NOTICE OF PROPOSED CONSTRUCTION OF A SUBSTATION AND HIGH-VOLTAGE ELECTRIC TRANSMISSION LINES Eversource Plans Enhancements to Transmission System for Improved Reliability The Connecticut Light and Power Company, doing business as Eversource Energy (Eversource), is continuing its efforts to improve the electric system in Greenwich so customers will have reliable electric power to meet their growing energy needs. We plan to construct a new 115-kilovolt (kV) bulk substation and two new underground 115-kV transmission lines in Greenwich, Connecticut. The project is known as the Greenwich Substation and Line Project. This notice provides a summary of our plan, as currently proposed. Project Summary Within the next 60 days, Eversource plans to apply to the Connecticut Siting Council (Siting Council) for a Certificate of Environmental Compatibility and Public Need (Certificate) to construct and operate two new 115-kV electric transmission lines in Greenwich. The Greenwich Substation and Line Project (Project) would extend approximately 2.3 miles from the existing Cos Cob Substation on Sound Shore Drive to 290 Railroad Avenue in Greenwich. The application to the Siting Council will also include the construction and operation of a new substation at 290 Railroad Avenue in Greenwich. The Project is needed to address increasing customer demand and to improve reliability of electric supply in Greenwich. The existing electric infrastructure serving Greenwich is expected to reach its maxi- mum capacity in 2017. By adding a new substation, Eversource will be able to meet expected customer demand for approximately 30 years. If approved by the Siting Council, construction is projected to begin in the third quarter of 2016. The new substation and underground transmission lines are proposed to be completed and in service by the end of 2017. Technical Description Eversource proposes to use high-pressure fluid-filled (HPFF) power cables installed in two steel pipes with dielectric (insulating) fluid. The two 8” pipes and other smaller pipes and conduits (or ducts) would be installed underground, within or adjacent to roads along the route. Installation would involve excavating a continuous trench to an average depth of 6 feet with a typical width of 4.5 feet. In addition to the trench, the Project would include installation of concrete splice vaults, which are typically spaced at intervals of approximately 2,000 to 2,800 feet, depending upon cable construction and route characteristics. To install each concrete splice vault, an excavation area approximately 12 feet wide, 12 feet deep and 24 feet long would be required. Eversource’s application will provide additional siting and technical details, including information as to how the specific design of the line impacts magnetic field levels and measures to minimize magnetic fields. The proposed new lines will meet the requirements of the Siting Council’s “Best Man- agement Practices for Electric and Magnetic Fields,” as amended. Burying transmission lines in the earth does not eliminate magnetic fields, because these fields can pass through soil. However, certain inherent features of an underground design, such as the close proximity of the currents in the cables, provide some cancellation of magnetic fields. Project siting, magnetic field information, including calculated magnetic field levels, and vault and cable specifications will be included in the application. The application will be available on the Project’s website at www.eversource.com, the Siting Council’s website at www.ct.gov/csc or at the Greenwich libraries. Additional information about the Project can be obtained by calling 1-800-793-2202 or by emailing TransmissionInfo@ eversource.com. Additional information on electric and magnetic fields may be obtained by calling 1-800-793-2202 or contacting the Connecticut Department of Public Health at 860-509-7740. Preferred Route Under Consideration The preferred route in Greenwich would extend approximately 2.3 miles from the existing Cos Cob Substation on Sound Shore Drive to 290 Railroad Avenue. The line would exit Cos Cob Substation to the north, under the railroad lines. The route would then head west under Station Drive, through the Cos Cob train station area, to the west side of Indian Field Road. On the west side of Indian Field Road, Eversource would perform a horizontal directional drill (HDD) under the railroad and Interstate 95, coming up at the end of Kinsman Lane. The route would then continue under Kinsman Lane to the intersection of Bruce Park Avenue. At the intersection of Bruce Park Avenue and Kinsman Lane, Eversource would perform another horizontal directional drill under Bruce Park, coming up on the north side of Davis Avenue. (Another option is to go along the road in the park.) The route would continue west under Davis Avenue to Museum Drive to Arch Street. At Arch Street, the route would turn north to Railroad Avenue. At Railroad Avenue, the route would turn west to 290 Railroad Avenue, ending at the site of the proposed substation. The map above depicts the proposed route of the new substation and the two new 115-kV transmission lines. Additional Information Available For more information regarding the project, please contact: Greenwich Substation and Line Project Eversource P.O. Box 270, Hartford, CT 06141 1-800-793-2202 [email protected] This notice is provided pursuant to §16-50l (b) of the Connecticut General Statutes. This insert is paid for by customers. 3/4/5/15-95M Field Point Rd. Arch St. Indian Field Rd. I-95 I-95 Proposed Greenwich Substation Existing Cos Cob Substation 700 350 0 700 LEGEND Preferred Route Preferred Route HDD Crossing Preferred Route Open Trench Variation Preferred Route Map Greenwich Substation and Line Project feet

Upload: nguyentram

Post on 06-Feb-2018

213 views

Category:

Documents


1 download

TRANSCRIPT

NOTICE OF PROPOSED CONSTRUCTION OF A SUBSTATION

AND HIGH-VOLTAGE ELECTRIC TRANSMISSION LINES

Eversource Plans Enhancements to Transmission System for Improved Reliability

The Connecticut Light and Power Company, doing business as Eversource Energy (Eversource), is continuing its efforts to improve the electric system in Greenwich so customers will have reliable electric power to meet their growing energy needs. We plan to construct a new 115-kilovolt (kV) bulk substation and two new underground 115-kV transmission lines in Greenwich, Connecticut. The project is known as the Greenwich Substation and Line Project. This notice provides a summary of our plan, as currently proposed.

Project Summary

Within the next 60 days, Eversource plans to apply to the Connecticut Siting Council (Siting Council) for a Certificate of Environmental Compatibility and Public Need (Certificate) to construct and operate two new 115-kV electric transmission lines in Greenwich. The Greenwich Substation and Line Project (Project) would extend approximately 2.3 miles from the existing Cos Cob Substation on Sound Shore Drive to 290 Railroad Avenue in Greenwich. The application to the Siting Council will also include the construction and operation of a new substation at 290 Railroad Avenue in Greenwich.

The Project is needed to address increasing customer demand and to improve reliability of electric supply in Greenwich. The existing electric infrastructure serving Greenwich is expected to reach its maxi-mum capacity in 2017. By adding a new substation, Eversource will be able to meet expected customer demand for approximately 30 years.

If approved by the Siting Council, construction is projected to begin in the third quarter of 2016. The new substation and underground transmission lines are proposed to be completed and in service by the end of 2017.

