Environmental Impact Assessment for the proposed Kap Vley Wind Energy Facility near Kleinzee in the Northern Cape. APPENDIX C – I&AP DATABASE pg 5 No. First Name Surname Company/ Organisation Notice of Release of Draft Scoping Report for comments Email: Notice of Submission of Scoping Reports to DEA Notice of Release of Draft EIA Reports and BA Report Email: Notice of Submission of EIA Reports and BA Report to DEA Notice of EA for BAs and EIAs 47. Nicole Abrahams South African Roads Agency Limited (Western Region) 48. M Lepheane Department of Labour 49. A Botes Department of Social Development 50. Riaan Warie Northern Cape Economic Development Agency 51. Andrew Timothy Directorate Heritage, Department - Sports, Arts and Culture 52. Lizell Stroh South African Civil Aviation Authority 53. John Geeringh ESKOM 54. Kevin Leask ESKOM 55. Justine Wyngaardt Eskom Holdings Limited: Eskom Distribution Western Operating Unit 56. Sharon Steyn Northern Cape Chamber of Commerce and Industry 57. H Myburgh Agri Northern Cape 58. Mayvyn Bhana Transnet 59. Clive Stephenson Transnet 60. The Director Department of Energy Northern Cape

Upload: others

Post on 23-May-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

Environmental Impact Assessment for the proposed Kap Vley Wind Energy Facility near Kleinzee in the Northern Cape.

APPE NDI X C – I& AP D ATAB A SE

pg 5

No. First Name Surname Company/ Organisation

Not

ice

of R

elea

se o

f Dra

ft S

copi

ng

Repo

rt fo

r com

men

ts

Emai

l: N

otic

e of

Sub

mis

sion

of

Scop

ing

Repo

rts t

o DE

A

Not

ice

of R

elea

se o

f Dra

ft E

IA R

epor

ts

and

BA R

epor

t

Emai

l: N

otic

e of

Sub

mis

sion

of

EIA

Repo

rts a

nd B

A Re

port

to D

EA

Not

ice

of E

A fo

r BAs

and

EIA

s

47. Nicole Abrahams South African Roads Agency Limited (Western Region)

48. M Lepheane Department of Labour

49. A Botes Department of Social Development

50. Riaan Warie Northern Cape Economic Development Agency

51. Andrew Timothy Directorate Heritage, Department - Sports, Arts and Culture

52. Lizell Stroh South African Civil Aviation Authority

53. John Geeringh ESKOM

54. Kevin Leask ESKOM

55. Justine Wyngaardt Eskom Holdings Limited: Eskom Distribution Western Operating Unit

56. Sharon Steyn Northern Cape Chamber of Commerce and Industry

57. H Myburgh Agri Northern Cape

58. Mayvyn Bhana Transnet

59. Clive Stephenson Transnet

60. The Director Department of Energy Northern Cape

Page 2: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

Environmental Impact Assessment for the proposed Kap Vley Wind Energy Facility near Kleinzee in the Northern Cape.

APPE NDI X C – I& AP D ATAB A SE

pg 6

No. First Name Surname Company/ Organisation

Not

ice

of R

elea

se o

f Dra

ft S

copi

ng

Repo

rt fo

r com

men

ts

Emai

l: N

otic

e of

Sub

mis

sion

of

Scop

ing

Repo

rts t

o DE

A

Not

ice

of R

elea

se o

f Dra

ft E

IA R

epor

ts

and

BA R

epor

t

Emai

l: N

otic

e of

Sub

mis

sion

of

EIA

Repo

rts a

nd B

A Re

port

to D

EA

Not

ice

of E

A fo

r BAs

and

EIA

s

61. Ragna Redelstorff SAHRA

62. Natasha Higgit SAHRA

63. Kgauta Mokoena Department of Mineral Resources

64. Elliot Sibeko Department of Telecommunication & Postal Services

65. Chris Coetzee Southern African Large Telescope (SALT) Sutherland

66. Adrian Tiplady SKA SA

67. Raoul Van den Berg Southern African Large Telescope (SALT) Sutherland

Conservation organizations and NGOs

68. Simon Gear Birdlife South Africa

69. Lubabalo Ntsolo C.A.P.E. Co-ordination Unit: Northern Cape

70. Freyni du Toit Grasslands Society of Southern Africa

71. Endangered Wildlife Trust, Wildlife and Energy Programme

72. Dr. Howard Hendricks South African National Parks (SANParks) - Snr GM: Policy & Governance Conservation Services Division

Page 3: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

Environmental Impact Assessment for the proposed Kap Vley Wind Energy Facility near Kleinzee in the Northern Cape.

APPE NDI X C – I& AP D ATAB A SE

pg 7

No. First Name Surname Company/ Organisation

Not

ice

of R

elea

se o

f Dra

ft S

copi

ng

Repo

rt fo

r com

men

ts

Emai

l: N

otic

e of

Sub

mis

sion

of

Scop

ing

Repo

rts t

o DE

A

Not

ice

of R

elea

se o

f Dra

ft E

IA R

epor

ts

and

BA R

epor

t

Emai

l: N

otic

e of

Sub

mis

sion

of

EIA

Repo

rts a

nd B

A Re

port

to D

EA

Not

ice

of E

A fo

r BAs

and

EIA

s

73. Dr. Joh R Henschel SAEON Arid Lands Node

74. Dr Mike Knight SANParks

75. Angus Burns WWF-SA: Land and Biodiversity Stewardship Programme

76. Praneel Ruplal Independent Communications Authority of South Africa (ICASA)

Land Owners and Adjacent Property Owners

77. Albertus Johannes Roux Landowner

78. Deon Kotze Landowner

79. S Titus Komaggas Community

80. Willem Engelbrecht Adjacent Landowners

81. Danie Engelbrecht Adjacent Landowners

82. Meisie Engelbrecht Adjacent Landowners

83. Bertus Brand Adjacent Landowners

84. Susan Brand Adjacent Landowners

Page 4: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

Environmental Impact Assessment for the proposed Kap Vley Wind Energy Facility near Kleinzee in the Northern Cape.

