Page 1: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now

ABS PRIMACY FORFEITURE DISCHARGES

Treatment Opportunities and Challenges

Joseph G. PizarchikDirector

Bureau of Mining and ReclamationDepartment of Environmental Protection

Commonwealth of Pennsylvania

Page 2: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now

Federal Surface Mining Control and Reclamation Act.

Addresses two broad coal mining categories.

1. Abandoned Mine Lands, including abandoned discharges (AML) created before 1977, generally speaking.

2. Active coal mining.

Page 3: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now

AML is covered by Title IV of Federal SMCRA

Each coal company pays a tax/AML fee, on every ton of coal mined.

Federal law mandates the money be used to reclaim AML.

States authorized to use up to 30% for mine drainage.

Page 4: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now

Not about Title IVNot about AML

Not about money that coming in FutureAbout $ Available

Now

Page 5: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now

Active coal mining is covered by Title V.

Mine operators required to post bond to ensure reclamation.

If the operator does not complete reclamation, bond forfeited and used

to complete reclamation.

Page 6: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now

Title V allows states to have primary responsibility for regulating coal mining.

-Establishes the minimum standards.

-Allows states to use full cost conventional bonding or an alternative system.

Page 7: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now

From 1982 until 2001 Pennsylvania used an alternate bonding system for surface coal mines.

-Bond was a portion of the reclamation cost plus a nonrefundable reclamation fee.

-Initially $50/acre. -Increased to $100/acre in 1992.

Page 8: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now

In 1991 OSM determined the ABS was deficient.

Did not generate sufficient $ to complete reclamation of BF

sites.

OSM directed PA to amend its alternate bonding system.

Page 9: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now

PA made a number of changes and tried to fix ABS.

Concluded in late 1990s that ABS could not be fixed.

2001 PA terminated ABS and converted to full cost bonding.

Page 10: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now

General Assembly appropriated the money needed to complete

land reclamation at primacy ABS BF Sites.

The number of primacy ABS BF sites needing land reclamation

has been reduced from about 150 to about 2 dozen.

Page 11: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now

As of July 2008-61 primacy ABS bond forfeiture permits had post mining

discharges that need continued treatment.

Some permits have multiple discharges.

As of July 2008-101 discharges on the 61 primacy ABS bond forfeiture sites,

AKA – ABS Legacy.

Page 12: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now

About 30 of the ABS Legacy have functioning

treatment systems.

Treatment systems will be built on the remaining ABS Legacy discharges.

Page 13: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now

There are opportunities for you to be paid to build,

operate and maintain these systems.

The new treatment systems will be a mix of passive and

active systems.

Page 14: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now

Commonwealth contracting processes

will be used to select the people to build, operate

and maintain these systems.

Page 15: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now

Why should you care?PADEP: Has the $ to build

treatment facilities.

Has the $ to O & M existing treatment facilities.

Has a revenue stream to permanently pay the future O & M and recapitalization.

Page 16: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now

PADEP does not have the people to build, operate and

maintain these treatment systems.

Page 17: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now
Page 18: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now
Page 19: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now
Page 20: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now
Page 21: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now

The Cambria, Moshannon, Knox and Greensburg DMOs

are working on securing contractors.

In position to now hire for O & M and soon hire to

build.

Page 22: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now

Services to be obtained thru competitive bid

process.

Law also allows for negotiating a contract

w/certain people.

Page 23: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now

Law allows DEP to negotiate contract w/land

owner or licensed operator.

25 Pa Code subchapter K. Sections 86.351 thru

86.359

Page 24: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now

Challenges may be property access

issues.

Technical Challenges.

Page 25: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now

Martin Bell Mine

Page 26: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now

29 1-30-2008Flow-15 gpmpH- 3Alk- 0Acid-226.8

Iron-31.841Mn-35.249Al-4.565SO4-551.3TSS- 6

29-Discharge originating from old low wall drain

Page 27: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now

ALD Outlet

Page 28: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now
Page 29: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now
Page 30: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now
Page 31: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now
Page 32: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now
Page 33: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now
Page 34: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now
Page 35: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now
Page 36: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now
Page 37: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now
Page 38: Not about Title IV Not about AML Not about money that coming in Future About $ Available Now