Technical Description

Eversource proposes to use high-pressure fluid-filled (HPFF) power cables installed in two steel pipes with dielectric (insulating) fluid. The two 8” pipes and other smaller pipes and conduits (or ducts) would be installed underground, within or adjacent to roads along the route. Installation would involve excavating a continuous trench to an average depth of 6 feet with a typical width of 4.5 feet. In addition to the trench, the Project would include installation of concrete splice vaults, which are typically spaced at intervals of approximately 2,000 to 2,800 feet, depending upon cable construction and route characteristics. To install each concrete splice vault, an excavation area approximately 12 feet wide, 12 feet deep and 24 feet long would be required.

Eversource’s application will provide additional siting and technical details, including information as to how the specific design of the line impacts

magnetic field levels and measures to minimize magnetic fields. The proposed new lines will meet the requirements of the Siting Council’s “Best Man-agement Practices for Electric and Magnetic Fields,” as amended. Burying transmission lines in the earth does not eliminate magnetic fields, because these fields can pass through soil. However, certain inherent features of an underground design, such as the close proximity of the currents in the cables, provide some cancellation of magnetic fields.

Project siting, magnetic field information, including calculated magnetic field levels, and vault and cable specifications will be included in the application. The application will be available on the Project’s website at www.eversource.com, the Siting Council’s website at www.ct.gov/csc or at the Greenwich libraries. Additional information about the Project can be obtained by calling 1-800-793-2202 or by emailing [email protected]. Additional information on electric and magnetic fields may be obtained by calling 1-800-793-2202 or contacting the Connecticut Department of Public Health at 860-509-7740.

Preferred Route Under Consideration

The preferred route in Greenwich would extend approximately 2.3 miles from the existing Cos Cob Substation on Sound Shore Drive to 290 Railroad Avenue. The line would exit Cos Cob Substation to the north, under the railroad lines. The route would then head west under Station Drive, through the Cos Cob train station area, to the west side of Indian Field Road. On the west side of Indian Field Road, Eversource would perform a horizontal directional drill (HDD) under the railroad and Interstate 95, coming up at the end of Kinsman Lane. The route would then continue under Kinsman Lane to the intersection of Bruce Park Avenue. At the intersection of Bruce Park Avenue and Kinsman Lane, Eversource would perform another horizontal directional drill under Bruce Park, coming up on the north side of Davis Avenue. (Another option is to go along the road in the park.) The route would continue west under Davis Avenue to Museum Drive to Arch Street. At Arch Street, the route would turn north to Railroad Avenue. At Railroad Avenue, the route would turn west to 290 Railroad Avenue, ending at the site of the proposed substation.

The map above depicts the proposed route of the new substation and the two new 115-kV transmission lines.

Additional Information Available

For more information regarding the project, please contact:

Greenwich Substation and Line ProjectEversourceP.O. Box 270, Hartford, CT 06141

1-800-793-2202 [email protected]

This notice is provided pursuant to §16-50l(b) of the Connecticut General Statutes.

This insert is paid for by customers. 3/4/5/15-95M

Field

Poi

nt R

d.

Arch

St.

Indi

an F

ield

Rd.

I-95

I-95

ProposedGreenwichSubstation

ExistingCos CobSubstation

700 350 0 700LEGENDPreferred RoutePreferred Route HDD CrossingPreferred Route Open Trench Variation

Preferred Route MapGreenwich Substation and Line Project

feet

NOTIFICACIÓN DE PROPUESTA DE CONSTRUCCIÓN DE UNA SUBESTACIÓN

Y DE LÍNEAS DE TRANSMISIÓN ELÉCTRICA DE ALTO VOLTAJE

Eversource planifica mejoras al sistema de transmisión para aumentar la confiabilidad

The Connecticut Light and Power Company, que opera como Eversource Energy (Eversource), continúa sus esfuerzos para mejorar el sistema eléctrico de Greenwich, para que los clientes tengan un sistema eléctrico confiable que satisfaga sus crecientes necesidades energéticas. Planeamos construir una nueva subestación de transmisión masiva de 115 kilovoltios (kV) y dos líneas de transmisión subterráneas de 115 kV en Green-wich, Connecticut. El proyecto se denomina Proyecto de Subestación y Líneas de Greenwich. Este documento contiene un resumen de nuestro plan, según la propuesta actual.

Resumen del proyectoDentro de los próximos 60 días, Eversource solici-tará un Certificado de Compatibilidad Ambiental y Necesidad Pública al Consejo de Emplazamiento de Connecticut (Connecticut Siting Council) para construir y operar dos nuevas líneas de transmis-ión eléctrica de 115-kV en Greenwich. El Proyecto de Subestación y Líneas de Greenwich (Proyecto)se extendería a lo largo de aproximadamente 2.3 millas desde la subestación Cos Cob existente en Sound Shore Drive hasta 290 Railroad Avenue en Greenwich. La solicitud al Consejo de Emplazamiento también incluirá la construcción y operación de una nueva subestación en 290 Railroad Avenue en Greenwich.

El Proyecto es necesario para hacer frente a las cre-cientes demandas de los clientes y para aumentar la confiabilidad del suministro eléctrico en Greenwich. Se espera que la infraestructura eléctrica existente de Greenwich alcance su capacidad máxima en 2017. Con una nueva subestación, Eversource podrá cubrir la demanda prevista de los clientes durante aproximadamente 30 años.

Si es aprobado por el Consejo de Emplazamiento, la construcción está pautada para comenzar el tercer trimestre del 2016. La nueva subestación y las líneas de transmisión subterráneas están planeadas para fi-nalizarse y entrar en funcionamiento a fines de 2017.

Descripción técnicaEversource propone utilizar cables de alimentación de alta presión impregnados de fluido (HPFF) insta-lados en dos tuberías de acero con fluido dieléctrico (aislante). Las dos tuberías de 8” y otras tuberías y conductos más pequeños se instalarían bajo tierra, dentro de las carreteras o adyacentes a ellas, a lo lar-go del trayecto. Esto implicaría la excavación de una zanja continua de 6 pies de profundidad promedio con un ancho típico de 4.5 pies. Además de la zanja, el Proyecto incluye la instalación de bóvedas de hormigón de empalme, que se colocan típicamente a intervalos de aproximadamente 2000 a 2800 pies de distancia, según la construcción del cable y las características del trayecto. Para instalar cada bóveda de hormigón de empalme, se requerirá una área de excavación de aproximadamente 12 pies de ancho, por 12 pies de profundidad y 24 pies de largo.

