” the list of which is maintained by the NPCC Task Force on System
Studies and approved by the NPCC Reliability Coordinating Committee.
NPCC Reliability Reference Directory # 9 Verification of Generator
Gross and Net Real Power Capability
This document, when downloaded or printed, becomes UNCONTROLLED. Users should check the NPCC
website for the current CONTROLLED version of this document. 5
Requirements to abide by an NPCC Directory may also reside in external tariff
requirements, bilateral contracts and other agreements between facility owners
and/or operators and their assigned Reliability Coordinator, Planning Coordinator,
Transmission Operator, Balancing Authority and/or Transmission Owner as
applicable and may be enforceable through those external tariff requirements,
bilateral contracts and other agreements. NPCC will not enforce compliance to the
NPCC Directory requirements in this document on any entity that is not an NPCC
Full Member.
6.1 Functional Entities (Responsible Entities)
Generator Owners
Transmission Operators (in whose area the generator or generation
facility resides)
B. NERC ERO Reliability Standard Requirements
The NERC ERO Reliability Standards containing requirements that are associated
with this Directory include, but may not be limited to:
MOD-024-1 -Verification of Generator Gross and Net Real Power Capability
TOP-002-2 - Normal Operations Planning
FAC-008-1 - Facility Ratings Methodology
FAC-009-1 - Establish and Communicate Facility Ratings
C. NPCC Regional Reliability Standard Requirements
None.
D. NPCC “Full Member” More Stringent Criteria Requirements
1. Requirements
1.1 Developing the List of Generators or Generation Facilities to be verified
R1. The Transmission Operator shall develop and maintain documentation of
those generators or generation facilities that must verify the Gross Real
Power Capability and Net Real Power Capability for the summer and
winter capability seasons. The documentation maintained by the
Transmission Operator shall include the following:
NPCC Reliability Reference Directory # 9 Verification of Generator Gross and Net Real Power Capability
6 This document, when downloaded or printed, becomes UNCONTROLLED. Users should check the
NPCC website for the current CONTROLLED version of this document.
R1.1 All generators or generation facilities Declared Gross Real Power
Capability and Declared Net Real Power Capability.
R1.2 All generators or generation facilities Verified Gross Real Power
Capability and Verified Net Real Power Capability, verification
date and method of verification.
R1.3 Discrepancies between a Generator Owner’s declared and verified
Gross Real Power Capability and Net Real Power Capability,
the reason for such discrepancies and the Generator Owner’s plan
to address the discrepancies.
R1.4 Generator Owner supplied Gross Real Power Capability and Net
Real Power Capability testing, manufacturer data, performance
tracking or operating historical data, certification documentation,
as specified by the Transmission Operator.
R1.5. All generators or generation facilities exempted from the
verification requirements and the basis for their exemption (see
Section 1.5).
1.2 Establishing the Generator Real Power Capability Verification Program
R2. The Transmission Operator shall establish and document a program to
periodically verify the Gross Real Power Capability and Net Real
Power Capability of all generators and generation facilities that are
subject to periodic seasonal Gross Real Power Capability and Net Real
Power Capability verification.
R3. The Transmission Operator shall provide any changes to its verification
process to the Generator Owners within 30 calendar days of issue.
R4. The Transmission Operator shall establish and document requirements for
a Generator Owner to notify the Transmission Operator within a specified
time period when its generator or generation facility cannot achieve the
Declared Gross Real Power Capability or Declared Net Real Power
Capability because of equipment issues.
R5. The Transmission Operator shall establish and document a time frame for
the Generator Owner to address equipment issues that result in a generator
or generation facility not achieving the Declared Gross Real Power
Capability or Declared Net Real Power Capability.
R6. The Transmission Operator shall establish and document the ambient
conditions that correspond to the summer and winter capability seasons for
NPCC Reliability Reference Directory # 9 Verification of Generator
Gross and Net Real Power Capability
This document, when downloaded or printed, becomes UNCONTROLLED. Users should check the NPCC
website for the current CONTROLLED version of this document. 7
which the Gross Real Power Capability and Net Real Power Capability
are verified.
R7. The Transmission Operator shall establish and document those
intermittent or small generating units whose capability may be represented
by verification results of a single generating unit.
