Old Brick Sewers
![Page 3: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/3.jpg)
Long Time Coming
![Page 4: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/4.jpg)
Location
![Page 5: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/5.jpg)
Residential
Section along MPIS
![Page 6: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/6.jpg)
Environmental Concerns
![Page 7: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/7.jpg)
NSP1 Geology
Weathered Silurian along NDS Section 2 (NSP-1)
• Melbourne Formation (Silurian Age)
![Page 8: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/8.jpg)
NSP2 Geology
• New Volcanics (Basalt)
Massive Basalt NIS Section 2 (NSP2)
![Page 9: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/9.jpg)
Long Section NSP1 – NDS 2
![Page 10: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/10.jpg)
Excavation Methods
(photo courtesy of John Holland/Melbourne Water)
• Tunneling (3 TBMs):• EPB 3-meter dia. = 4,700m• EPB 4-meter dia. = 3950m• Main Beam 3-meter dia. = 3190m
![Page 11: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/11.jpg)
Primary and Secondary Support
2400 I.D Test Ring (photo courtesy of John Holland)
• 5 SEGMENTS PLUS A KEY• RIGHT, LEFT AND STRAIGHT
RINGS
![Page 12: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/12.jpg)
Primary and Secondary Support
INITIAL SUPPORT (Rock Bolts)
Final Lining (RCP w/ Sac. Concrete, or FRPP)
1800
R 1500
Heavy Support Light Support
TIMBER BLOCKING
RING BEAM
BACKFILL GROUT
![Page 13: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/13.jpg)
Spatial Constraints
NSP Stage 2 Support Types
![Page 14: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/14.jpg)
Lining Required?
![Page 15: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/15.jpg)
Lining Required?
![Page 16: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/16.jpg)
Lining Required?
![Page 17: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/17.jpg)
Lining Required?
![Page 18: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/18.jpg)
Lining Required?
![Page 19: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/19.jpg)
Lining Required?
![Page 20: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/20.jpg)
Similar Projects
• Singapore DTSS• Pantai Trunk Sewer, Kuala Lumpur• Perth Main Sewer• S1 Sewer, Brisbane• Hallam Valley Main Sewer, Melbourne
![Page 21: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/21.jpg)
Corrosion - Sulphide
Sulphate, SO4
Sulphide, S2-
Hydrogen Sulphide, H2S[aq][aq]
Hydrogen Sulphide, H2S[g][g]
Sulphuric Acid, H2SO4
Moisture on walls
Prevent sulphate reducing to sulphide - add oxygen, nitrate, reduce temperature, BOD, sulphate
Prevent sulphide converting to aqueous hydrogen sulphide - increase pH
Minimise turbulence to prevent hydrogen sulphide in liquid releasing to sewer atmosphere.
Ventilate to prevent hydrogen sulphide converting to sulphuric acid on walls
Liner impervious to sulphuric acid,
Control exits and treat odours.
![Page 22: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/22.jpg)
Investigation
Sulphide and Ventilation
Models
Corrosion of unprotected concrete (>0.5mm/year?)
Durability Reports
Sewer Hydraulics
Minor Surcharge
Should NIS be lined?
Yes
No
![Page 23: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/23.jpg)
Lining Options
S a c r i f i c i a l C o n c r e t eS e c t i o n
P o l y m e r C o n c r e t e
P l a s t i c L i n e dS e g m e n t s
A c i d R e s i s t a n tC o n c r e t e
O N E - P A S S( B G S )
C I P S a c r i f i c i a lC o n c r e t e
A G R U S u r e G r i pG S E S t u d l i n e r / A K S
C a r p i L i n i n g
L i n a b o n d
F l e x i b l eM e m b r a n e L i n e r s
C a s t - i n t o - B a c k f i l l
R C P G R P
E R O C R o s L o k
S e m i - r i g i dL i n e r s
C a s t - i n t o - B a c k f i l l
P l a s t i c L i n e dC o n c r e t e P i p e
K e r a l i n e L i n e dC o n c r e t e P i p e
G l a s s F i b r e R C P w / E p o x y L a m i n a t e
S t e e l P i p e w /E p o x y L i n i n g
F R P P
S t r u c t u r a l P i p e L i n e r
w / B a c k f i l l
T W O - P A S S( B G S + S e c o n d a r y L i n i n g )
F I N A L T U N N E L L I N I N G
![Page 24: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/24.jpg)
Durability
![Page 25: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/25.jpg)
Durability
![Page 26: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/26.jpg)
Durability
![Page 27: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/27.jpg)
Groundwater
![Page 28: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/28.jpg)
Groundwater
![Page 29: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/29.jpg)
Final Lining Selection
• MWC team• industrial catchment• deeper sewer• sedimentary• residential route• groundwater excluded• more $ in BG segments• more sewer drops
• higher risk of H2S corrosion
• required 100% liner• PE sheet
• YVW team• domestic catchment• shallower sewer• basalt• creek valley route• groundwater infiltration• less $ on segments• fewer sewer drops• accepted shaft risk,
avoided tunnel risk • preferred robust liner• GRP pipe
![Page 30: Northern Sewerage Project:Lining Selection in a Corrosive Environment](https://reader030.vdocuments.us/reader030/viewer/2022020218/559429581a28abc55a8b45c7/html5/thumbnails/30.jpg)
QUESTIONS?