La solicitud de Eversource incluirá detalles técnicos y de emplazamiento adicionales, como información sobre cómo el diseño específico de la línea afec-tará los niveles y medidas de campos magnéticos para minimizar los campos magnéticos. Las líneas

nuevas propuestas cumplirán con los requisitos del Consejo de Emplazamiento respecto de las “Buenas Prácticas de Manejo de Campos Magnéticos y Eléc-tricos”, según lo enmendado. Enterrar las líneas de transmisión bajo tierra no elimina los campos mag-néticos, porque estos campos pueden atravesar el suelo. Sin embargo, determinadas características inherentes de un diseño subterráneo, como la estrecha proximidad de las corrientes de los cables, proporcionan un cierto grado de cancelación de los campos magnéticos.

En la solicitud se incluirá información del empla-zamiento del proyecto y de campos magnéticos, incluidos los niveles calculados de los campos magnéticos, así como las especificaciones de cables y bóvedas. La solicitud estará disponible en el sitio web del Proyecto en www.eversource.com, el sitio web del Consejo de Emplazamiento en www.ct.gov/csc, o en las bibliotecas de Greenwich. Puede obtenerse información adicional del Proyecto llamando al 1-800-793-2202, o enviando un correo electrónico a [email protected]. Para obtener información sobre campos magnéti-cos y eléctricos, puede llamar al 1-800-793-2202 o comunicarse con el Departamento de Salud Pública de Connecticut al 860-509-7740. Trayecto propuesto en consideraciónLa vía propuesta en Greenwich se extendería aproximadamente a lo largo de 2.3 millas, desde la subestación existente de Cos Cob en Sound Shore Drive hasta 290 Railroad Avenue. La línea partiría desde la subestación de Cos Cob hacia el norte, por debajo de las líneas del ferrocarril. La vía luego se dirigiría hacia el oeste por debajo de Station Drive, a través de la zona de la estación de Cos Cob, hacia el extremo oeste de Indian Field Road. En el extremo oeste de Indian Field Road, Eversource realizaría una perforación horizontal dirigida (HDD), debajo del ferrocarill y la ruta interestatal 95, hasta el extremo de Kinsman Lane. La vía luego continúa por debajo de Kinsman Lane hasta la intersección con Bruce Park Avenue. En la intersección de Bruce Park Avenue y Kinsman Lane, Eversource realizaría otra perforación horizontal dirigida debajo de Bruce Park, hasta el extremo norte de Davis Avenue. (Otra opción es seguir el camino del parque). La vía luego continúa en dirección oeste por debajo de Davis Avenue hacia Museum Drive y hasta Arch Street. En Arch Street, la vía gira al norte por Railroad Avenue. En Railroad Avenue, la vía se dirige al oeste hasta 290 Railroad Avenue, donde finaliza en el empla-zamiento de la subestación propuesta.

El mapa de arriba muestra el trayecto propuesto de la nueva subestación y las dos nuevas líneas de transmisión de 115 kV.

Información adicional disponible

Datos de contacto para obtener más información

sobre el proyecto:

Greenwich Substation and Line ProjectEversourceP.O. Box 270, Hartford, CT 06141

1-800-793-2202 [email protected]

Esta notificación se proporciona conforme a §16-50l(b) de los Estatutos Generales de Connecticut. Este folleto es pagado por los clientes.

Field

Poi

nt R

d.

Arch

St.

Indi

an F

ield

Rd.

I-95

I-95

ProposedGreenwichSubstation

ExistingCos CobSubstation

700 350 0 700LEGENDPreferred RoutePreferred Route HDD CrossingPreferred Route Open Trench Variation

Preferred Route MapGreenwich Substation and Line Project

feet

Mapa del trayecto propuestoProyecto de subestación y líneas de Greenwich

Notice of Application by The Connecticut Light and Power Company

doing business as Eversource Energy for Approval of a new Substation and Underground Electric Transmission Lines

in the Town of Greenwich, Connecticut

Pursuant to the provisions of Section 16-50l(b) of the General Statutes of Connecticut, Section 16-50l-1(e) of the regulations of the Connecticut Siting Council, and the Application Guides for Electric Substation Facilities and for an Electric and Fuel Transmission Line Facility of the Connecticut Siting Council (both adopted April 2010), notice is hereby given that The Connecticut Light and Power Company doing business as Eversource Energy (Eversource or the Company) will on or about June 26, 2015, submit an Application to the Connecticut Siting Council seeking a Certificate of Environmental Compatibility and Public Need (Application) for the Greenwich Substation and Line Project (Project). The Project would include construction of a new bulk substation at 290 Railroad Avenue in Greenwich (Greenwich Substation) and two new underground 115-kV electric transmission lines between the Greenwich Substation and Eversource’s existing Cos Cob Substation at Sound Shore Drive in Greenwich, and related modifications to Cos Cob Substation. The Preferred Route for the transmission lines is as follows: originating at Cos Cob Substation, the Preferred Route would extend north from the substation; the route would cross under the Metro-North Railroad (MNRR) corridor to a parking lot next to Station Drive; the route would then extend west on state-owned property along the north side of Station Drive to the intersection with Loughlin Avenue; the route would continue west along Station Drive to the intersection with Sachem Road; the route would continue west on Station Drive and cross Indian Field Road on to Town-owned property to a horizontal directional drill (HDD) staging area for an HDD crossing under the MNRR and I-95. The HDD would extend in a southwesterly direction to an HDD receiving area at the end of Kinsman Lane. From this location, the route would continue down Kinsman Lane to a second HDD staging area east of the intersection of Kinsman Lane and Bruce Park Drive. At this point the route would proceed with a second HDD under the Bruce Park ball field and adjacent waterways to an HDD receiving site on Davis Avenue just west of Home Place; the route would continue west along Davis Avenue to the intersection with Indian Harbor Drive; the route would continue along Indian Harbor Drive to Museum Drive, which becomes Arch Street beyond the intersection with Steamboat Road. The route would continue along Arch Street, turning north and crossing beneath I-95 and the MNRR corridor to the intersection with Railroad Avenue; the route would turn west on to Railroad Avenue and left into the Greenwich Substation. Except where noted as HDD, the line will be installed using open trench line construction. The Company also developed a variation of the Preferred Route through Bruce Park (referred to as the Bruce Park Underground Trenching Variation) that would generally follow Kinsman Lane and Bruce Park Drive also using open trench line installation construction and eliminate a direct crossing of the Park lands. This variation requires the installation of temporary coffer dams to trench through two of the Park’s water bodies.

