Notes from the Metrolink Field Our Approach to Building an Integrated TAM-EAM System 1 PLANNING + DEVELOPMENT DEPARTMENT MAY 2017

Upload: others

Post on 24-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Notes from the Metrolink Field - FTA · Notes from the Metrolink Field Our Approach to Building an Integrated TAM-EAM System . 1 PLANNING + DEVELOPMENT DEPARTMENT MAY 2017

Notes from the Metrolink FieldOur Approach to Building an Integrated

TAM-EAM System

1

PLANNING + DEVELOPMENT DEPARTMENTMAY 2017

Page 2: Notes from the Metrolink Field - FTA · Notes from the Metrolink Field Our Approach to Building an Integrated TAM-EAM System . 1 PLANNING + DEVELOPMENT DEPARTMENT MAY 2017

SNAPSHOT OF THE METROLINK FIELD

Number of Routes 7Route Miles 534

Trains Operated (Weekdays) 171Average Ridership (Weekdays) 39,368

Stations in Service 59Total Passenger Miles 100,351,867

Number of Locomotives 55Number of Passenger Cars 258

Annual Budgeted Revenues $102MAnnual Operating Budget $244

Revenue Recovery Ratio 47%Source: FY 2016-2017 Budget

Page 3: Notes from the Metrolink Field - FTA · Notes from the Metrolink Field Our Approach to Building an Integrated TAM-EAM System . 1 PLANNING + DEVELOPMENT DEPARTMENT MAY 2017

Building Our Asset Inventory…

3

A Brief History of TAM @ Metrolink

2014 − Reviewed the Existing EAM & Independent Datasets

− Confirmed % of Assets Captured, Created Asset Inventory

2015− Assessed the Completeness of the Data Against the

TERM-Lite Asset Classifications (Useful Life)

2016 − Compared the Valuation of Assets− TAM Plan & Policy Adoption

−2017 Currently assessing an appropriate and useful asset breakdown structure that supports risk assessments and project prioritization

Page 4: Notes from the Metrolink Field - FTA · Notes from the Metrolink Field Our Approach to Building an Integrated TAM-EAM System . 1 PLANNING + DEVELOPMENT DEPARTMENT MAY 2017

4

PORTFOLIO OF METROLINK ASSETS

Asset Category Valuation ($2015) % of Asset Base

Track $1,308,413,247 22.4%

Bridges/Culverts $1,138,143,766 19.5%

Tunnels $609,697,973 10.4%

Revenue Vehicles $1,151,057,689 19.7%

Non-Revenue Vehicles $15,968,218 0.3%

Signals & Train Control $543,719,834 9.3%

Systems, Other $101,440,210 1.7%

Stations $508,185,000 8.7%

Facilities $474,920,496 8.1%

Total $5,851,516,433 100.0%

Page 5: Notes from the Metrolink Field - FTA · Notes from the Metrolink Field Our Approach to Building an Integrated TAM-EAM System . 1 PLANNING + DEVELOPMENT DEPARTMENT MAY 2017

PROJECTED STATE OF GOOD REPAIR INVESTMENT NEEDS

5

$544

$76$55 $63 $51

$144

$211

$118 $110

$166$202

FY15 FY16 FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25$0

$100

$200

$300

$400

$500

$600

Backlog ($Millions) Average Rehab Funding ($32 Million) *

Historical Funding Average:

$32 M/Year

Source: TERM Lite, 2015 (Not linked to FY15-17 Budgeted Project Submittals)

If backlog is cleared

Backlog of 544M:

40% Track & Structures

25% Rolling Stock

18% Signals & Communications

Page 6: Notes from the Metrolink Field - FTA · Notes from the Metrolink Field Our Approach to Building an Integrated TAM-EAM System . 1 PLANNING + DEVELOPMENT DEPARTMENT MAY 2017

6

Understanding the Backlog:Where is the Money Critically Needed?

Source: TERM Lite, 2015

Backlog of 544M:

40% Track & Structures

25% Rolling Stock

18% Signals & Comm.

Page 7: Notes from the Metrolink Field - FTA · Notes from the Metrolink Field Our Approach to Building an Integrated TAM-EAM System . 1 PLANNING + DEVELOPMENT DEPARTMENT MAY 2017

Our TAM Question:

How do we sustain a unified asset inventory and create condition

assessment scale that encapsulates risk and is useful for

operational staff & long term capital planning?