APPE NDI X C – I& AP D ATAB A SE

pg 8

No. First Name Surname Company/ Organisation

Not

ice

of R

elea

se o

f Dra

ft S

copi

ng

Repo

rt fo

r com

men

ts

Emai

l: N

otic

e of

Sub

mis

sion

of

Scop

ing

Repo

rts t

o DE

A

Not

ice

of R

elea

se o

f Dra

ft E

IA R

epor

ts

and

BA R

epor

t

Emai

l: N

otic

e of

Sub

mis

sion

of

EIA

Repo

rts a

nd B

A Re

port

to D

EA

Not

ice

of E

A fo

r BAs

and

EIA

s

Additional Registered I&APS

85. Koos Bisschoff Private

86. Karen Jodas Savannah Environmental

87. Sonia Miszczak Genesis Zonnequa Wind (Pty) Ltd)

88. Maureen Kruger Private

89. Ralph Damonse Genesis Eco-Energy (Pty) Ltd

90. Rodville Adams Private

91. Joseph Harding WindLab

Distribution

92. Kleinzee Police station

93. Kleinzee Library

Page 5: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters
Page 6: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 1

D1: NOTICE BOARDS 2 Site Notice Board-English 2 Site Notice Board-Afrikaans 3 Site Notice board placed at the entrance of Hazra General Dealer in Kleinzee (Co-Ordinates: 29°40'49.18"S and 17° 4'11.51"E) 4 Site Notice board placed at the entrance of Helpmekaar Kafee in Komaggas (Co-ordinates 29°47'44.40"S and 17°29'9.50"E) 4 Site Notice board placed at one of the entrance of the Farm (Co-ordinates 29°52'4.30"S and 17°23'39.90"E) 5 Site Notice board placed at one of the entrance of the Farm (Co-ordinates: 29°51'27.40"S 17°15'6.60"E) 6 Site Notice board placed at one of the entrance of the Farm (Co-ordinates: 29°49'28.04"S and 17°21'52.05"E) 6

D2: NEWSPAPER ADVERTISEMENT (" DIE PLATTELANDER" DATED 27 OCTOBER 2017) 7

D3: CORRESPONDENCE SENT TO I&APS AND PROOF THEREOF 8 Copies and Proof of Correspondence Sent to I&APs for the Release of the Draft Scoping Report for Review 8 Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters sent with the release of the Draft Scoping Report 13 Follow up reminder sent to I&APs on 29 November 2017 during the review of the Draft Scoping Report 15 Proof of delivery of Draft Scoping Report 16 Proof of emails 16 Proof of courier waybills 32 Proof of registered mail sent 44

D4: COMMENTS RECEIVED FROM I&APS 56 Letters and emails received from I&APs 56 Email responses to some of the comments received 78

Page 7: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 2

D1: NOTICE BOARDS

Site Notice Board-English

Page 8: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 3

Site Notice Board-Afrikaans

Page 9: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 4

Site Notice board placed at the entrance of Hazra General Dealer in Kleinzee (Co-Ordinates: 29°40'49.18"S and 17° 4'11.51"E)

Site Notice board placed at the entrance of Helpmekaar Kafee in Komaggas (Co-ordinates 29°47'44.40"S and 17°29'9.50"E)

Page 10: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 5

Site Notice board placed at one of the entrance of the Farm (Co-ordinates 29°52'4.30"S and 17°23'39.90"E)

Page 11: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 6

Site Notice board placed at one of the entrance of the Farm (Co-ordinates: 29°51'27.40"S 17°15'6.60"E)

Site Notice board placed at one of the entrance of the Farm (Co-ordinates: 29°49'28.04"S and 17°21'52.05"E)

Page 12: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 7

D2: NEWSPAPER ADVERTISEMENT (" DIE PLATTELANDER" DATED 27 OCTOBER 2017)

Page 13: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 8

D3: CORRESPONDENCE SENT TO I&APS AND PROOF THEREOF

Copies and Proof of Correspondence Sent to I&APs for the Release of

the Draft Scoping Report for Review

Page 14: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 9

I&AP COMMENT & REGISTRATION FORM PROPOSED CONSTRUCTION OF THE KAP VLEY WIND ENERGY FACILITY AND ASSOCIATED

INFRASTRUCTURE NEAR KLEINZEE, NORTHERN CAPE PROVINCE

Please provide your full contact details: First Name: Surname: Organisation: Designation: Postal Address:

Street Address:

Postal Code: Street Code: Phone: ( ) Fax: ( ) Cell: Email:

Please indicate if you want to be registered as an Interested and Affected Party (I&AP) for the proposed projects (please tick the appropriate box). PLEASE NOTE: Registration as an I&AP is required in order to receive further correspondence regarding the EIA Process

YES NO Please clearly state any interest (business, financial, personal or other) you may have in the projects and/or the applications for Environmental Authorisation:

Please describe any issues or concerns you may have which you think should be considered during the Scoping and Environmental Impact Assessment Process: Please provide details of any other individuals or organisations that should be registered as I&APs:

Please return all completed I&AP Comment & Registration Forms to Reinett Mogotshi at:

CSIR I PO Box 320 I Stellenbosch I I 7599

Tel: (021) 888 2432 I Fax: (021) 888 2693I Email: [email protected] Please visit the project website at:

https://www.csir.co.za/environmental-impact-assessment

Page 15: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 10

Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment

Page 16: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 11

Page 17: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 12

Page 18: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 13

Copies of letters sent with the release of the Draft Scoping Report

Page 19: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 14

Page 20: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 15

Follow up reminder sent to I&APs on 29 November 2017 during the review of the Draft Scoping Report

From: Reinett Mogotshi To: BC Minnelise Levendal Date: 29/11/2017 14:45 Subject: Re: juwi Kap Vley WEF project; release of DSR for public comment Dear Stakeholder, Please be reminded that the comment period for the below-mentioned juwi Kap Vley WEF Draft Scoping Reports ends on Thursday the 30th of November. Kindly submit all comments to the undersigned by that date. Please contact me should you require any further information. Kind Regards Reinett Mogotshi Environmental Management Services CSIR 021 888 2432 >>> Reinett Mogotshi 31/10/2017 15:59 >>> Dear Stakeholder, RE: Release of the Draft Scoping Report for comment for the development of the proposed Kap Vley Wind Energy Facility 30 km south east of Kleinzee, Northern Cape Province Please see attached letter notifying you that an application for Environmental Authorisation has been submitted to the national Department of Environmental Affairs for the proposed Kap Vley Wind Energy Facility near Kleinzee and of the availability of the Draft Scoping Report for public comment. In terms of the National Environmental Management Act (Act 107 of 1998, as amended) (NEMA) the 2014 NEMA Environmental Impact Assessment (EIA) Regulations, as amended, promulgated in Government Gazette 40772 and Government Notice (GN) R327, R326, R325 and R324 on 7 April 2017, a full Scoping and EIA Process is required for the construction of the Kap Vley WEF. A separate Basic Assessment Process is required and will be undertaken for the development of the associated electrical infrastructure including a transmission line to connect the wind farm to the Gromis or the new Eskom substation,. The Council for Scientific and Industrial Research (CSIR) has been appointed by the Project Applicant to undertake the separate required Basic Assessment as well as the Scoping and EIA Processes for the proposed project. A hard copy of the Draft Scoping Report is available for public viewing at the Kleinzee Library as well as at the Kleinzee Police Station. The Draft Scoping Report can also be downloaded from the following website: https://www.csir.co.za/environmental-impact-assessment As a registered I&AP on the project database, you are hereby notified of the release of the Draft Scoping Report for the proposed Kap Vley WEF for a 30-day review period, ending on 30 November2017. Please submit your comments before or on this date to Ms Reinett Mogotshi at the contact details provided below. Kindly contact the undersigned for further information or for any queries relating to the above. Reinett Mogotshi CSIR Project Manager CSIR Stellenbosch Tel: 021 888 2432 PO Box 320, Stellenbosch, 7599 Email: [email protected]