Variations to the Preferred Route: there are two variations to the Preferred Route for crossing the Bruce Park/Kinsman Lane area that would originate at the Department of Public Works property or at the end of Kinsman Lane and extend west through Bruce Park, via open trenching, to an HDD staging area to be located at a point near the eastern-most waterbody in Bruce Park (part of Indian Harbor) for an HDD crossing to Davis Avenue. After arriving at the Davis Avenue HDD receiving area, the remainder of the route would follow the same path as described above for the Preferred Route. The first variation would initially run southwest in Bruce Park parallel to and north of Kinsman Lane. At the point where the route meets the ball field/open space, the route turns north and follows the edge of the existing tree line before turning west to the HDD staging area. The second variation would head west through the northern portion of Bruce Park, parallel to I-95, to the HDD staging area. Alternatives to the Preferred Route The Southern Alternative route is described as follows: originating at Cos Cob Substation the route exits north from the substation property, turning west to Sound Shore Drive; the route would continue west along Sound Shore Drive under the I-95 overpass to the intersection with Sachem Road; the route would continue west on Sound Shore Drive to an HDD staging area near One Sound Shore Drive for an HDD crossing under I-95. The HDD would extend southwest to an HDD receiving area at Town-owned property near the end of Kinsman Lane. From this location, the route would continue down Kinsman Lane, via open trenching, to the intersection of Bruce Park Drive to a second HDD staging area in order to cross under the Bruce Park ball fields and waterways to the HDD receiving site on Davis Avenue just west of Home Place; the route would extend westward along Davis Avenue to the intersection with Indian Harbor Drive; the route would continue west along Indian Harbor Drive and Museum Drive, which becomes Arch Street beyond the intersection with Steamboat Road. The route would continue along Arch Street, turning north and crossing beneath I-95 and the MNRR to the intersection with Railroad Avenue; the route would turn west on Railroad Avenue and left into the Greenwich Substation. Similar to the Preferred Route described above, the Bruce Park Underground Trenching Variation could apply to the Southern Alternative route. The Northern Alternative for the transmission lines is as follows: originating at Cos Cob Substation, this route would extend north from the substation and cross under the MNRR corridor to Station Drive; the route would turn right and then extend north on Strickland Road crossing under the I-95 overpass to the intersection with East Putnam Avenue (Route 1); the route would turn west onto East Putnam Avenue and continue west to the intersection with Indian Field Road; the route would continue west on East Putnam Avenue to the intersection with Overlook Drive; the route would continue southwest on East Putnam Avenue to the intersection with Milbank Avenue; the route would continue southwest on East Putnam Avenue, which becomes West Putnam Avenue, to Field Point

Road; the route would follow Field Point Road south and cross Railroad Avenue into the Greenwich Substation. The transmission line system would be constructed underground and would use high pressure fluid filled (known as HPFF) transmission cables which contain polybutene fluid, an insulation fluid that does not contain polychlorinated biphenyls (PCBs). The Project’s HPFF underground 115-kV line system would consist of three 8-inch steel pipes in a common trench, in which the two HPFF lines would be installed, along with a 8-inch fluid return pipe for fluid circulation, three conduits for distributed temperature sensing and two conduits housing fiber optic cables. This would involve the excavation of a trench measuring approximately 4.5 feet wide by 5.5 feet deep.

Pre-fabricated reinforced concrete splice vaults would be installed below ground for cable pulling and splicing. The individual vaults are expected to be spaced up to 2,800 feet apart along the route. To install each splice vault, an excavation area approximately 16 feet wide and 12 feet high and up to 24 feet long would be required. The exact number and location of splice vaults will depend on final design considerations and other factors. The Application includes an alternate site for the Greenwich Substation at 281 Railroad Avenue in Greenwich. The Project also includes expansion of Cos Cob Substation for the installation of new equipment to support the underground transmission lines and provide for safe and proper operation. The Cos Cob Substation fence would be partially extended by approximately 140 feet to the south to accommodate the new equipment installation.

The Application will describe the site for and features of the Greenwich Substation, along with the required modifications of Cos Cob Substation needed to accommodate additional equipment. The Application will also include a description of the Preferred Route and alternate routes considered for the transmission lines, along with an evaluation of the environmental, engineering, reliability, operability, and cost considerations associated with those routes.

If approved by the Connecticut Siting Council, Project construction is projected to begin in the fourth quarter of 2016. The new underground transmission line system is proposed to be completed and in-service by second quarter of 2018. Copies of the Application will be available at the municipal offices of the Town of Greenwich. For further information about this Project, please visit www.Eversource.com, call 1.800.793.2202, or email [email protected].

* * * * * * * * * * * *

Cos Cob Harbor

!H

!H!H

368-4585-SSOUND SHORE DRIVESTATE CONNECTICUT

368-9621-S4 SOUND SHORE DRIVE

CONDOMINIUMSWATERFORD ASSOCIATION

368-1708-S12 SOUND

SHORE DRIVECONNECTICUT LIGHT& POWER COMPANY

368-1523-S8 SOUND SHORE DRIVE

8 SOUND SHOREASSOCIATES LLC

C/O EUGENE A. HOFFANMANAGEMENT INC

368-4586-SSOUND

SHORE DRIVETOWN OF

GREENWICH

344-1218-S6 INTRIERI LANE

KATHLEEN &EDWARD SILARD

344-2453-S35 SACHEM

ROADJAMES & LISA

MCDONALD

368-1408-S97 LOUGHLIN

AVENUETOMOFUMI &

YUMINAKANISHI

368-1409-S99 LOUGHLIN

AVENUEMIROSLAV &

BARBARAWIECZOREK

344-1807-S1 INTRIERI

LANEFRED

INTRIERI

344-1922-S5 STATION DRIVE

PERRY V. &LAUREN H.

FARAGASSO

344-1935-S40 SACHEM ROADDANIEL JOSEPH

& SUSAN MICHELLESCHULLER

368-4587-SSOUND SHORE DRIVE

STATE OFCONNECTICUT

344-1805-S2 INTRIERI

LANEKOWA

AMERICAN CORP

368-2748-S100 STRICKLAND

ROAD - UNIT 1GILLIAN H LEVY& ALEXANDERFINKELSTEIN

368-4620-SSTRICKLAND

ROADTOWN OF

GREENWICH

344----STATION DRIVE (PRIVATE)

STATION DRIVE ASSOCIATE, INC.