BUILDING AN INTEGRATED TAM-EAM SYSTEM

Page 8: Notes from the Metrolink Field - FTA · Notes from the Metrolink Field Our Approach to Building an Integrated TAM-EAM System . 1 PLANNING + DEVELOPMENT DEPARTMENT MAY 2017

AGENDA

I. Navigating a Solution: Understanding Inventory Data

II. Defining EAM-TAM System Criteria

III. Lessons Learned

Page 9: Notes from the Metrolink Field - FTA · Notes from the Metrolink Field Our Approach to Building an Integrated TAM-EAM System . 1 PLANNING + DEVELOPMENT DEPARTMENT MAY 2017

9

I. Navigating a Solution To understand the need, expectation, granularity and

approach, pros & cons of all our data inventories

Project Planning

Operations

Finance

Support Services: I.T. Legal, Safety, Purchasing & Contracts

Engineering

Maintenance

Inventory & Materials

Asset Management

Page 10: Notes from the Metrolink Field - FTA · Notes from the Metrolink Field Our Approach to Building an Integrated TAM-EAM System . 1 PLANNING + DEVELOPMENT DEPARTMENT MAY 2017

10

Need to Understand Asset Data

Asset Condition

Inspection Reports

Track Geometry

Data

Ground Penetrating

Radar

Vehicle/Track Interaction

Data

Maintenance Records

GASB 34 Assessments

Page 11: Notes from the Metrolink Field - FTA · Notes from the Metrolink Field Our Approach to Building an Integrated TAM-EAM System . 1 PLANNING + DEVELOPMENT DEPARTMENT MAY 2017

11

Need to Integrate Asset Data

Condition Assessment Method GASB 34 NetFacilities RAMS AssetWorks TERM Lite

Asse

t Typ

e

Equipment X X

Rolling Stock X X

Infrastructure X X X

Facilities X X

Rating Scale 0 to 100 None 1 to 6 None 1 to 5

ApproachOn-site

AssessmentOn-site

AssessmentOn-site

AssessmentOn-site

AssessmentEstimated Condition

Page 12: Notes from the Metrolink Field - FTA · Notes from the Metrolink Field Our Approach to Building an Integrated TAM-EAM System . 1 PLANNING + DEVELOPMENT DEPARTMENT MAY 2017

What are we currently doing?

ACTIONTAM Plan:

Board Adopted(12/2016)

• Working to determine interrelationships of inventories

• Confirming Relationships Between Life Cycle & Cost Factors

• Connecting Inventory and Condition Data to a Risk Based Prioritization

• Incorporating Risk & Condition Analysis into Project Criteria

• Developing an integrated Enterprise Asset Management Program with

the Information Technology (IT) department

12

Page 13: Notes from the Metrolink Field - FTA · Notes from the Metrolink Field Our Approach to Building an Integrated TAM-EAM System . 1 PLANNING + DEVELOPMENT DEPARTMENT MAY 2017

III. Defining EAM-TAM System Criteria

13

Asset Inventory(TERM Lite)

Base Data: Need for Consistent Coding that allows for cross functional system linkage

Accounting system

Budgets Capital Planning

Audit & Financial Reporting

Suppliers & Purchasing

Inventory Management

Personnel Management

Routine Maintenance (Tasks & Prompts)

Work Requests & Work Order Management

Work ProceduresCost

Estimating

Work Scheduling

Engineering Drawings, Data and Technical

Documents

Mapping Capability

Page 14: Notes from the Metrolink Field - FTA · Notes from the Metrolink Field Our Approach to Building an Integrated TAM-EAM System . 1 PLANNING + DEVELOPMENT DEPARTMENT MAY 2017

IV. Lessons Learned

14

Software isn’t the solution, it’s apart of a whole.

But before buying software….

Create a process map of all business processes that surround the asset inventory. Find the right incentives. Be clear on the TAM-EAM long term goal.

Full utilization of an integrated TAM-EAM software requires buy-in and particular needs to be addressed.

Normalizing data sets and coding is very important to ensure that data relationships are streamlined.

Inventory fields need to be driven by the user of the data.

Page 15: Notes from the Metrolink Field - FTA · Notes from the Metrolink Field Our Approach to Building an Integrated TAM-EAM System . 1 PLANNING + DEVELOPMENT DEPARTMENT MAY 2017

15

Passing on our TAM-EAM Inventory Blueprint

Data Gap Analysis

What assets are we missing?

Is process repeatable (with reasonable effort)?

EAM Gap Assessment

Can our EAM support our inventory needs?

Are current capabilities being used?

Data StrategyHow do we close the gaps?

Single EAM solution?

Page 16: Notes from the Metrolink Field - FTA · Notes from the Metrolink Field Our Approach to Building an Integrated TAM-EAM System . 1 PLANNING + DEVELOPMENT DEPARTMENT MAY 2017

Acknowledgements

Metrolink Operations DivisionsRoderick Diaz, Metrolink (Director of Planning + Development)Karen Sakoda, Metrolink (Planning Manager)CH2M Hill Transit Asset Management TeamMARTA Asset Management & Capital Planning Staff

16

Page 17: Notes from the Metrolink Field - FTA · Notes from the Metrolink Field Our Approach to Building an Integrated TAM-EAM System . 1 PLANNING + DEVELOPMENT DEPARTMENT MAY 2017

Resources

(1) Anthony, Nicholas. Physical Asset Management. Springer, 2015

(2) Blanchard, Ben. Logistics Engineering & Management. Pearson, 2003

(3) Wireman, Terry. Developing Performance Indicators for Maintenance. Industrial Press, 2005

17