Page 21: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 16

Proof of delivery of Draft Scoping Report

Proof of emails

Proof of email delivery dated 29/11/2017 to notify I&APs of the release of the Draft Scoping Report for comment

Page 22: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 17

Page 23: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 18

Message Id: 59F881C5.431 : 164 : 34641 Subject: juwi Kap Vley WEF project; release of DSR for public comment Created By: [email protected]

Scheduled Date: Creation Date: 31/10/2017 15:59 From: Reinett Mogotshi

Recipients:

Recipient Action Date & Time

Comment

3i.co.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

agri.ncape.gov.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

agric.co.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Undeliverable

31/10/2017 15:59

birdlife.org.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Delivered 31/10/2017 15:59

caa.co.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Transferred 31/10/201

7 16:03

2.0.0 message relayed

daff.gov.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) BC: [email protected]([email protected]) BC: [email protected]([email protected]) BC: [email protected]([email protected]) debeersgroup.com Transferred 31/10/201

7 15:59 BC: [email protected]([email protected])

Transferred 31/10/2017 16:03

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 31/10/201

7 16:03

2.0.0 message relayed

dmr.gov.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

dtps.gov.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

dwa.gov.za Transferred 31/10/201

Page 24: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 19

7 15:59 BC: [email protected]([email protected])

Transferred 31/10/2017 15:59

2.0.0 message relayed

dws.gov.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

environment.gov.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

eskom.co.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Transferred 31/10/201

7 16:10

2.0.0 message relayed

BC: [email protected]([email protected]) Undeliverable

31/10/2017 16:00

BC: [email protected]([email protected]) Transferred 31/10/201

7 16:10

2.0.0 message relayed

ewt.org.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Delivered 31/10/2017 15:59

gmail.com Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 31/10/201 2.0.0

Page 25: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 20

7 15:59 message relayed

grasslands.org.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Undeliverable

31/10/2017 15:59

icasa.org.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Transferred 31/10/201

7 16:03

2.0.0 message relayed

juwi.co.za Transferred 31/10/2017 15:59

BC: van der Westhuizen Corne([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

kingsley.co.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Undeliverable

31/10/2017 16:00

labour.gov.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

namakhoi.gov.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Undeliverable

31/10/2017 16:03

BC: [email protected]([email protected]) Transferred 31/10/201

7 16:03

2.0.0 message relayed

ncpg.gov.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

nda.agric.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) nersa.org.za Transferred 31/10/201

7 15:59

Page 26: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 21

BC: [email protected]([email protected]) Undeliverable

31/10/2017 16:00

nocci.co.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) nra.co.za Transferred 31/10/201

7 15:59 BC: [email protected]([email protected])

Transferred 31/10/2017 16:03

2.0.0 message relayed

POBOX1.STELLBOS Delivered 31/10/2017 15:59

BC: Minnelise Levendal([email protected]) Read 31/10/2017 15:59

nra.co.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Transferred 31/10/201

7 16:03

2.0.0 message relayed

rumboll.co.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

saeon.ac.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

sahra.org.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

salt.ac.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.6.0 message relayed

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.6.0 message relayed

sanbi.org.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Undeliverable

31/10/2017 15:59

sanparks.org Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

ska.ac.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

transnet.net Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Transferred 31/10/2017 16:03

2.0.0 message

Page 27: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 22

relayed BC: [email protected]([email protected])

Transferred 31/10/2017 16:03

2.0.0 message relayed

trpw.ncape.gov.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Undeliverable

31/10/2017 15:59

uct.ac.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Transferred 31/10/201

7 16:03

2.0.0 message relayed

visagie.net Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

worldonline.co.za Transferred 31/10/2017 15:59

BC: [email protected]([email protected]) Transferred 31/10/201

7 15:59

2.0.0 message relayed

Post Offices

Post Office Delivered Route 3i.co.za 3i.co.za agri.ncape.gov.za agri.ncape.gov.za agric.co.za agric.co.za birdlife.org.za birdlife.org.za caa.co.za caa.co.za daff.gov.za daff.gov.za debeersgroup.com debeersgroup.com dmr.gov.za dmr.gov.za dtps.gov.za dtps.gov.za dwa.gov.za dwa.gov.za dws.gov.za dws.gov.za environment.gov.za environment.gov.za eskom.co.za eskom.co.za ewt.org.za ewt.org.za gmail.com gmail.com grasslands.org.za grasslands.org.za icasa.org.za icasa.org.za juwi.co.za juwi.co.za kingsley.co.za kingsley.co.za labour.gov.za labour.gov.za namakhoi.gov.za namakhoi.gov.za ncpg.gov.za ncpg.gov.za nda.agric.za nda.agric.za nersa.org.za nersa.org.za nocci.co.za nocci.co.za nra.co.za nra.co.za nra.co.za nra.co.za POBOX1.STELLBOS 31/10/2017 15:59 csir.co.za rumboll.co.za rumboll.co.za

Page 28: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 23

saeon.ac.za saeon.ac.za sahra.org.za sahra.org.za salt.ac.za salt.ac.za sanbi.org.za sanbi.org.za sanparks.org sanparks.org ska.ac.za ska.ac.za transnet.net transnet.net trpw.ncape.gov.za trpw.ncape.gov.za uct.ac.za uct.ac.za visagie.net visagie.net worldonline.co.za worldonline.co.za

Files

File Size Date & Time JUWI IAPS LETTER 1 RELEASE OF DSR_30Oct2017.pdf 113 KB (116639 Bytes) 31/10/2017 13:08 MESSAGE 3 KB (3758 Bytes) 31/10/2017 15:59 TEXT.htm 7 KB (7905 Bytes) 31/10/2017 15:59

Options

Auto Delete: No Concealed Subject: No Expiration Date: None Notify Recipients: Yes Priority: Standard Reply Requested By: None Security: Standard To Be Delivered: Immediate

Record Id

Record Id: 59F89DE5.STELLBOS.POBOX1.100.1383869.1.388F.1 Common Record Id: 59F881C5.STELLBOS.POBOX1.200.20000A4.1.4945A.1

Page 29: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 24

Proof of email delivery dated 29/11/2017 for reminder to I&APs to comment on the Draft Scoping Report

Page 30: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 25

Page 31: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 26

Message Id: 5A1EABDE.DC0 : 164 : 34641 Subject: Re: juwi Kap Vley WEF project; release of DSR for public comment Created By: [email protected]

Scheduled Date: Creation Date: 29/11/2017 14:45 From: Reinett Mogotshi

Recipients:

