nottingham flood risk management schemes
TRANSCRIPT
WHY now?
WHAT are we planning?
When will it happen?
How will we do it?
Nottingham Flood Risk Management Schemes
River Trent Fluvial Strategy
• High level review of the Trent Catchment.
• Considered problem areas.
• Considered numerous options and discounted extremes.
• Recommended some for further investigation.
Nottingham Strategy
Rylands
Queens Drive
Attenborough
Trent Meadows
Sawley
Meadows Colwick
West Bridgford
Wilford
Nottingham Strategy
g Current defences built in the
1950s
4Reaching end of design life
4Protect to a lower standard
than recommended by Defra
1947 floods, Bosworth Road Shop
What are we doing?
g Raising existing defences by between 0.5m
and 1.0m
g Constructing new defences- walls- embankments
Who Pays for it?
g Central block Grant from Defra to the EA
g Schemes then bid for a slice of the ‘pot’
g Internal prioritisation based on a scoring
system
g Central Government Funding
What else have we considered?
g Dredging
g Flood storage
g Bypass channel
g Removing weirs
g Managed realignment
g River reprofiling
Programme
g Detailed Design start4Now
g Construction Start4Spring 2007
g Scheme complete4Autumn 2010
Summary
Figures
• 30 Km of defences
• Protecting 22,000 Homes
• £64 Million combined cost
• 4 years to build
PPG25 - Current Guidance on Development and Flood Risk, due to be replaced in October 2006 by PPS25.
•Main changes expected:•Extreme flood – 1 in 1000 yr FZ 2•Climate Change – lifetime of development 50 years•Exception Test•Development behind flood defences •Statutory Consultee on flood risk matters
Changing Planning policies