-4587-SSOUND SHORE DRIVE

STATE OF CONNECTICUT

-1348-S88 LOUGHLIN

AVENUEJOHN & LISAO'CONNOR

368-1765-S4 SOUND SHORE DRIVE, UNIT 23

PER & ASTRID HEIDENREIGH

368-1762-S4 SOUND SHORE DRIVE, UNIT 20

DONALD C WAITE III LIVING TRUST368-1763-S

4 SOUND SHORE DRIVE, UNIT 21BOBTERRI REALTY LLC

368-1764-S4 SOUND SHORE DRIVE, UNIT 22

HEIDENREIGH REAL ESTATE INVESTMENTS LLC

368-1766-S4 SOUND SHORE DRIVE, UNIT 24JOSEPH J SHROPSHIRE TRUST

368-1760-S4 SOUND SHORE DRIVE, UNIT 18

JONATHAN P & LAURIE P NELSON, THE WATERFORD

368-1759-S4 SOUND SHORE DRIVE, UNIT 17

LYNDA M BRIGGS TRUST

368-1756-S4 SOUND SHORE DRIVE, UNIT 14

MAUREEN R SMITH & RYANJ JAMES TRUST C/O RYAN J JAMES

368-1757-S4 SOUND SHORE DRIVE, UNIT 15

JAMES A LASH & DEBORAH JONES

368-1758-S4 SOUND SHORE DRIVE, UNIT 16

LUCY F GREENE TRUSTC/O LUCY F GREEN

368-1761-S4 SOUND SHORE DRIVE, UNIT 19

FRED G & REGINE LANGHAMMER

368-1755-S4 SOUND SHORE DRIVE, UNIT 13

HOLLIANN LLC

368-1753-S4 SOUND SHORE DRIVE, UNIT 11

HENRY VOLQUARDEN

368-1750-S4 SOUND SHORE DRIVE, UNIT 8GENSSLER ENTERPRISES LLLP

368-1751-S4 SOUND SHORE DRIVE, UNIT 9ROBERT H, JR & ROSLIE CLARK

368-1752-S4 SOUND SHORE DRIVE, UNIT 10

DAVID J & DONALD T MACNAUGHTON

368-1754-S4 SOUND SHORE DRIVE, UNIT 12KELESHIAN INVESTMENTS LLC

368-1752-S4 SOUND SHORE DRIVE, UNIT 7

ROBERT F FULLER REVOCABLE TRUST

368-1747-S4 SOUND SHORE DRIVE, UNIT 5

VJHC DEVELOPMENT CORP C/O MOTT &

PRINCE MANAGEMENT INC

368-1744-S4 SOUND SHORE DRIVE, UNIT 2

IGOR TULCHINSKY368-1745-S

4 SOUND SHORE DRIVE, UNIT 3TDC JR FAMILY

INVESTMENT LLC C/O CABOT-WELLINGTON LLC

368-1746-S4 SOUND SHORE DRIVE, UNIT 4

ALICE P MELLY & BENSLEY TRUSTEES

368-1748-S4 SOUND SHORE DRIVE, UNIT 6

LILLIAN C ANDERSON REVOCABLE TRUST

368-1688-S4 SOUND SHORE DRIVE, UNIT 1

BRUCE L & ANN MARGARET WARWICK

UNIT

6UN

IT 5

UNIT

4UN

IT 3

UNIT

2UN

IT 1

UNIT

7UN

IT 8

UNIT

9

UNIT

10UN

IT 11

UNIT

12

UNIT 1

3

UNIT 1

9

UNIT 1

4UN

IT 15

UNIT 1

6UN

IT 17

UNIT 1

8UN

IT 20

UNIT 2

1UN

IT 22

UNIT 2

3UN

IT 24

Sound Shore Dr

Station Dr

I 95

Strick

land R

d

Exit 4

Loug

hlin A

ve

Sachem Rd

Cos CobPark

P4

P1

P3P2

Connecticut

Massachusetts

INDEX MAP

4

LakeAve

B rucePark Dr

A rc h St

D a vis Ave

Fi eld

Point

RdEa

s tPu

tnam Ave

I nd i an Fi eldRd

Rai lroad Ave

M useumDr

Putnam Ave

Pro sp ec tS t

DearfieldD r

Exit 3

Exit 4

Greenwich

l June 2015Base Map: 2012 Aerial Photograph (CTECO)150 0 15075

Feet

1 inch = 150 feetGreenwich Substation and Line Project

Abutters MapPreferred Route Map Segments

Mapsheet 1 of 6!H Preferred Route Segment Point

!H Route Variation Segment Point

!H Route Variation Segment Point

!H Route Variation Segment Point

Greenwich Parcels (Greenwich GIS)Legend

Preferred RoutePreferred Route HDD CrossingPreferred Route Open Trench CrossingRoute Variation HDD CrossingRoute Variation Open Trench CrossingRoute Variation HDD CrossingRoute Variation Open Trench CrossingRoute Variation HDD CrossingRoute Variation Open Trench Crossing

Proposed Greenwich Substation Site

Parcel Abutter (date provided by Cornerstone Energy Services 5/6/2015)

!H

!H

!H

!H

344-2362-S17 CIRCLE DRIVE

NORMAN TIEN-LEELIU & AHMEDMENA ET AL

344-4545-SINDIAN FIELD ROAD

TOWN OF GREENWICH

345-2672-S89 INDIAN

FIELD ROADDONALD FOX

& SUSANLENCZYCKI - FOX

345-4557-S100 INDIAN

FIELD ROADTOWN OF

GREENWICH

344-2361-S11 CIRCLE DRIVEJOHN P. FOOTE

344-4546-SINDIAN FIELD ROAD

TOWN OF GREENWICH

344-1218-S6 INTRIERI LANE

KATHLEEN &EDWARD SILARD

344-2453-S35 SACHEM

ROADJAMES & LISA

MCDONALD

344-2671-S89 INDIAN

FIELD ROADDONALD FOX & SUSAN

LENCZYCKI - FOX

344-9005-SSTATION DRIVE

INTRIERILANE, INC.

C\O PIERAIORI

344-11806-S5 INTRIERI LANE

BENJAMIN & SANDRAMARIE MILLSPAUGH

344-1807-S1 INTRIERI

LANEFRED

INTRIERI

344-1922-S5 STATION DRIVE

PERRY V. &LAUREN H.

FARAGASSO

344-1935-S40 SACHEM ROADDANIEL JOSEPH

& SUSAN MICHELLESCHULLER

344-2303-S94 INDIAN FIELD ROAD

AMELIA M BUSCH

344-2340-S11 CIRCLE DRIVE

WEBER &ASSOCIATES

LLC

344-1805-S2 INTRIERI

LANEKOWA

AMERICAN CORP

344-1804-S3 INTRIERI

LANENEREO &

PIERA IORI344-1803-S4 INTRIERI

LANEGORDON NG& SHERI CHIN

344----STATION DRIVE (PRIVATE)

STATION DRIVE ASSOCIATE, INC.