Recipient Action Date & Time

Comment

3i.co.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

agri.ncape.gov.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

agric.co.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Undeliverable

29/11/2017 14:45

birdlife.org.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Delivered 29/11/2017 14:45

caa.co.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

daff.gov.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) BC: [email protected]([email protected]) BC: [email protected]([email protected]) BC: [email protected]([email protected]) debeersgroup.com Transferred 29/11/201

7 14:45 BC: [email protected]([email protected])

Transferred 29/11/2017 14:45

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

dmr.gov.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

dtps.gov.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

dwa.gov.za Transferred 29/11/2017 14:45

Page 32: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 27

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

dws.gov.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

environment.gov.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

BC: Wilma Lutsch([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

eskom.co.za Transferred 29/11/2017 14:45

BC: John Geeringh([email protected]) Transferred 29/11/201

7 14:47

2.0.0 message relayed

BC: [email protected]([email protected]) Undeliverable

29/11/2017 14:47

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:47

2.0.0 message relayed

ewt.org.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Delivered 29/11/2017 14:45

gmail.com Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

BC: Koos Bisschoff([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

BC: Maureen Kruger([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 29/11/2017 14:45

2.0.0 message

Page 33: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 28

relayed BC: [email protected]([email protected])

Transferred 29/11/2017 14:45

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

grasslands.org.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Undeliverable

29/11/2017 14:45

icasa.org.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

juwi.co.za Transferred 29/11/2017 14:45

BC: van der Westhuizen Corne([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

kingsley.co.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Undeliverable

29/11/2017 14:46

labour.gov.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

namakhoi.gov.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Undeliverable

29/11/2017 14:45

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

ncpg.gov.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

Page 34: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 29

nda.agric.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) nersa.org.za Transferred 29/11/201

7 14:45 BC: [email protected]([email protected]) Undeliverabl

e 29/11/2017 14:46

POBOX1.STELLBOS Delivered 29/11/2017 14:45

BC: Minnelise Levendal([email protected]) Read Replied

29/11/2017 14:48 29/11/2017 14:51

nocci.co.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) nra.co.za Transferred 29/11/201

7 14:45 BC: [email protected]([email protected])

Transferred 29/11/2017 14:45

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

rumboll.co.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

saeon.ac.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

sahra.org.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

salt.ac.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.6.0 message relayed

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.6.0 message relayed

sanbi.org.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Undeliverable

29/11/2017 14:46

sanparks.org Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

ska.ac.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Transferred 29/11/2017 14:45

2.0.0 message

Page 35: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 30

relayed

transnet.net Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

trpw.ncape.gov.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Undeliverable

29/11/2017 14:45

uct.ac.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

visagie.net Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

worldonline.co.za Transferred 29/11/2017 14:45

BC: [email protected]([email protected]) Transferred 29/11/201

7 14:45

2.0.0 message relayed

Post Offices

Post Office Delivered Route 3i.co.za 3i.co.za agri.ncape.gov.za agri.ncape.gov.za agric.co.za agric.co.za birdlife.org.za birdlife.org.za caa.co.za caa.co.za daff.gov.za daff.gov.za debeersgroup.com debeersgroup.com dmr.gov.za dmr.gov.za dtps.gov.za dtps.gov.za dwa.gov.za dwa.gov.za dws.gov.za dws.gov.za environment.gov.za environment.gov.za eskom.co.za eskom.co.za ewt.org.za ewt.org.za gmail.com gmail.com grasslands.org.za grasslands.org.za icasa.org.za icasa.org.za juwi.co.za juwi.co.za kingsley.co.za kingsley.co.za labour.gov.za labour.gov.za namakhoi.gov.za namakhoi.gov.za ncpg.gov.za ncpg.gov.za nda.agric.za nda.agric.za nersa.org.za nersa.org.za nocci.co.za nocci.co.za

Page 36: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 31

nra.co.za nra.co.za POBOX1.STELLBOS 29/11/2017 14:45 csir.co.za rumboll.co.za rumboll.co.za saeon.ac.za saeon.ac.za sahra.org.za sahra.org.za salt.ac.za salt.ac.za sanbi.org.za sanbi.org.za sanparks.org sanparks.org ska.ac.za ska.ac.za transnet.net transnet.net trpw.ncape.gov.za trpw.ncape.gov.za uct.ac.za uct.ac.za visagie.net visagie.net worldonline.co.za worldonline.co.za

Files

File Size Date & Time MESSAGE 4 KB (4763 Bytes) 29/11/2017 14:45 TEXT.htm 9 KB (10182 Bytes) 29/11/2017 14:45

Options

Auto Delete: No Concealed Subject: No Expiration Date: None Notify Recipients: Yes Priority: Standard Reply Requested By: None Security: Standard To Be Delivered: Immediate

Record Id

Record Id: 5A1EC7FE.STELLBOS.POBOX1.100.1383869.1.3C89.1 Common Record Id: 5A1EABDE.STELLBOS.POBOX1.200.20000A4.1.4A2ED.1

Page 37: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 32

Proof of courier waybills

Page 38: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 33

Page 39: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 34

Page 40: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 35

Page 41: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 36

Page 42: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 37

Page 43: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 38

Page 44: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 39

Page 45: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 40

Page 46: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 41

Page 47: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 42

Page 48: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 43

Page 49: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 44

Proof of registered mail sent

Page 50: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 45

Page 51: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 46

Page 52: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 47

Page 53: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 48

Page 54: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 49

Page 55: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 50

Page 56: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 51

Page 57: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 52

Page 58: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 53

Page 59: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 54

Page 60: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 55

Page 61: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 56

D4: COMMENTS RECEIVED FROM I&APS

Letters and emails received from I&APs

Page 62: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 57

Page 63: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 58

Page 64: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 59

Page 65: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 60

Page 66: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 61

Page 67: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 62

>>> Joe Harding <[email protected]> 08/11/2017 11:53 >>> Apologies Paul - Could the contact email address please be recorded as [email protected] for the below request. Joseph Harding Project Developer | Windlab Developments South Africa Pty Ltd Unit 3, Demar Square | 45 Bell Crescent Road | Westlake 7945 | South Africa (Physical) Postnet Suite 216| Private Bag X26 | Tokai 7966| South Africa (Postal) Office: +27-21-701-1292 | Mobile: +27-64-778-1484 | [email protected] | www.windlab.com On Wed, Nov 8, 2017 at 11:04 AM, Joe Harding <[email protected]> wrote: Hi there Paul, I am putting together a database of Renewable Energy projects being developed in South Africa and would like to be added to the Interested & Affected Parties list for the following projects: Juwi Projects: Skeerhok 1, 2 & 3. Kep Valley WEF. Mainstream: Sutherland I & II & Rietrug WEF Grid infrastructure BA process as well as Substantive EIA Amendment process. As well as the City of Cape Town's Atlantis Gas to Power Project. Thanks in advance! Kind regards, Joseph Harding Project Developer | Windlab Developments South Africa Pty Ltd Unit 3, Demar Square | 45 Bell Crescent Road | Westlake 7945 | South Africa (Physical) Postnet Suite 216| Private Bag X26 | Tokai 7966| South Africa (Postal) Office: +27-21-701-1292 | Mobile: +27-64-778-1484 | [email protected] | www.windlab.com >>> Wilma Lutsch <[email protected]> 31/10/2017 16:36 >>> [The e-mail server of the sender could not be verified (SPF Record)] Dear Reinet It would be appreciated if you could furnish me with a CD of the Scoping report, delivered to Environment House Cnr Steve Biko and Soutpansberg Road Pretoria 0001 Thanks Wilma Lutsch Tel 012 3998827

