north shore at canton
DESCRIPTION
North Shore at Canton. Beau Menard Structural Option Advisor: Professor Parfitt. The Pennsylvania State University Architectural Engineering Senior Thesis. North Shore at Canton. Beau Menard Structural Option. Table of Contents: Building Overview Problem Statement Solution Overview - PowerPoint PPT PresentationTRANSCRIPT
North Shore at CantonNorth Shore at Canton
The Pennsylvania State UniversityThe Pennsylvania State University
Architectural Engineering Senior ThesisArchitectural Engineering Senior Thesis
Beau Menard
Structural Option
Advisor: Professor Parfitt
North Shore at CantonNorth Shore at Canton
Table of Contents:Table of Contents:
1.1. Building OverviewBuilding Overview2.2. Problem StatementProblem Statement3.3. Solution OverviewSolution Overview4.4. Structural RedesignStructural Redesign
– Steel SolutionSteel Solution– Pre-cast solutionPre-cast solution
5.5. Construction Management IssuesConstruction Management Issues– Material CostsMaterial Costs– Construction DurationsConstruction Durations
6.6. ConclusionConclusion7.7. AcknowledgementsAcknowledgements8.8. QuestionsQuestions
Beau Menard
Structural Option
BuildingBuilding OverviewOverview
LocationLocation– Baltimore, MDBaltimore, MD
2300 block of Boston Street2300 block of Boston Street Residential StructureResidential Structure
– 1 level covered parking1 level covered parking– 3 levels of living units3 levels of living units– 60,000 sq ft60,000 sq ft
North Shore at CantonNorth Shore at CantonBeau Menard
Structural Option
Structural SystemStructural System– FoundationFoundation
Pre-cast concrete pilesPre-cast concrete piles Concrete strength, f’c = 7000 psiConcrete strength, f’c = 7000 psi Grade 60 reinforcing steelGrade 60 reinforcing steel
– Parking level Parking level Floor system- 12” pre-cast planks Floor system- 12” pre-cast planks
w/ 4-1/2” toppingw/ 4-1/2” topping Steel Columns and GirdersSteel Columns and Girders 8” pre-cast planks w/ 2-1/2” 8” pre-cast planks w/ 2-1/2”
toppingtopping
North Shore at CantonNorth Shore at CantonBeau Menard
Structural Option
BuildingBuilding OverviewOverview
Structural SystemsStructural Systems– Living UnitsLiving Units
Bearing/Shear wall systemBearing/Shear wall system– Steel StudsSteel Studs– ½” Gypsum Sheathing½” Gypsum Sheathing
Floor systemFloor system– 16” deep pre-engineered wood 16” deep pre-engineered wood
floor trusses, spaced 16” o.c.floor trusses, spaced 16” o.c.– ¾” OSB topping¾” OSB topping
Roof systemRoof system– Pre-engineered roof trusses, Pre-engineered roof trusses,
spaced 24” o.c.spaced 24” o.c.
North Shore at CantonNorth Shore at CantonBeau Menard
Structural Option
BuildingBuilding OverviewOverview
Inherent Moisture ProblemInherent Moisture Problem
Structural IntegrityStructural Integrity
North Shore at CantonNorth Shore at CantonBeau Menard
Structural Option
ProblemProblem StatementStatement
Structural SolutionStructural Solution
– Steel RedesignSteel Redesign Combination Moment and Braced Combination Moment and Braced
FrameFrame Open web steel joistsOpen web steel joists
– Pre-cast Concrete RedesignPre-cast Concrete Redesign Shear-wall lateral systemShear-wall lateral system Pre-cast columns and girdersPre-cast columns and girders Pre-cast planksPre-cast planks
North Shore at CantonNorth Shore at CantonBeau Menard
Structural Option
SolutionSolution OverviewOverview
Design Loads Design Loads (IBC 2003 & ASCE 7-02)(IBC 2003 & ASCE 7-02)
– Live LoadLive Load 40 psf 40 psf Roof Live Load ~ 20 psf Roof Live Load ~ 20 psf
– Snow LoadSnow Load 20 psf 20 psf
– Lateral LoadsLateral Loads Wind Load ~ 20 psf (steel structure)Wind Load ~ 20 psf (steel structure) Seismic Loads as noted (concrete structure)Seismic Loads as noted (concrete structure)
– Dead LoadsDead Loads Structure Weight ~ variesStructure Weight ~ varies Roof Dead Load ~ 20 psfRoof Dead Load ~ 20 psf MEP and Ceiling ~ 20 psfMEP and Ceiling ~ 20 psf
North Shore at CantonNorth Shore at CantonBeau Menard
Structural Option
StructuralStructural RedesignRedesign
Steel DesignSteel Design– Floor SystemFloor System
Open Web Steel JoistsOpen Web Steel Joists– 16k4 (25’ max span, 3’ 16k4 (25’ max span, 3’
spacing)spacing) Allowable Load ~ 313 plfAllowable Load ~ 313 plf Total Load ~ 270 plfTotal Load ~ 270 plf