1.3 Implementing the Generator Real Power Capability Verification Program
R8. The Transmission Operator shall request Generator Owners to verify the
seasonal Gross Real Power Capability and Net Real Power Capability
of their generators or generation facilities that are subject to periodic
seasonal Gross Real Power Capability and Net Real Power Capability
verification every three (3) years or more frequently as required by the
Transmission Operator. The two (2) capability seasons are defined as
summer and winter as specified by the Transmission Operator.
R9. If a Transmission Operator determines that only one seasonal generating
capability value is required for NPCC Bulk Power System reliability
analysis, then periodic verification will be required only for that particular
season.
R10. If a Transmission Operator determines that the difference between the
Declared Gross Real Power and Declared Net Real Power Capability
of a generator or generation facility is insignificant for NPCC Bulk Power
System reliability analysis, then periodic verification will be required for
only one numerical value.
R11. The Generator Owner shall provide generator or generation facility
Declared Gross Real Power Capability and Declared Net Real Power
Capability to the Transmission Operator.
R12. The Generator Owner shall provide evidence, upon request, to the
Transmission Operator that the generator or generation facility Gross Real
Power Capability and Net Real Power Capability have been verified.
R13. The Generator Owner shall report to the Transmission Operator any
discrepancies between declared and verified Gross Real Power
Capability or Net Real Power Capability within a time frame specified
by the Transmission Operator and develop and implement a plan to
resolve the discrepancies.
NPCC Reliability Reference Directory # 9 Verification of Generator Gross and Net Real Power Capability
8 This document, when downloaded or printed, becomes UNCONTROLLED. Users should check the
NPCC website for the current CONTROLLED version of this document.
R14. The Generator Owner shall determine and report to the Transmission
Operator the generator or generation facility real power seasonal auxiliary
loads (including common station loads).
1.4 Verification Criteria for Generator and Generation Facility Real Power
Capability
R15. The Generator Owner shall comply with Transmission Operator requests
for periodic verification of Gross Real Power Capability and Net Real
Power Capability of their generators or generation facilities.
R16. The Generator Owner shall verify the Gross Real Power Capability and
Net Real Power Capability of thermal generators on the basis of
operation for no less than one hour.
R16.1. The verification of thermal generator’s capability shall include any
of the following:
Testing,
Use of operating historical data,
Commissioning data (for new generators only),
Performance tracking data acquired during the same
seasonal capability period.
R17. The Generator Owner shall verify the Gross Real Power Capability and
Net Real Power Capability of internal combustion generators and gas
turbine generators. The verification shall correspond to operation for no
less than one hour under the ambient conditions established in R6 for
which the Gross Real Power Capability and Net Real Power Capability
are being claimed.
R17.1. The verification of internal combustion and gas turbine generators
capability shall include any of the following:
Testing,
Use of operating historical data,
Commissioning data (for new generators only),
Performance tracking data acquired during the same
seasonal capability period.
R18. The Generator Owner shall verify the Gross Real Power Capability and
Net Real Power Capability of hydro generators either on a generation
facility or on an individual generator basis. The Gross Real Power
Capability and Net Real Power Capability shall be determined on the
basis of the availability of sufficient water at an adequate head to provide
the output for no less than one hour.
R18.1. The verification of hydro generator’s capability shall include any of
NPCC Reliability Reference Directory # 9 Verification of Generator
Gross and Net Real Power Capability
This document, when downloaded or printed, becomes UNCONTROLLED. Users should check the NPCC
website for the current CONTROLLED version of this document. 9
the following:
Testing,
Use of operating historical data,
Commissioning data (for new generators only),
Performance tracking data acquired during the same
seasonal capability period.
R19. The Generator Owner shall verify the Gross Real Power Capability and
Net Real Power Capability of combined cycle generators on a generation
facility, individual generator or on a generator stage basis for no less than
one hour under the ambient conditions established by the Transmission
Operator in R6 for which the Gross Real Power Capability and Net Real
Power Capability are being claimed.
R19.1 The verification of a combined cycle generator’s capability shall
include any of the following:
Testing,
Use of operating historical data,
Commissioning data (for new generators only),
Performance tracking data acquired during the same
seasonal capability period.