Page 68: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 63

From: Stanley Tshitwamulomoni [mailto:[email protected]] Sent: Thursday, November 09, 2017 11:35 AM To: Muhammad Essop; van der Westhuizen, Corne Subject: Re: Kap Vley Wind Farm - Scoping Report to DEA internal Departments Good day A cd should be delivered to my attention and 30 days comenting period will commence from the date of receipt of your document. Please note that we dont work with emailed documents or links. Regards Stanley Sent from my Samsung Galaxy smartphone. >>> Koos Bisschoff <[email protected]> 16/10/2017 10:25 >>> ---------- Forwarded message ---------- From: "Koos Bisschoff" <[email protected]> Date: 16 Oct 2017 08:39 Subject: Csir/ems/it/2017/0010/a To: <[email protected]> Cc:

Goeie more Kan u my asb registreer as diensverskaffer Beskik oor akkomodasie Dank Koos 0815587261 >>> Koos Bisschoff <[email protected]> 10/11/2017 07:22 >>> Good morning Reinett Somebody also registered refer to an email they received where they need to click and open for services they can deliver.( a 200 page and 600page). I just want to make sure or everything on my registration is in place. Thanks Koos On 31 Oct 2017 15:59, "Reinett Mogotshi" <[email protected]> wrote: >>> Maureen Kruger <[email protected]> 16/10/2017 11:52 >>> Goeie middag Ek is tans 'n inwoner in Koingnaas en ook 'n grondeienaar in Kleinzee. Ek het die kennisgewing van bogenoemde projek by 'n plaaslike supermark in Kleinzee gesien. Kan u my meer inligting gee aangaande die projek. Wil ook weet wat dit behels om te registreer as Belangstellende en Geaffekteerde Party? Hoor graag van u. Maureen Kruger

Page 69: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 64

>>> "Karen Jodas" <[email protected]> 16/11/2017 09:51 >>> [The e-mail server of the sender could not be verified (SPF Record)] Dear Reinett Please can you register me as an I&AP on the Kap Vley Wind farm EIA process. My contact details are below. Thank you Kind regards Karen Jodas >>> Ralph Damonse <[email protected]> 15/11/2017 10:48 >>> Dear Ms. Mogotshi Our company is currently in process of developing three wind farms and three solar parks directly to the north and the north west of your Kap Vley WEF. As an I &AP with rights over the neighbouring properties, please for forward relevant documentation to register us on our I&AP Database. Also, are the Kmz or Kml shapefiles for your WEF land parcels available? Thank you. Ralph Damonse Head: Project Development Genesis Eco-Energy (Pty) Ltd PO Box 363 Newlands 7725 Cape Town Mobile:+27 82 344 5911 Fax:+27 86 672 6096 Email: [email protected] / Web: http://www.genesis-eco.com

Genesis Eco-Energy - Pioneering renewable energy in South Africa since 2001 >>> Ralph Damonse <[email protected]> 16/11/2017 08:50 >>> Dear Reinett Please confirm whether the Alternate 2 for Grid Connection envisages to cross the land parcel Zonnequa 0 of 326. See attached land detail. Thank you. Ralph Damonse Head: Project Development Genesis Eco-Energy (Pty) Ltd PO Box 363 Newlands 7725 Cape Town Mobile:+27 82 344 5911 Fax:+27 86 672 6096 Email: [email protected] / Web: http://www.genesis-eco.com

Page 70: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 65

Genesis Eco-Energy – Pioneering renewable energy in South Africa since 2001 >>> John Geeringh <[email protected]> 06/11/2017 09:19 >>> [The e-mail server of the sender could not be verified (SPF Record)] Please send me the BID document via e-mail and if possible a KMZ file of the affected properties . Please find attached Eskom requirements for development close to Eskom infrastructure and servitudes. Regards John Geeringh (Pr Sci Nat) Senior Consultant Environmental Management Eskom: GC Land Development D1 Y39 Megawatt Park P O Box 1091 Johannesburg 2000 Tel: 011 516 7233 Fax: 086 661 4064 Cell: 083 632 7663 E-mail: [email protected] >>> John Geeringh <[email protected]> 07/11/2017 10:15 >>> [The e-mail server of the sender could not be verified (SPF Record)] Thank you, this will suffice. Please check with the landowners regarding an Eskom servitude for the Juno-Gromis 400kV power line that is going to be constructed in the new year. The setback document I sent you requires a 3 x tip height distance from the edge of the Eskom 400kV servitude to the nearest turbine positions. Regards John >>> Sonia Miszczak <[email protected]> 28/11/2017 14:02 >>> Dear Reinett, I would please like to be registered as an I&AP for the proposed KAP VLEY WIND ENERGY FACILITY. Please find attached I&AP Comment and Registration Form. Kind regards _____________________________________ Sonia Miszczak Project Manager Atlantic Renewable Energy Partners (Pty) Ltd

Page 71: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 66

Page 72: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 67

Page 73: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 68

Page 74: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 69

Page 75: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 70

Page 76: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 71

Page 77: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 72

Page 78: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 73

Page 79: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 74

Page 80: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 75

Page 81: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 76

Page 82: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 77

Page 83: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 78

Email responses to some of the comments received

Email to Koos Bissschoff: >>> Reinett Mogotshi 20/10/2017 16:20 >>> Good Day Thank you very much for the Email. You have been registered as an Interested and Affected Party. Kind Regards Reinett Mogotshi Environmental Management Services CSIR 021 888 2432

>>> Reinett Mogotshi 16/11/2017 08:13 >>> Good Afternoon Koos Bisschoff Thank you for the email. You have been registered as an Interested and Affected Party to receive information regarding the project. Please note we are undertaking an Environmental Assessment for the Kap Vley project where interested and affected parties are given an opportunity to raise comments and concerns on the wind energy project. A hard copy of the Draft Scoping Report is available for public viewing at the Kleinzee Police Station. Kind Regards Reinett Mogotshi Environmental Management Services CSIR 021 888 2432

Email to Maureen Kruger: >>> Reinett Mogotshi 20/10/2017 16:21 >>> Good Day Thank you very much for the email. You have been registered as an Interested and Affected Party for this project. Kind Regards Reinett Mogotshi Environmental Management Services