368-1750-S4 SOUND SHORE DRIVE, UNIT 8GENSSLER ENTERPRISES LLLP

368-1751-S4 SOUND SHORE DRIVE, UNIT 9ROBERT H, JR & ROSLIE CLARK

368-1752-S4 SOUND SHORE DRIVE, UNIT 10

DAVID J & DONALD T MACNAUGHTON

368-1752-S4 SOUND SHORE DRIVE, UNIT 7

ROBERT F FULLER REVOCABLE TRUST

368-1747-S4 SOUND SHORE DRIVE, UNIT 5

VJHC DEVELOPMENT CORP C/O MOTT &

PRINCE MANAGEMENT INC

368-1744-S4 SOUND SHORE DRIVE, UNIT 2

IGOR TULCHINSKY368-1745-S

4 SOUND SHORE DRIVE, UNIT 3TDC JR FAMILY

INVESTMENT LLC C/O CABOT-WELLINGTON LLC

368-1746-S4 SOUND SHORE DRIVE, UNIT 4

ALICE P MELLY & BENSLEY TRUSTEES

368-1748-S4 SOUND SHORE DRIVE, UNIT 6

LILLIAN C ANDERSON REVOCABLE TRUST

368-1688-S4 SOUND SHORE DRIVE, UNIT 1

BRUCE L & ANN MARGARET WARWICK

Cobb

Isl

andDr

SachemRd

Intrieri Ln

I 95

Indian

Field

RdMorningside Dr

Station Dr

Exit 4

Sound Shore Dr

Circle Dr

MNRR/I-95

Crossing

Variation HDD

P5 HDD

P3

P4

Connecticut

Massachusetts

INDEX MAP

4

LakeAve

B rucePark Dr

A rc h St

D a vis Ave

Fi eld

Point

RdEa

s tPu

tnam Ave

I nd i an Fi eldRd

Rai lroad Ave

M useumDr

Putnam Ave

Pro sp ec tS t

DearfieldD r

Exit 3

Exit 4

Greenwich

l June 2015Base Map: 2012 Aerial Photograph (CTECO)150 0 15075

Feet

1 inch = 150 feetGreenwich Substation and Line Project

Abutters MapPreferred Route Map Segments

Mapsheet 2 of 6!H Preferred Route Segment Point

!H Route Variation Segment Point

!H Route Variation Segment Point

!H Route Variation Segment Point

Greenwich Parcels (Greenwich GIS)Legend

Preferred RoutePreferred Route HDD CrossingPreferred Route Open Trench CrossingRoute Variation HDD CrossingRoute Variation Open Trench CrossingRoute Variation HDD CrossingRoute Variation Open Trench CrossingRoute Variation HDD CrossingRoute Variation Open Trench Crossing

Proposed Greenwich Substation Site

Parcel Abutter (date provided by Cornerstone Energy Services 5/6/2015)

Indian Harbor

!H

!H

!H

!H

!H!H!H

!H

345-1479-S5 KINSMAN LANEADAM C TUBBS &

LAURA J GARR

345-4557-S100 INDIAN

FIELD ROADTOWN OF

GREENWICH

345-1598-S6 KINSMAN

LANEMARIANNE

SESSA

318-4511-SBRUCE

PARK DRIVETOWN OF

GREENWICH

345-1477-S4 KINSMAN LANE

ADRIAN &MALGORZATA

STROIE

345-1480-S3 KINSMAN

LANECECILIA HMORGAN

346-1475-S2 KINSMAN LANEKATRINA MARIA

VITAGLIANOPAPE ET AL

318-4511-SBRUCE

PARK DRIVETOWN OF

GREENWICH

345-4517-S200 INDIAN

FIELD ROADTOWN OF

GREENWICH

318-4511-SBRUCE

PARK DRIVETOWN OF

GREENWICH

345-4517-S200 INDIAN

FIELD ROADTOWN OF

GREENWICH

CobbIsland Dr

Woods Rd Wood Rd

Kinsman Ln

Exit 4

Bruce Park

Indian

Field Rd

Bruce Park Dr

I 95

BrucePark

BPV2 HDD BPV1 HDD

BPV2 Open Trench

BPV1 Open

Trench

DPW OpenTrench

Variation

MNRR/I-95

Crossing

Variation HDD

P5 Open

Trench

P6 Open Trench Variation

P5 HDD

P6 HDD

Connecticut

Massachusetts

INDEX MAP

4

LakeAve

B rucePark Dr

A rc h St

D a vis Ave

Fi eld

Point

RdEa

s tPu

tnam Ave

I nd i an Fi eldRd

Rai lroad Ave

M useumDr

Putnam Ave

Pro sp ec tS t

DearfieldD r

Exit 3

Exit 4

Greenwich

l June 2015Base Map: 2012 Aerial Photograph (CTECO)150 0 15075

Feet

1 inch = 150 feetGreenwich Substation and Line Project

Abutters MapPreferred Route Map Segments

Mapsheet 3 of 6!H Preferred Route Segment Point

!H Route Variation Segment Point

!H Route Variation Segment Point

!H Route Variation Segment Point

Greenwich Parcels (Greenwich GIS)Legend

Preferred RoutePreferred Route HDD CrossingPreferred Route Open Trench CrossingRoute Variation HDD CrossingRoute Variation Open Trench CrossingRoute Variation HDD CrossingRoute Variation Open Trench CrossingRoute Variation HDD CrossingRoute Variation Open Trench Crossing

Proposed Greenwich Substation Site

Parcel Abutter (date provided by Cornerstone Energy Services 5/6/2015)

Smith Cove

Indian Harbor

Indian Harbor!H

!H

318-1206-S368 DAVIS AVENUE

TPF DEVELOPMENTCORPORATION

318-4513-SDAVIS

AVENUETOWN OF

GREENWICH

286-4505-SSTEAMBOAT

ROADTOWN OF

GREENWICH

318-1148-S354 DAVIS AVENUE

LUKE T., JR. &THERESA A.FRANGIONE

318-1161-S356 DAVISAVENUELUKE T.

FRANGIONE, EST

318-1235-S8 HOME PLACEHO POI KWONG& MING KUEN(A/K/A PAUL

K. & DIANE HO)

318-1559-S376 DAVISAVENUE

TPF DEVELOPMENTCORPORATION

318-1109-S392 DAVIS AVENUE

PETER C.EST & LISA

LASORSA ET AL

318-1062-S393 DAVIS

AVENUESCHINTO,

WILLIAM C. JR.