R20. The Generator Owner shall verify the Gross Real Power Capability and
Net Real Power Capability of intermittent power resources (wind, solar,
tidal geo-thermal, etc.) using any of the following:
Manufacturer’s data,
Performance tracking,
Operating historical data
R21. The Generator Owner shall verify the Gross Real Power Capability and
Net Real Power Capability of multiple generator facilities when limited
by common elements based on the real power capability of the facility and
not the sum of the capabilities of the individual generators.
R22. The Generator Owner shall identify any equipment or other factor that will
limit the capability of the generator or generation facility to meet its
Declared Gross Real Power Capability or Declared Net Real Power
Capability.
1.5 Exemption of Generators or Generation Facilities from Verification
Testing
R23. The Generator Owner shall notify the Transmission Operator and request
an exemption if it cannot conduct seasonal capability testing of a generator
or generation facility for any of the reasons listed below.
NPCC Reliability Reference Directory # 9 Verification of Generator Gross and Net Real Power Capability
10 This document, when downloaded or printed, becomes UNCONTROLLED. Users should check the
NPCC website for the current CONTROLLED version of this document.
Adverse impact on transmission system reliability
Potential damage to transmission system or generator equipment
Environment conditions
Governmental regulatory or operating license limitations
An extended outage to the generator or generation facility
R24. The Transmission Operator shall, within 30 calendar days of receiving
notification from a Generator Owner that it is requesting an exemption
because it cannot perform verification for the required seasonal period,
notify the Generator Owner whether its generator will be exempted from
the seasonal capability testing. Where the exemption is approved, the
Transmission Operator shall coordinate with the Generator Owner to
reschedule the verification for the next seasonal verification period.
R25. The Generator Owner for a generator or generation facility exempted from
seasonal capability testing shall submit the following to the Transmission
Operator:
For existing generators, generator operation records, manufacturer
data, or performance tracking for the previous applicable seasonal
verification period for this generator or generation facility.
Engineering analysis in conjunction with performance tracking
data to justify any difference between a generators or generation
facilities declared capability and previous applicable seasonal
performance tracking data.
For new generators only, commissioning data.
E. Compliance
1. Compliance Monitoring Process
Compliance with the requirements set forth in this Directory will be in accordance with the
NPCC Criteria Compliance and Enforcement Program (CCEP).
Measures and corresponding Levels of Non Compliance for these requirements are contained
within the compliance template associated with this Directory.
2. Data Retention
Responsible Entities shall keep evidence of compliance for a minimum of three years. A
Responsible Entity found non-compliant shall keep information related to the non-
compliance until found compliant.
NPCC Reliability Reference Directory # 9 Verification of Generator
Gross and Net Real Power Capability
This document, when downloaded or printed, becomes UNCONTROLLED. Users should check the NPCC
website for the current CONTROLLED version of this document. 11
Prepared by: Task Force on Coordination of Operation
Review and Approval: Revision to any portion of this Directory will be posted by the lead
Task Force in the NPCC Open Process for a 45 day review and
comment period. Upon satisfactorily addressing all the comments in
this forum, the Directory document will be sent to the remaining Task
Forces for their recommendation to seek RCC approval.
Upon approval of the RCC, this Directory will be sent to the Full
Member Representatives for their final approval if sections pertaining
to the Requirements and Criteria portion have been revised. All voting
and approvals will be conducted according to the most current "NPCC.
Bylaws" in effect at the time the ballots are cast.
Revisions pertaining to the Appendices or any other portion of the
document such as links, glossary terms, etc., only RCC Members will
need to conduct the final approval ballot of the document.
This Directory will be updated at least once every three years and as
often as necessary to keep it current and consistent with NERC,
Regional Reliability Standards and other NPCC documents.
References: NPCC Glossary of Terms
NPCC Reliability Reference Directory # 9 Verification of Generator Gross and Net Real Power Capability
12 This document, when downloaded or printed, becomes UNCONTROLLED. Users should check the
NPCC website for the current CONTROLLED version of this document.
Appendix A- Basic Flow Chart for Verification of Generator Gross and Net Real Power
Capability
Generator verification is
required
No
Notify
Generator Owners
Exempted from
seasonal verification
Yes
Document units/
data
Meet or Exceed
Declared Value
Gross and Net
verified
TOP review, resolve
issue and reschedule
Yes
No
Generator Owners
provided required
data or conducted tests