Page 84: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 79

CSIR 021 888 2432 Email to Karen Jodas >>> Reinett Mogotshi 16/11/2017 10:03 >>> Good Day Karen Thank you very much for your email. You have been registered as an Interested and Affected Party for the project. Kind Regards Reinett Mogotshi Environmental Management Services CSIR 021 888 2432 Email to Stanley Stanley Tshitwamulomoni >>> Reinett Mogotshi 10/11/2017 12:18 >>> Good Day Stanley Thank you for your query this morning. Please note that an email notification for the release of the Draft Scoping Report as well as a CD copy of the Draft Scoping Report were sent to Wilma Lutsch via registered mail on the 30th of October 2017. Please see the attached proof of postage. In addition, two additional CDs were sent via courier to you and Pamela yesterday. Thank you for confirmation of receipt as discussed with Minnelise Levendal this morning. Kind Regards Reinett Mogotshi Environmental Management Services CSIR 021 888 2432 Emails to Ralph Damonse: >>> Reinett Mogotshi 15/11/2017 14:51 >>> Dear Ralph Damonse Thank you very much for the email. I have added you to our database as an I&AP, for you to receive information regarding the project. As requested, please see the attached Kmz file.

Page 85: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 80

Do not hesitate to contact me should you require any additional information. Kind Regards Reinett Mogotshi Environmental Management Services CSIR 021 888 2432 >>> Reinett Mogotshi 17/11/2017 09:53 >>> Good Day Ralph Thank you for the email. I can confirm that the proposed Alternative 2 for the transmission line crosses the Remainder of the Farm Zonnekwa 326. Kind Regards Reinett Mogotshi Environmental Management Services CSIR 021 888 2432 Email to Sonia Miszczak >>> Minnelise Levendal 04/12/2017 11:32 >>> Dear Sonia I have received the completed comment and registration form. Thank you very much. Best wishes, Minnelise Minnelise Levendal CSIR, Implementation Unit (Environmental Management Services) PO Box 320 Stellenbosch 7599 Tel: + 27-21 888-2495 Cell: 083 309 8159 Fax: 021-888 2693 Email: [email protected]

Page 86: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 81

From: Reinett Mogotshi [[email protected]] Sent: 06 November 2017 03:56 PM To: John Geeringh Subject: RE: juwi Kap Vley WEF project; release of DSR for public comment Good Day John Thank you for the email. Please note that a BID was not released for this project. As requested, please see the attached standalone summary of the Scoping Report as well as the kmz files. Kindly advise if this information will be sufficient or if you would like to receive a CD of the Scoping Report. Kind Regards Reinett Mogotshi Environmental Management Services CSIR 021 888 2432 >>> Reinett Mogotshi 07/11/2017 11:09 >>> Good Day John Thank you for the email. Please note that juwi is aware of where the Eskom servitude is planned and have taken it into consideration during planning. Kind Regards Reinett Mogotshi Environmental Management Services CSIR 021 888 2432 From: Reinett Mogotshi [[email protected]] Sent: 01 November 2017 10:31 AM To: Wilma Lutsch Subject: RE: juwi Kap Vley WEF project; release of DSR for public comment

Hi Wilma

Thank you for the email. Please note that the CD of the Scoping Report was send via registered mail on Monday the 30th of November 2017.

Please see the attached proof of post.

Kind Regards

Page 87: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

APPE NDI X D – PUBL I C P AR T IC IPAT ION

pg 82

Reinett Mogotshi Environmental Management Services

CSIR

021 888 2432

Page 88: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters
Page 89: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 1

APPENDIX E1: PRE-APPLICATION MEETING WITH DEA 2 MEETING NOTES OF PRE-APPLICATION MEETING WITH DEA ON 11 OCTOBER 2017 2 APPENDIX 1: Agenda and Attendance Register 10 APPENDIX 2: Presentation of the proposed Kap Vley WEF and associated electrical infrastructure12 APPENDIX 3: Letters to provide in-principal agreement from WWF and SANParks to determine a

biodiversity offset for the Kap Vley WEF project 23 APPENDIX E2: DEA LETTER OF ACKNOWLEDGEMENT OF APPLICATION AND DRAFT SCOPING REPORT 25 APPENDIX E3: DEA LETTER OF COMMENTS ON DRAFT SCOPING REPORT 27

Page 90: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 2

APPENDIX E1: PRE-APPLICATION MEETING WITH DEA

MEETING NOTES OF PRE-APPLICATION MEETING WITH DEA ON 11 OCTOBER 2017

MEETING NOTES OF PRE-APPLICATION MEETING WITH DEA TO DISCUSS THE PROPOSED KAP VLEY WIND ENERGY FACILITY AND ASSOCIATED ELECTRICAL INFRASTRUCTURE PROPOSED BY

JUWI RENEWABLE ENERGIES (PTY) LTD (juwi) NEAR KLEINZEE IN THE NORTHERN CAPE

11 October 2017, 9H30-11H30, DEA Office, Environment House, Arcadia, Pretoria Attendance:

Name Organisation Muhammad Essop (ME) DEA Thabile Sangweni (TS) DEA Corne van der Westhuizen (CvdW) juwi Minnelise Levendal (ML) CSIR Reinett Mogotshi (RM) CSIR

Attachments:

1. Agenda and Attendance Register (Appendix 1) 2. Presentation of the proposed Kap Vley WEF and associated electrical infrastructure (Appendix 2) 3. Letters to provide in-principal agreement from WWF and SANParks to determine a biodiversity offset

for the Kap Vley WEF project (Appendix 3). Purpose of the meeting: This meeting constitutes the Pre-Application Meeting with DEA to discuss the Environmental Impact Assessment (EIA) for the proposed Kap Vley Wind Energy Facility that is currently being undertaken by CSIR. It is also to discuss the proposed associated electrical infrastructure of the project which will constitute a separate Basic Assessment (BA) process. The meeting is to provide an overview of the proposed WEF and associated electrical infrastructure and to confirm the proposed EIA and BA processes to be undertaken. This includes the proposed approaches and requirements of the Scoping, EIA and BA processes. It also includes the Public Participation Process, Alternatives and Cumulative impacts to be included and assessed as well as the proposed EIA Schedule. The meeting will also provide feedback on the approach and progress to date to secure a biodiversity offset for the project as it falls within an area of high biodiversity sensitivity. 1. Notes - Welcome and introductions

ME welcomed all participants to the meeting. The participants introduced themselves.

Page 91: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 3

2. Notes - Overview of the Kap Vley Wind Energy Facility

RM presented an overview of the proposed project (see Appendix 1 for the full presentation):

• Kap Vley WEF near Kleinzee in the Northern Cape:

o juwi is proposing the development of the Kap Vley WEF and associated electrical infrastructure:

Located approximately 30 km south east of Kleinzee in the Northern Cape. It falls within the Namakhoi Local Municipality which falls under the Namaqualand District Municipality.

