not your average spool -...
TRANSCRIPT
Early Lessons Learned
Early Field Input and Buy-In
Subcontractor Models Must be Accurate
Current Software Needs Development
2009 2010 2011 2012 2013
The Drywall Spool Sheet
SPOOL SHEETS GENERATED
16K
2009 2010 2011 2012 2013
SQFT OF HOSPITAL
1.3
M
FULL TIME MODELERS
8
PRODUCTION INCREASE FULL HEIGHT FRAMING
PRODUCTION INCREASE TAPING AND FINISHING
DECREASE MATERIAL WASTE
8%
11% 6%
PRODUCTION INCREASE SHEETROCK INSTALL 4%
The Payback: Productivity!
Prefab Brainstorming
Full
Height
Walls
Prefabrication
BIM Model
Leadership Group
Design Structural Impacts
Spool
Sheets
Buy-in
Floor
Flatness
Coordi
nation
QC
Review
Panels Modules
Shared
Racks
Fire-
rating
Acoustics
Owner
MEP
Drywall
Safety
Schedule
Quality
Tracking
Enabling
Details
Full
Height
Posts
On-site
Fab?
Sequencing
Off-site?
Shipping
Warehouse
Logistics
BIM
$
“If you want to make enemies, try to change
something.”
- Woodrow Wilson President, United States of America
"People are starting to give reasons why [prefab]
can't be done...we must be doing something right."
- John Vardaman Innovation, DPR Construction
What to Prefab? Shared Racks!
Elec. Rm.
IDF
Mech.
Riser 2
Mech.
Riser 1
Electrical Route
Tele-Data Route
Mechanical Mains
Wall by Wall Review
8’ 4 7/8’ to
center line
Confirm ADA
reach/height at
soap disp.
Move 8”
Millworker to comment
on supports
Confirm specs
and mounting
req’s for
accessories
Final
verification of
outlet locations
Frame / Top Down Full-Height and Priority Walls
Frame Walls
MEP Wall Rough-in
Hang and Tape Walls
Ceiling Installation
MEP Overhead Rough-in
Three Weeks
Install Wall Panels
The Results – Schedule Study
The Results – Productivity Savings
Trade
% Savings ( Work
Hours Actual / Work
Hours Budget)
Mechanical 18.75%
Electrical -5%
Plumbing 0
Drywall 50%