Thomas Alexion - Nozzle 83/84 PT Report Page 1
From: "BENNETT, STEVE A <SBENNE2@entergycom>To: Tom Alexion <twa6Dnrc.gov>Date: 10/7/03 9:59AMSubject: Nozzle 83/84 PT Report
Tom,Attached is the PT Report that was provided to the NRC Inspector here on the PT Information forANO-2 ICI Nozzles 83 & 84. This should help Terence's group better understand where the indicationswere located.
Steve BennettNSA - Licensing479-858-4626Pager: 479-890-3323
I C.WIND0WS\TEMP\GWI00001.TMP Page 1 I C:\WINDOWS\TEMP\GWIOQOO1 .TMP Paqe 1 I
Mail Envelope Properties (3F82C6CA.9E0:13: 55776)
Subject:Creation Date:From:
Nozzle 83/84 PT Report10/7/03 9:57AM"BENNETT, STEVE A" <[email protected]>
Created By: SBENNE2 @entcrzv.com
Recipientsnrc.gov
owf4_po.OWFN_DOTWA (Thomas Alexion)
Post Officeowf4,.po.OWFNDO
Routenrc.gov
Files SizeMESSAGE 285Part.001 1002ANO2 Nozzle 83&84 PT Exams.pdfMime.822 2037643
Date & Time10/07/03 09:57AM
1486826
OptionsExpiration Date:Priority:Reply Requested:Return Notification:
Concealed Subject:Security:
NoneStandardNoNone
NoStandard
NDE REPORT NOANO LIQUID PENETRANT ® 1-9 2031SIPTOOS
e NDE EXAMINATION 0 PSI 0 MAINTENANCE _ 203151PT0050 INFO 0 WQT0 UNIT #1 ® UNIT 92OUTAGE JOB ORDER NO OTHER TRACE DOCUMENTS DATE
2R16 IN/A |ER-ANO-2003-0245-003 9/2812003
SYSTEII I INE NO | ISO/DWG; NO | COMPONENT DESCR IPTIONRPV ~~N/A | E 234-76 RPV ICI NOZZLE
CODE SECTION EDITION CODE SUBSECTION EXAM CATEGORY PROCEDUREIREVASME SECTION Xl 92 N/A NM . NDE 9.41 1 1
MATERIAL TYPE SURFACE CONDITION ZERO REFERENCEO CS SS 13 INCONEL BUFFED LOW HILL CIL
TECHNIQUE METHOD UV METER@) SOLVENT REMOVABLE (3 VISIBLE MODEL NO NIAO WATER WASHABLE 0 FLOURESC ENT SIN: N/A
TEMP EXAM SURFACE TEMP MATERIALS THERMOMETER80 800 SIN 214516 EXP DATE 2/2712004
PENETRANT CLEANER DEVELOPER
BRAND# BATCH# TIME BRAND# BATCH# BRAND# BATCH# TIMESKL-SP |OH04K 20 min SKC-S I 02801K SKD-S2 01A01K 7 min
PART IDENTIFICATION RESULTS CODE REMARKS
RPV ICI NOZZLE 82 ACC NI
RPV ICI- NOZZLE 83 REJ Linear SEE ATTACHED SKETCH.
RPV IC NOZZLE 84 REJ Linear SEE ATTACHED SKETCH.
RPV ICI NOZZLE 85 ACC NI
RPV ICI NOZZLE 86 ACC NI
RPV ICI NOZZLE 87 ACC NI
RPV ICI NOZZLE 88 ACC Ni
RP VI tC M ZLt 8 4CCt ,Jt4?t
COMMENTS:Indicate size, location. orientation, and distribution of indications. Provide dimensions on all sketches, use additional sheets Ifrequired.EXAMINATION PERFORMED IN UNIT 2 REACTOR BUILDING. UNDER THE RPV HEAD ON THE HEADSTAND.EXAMINATIONS PERFORMED TO MEET REQUIREMENTS OF NRC ORDER EA-03-009. REQUIRED EXAMINATION VOLUMEWAS OBTAINED PER DIRECTIONS IN ER. EXAMINATION ASSISTED BY WADE SELBY U111, MIKE BRILEY LIlI, RUDYMEDINA 1111, STEVE CLERC Ull, MARIO CASTRO 111.