Maximum number of turbines: 56

Maximum turbine height and rotor diameter: 150 m & 160 m respectively

o Proposed Scoping and EIA – to be undertaken for the WEF

o Separate BA process to be undertaken for the electrical infrastructure component associated with the proposed WEF. The BA and EIR processes will run concurrently. One integrated PPP will be followed to ensure that the timeframes for the issuing of the Environmental Authorisations for the proposed Kap Vley WEF and the electrical component are aligned.

o Specialist studies will be undertaken to inform the EIA Process - Please refer to slide 12 of the Presentation in Appendix 2 for a full list of the specialist studies.

o In addition to the specialist studies, a Biodiversity Offset study will be undertaken by Simon Todd Consulting as the site falls within a Critical Biodiversity Area (CBA) 1 & 2. Juwi is taking a pro-active approach and investigating the potential need and opportunity for an offset to compensate for the likely impact of the development. Meetings have been held with WWF, SANParks and the Department of Environment and Nature Conservation of the Northern Cape Province (DENC).

o In principle support letters were obtained from WWF and SANParks for the process of determining an offset whereby land will be acquired from WWF to expand the Namaqua National Park (See Appendix 3).

Page 92: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 4

3. Notes - Key Questions and Discussion

CSIR QUESTION DEA RESPONSE ACTION

Confirmation of EIA and BA Processes/ Approaches:

o Submit two separate applications, i.e. one for Scoping and EIA (Kap Vley WEF) and one for the BA process (associated electrical infrastructure).

o Submit separate Scoping and EIA Reports and a Separate BA Report.

o Undertake one integrated PPP for the BA and EIA Processes

o The final EIA Report and the final BA Report to be submitted to DEA simultaneously to align Environmental Authorisations from DEA.

Proposal for EIA and BA approaches (i.e. to undertake separate processes and one integrated PPP) is acceptable.

ME enquired whether consent was obtained from all the landowners. CvdW confirmed that consent was obtained, except from the land owners for the two farm portions to be traversed by the new roads to be constructed. CvdW indicated that since there are only linear activities occurring on these properties, he is of the view that landowner consent is not required for these two properties, the same way consents are not required for properties only traversed by powerlines. .

ME referred to Section 39(1) of the NEMA Regulations and indicated the need for consents for these properties will be confirmed as part of the approval of these meeting notes.

ME asked that the EAP on the project is not working on the SEA, and ML confirmed that she is not part of the SEA team.

ML to proceed with the proposed approach to submit two separate Applications for Scoping and EIA and the BA processes. Integrated PPP to be followed for the above.

ME to confirm whether consent must be obtained from landowners for the construction of roads as linear activities on their properties.

ME confirms, after discussions internally, that seeing that the new roads to be constructed is directly related to the Wind Energy Facility, it cannot be isolated, and hence, seeing that landowner consent is needed for the properties in question for the wind energy facility, then landowner consent is needed for the new roads.

If the CSIR can prove that the new roads constructed are not for the purpose of the Wind Energy facility, then the DEA may change its opinion.

Confirmation on Alternatives:

o No-go alternative will be assessed

o There are no site /location alternatives and motivation why these are not included will be provided in the Scoping Report. juwi identified three

It is important that each specialist provides a detailed assessment of the no-go alternative in their specialist reports to be included in the EIA Reports.

Alternatives do not refer to site/location alternatives only. It also includes other alternatives, e.g. technology

Detailed motivation will be provided in the Scoping Report why site or location alternatives are not available to take forward into the EIA phase.

All other alternatives will be included in the Scoping Report and assessed in the EIA Report.

Page 93: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 5

CSIR QUESTION DEA RESPONSE ACTION

potential sites during the project screening phase:

Kiap: unfeasible due to environment i.e. nearby Goegab Nature Reserve;

Brazil: unfeasible due to land ownership; and

Kap Vley: Feasible and taken forward for S&EI process.

Three powerline routing alternatives will be assessed in the BA.

From the on-site substation to Gromis Substation (app 36 km);

From the on-site substation to Gromis Substation or closer to new proposed Eskom substation for which location still needs to be determined (approx. 36 km); and

Directly to the Gromis substation from the on-site substation (approx. 32 km).

alternatives.

The 2014 NEMA EIA Regulations make provision if no alternatives, including alternative sites or locations for the activity were investigated, to provide motivation for not considering these.

Please provide substantial motivation why site or location alternatives are not included in the Scoping Report. This will form the basis as to why no alternatives will be investigated going forward.

TS asked which one is the preferred powerline routing alternative? CvdW confirmed it will be the shortest routing alternative and this will be confirmed once the Eskom substation is built.

Please identify all other feasible alternatives in the Scoping Report.

The “No-go” alternative will also be included and assessed in detail by the specialists and will be included in the EIA Reports.

Uncertainty regarding turbine capacity, number and model at this stage.

Turbine specifications will only be finalised during the EIA phase as new or updated models or specifications become available all the time.

ME notes it is understandable that some turbine specifications will only be finalised closer to construction. It is however important that the “worst-case scenario” be presented and assessed by the specialists.

o the maximum number of turbines: 56

o maximum hub height and rotor diameter: 150 m & 160 m respectively.

Specialists must also consider and assess all possible

The bird, bat and visual specialists will be requested to consider and assess the different ranges of the turbine height and rotor diameter and include it in their specialist reports.

The ranges will be incorporated into the ToRs of the specialist studies and in the PoS for EIA.

Page 94: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 6

CSIR QUESTION DEA RESPONSE ACTION

ranges, e.g.: hub height: 80-150 m; rotor radius: 40-70m, minimum bottom clearance: 30 m, max tip height 230 m. These ranges will affect the sweep area and the potential kill zone of birds and bats and will impact the significance ratings these impacts, e.g. bats will be affected at a lower sweep area. It is therefore important for the relevant specialists to assess all possible ranges. The tip height ranges will affect the visual study and must therefore be considered and assessed by the visual specialist.

Confirmation on approach to assess cumulative impacts:

Assess other renewable energy projects and associated electrical infrastructure (e.g. powerlines) within a radius of 50 km. Should solar projects be considered as well?

DEA agrees with CSIR proposal to assess other renewable energy projects and associated electrical infrastructure projects within a radius of 50 km.

Wind and solar projects must be considered to determine the cumulative impacts as similar impacts may be effected, e.g. the loss of vegetation or habitat.

Specialists will be requested to consider and assess cumulative impacts associated with other renewable energy projects (wind and solar) and electrical infrastructure within 50 km of the project site.

Confirmation on the proposed approach to acquire a biodiversity off-set for the project:

The Kap Vley WEF site is located in a CBA1 and CBA2. A biodiversity offset is required and juwi is investigating the potential to contribute to the WWF land acquisition programme in the area to expand the Namaqua NP as an offset. A Draft Biodiversity offset study was prepared by Simon Todd Consulting and will be included in the scoping report.