318-1373-S397 DAVIS AVENUE

RICHARD C. &BARBARA A. JOHANN

318-1062-S399 DAVIS AVENUEJOHN & BARBARA

K GOULEMAS,AS TRUSTEES

318-1113-S131 ONEIDA

DRIVESARA M.CARTER

318-1463-S35 INDIAN

HARBOR DRIVEWHITE SHADE LLC

286-1464-S39 INDIAN

HARBOR DRIVEM VENTURES LLC

250-1218-S475 STEAMBOAT ROADBERKLEY INSURANCE

COMPANY

318-1799-S364 DAVIS

AVENUE, UNIT 1CHARLOTTE

MONIQUE PARKER

318-1798-S364 DAVIS

AVENUE, UNIT 3JANETTE DILLER

318-1602-S364 DAVIS

AVENUE, UNIT 4MICHAEL & SUSAN

SAMPSON

318-1119-S364 DAVIS

AVENUE, UNIT 2WILLY J & SHARON L

WOLTER286-1652-S

25 INDIAN HARBORDRIVE, UNIT 1

MARK & LILLIANENGEBRETSON, ETAL

286-1653-S25 INDIAN HARBOR

DRIVE, UNIT 2LYNN FERGUSON

286-1654-S25 INDIAN HARBOR

DRIVE, UNIT 3FRANCES FANNIN

286-1655-S25 INDIAN HARBOR

DRIVE, UNIT 4JESSICA L MURPHY &ANDREW H WALKER

286-1656-S25 INDIAN HARBOR

DRIVE, UNIT 5ARCHIE T WALLACE

& BEVERLEY E SHAW286-1657-S

25 INDIAN HARBORDRIVE, UNIT 6NADEZHDA &

MEHMET SAHIN286-1658-S

25 INDIAN HARBORDRIVE, UNIT 7

ANDREW MARK FRITZ286-1659-S

25 INDIAN HARBORDRIVE, UNIT 8

ELLEN P TARTAGLIONE& ROBIN GUERRIERI

BRADSHAW

286-1662-S25 INDIAN HARBOR

DRIVE, UNIT 12ANNIKA HEBRAND

286-1661-S25 INDIAN

HARBOR DRIVE,UNIT 11

DONNA KOZAK

286-1660-S25 INDIAN HARBOR

DRIVE, UNIT 9FERGUS &

ANNE MADIGAN286-1661-S

25 INDIAN HARBORDRIVE, UNIT 10

ELIZABETHKRISTOFF

UNIT 4

UNIT 3UNIT 2

UNIT 1

UNIT

5UN

IT 6

UNIT

7UN

IT 8

UNIT

9UN

IT 10

UNIT

11UN

IT 12

CONDOS25 INDIAN

HARBOR DRIVEINDIAN HARBOR

ASSOCIATION

UNIT

4

CONDOS362 & 364

DAVIS AVE

UNIT

3

UNIT 1

UNIT 2

286-4505-SSTEAMBOAT

ROADTOWN OF

GREENWICH

318-4511-SBRUCE

PARK DRIVETOWN OF

GREENWICH

345-4517-S200 INDIAN

FIELD ROADTOWN OF

GREENWICH

Chimney Corner Ln

DavisAve

Indian

Harbo

r Dr

ConnectingRoadI 95

Museum Dr

Bruce

Park Dr

Oneid

a Ct

LakewoodCir

Oneida Dr

Home Pl

Orchard Pl

BPV2 HDD BPV1 HDD

P6 Open Trench Variation

P6 HDD

P8P7

Connecticut

Massachusetts

INDEX MAP

4

LakeAve

B rucePark Dr

A rc h St

D a vis Ave

Fi eld

Point

RdEa

s tPu

tnam Ave

I nd i an Fi eldRd

Rai lroad Ave

M useumDr

Putnam Ave

Pro sp ec tS t

DearfieldD r

Exit 3

Exit 4

Greenwich

l June 2015Base Map: 2012 Aerial Photograph (CTECO)150 0 15075

Feet

1 inch = 150 feetGreenwich Substation and Line Project

Abutters MapPreferred Route Map Segments

Mapsheet 4 of 6!H Preferred Route Segment Point

!H Route Variation Segment Point

!H Route Variation Segment Point

!H Route Variation Segment Point

Greenwich Parcels (Greenwich GIS)Legend

Preferred RoutePreferred Route HDD CrossingPreferred Route Open Trench CrossingRoute Variation HDD CrossingRoute Variation Open Trench CrossingRoute Variation HDD CrossingRoute Variation Open Trench CrossingRoute Variation HDD CrossingRoute Variation Open Trench Crossing

Proposed Greenwich Substation Site

Parcel Abutter (date provided by Cornerstone Energy Services 5/6/2015)

Greenwich HarborGreenwich Harbor

Smith Cove

!H

286-4505-SSTEAMBOAT

ROADTOWN OF

GREENWICH

286-4502-S0 STEAMBOAT

ROADTOWN OF

GREENWICH

287-4522-S100 ARCHSTREET

TOWN OFGREENWICH

250-2286-S144 RAILOAD AVENUE

SAUGATUCKMOTORS INC.

286-1603-S2 STEAMBOAT ROADGREENWICH PLAZA

INC. C/O ALBERTBASHFORTH

286-4509-SARCH

STREETTOWN OF

GREENWICH

286-4525-S1 HORSENECK

LANETOWN OF

GREENWICH

318-1463-S35 INDIAN

HARBOR DRIVEWHITE SHADE LLC

286-1464-S39 INDIAN

HARBOR DRIVEM VENTURES LLC

250-1218-S475 STEAMBOAT ROADBERKLEY INSURANCE

COMPANY

287-1270-S500

STEAMBOATROAD

GREENWICHHARBOR (DEL) LLC

286-1652-S25 INDIAN HARBOR

DRIVE, UNIT 1MARK & LILLIAN

ENGEBRETSON, ETAL

UNIT 4

UNIT 3UNIT 2

UNIT 1

UNIT

5UN

IT 6

UNIT

7UN

IT 8

UNIT

9UN

IT 10

UNIT

11UN

IT 12

CONDOS25 INDIAN

HARBOR DRIVEINDIAN HARBOR

ASSOCIATION

286-4505-SSTEAMBOAT

ROADTOWN OF

GREENWICH

Indian

Harbo

r Dr

Arch St

I 95

State Hwy 742

Orchard Pl

Museum Dr

Stea

mboa

t Rd Lakewood

Cir

Exit 3

Davenport Ave

Roger ShermanBaldwin Park

P7

P8

Connecticut

Massachusetts

INDEX MAP

4

LakeAve

B rucePark Dr

A rc h St

D a vis Ave

Fi eld

Point

RdEa

s tPu

tnam Ave

I nd i an Fi eldRd

Rai lroad Ave

M useumDr

Putnam Ave

Pro sp ec tS t

DearfieldD r

Exit 3

Exit 4

Greenwich

l June 2015Base Map: 2012 Aerial Photograph (CTECO)150 0 15075

Feet

1 inch = 150 feetGreenwich Substation and Line Project

Abutters MapPreferred Route Map Segments

Mapsheet 5 of 6!H Preferred Route Segment Point

!H Route Variation Segment Point

!H Route Variation Segment Point

!H Route Variation Segment Point

Greenwich Parcels (Greenwich GIS)Legend

Preferred RoutePreferred Route HDD CrossingPreferred Route Open Trench CrossingRoute Variation HDD CrossingRoute Variation Open Trench CrossingRoute Variation HDD CrossingRoute Variation Open Trench CrossingRoute Variation HDD CrossingRoute Variation Open Trench Crossing