,EXAMINED BY I LEVEI ASSISTED BY I LEVEL RE RIEWED BY) • i ~ t L ~ ( ( . 7_ f, * _ _ _ _ _ _ _ _ _ _ _-_
RONALD VSWAIN I II IDATE 9/28/2003 DATE DATE 21&/03
ANII REVIEW _ DATE _
ENCLOSURE ADDED ( YES 0 NO PAGE / OF
A . t . A. I-r 0 , -~p-J 'd-.- l~ -.. 'tl-4 , .
em - v, P M, p , - -
f/2f/o
Ic # - C
MAP LEGEND
J-Weld
Outside ICI Stub -
Cut End of ICI Stub
Blend Radius formIC1 Stub End to ID
135
.Vkbs , a, 3
(e- t.'W Sc
atXm LCA
45
@ AS.¢!LX~f. ¢ . O z~~~~~." .It.
o/~~~~~~~~~~~~~~~~~ , CEL n
-TAlb . tf
:~It i;A t . AP
-Low Hill Side Looking Up
gL1IcI #,2 3 1-5 P7 °rOcy-
0 Ot'pl -o eA/1' 3
'~~1~~1/C7)
._ . ...
MAP LEGEND
I-Weld
Dutside IC] Stub -
Tut End of ICI Stub
3lend Radius form:CI Stub End to ID
VT,o}
I jtcI 35. I
fimil%135
-U ItC4 /'s
c~prtI e4
KP4A%
, it I t
'vfj,' eo':U"
0Low Hill Side Looking Up
I
NDE REPORT NOANO LIQUID PENETRANT | ISI 2031SPTOOG
EXAMINATION 0 PSI 0 MAINTENANCE20S1T6NDE 0 INFO 0 WQT 0 UNIT#1 ( UNIT#2
OUTAGE JOB ORDER NO OTHER TRACE DOCUMENTS DATE2R16 I NMA ER-ANO-2003-0245-003 and -005 913012003
SYSTEM | LINE NO ISO1DWG NO COMPONENT DESCRIPTIONRPV | IA NIA RPV ICI NOZZLES
CODE SECTION EDITION CODE SUBSECTION EXAM CATEGORY PROCEDURE/REVASME SECTION Xi 1992 NIA NIA NDE 9.41 I 1
MATERIAL TYPE SURFACE CONDITION ZERO REFERENCEo CS 0 SS ( INCONEL GROUND : LOW HILL CIL
TECHNIQUE METHOD UV METER( SOLVENT REMOVABLE G) VISIBLE MODEL NO N/Ao WATER WASHABLE 0 FLOURESCENT SIN: NIA
TEMP EXAM SURFACE TEMP MATERIALS THERMOMETER80| 80 . _ _ _ SIN 214516 EXP DATE 2/27/2004
PENETRANT CLEANER DEVELOPER
BRAND# BATCH# TIME BRAND# BATCH# BRAND# BATCH# TIMESKL-SP 00H04K 20 min SKC-S I 02BO1K SKD-S2 I 01A01K | 7 min
PART IDENTIFICATION RESULTS IND. REMARKS
RPV ICI Nozzle 84 ACC NRI AFTER GRINDING TO REMOVE INDICATIONS. REF:REPORT 2031SIPT005
ACCpl'#.jCe te,?CA-, o &
______I'v ____ ICow}. Ad ,za d t
. , '°/ffi/43~Lr'L,~
COMMENTS:Indicate size, location, oientation, and distribution of indications. Provide dimensions on all sketches, use additional sheets ifrequired.EXAMINATION PERFORMED IN UNIT 2 REACTOR BUILDING, UNDER THE RPV HEAD ON THE HEADSTAND.EXAMINATIONS PERFORMED TO MEET REQUIREMENTS OF NRC ORDER EA-03-009. EXAMINATION VOLUME WASLIMITED TO THE AREA OF INDICATION REMOVAL. EXAMINATION ASSISTED BY MIKE BRILEY, LEVEL III AND RONNIESWAIN, LEVEL II.
I
ENCLOSURE ADDED 0 YES
ANII REVIEW DATE
PAGE 1 OF ( NO
NDE REPORT NOAft ANO LIQUID PENETRANT IS 2031SIPT007
^ NDE REXAMINATION 0 PSI .0 MAINTENANCEN D E ~~0 INFOO0 WQT 0 UN1T#1 0) UNIT$2OUTAGE JOB ORDER NO OTHER TRACE DOCUMENTS DATE
2R16 | NIA ER-ANO-2003-0245-003 and -005 913012003
SYSTEM LINE NO ISOIDWG NO COMPONENT DESCRIPTIONRPV NIA N/A I RPV ICI NOZZLES
CODE SECTION EDITION CODE SUBSECTION EXAM CATEGORY PROCEDUREIREVASME SECTION X 1992 NIA NIA NDE .41 i I
MATERIAL TYPE SURFACE CONDITION ZERO REFERENCEo CS SS (0 INCONEL GROUND LOW HILL CIL
TECHNIQUE METHOD UV METER( SOLVENT REMOVABLE 0 VISIBLE MODEL NO NIAo WATER WASHABLE 0 FLOURESCENT SIN: NIA
TEMP EXAM SURFACE TEMP MATERIALS THERMOMETER80, Sol SIN 214516 EXP DATE 2/27/2004
PENETRANT CLEANER DEVELOPER
BRAND# i ATCH# TIME BRAND# BATCH# BRAND# BATCH#i TIMESKL-SP 0H04K 20 min SKC-S I 02B01K SKD-S2 01A01K 7 min
PART IDENTIFICATION RESULTS IND. REMARKS
RPV ICI Nozzle 83 REJ Linear AFTER GRINDING, IDENTIFIED MULTIPLE INDICATIONSON THE FACE END OF THE NOZZLE STUB PIECE FROMAPPROXIMATELY 350 TO 30 WITH MAXIMUMDIMENSIONS OF 25'.