ME notes that the determination of a biodiversity offset is a sensitive issue and needs to be addressed in an appropriate manner by all affected parties. ME cautions not to provide a direct financial offset to any government department. ME agrees with the proposed approach of juwi to contribute to the WWF Land Acquisition Programme to expand the Namaqualand National Park. The final offset study needs to be included in the Draft EIA Report. The requirements of the Draft National Biodiversity Offset Guideline (April 2017) must be adhered to.

The EAP to include the draft biodiversity offset study in the Draft Scoping Report. juwi to proceed with negotiations with WWF and SANParks to finalise the biodiversity offset and the offset study. It will be included in the Draft EIA Report.

Comments must also be sought from the relevant authorities, within the DEA as well as the NC on the proposed offset.

The offset must be finalised before the final EIAr is submitted to ensure it can be considered as part of the decision making process.

Page 95: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 7

CSIR QUESTION DEA RESPONSE ACTION

Confirmation on the specialist studies:

The specialist impact assessments have not been finalised. The final specialist studies to be included in the EIA will meet the requirements of Appendix 6 and will be included in the Draft and Final EIA Reports.

The draft inputs provided by the specialists to date can be included in the Draft and Final Scoping Reports. It should be marked as “scoping inputs from the specialists.” It will not be regarded as specialist impacts assessments and will not be required to meet the requirements of Appendix 6 of the NEMA EIA Regulations during the scoping phase. TS noted that she can comment on the ToRs for the specialist studies to be addressed in the final specialist studies to be included in the EIA Report.

ML to include the draft specialist inputs in the Draft and Final Scoping Reports. The final specialist studies will be included in the EIA Report and will adhere to Appendix 6 of the NEMA EIA Regulations.

Confirmation on the PPP:

Integrated PPP to be followed for the EIA and BA processes.

As indicated above, DEA accepts the proposed approach that an integrated PPP will be followed for the EIA and BA processes

Integrated PPP to be undertaken for the EIA and BA processes.

Issues will only be captured during the 30-day public review periods

ME: Issues can also be captured outside of the 30-day public review period. The EAP should be reasonable, e.g. if comments are a few days late, it can still be incorporated, otherwise comments to be included and addressed in the following phase. Comments on the final reports submitted after the final reports were submitted for decision-making, should be sent directly to DEA for their consideration.

It is important to maintain separate issues and responses trails for the EIA and BA. Comments can be received collectively, but the comments must be split for each process.

Comments will be captured during the 30-day public review periods, but also outside of these periods, where reasonable and where the extension will not lead to missing deadlines for report submissions and the lapsing of the Application. Should it not be possible to capture comments beyond the 30-day review period, the comments will be captured and responded to in the Issues and Responses trail of the next report (as applicable).

Need for Focus Group Meetings and Public Open House Meetings if requested.

Public Meetings or Public Open House Meetings are not required or regulated under the 2014 NEMA EIA Regulations. However, the EAP must do what is

The need to have Focus Group Meetings and/or Public meetings or Public Open-House Meetings will be

Page 96: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 8

CSIR QUESTION DEA RESPONSE ACTION

At this stage it is not anticipated that Public meetings will be held in the EIA Phase. However, these meetings or focus group meetings will be held on request and pending the responses received during the Scoping Phase.

reasonable and may decide to have one upon request. determined during the Scoping and EIA Processes.

Page 97: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 9

• Recommendations from DEA on the EIA process following queries from CSIR: Please adhere to all the requirements in Appendices 2 and 3 for Scoping and EIA Reports

respectively under the 2014 NEMA EIA Regulations (as amended, April 2017).

Please adhere to the legislated timeframes under section 3 of the 2014 NEMA EIA Regulations (as amended). Deliveries via courier should be done during office hours between 8-16H30. Deadlines may be missed if reports are delivered at security office after hours. If timeframes are not met, the Application will lapse and a new Application for EA would need to be lodged.

Request for Extension can be submitted in terms of Regulation 3 (7) of the NEMA EIA Regulations. However, this request will only be granted where exceptional circumstances can be demonstrated prior to the lapsing of the prescribed timeframe. Requests for Extension will not be granted if e.g. more time is requested to complete an Ecology study in the appropriate season.

The commenting period for DEA starts from the date that the Application or Report is received and stamped by DEA. The commenting period does not start from the date that the Application or Report is delivered at DEA, as this may be after the DEA offices have closed and it will therefore only be stamped the following day. It also does not start from the date that the application or report has been acknowledged.

Public participation or commenting on reports will not take place during the December holiday period, i.e. from 16 December to 5 January.

4. Way forward and Closure

ML to draft the meeting notes and send to DEA for approval and sign-off.

The meeting notes with the meeting reference number must be included as an appendix to the cover letter of the Application for EIA. This will ensure that the project will be assigned to TS and ME once the Application for the EIA has been lodged as they have attended the pre-application meeting and know the project background.

CvdW requests that the case officer should phone ML if she has any questions or if anything is unclear to avoid unnecessary delays and misunderstandings on the projects.

The meeting notes must be included in the Scoping, EIA and BA Reports.

ML and CvdW thanked DEA for the opportunity to meet with them and for providing feedback on the queries relating to the Scoping, EIA and BA approaches and processes for the proposed Kap Vley WEF and associated electrical infrastructure near Kleinzee in the Northern Cape.

THE MEETING ADJOURNED AT 11H15.

Page 98: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 10

APPENDIX 1: Agenda and Attendance Register

Page 99: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 11

ATTENDANCE REGISTER

Page 100: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 12

APPENDIX 2: Presentation of the proposed Kap Vley WEF and associated electrical infrastructure

Page 101: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 13

Page 102: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 14

Page 103: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 15

Page 104: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 16

Page 105: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 17

Page 106: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 18

Page 107: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 19

Page 108: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 20

Page 109: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 21

Page 110: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 22

Page 111: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 23

APPENDIX 3: Letters to provide in-principal agreement from WWF and SANParks to determine a

biodiversity offset for the Kap Vley WEF project

Page 112: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 24

Page 113: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 25

APPENDIX E2: DEA LETTER OF ACKNOWLEDGEMENT OF APPLICATION AND DRAFT SCOPING REPORT

Page 114: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 26

Page 115: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 27

APPENDIX E3: DEA LETTER OF COMMENTS ON DRAFT SCOPING REPORT

Page 116: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 28

Page 117: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 29

Page 118: Notice of Release of Draft Scoping Report for comments ......Cover letter to DEA with the Application for EIA and submission of the Draft Scoping Report for comment 10 Copies of letters

S c o p i n g a n d E n v i r o n m e n t a l I m p a c t A s s e s s m e n t f o r t h e p r o p o s e d d e v e l o p m e n t o f t h e K a p V l e y W i n d E n e r g y F a c i l i t y n e a r K l e i n z e e i n t h e N o r t h e r n C a p e

A P P E N D I X E – C O R R E S P O N D E N C E W I T H D E A

pg 30