Proposed Greenwich Substation Site

Parcel Abutter (date provided by Cornerstone Energy Services 5/6/2015)

Horseneck Brook

!H

250-2254-S330 RAILROAD AVENUECONNECTICUT LIGHT

& POWER CO.

250-2540-S255 FIELD

POINT ROADBARRY

GREENWICH LLC

250-2754-S282 RAILROAD AVENUE

NATIONALRAILROAD PASSENGER

CORPORATION C/O JOELPAUL BERGER ET AL

286-4502-S0 STEAMBOAT

ROADTOWN OF

GREENWICH

250-2389-S290 RAILOAD AVENUE

290 RAILROAD AVELLC C/O FRIEDBERGSMITH & CO PC-ATTJOSEPH ROSEMAN

250-2539-S255 FIELD

POINT ROADBARRY

GREENWICH LLC

286-2257-S142 RAILROAD AVENUE

142 RAILROADAVENUE LLC

250-2286-S144 RAILOAD AVENUE

SAUGATUCKMOTORS INC.

250-2519-S280 RAILOAD AVENUE

JOEL PAULBERGER, ET AL

286-2520-S2-28 RAILROAD AVENUE

GREENWICH PLAZAC/O ALBERTB ASHFORD

250-2542-S44 RAILOAD

AVENUESAUGATUCKMOTORS INC.

250-2557-S200 RAILROAD AVENUE

200 RAILROADAVENUE LLCC/O ALLIED

PROPERTY GROUP

250-2753-S222 RAILROAD AVENUENATIONAL RAILROAD

PASSENGERCORPORATION C/O JOEL

PAUL BERGER ET AL

286-1603-S2 STEAMBOAT ROADGREENWICH PLAZA

INC. C/O ALBERTBASHFORTH

286-4509-SARCH

STREETTOWN OF

GREENWICH

286-4525-S1 HORSENECK

LANETOWN OF

GREENWICH

250-1811-S2 ARCH STREET

COLUMBIA HYDE GROUP LLC ETAL C/OCERUZZI HOLDINGS LLC

250-1558-SWOODLAND DRIVE

CONNECTICUTRAILWAY & LIGHTING

COMPANY

250-2242-SWOODLAND DRIVECONNECTICUTRAILWAY &LIGHTING COMPANY

250-1748-S 35 WOODLAND DRIVEROBERT L. &BARBARA JILLAILLEO LLC.250-1749-S33 WOODLANDDRIVECAROLM. COFONE

250-1741-S29 WOODLANDDRIVEPETER KEN CHEW& DENISE WONE

250-1673-S25 WOODLANDDRIVENUTMEG REALESTATE LLC 250-1674-S23 WOODLAND DRIVEMICHAEL & SEAN & KIM TIERNEYC/O PUC BAMSE PARTNERS250-1674-S

23 WOODLAND DRIVEMICHAEL & SEAN

& KIM TIERNEY C/OPUC BAMSE PARTNERS

286-2010-S151 RAILROAD

AVENUENUTMEG REAL

ESTATE LLC

250-2241-S249 RAILROAD AVENUEJOHN A. & SHIRLEYM. VIESTA TRST 250-1597-S205 RAILROAD AVENUEKEL REALTYLLC. C/O MILLMANAGEMENT

250-1697-S195 FIELD POINT ROADTIFFANY PROPERTIES& MANAGEMENT INC.

286-1566-S93 ARCHSTREET93 ARCH

STREET LLC

250-2290-S204 FIELD

POINT ROADJOHN & KIMBERLY

A. TUNG

286-2072-S19 RAILROAD AVENUE

ARCH STREETREALTY PUTNAM

MANAGEMENT LLC

250-2176-S193 FIELD POINT ROADRIDGEGREEN CORP

C/O THOMAS F HARTCH

250-1795-S191 FIELD POINT ROAD

JOZEFA DMITORWSKA ZYGMUNT

250-1197-S1987 FIELD POINT ROAD

JOZEFA DMITORWSKA ZYGMUNT250-2296-S41 WOODLAND DRIVETERESA ISABEL REAL

250-2033-S39 WOODLAND DRIVEWOODLANDS CROSSING INC.

Field P

oint R

d

ShoreR d

Horseneck Ln

Exit3

Steamboat Rd

I 95

Bridge St

IdlewildMnr

Prospect St

Arch St

SoundView Dr

State Hwy 742

Grigg St

Greenwich Ave

Greenwich Plz

Woodland Dr

Railroad Ave

P8

P9ProposedGreenwichSubstation

Connecticut

Massachusetts

INDEX MAP

4

LakeAve

B rucePark Dr

A rc h St

D a vis Ave

Fi eld

Point

RdEa

s tPu

tnam Ave

I nd i an Fi eldRd

Rai lroad Ave

M useumDr

Putnam Ave

Pro sp ec tS t

DearfieldD r

Exit 3

Exit 4

Greenwich

l June 2015Base Map: 2012 Aerial Photograph (CTECO)150 0 15075

Feet

1 inch = 150 feetGreenwich Substation and Line Project

Abutters MapPreferred Route Map Segments

Mapsheet 6 of 6!H Preferred Route Segment Point

!H Route Variation Segment Point

!H Route Variation Segment Point

!H Route Variation Segment Point

Greenwich Parcels (Greenwich GIS)Legend

Preferred RoutePreferred Route HDD CrossingPreferred Route Open Trench CrossingRoute Variation HDD CrossingRoute Variation Open Trench CrossingRoute Variation HDD CrossingRoute Variation Open Trench CrossingRoute Variation HDD CrossingRoute Variation Open Trench Crossing

Proposed Greenwich Substation Site

Parcel Abutter (date provided by Cornerstone Energy Services 5/6/2015)