Metal DeckingMetal Decking– 19 gauge (3 span)19 gauge (3 span)– 1-1/2” x 6” 1-1/2” x 6” – Light weight Concrete toppingLight weight Concrete topping
2-1/2” topping w/ 2-1/2” topping w/ gypsum ceilinggypsum ceiling
North Shore at CantonNorth Shore at CantonBeau Menard
Structural Option
StructuralStructural RedesignRedesign
Steel DesignSteel Design
– Initial frame systemsInitial frame systems Moment frame vs. Braced Moment frame vs. Braced
frameframe
– Combination FrameCombination Frame Moment and Braced Moment and Braced
ConnectionsConnections
North Shore at CantonNorth Shore at CantonBeau Menard
Structural Option
StructuralStructural RedesignRedesign
North Shore at CantonNorth Shore at CantonBeau Menard
Structural Option
Main Lateral Force Resisting Main Lateral Force Resisting SystemSystem– 5 Combination Frames5 Combination Frames
ColumnsColumns– w 10x49 (typ)w 10x49 (typ)
GirdersGirders– w 21x50 (int)w 21x50 (int)– w 18x35 (ext)w 18x35 (ext)
Bracing elementsBracing elements– w 8x24 (typ)w 8x24 (typ)
– Moment FrameMoment Frame ColumnsColumns
– w 10x49w 10x49 GirdersGirders
– w 18x40w 18x40
StructuralStructural RedesignRedesign - Steel - Steel1st Floor
North Shore at CantonNorth Shore at CantonBeau Menard
Structural Option
Main Lateral Force Resisting Main Lateral Force Resisting SystemSystem– 5 Combination Frames5 Combination Frames
ColumnsColumns– w 10x49 (typ)w 10x49 (typ)
GirdersGirders– w 18x35 (int)w 18x35 (int)– w 16x26 (ext)w 16x26 (ext)
Bracing elementsBracing elements– w 8x24 (typ)w 8x24 (typ)
– Moment FrameMoment Frame ColumnsColumns
– w 10x49w 10x49 GirdersGirders
– w 18x40w 18x40
StructuralStructural RedesignRedesign - Steel - Steel2nd Floor
North Shore at CantonNorth Shore at CantonBeau Menard
Structural Option
Main Lateral Force Resisting Main Lateral Force Resisting SystemSystem– 5 Combination Frames5 Combination Frames
ColumnsColumns– w 10x49 (typ)w 10x49 (typ)
GirdersGirders– w 16x26 (int)w 16x26 (int)– w 16x26 (ext)w 16x26 (ext)
Bracing elementsBracing elements– w 8x24 (typ)w 8x24 (typ)
– Moment FrameMoment Frame ColumnsColumns
– w 10x49w 10x49 GirdersGirders
– w 18x40w 18x40
StructuralStructural RedesignRedesign - Steel - Steel3rd Floor
North Shore at CantonNorth Shore at CantonBeau Menard
Structural Option
Main Lateral Force Resisting Main Lateral Force Resisting SystemSystem– 5 Combination Frames5 Combination Frames
ColumnsColumns– w 10x49 (typ)w 10x49 (typ)
GirdersGirders– w 22x55 (typ)w 22x55 (typ)
– Moment FrameMoment Frame ColumnsColumns
– w 10x49w 10x49 GirdersGirders
– w 18x40w 18x40
StructuralStructural RedesignRedesign - Steel - Steel4th Floor
North Shore at CantonNorth Shore at CantonBeau Menard
Structural Option
StructuralStructural RedesignRedesign - Steel - Steel
Lateral DeflectionLateral Deflection
Story Total Lateral Displacement
(in)
1 .041
2 .079
3 .121
4 .276
North Shore at CantonNorth Shore at CantonBeau Menard
Structural Option
StructuralStructural RedesignRedesign - Steel - Steel
Gravity FrameGravity Frame– ColumnsColumns
w 10x49 (typ)w 10x49 (typ)
– GirdersGirders w 16x26w 16x26 w 18x40w 18x40 w 21x44w 21x44 w 24x55w 24x55
– Bracing elementsBracing elements w 8x24 (typ)w 8x24 (typ)
Foundation ImpactFoundation Impact– Slight Increase in Slight Increase in
axial loadsaxial loads– Lateral Load transfer Lateral Load transfer
– Pile CapacityPile Capacity
130 tons 130 tons CompressionCompression
30 tons tension30 tons tension
North Shore at CantonNorth Shore at CantonBeau Menard
Structural Option
StructuralStructural RedesignRedesign - Steel - Steel
Typical Frame LayoutTypical Frame Layout– Foundation ImpactFoundation Impact– Shear wallsShear walls– ColumnsColumns– GirdersGirders
North Shore at CantonNorth Shore at CantonBeau Menard
Structural Option
StructuralStructural RedesignRedesign – Pre- – Pre-castcast
Shear WallsShear Walls– LocationLocation
Long wallsLong walls Short wallsShort walls
– Loads AppliedLoads Applied Seismic ControlsSeismic Controls
– ReinforcementReinforcement Spacing ~ 18”Spacing ~ 18” ρ = 0.0025ρ = 0.0025
– # 6 bar # 6 bar
North Shore at CantonNorth Shore at CantonBeau Menard
Structural Option
StructuralStructural RedesignRedesign – Pre- – Pre-castcast
North Shore at CantonNorth Shore at CantonBeau Menard
Structural Option