COMMENTS:Indicate sze, location, orientation, and distribution of Indications. Provide dimensions on all sketches, use additional sheets ifrequired.EXAMINATION PERFORMED IN UNIT 2 REACTOR BUILDING, UNDER THE RPV HEAD ON THE HEADSTAND.EXAMINATIONS PERFORMED TO MEET REQUIREMENTS OF NRC ORDER EA-03-009. EXAMINATION VOLUME WASLIMITED TO THE AREA OF INDICATION REMOVAL.
M-IXAMA1,NI Y I LEVEL | ASSISTED BY I LEVEL REVIEOED B
RUDY MEDINA I II NIA I IDATE 930/2003 DATE DATE ID/A4/o 3
ANII REVIEW DATE
ENCLOSURE ADDED 0 YES ( NO PAGE 1 OF I
as Li A- I %_1 iruj%, wws k- UNII 1 W UNII Z
OUTAGE JOB ORDER NO OTHER TRACE DOCUMENTS DATE21316 NIA ER-ANO-2003-0245-003 and -005 . 01212003
SYSTEM LINE NO- ISOIDWG NO COMPONENT DESCRIPTIONRPV NIA NIA RPV ICI NOZZLE
CODE SECTION EDITION C CODE SUBSECTION EXAM CATEGORY PROCEDURE/REVASME SECTION XI 1992 N/A NIANDE9.41 1
MATERIAL TYPE SURFACE CONDITION ZERO REFERENCEo CS 0 SS ( INCONEL BUFFED LOW HILL CIL
TECHNIQUE METHOD UV METER( SOLVENT REMOVABLE ( VISIBLE MODEL NO N/Ao WATER WASHABLE 0 FLOURESCENT SIN: N/A
TEMP EXAM SURFACE I TEMP MATERIALS THERMOMETER80° 80° S/N 214516 EXP DATE 2127/2004
PENETRANT CLEANER DEVELOPER
BRAND# BATCH# | TIME BRAND# BATCH# BRAND# BATCH# TIMESKL-SP | 00H04K 20 mn SKC-S I 02B01K SKD-S2 I 01A01K 7 min
PART IDENTIFICATION RESULTS IND. REMARKS
RPV ICI Nozzle 83 REJ Rounded LOCALIZED AREA EXAMINED AFTER FLAW REMOVAL BYBUFFING. PROCESS BEGAN TO REMOVE THREEROUNDED INDICATIONS FROM THE PREVIOUSEXAMINATION. AFTER THREE PROCESSES OFSURFACE CONDITIONING AND PT EXAMINATIONS, THEAREA CONTAINED ONE REMAINING ROUNDEDINDICATION AT THE RIGHT SIDE OF THE EXCAVATIONADJACENT TO THE FUSION ZONE OF THE NOZZLE TOTHE FILLET WELD.
COMMENTS:Indicate size, location, orientation, and distribution of indications. Provide dimensions on all skelches, use additional sheets ifrequired.EXAMINATION PERFORMED IN UNIT 2 REACTOR BUILDING, UNDER THE RPV HEAD ON THE HEADSTAND.EXAMINATIONS PERFORMED TO MEET REQUIREMENTS OF NRC ORDER EA.03-009. THE EXAMINATION VOLUME WASLIMITED TO THE AREA OF FLAW REMOVAL ONLY. EXAMINATION ASSISTED BY WADE SELBY LuII, VIA REMOTEHEADSET.
EXAMINED /511 LEVEL ASSISTED BY I LEVEL REVIEDBY
WILLIAM A. RAYtjR I II IDATE 9128/2003 DATE DATE A /3
ANII RFVIFW _ _ _ __ _ DATF
ENCLOSURE ADDED (i YES 0 NO PAGE 1 OF 3
___ LU - } U INl-U Wl ( UNIT #1 i) UNIT #2OUTAGE JOB ORDER NO OTHER TRACE DOCUMENTS DATE
2R16 N/A ER-ANO-2003-0245-003 and -005 1012/2003
SYSTEM LINE NO ISO)DWG NO COMPONENT DESCRIPTIONRPV N/A N/A I RPV ICI NOZZLE
CODE SECTION EDITION CODESUBSECTION EXAM CATEGORY PROCEDURE/REVASME SECTION Xi 1992 N/A NIA NDE 9.41
MATERIAL TYPE SURFACE CONDITION. ZERO REFERENCEo CS 0 SS ® INCONEL BUFFED LOW HILL C/L
TECHNIQUE METHOD UV METERi SOLVENT REMOVABLE G) VISIBLE MODEL NO N/Ao WATER WASHABLE 0 FLOURESCENT S/N: NIA
TEMP EXAM SURFACE I TEMP MATERIALS THERMOMETER800 800 SIN 214516 EXP DATE 2/2712004
PENETRANT CLEANER DEVELOPER
BRAND# ATCH# TIME BRAND# BATCH# BRAND# BATCH# TIMESKL-SP OOH04K 20 mn SKC-S 02BO1K SKD-S2 01A01K 7 min
PART IDENTIFICATION RESULTS CODE REMARKS
RPV ICI Nozzle 83 REJ Rounded PT OF THE EXCAVATED AREA REVEALED 3INDICATIONS MEASURING APPROX. 118"x1i/16" EA.THESE INDICATIONS WERE CATAGORIZED AS SLAGINCLUSION BY VISUAL EXAMINATION.
COMMENTS:Indicate size, location, orientation, and distribution of ndications. Provide dimensions on all sketches, use additional sheets 1required.EXAMINATION PERFORMED IN UNIT 2 REACTOR BUILDING, UNDER THE RPV HEAD ON THE HEADSTAND.EXAMINATIONS PERFORMED TO MEET REQUIREMENTS OF NRC ORDER EA-03-009. THE EXAMINATION VOLUME WASTHE AREA OF FLAW REMOVAL ONLY.
AEXAMINED BY I LEVEL
e-'eRAY STRICKLAND
DATE 10/212003I I
ANIIRFVIFW - DATE
ENCLOSURE ADDED (3 YES NO PAGE 1 OF 1ENCLOSURE ADDED ® YES Owo PAGE 1 OF I
I Xy NDE tARMIINmA I IvivO INFO 0 WQT lo UNIT#1 G UNIT#2OTHER TRACE DOCUMENTS
ER-ANO-2003-0245-003 and -005DATE
_ 10/2/2003._ _ ._ .. ._ ._
COMPONENT DESCRIPTIONI RPV ICI NOZZLE
I
CODE SUBSECTIONI EXAM CATEGORYN/A N/A
PROCEDUREIREVI NDE 9.41 I I
SURFACE CONDITIONBUFFED
ZERO REFERENCELOW HILL CL
TECHNIQUE METHOD - UV METER® SOLVENT REMOVABLE i VISIBLE MODEL NO N/A i0 WATER WASHABLE 0 FLOURESCENT SIN: N/A
TEMP EXAM SURFACE TEMP MATERIALS THERMOMETER80 800 SIN 214516 EXP DATE 2127/2004
PENETRANT CLEANER DEVELOPER
BRAND# | BATCH# | TIME BRAND# BATCH# BRAND# BATCH# TIMESKL-SP | 00H04K I 20 mn SKC-S 02BOIK SKD-S2 01AOIK 7 min
PART IDENTIFICATION RESULTS CODE REMARKS
RPV ICI Nozzle 83 ACC NI THE FINAL PT EXAMINATION OF THE EXCAVATEDAREA. NO INDICATIONS REVEALED.
. oAS<< 7Ac-c al7-24, St6I
COMMENTS:Indicate size. location, orientation, and distribution of nd-iatit. .pvi de d imensions on all sketches, use additional sheets Ifrequired.EXAMINATION PERFORMED IN UNIT 2 REACTOR BUILDING. UNDER THE RPV HEAD ON THE HEADSTAND.EXAMINATIONS PERFORMED TO MEET REQUIREMENTS OF NRC ORDER EA-03-009. THE EXAMINATION VOLUME WASTHE AREA OF FLAW REMOVAL ONLY. . . . ..
.
IIDATF 101212003 I DATE
ANII RFVIFW . DAT..___ _ _ _
PAGE 1 OF ENCLOSURE ADDED YES 0 NO