StructuralStructural RedesignRedesign – Pre- – Pre-castcast
ColumnsColumns– LevelLevel
3-12”x12”3-12”x12” 2-12”x12”2-12”x12” 1-14”x14”1-14”x14”
– ReinforcementReinforcement γ = 0.6 γ = 0.6
(conservatively)(conservatively) ρ = 0.03 ρ = 0.03
– 3 -# 7 bars / face3 -# 7 bars / face
North Shore at CantonNorth Shore at CantonBeau Menard
Structural Option
StructuralStructural RedesignRedesign – Pre- – Pre-castcast
GirdersGirders– InteriorInterior
12”x14”12”x14”– Moment ReinforcementMoment Reinforcement
3-#9 (bot)3-#9 (bot) 4-#9 (top)4-#9 (top)
– Shear/torsion ReinforcementShear/torsion Reinforcement #3 bars @ s = 7”#3 bars @ s = 7”
– PerimeterPerimeter 10”x12”10”x12”
– Moment ReinforcementMoment Reinforcement 2-#5 (bot)2-#5 (bot) 2-#5 (top)2-#5 (top)
– Shear/torsion ReinforcementShear/torsion Reinforcement #3 bars @ s = 6”#3 bars @ s = 6”
North Shore at CantonNorth Shore at CantonBeau Menard
Structural Option
StructuralStructural RedesignRedesign – Pre- – Pre-castcast
Floor SystemFloor System– Pre-cast PlanksPre-cast Planks
Span ~ 25’Span ~ 25’ 8”x4’ SpanDeck –U.L.-8”x4’ SpanDeck –U.L.-
J917J917– Flexure 4 - 1/2" Φ Flexure 4 - 1/2" Φ
allowable load = 110 allowable load = 110 psf total load = 90 psfpsf total load = 90 psf
– 2” concrete topping2” concrete topping
North Shore at CantonNorth Shore at CantonBeau Menard
Structural Option
StructuralStructural RedesignRedesign – Pre- – Pre-castcast
Foundation ImpactFoundation Impact– Greatly Increase in Greatly Increase in
axial loadsaxial loads– Lateral Load Lateral Load
transfer transfer Shear wall Shear wall
connectionsconnections
North Shore at CantonNorth Shore at CantonBeau Menard
Structural Option
ConstructionConstruction ManagementManagement – – CostCost
Current systemCurrent system– Pier cost ~ $ 1,000,000Pier cost ~ $ 1,000,000– Town home cost ~ $448,600Town home cost ~ $448,600
Includes structure and facadeIncludes structure and facade
Steel SystemSteel System– Frame Cost ~ $650,000Frame Cost ~ $650,000
Includes framing and floor systemIncludes framing and floor system No additional pier costNo additional pier cost
Pre-cast SystemPre-cast System– Frame cost ~ $750,000Frame cost ~ $750,000
Includes framing and floor systemIncludes framing and floor system Pier cost increasedPier cost increased
North Shore at CantonNorth Shore at CantonBeau Menard
Structural Option
ConstructionConstruction ManagementManagement – Durations – Durations Current systemCurrent system
– Pier construction ~ 5 monthsPier construction ~ 5 months– Town home construction ~ 5 monthsTown home construction ~ 5 months
Includes structure and facadeIncludes structure and facade
Steel SystemSteel System– Frame construction ~ 4 monthsFrame construction ~ 4 months
Includes framing and floor systemIncludes framing and floor system No additional pier constructionNo additional pier construction
Pre-cast SystemPre-cast System– Frame construction ~ 6 monthsFrame construction ~ 6 months
Includes framing and floor systemIncludes framing and floor system Additional pier construction requiredAdditional pier construction required
North Shore at CantonNorth Shore at CantonBeau Menard
Structural Option
ConclusionsConclusions / / RecommendationsRecommendations Steel RedesignSteel Redesign
– AdvantagesAdvantages Light WeightLight Weight Less impact on Less impact on
foundationfoundation Cost effectiveCost effective Shorter construction Shorter construction
durationsdurations
– DisadvantagesDisadvantages Complex connectionsComplex connections Additional moisture Additional moisture
protectionprotection Additional fire Additional fire
proofingproofing
Pre-cast RedesignPre-cast Redesign– AdvantagesAdvantages
Moisture resistantMoisture resistant Fire resistantFire resistant Reduce lateral Reduce lateral
membersmembers
– DisadvantagesDisadvantages Increased structure Increased structure
weightweight Complex connectionsComplex connections Greatly impacts Greatly impacts
foundationfoundation Increased costIncreased cost Slightly increased Slightly increased
construction construction durationsdurations
North Shore at CantonNorth Shore at CantonBeau Menard
Structural Option
AcknowledgementsAcknowledgements
Don Taylor ~ DW Taylor Architects and Associates
Jim Diepold ~ Whitney, Bailey, Cox, Magnani
Friends and Family
AE Faculty