north roofing, waterproofing & building envelope …purchasing.sc.edu/solicitations/re bid...
TRANSCRIPT
DRAWING:
COVER SHEET
DRAWN BY: CGB
SCALE: N.T.S.
R-001
SHEET 1 OF 7
UN
IV
ER
SIT
Y O
F S
OU
TH
C
AR
OLIN
A
CO
LU
MB
IA
, S
C
RE
I P
RO
JE
CT
#: 14C
HS
-078
DATE: 03/04/2015
RE
B
ID
W
IL
LIA
MS
B
RIC
E B
UIL
DIN
G A
ND
EN
GIN
EE
RS
REVISION # REVISION DATE
2
1
3
4
RO
OF
IN
G, W
AT
ER
PR
OO
FIN
G &
B
UILD
IN
G
EN
VE
LO
PE
E
NG
IN
EE
RS
&
C
ON
SU
LT
AN
TS
ww
w.reiengineers.com
RE BID WILLIAMS BRICE
BUILDING AND AUDITORIUM
ROOF REPLACEMENT
UNIVERSITY OF SOUTH CAROLINA
1601 GREENE ST.
COLUMBIA, SC 29208
VICINITY MAP SITE MAP
SEAL:
DRAWING INDEX
R-001 COVER SHEET
R-101 ROOF PLAN
R-102 INSULATION ATTACHMENT PLAN
R-201
R-202 ROOF DETAILS
ROOF DETAILSR-203
ROOF DETAILS
ABBREVIATION LIST
MAX. MAXIMUM
MIN. MINIMUM
N.I.C. NOT IN CONTRACT
O.C.
S.S. STAINLESS STEEL
TERMINATIONTERM.
TYPICALTYP.
ON CENTER
SIM. SIMILAR
N
O
R
T
H
N.T.S. NOT TO SCALE
These documents are the property of REI Engineers, Inc. (REI) and retains all rights therein, including copyrights. It may only be used in a manner
consistent with REI's rights while REI is providing service for the specific project identified or referred to herein or extensions thereto. It may not be used for
any other purpose except with the express written agreement of, and compensation to, REI Engineers, Inc.
CODE COMPLIANCE REFERENCE LIST
2012 INTERNATIONAL BUILDING CODE WITH SC MODIFICATIONS
2012 INTERNATIONAL FIRE CODE WITH SC MODIFICATIONS
2012 INTERNATIONAL PLUMBING CODE
2012 INTERNATIONAL MECHANICAL CODE
2009 INTERNATIONAL ENERGY CONSERVATION CODE
2012 INTERNATIONAL FUEL GAS CODE WITH SC MODIFICATIONS
2011 NATIONAL ELECTRIC CODE
AU
DIT
OR
IU
M R
OO
F R
EP
LA
CE
ME
NT
R-103 LOADING PLAN
S S
C
D
S
1
1
2
:12
H
H
H
A
B
R-201
1
R-201
2
R-201
3
R-202
8
R-202
9R-202
10
R-202
11
R-202
12
R-203
13
R-203
15
8
88
8
7
R-201
3
R-201
3
8 8
S S
C
D
S
R-201
4
R-201
5
R-201
6
R-202
7
R-202
9
R-202
9
R-201
4
1
1
2
:12
7
7
R-203
16
R-203
16
12
12
R-201
3
SIM.
R-201
3
SIM.
R-201
3
R-201
3
SIM.SIM.
R-203
17
R-203
17
R-203
17
R-203
17
R-203
17
R-203
17
8
8
8
8
8
88
8
8
8
DRAWING:
ROOF PLAN
DRAWN BY: CGB
SCALE: 1"=10'-0"
R-101
SHEET 2 OF 7
DATE: 03/04/2015
EN
GIN
EE
RS
REVISION # REVISION DATE
2
1
3
4
RO
OF
IN
G, W
AT
ER
PR
OO
FIN
G &
B
UILD
IN
G
EN
VE
LO
PE
E
NG
IN
EE
RS
&
C
ON
SU
LT
AN
TS
ww
w.reiengineers.com
SEAL:
AREA (SQUARE FEET)SECTOR
±2,857
±527
A
B
C
D
±17,344
TOTAL
**CONTRACTOR TO VERIFY ALL
QUANTITIES PRIOR TO BIDDING**
PARAPET WALL
EQUIPMENT CURB
PIPE PENETRATION
STRUCTURAL SLOPES
KEY
HOT STACK
ROOF DRAIN
EQUIPMENT SUPPORT CURB
RIDGE-HIP-VALLEY
ROOF EDGE
TAPERED SLOPE
H
ROOF ACCESS LADDER
THROUGH WALL SCUPPER
SKYLIGHTS
NOTES:
1. RESECURE EXISTING NAILERS IN ACCORDANCE WITH FM DATA SHEET 1-49.
2. SECURE NEW NAILERS IN ACCORDANCE WITH FM DATA SHEET 1-49.
3. INSTALL NEW NAILERS AS REQUIRED TO MATCH SPECIFIED INSULATION THICKNESS. ADJUST NAILERS AS REQUIRED FOR SMOOTH
TRANSITIONS. MAINTAIN LEVEL HEIGHT ALONG PERIMETER EDGE. ADJUST AS REQUIRED TO PREVENT PONDING WATER.
4. PROVIDE CRICKETS BEHIND CURBS 12” WIDE OR GREATER.
5. CONTRACTOR SHALL BECOME FAMILIAR WITH AND VERIFY THE CONDITION, DIMENSION, AND LOCATION OF ALL ROOF AREAS
INCLUDING ROOFTOP EQUIPMENT, FLASHINGS, PIPE LINES, CONDUIT, PIPE SUPPORTS, ETC., BEFORE SUBMITTING BID. NOT ALL
EXISTING PIPES, CONDUIT, ELECTRICAL LINES, CABLES, GUY WIRES, AND DUCTWORK ABOVE THE ROOF SURFACE HAVE BEEN SHOWN
ON THE ROOF PLAN.
6. RAISE ALL ROOFTOP MOUNTED EQUIPMENT, SUPPORT STANDS AND OTHER APPURTENANCES AS NECESSARY TO PROVIDE AN EIGHT
INCH FLASHING HEIGHT ABOVE THE FINISHED ROOF SURFACE. RAISE OR EXTEND ASSOCIATED DUCTWORK, GAS LINES, AIR
CONDITIONING LINES, ETC. TO ACCOMMODATE PROPER REINSTALLATION OF THE LINES TO THE ASSOCIATED EQUIPMENT AFTER THE
EQUIPMENT HAS BEEN RAISED. PROVIDE NECESSARY EQUIPMENT TO BLEED FREON FROM AIR CONDITIONING AND HVAC LINES
7. PROVIDE WALKWAY PAD ROUTED FROM SPLASH PAN TO NEAREST INTERIOR ROOF DRAIN AS SPECIFIED.
8. REFER TO SECTION 07 62 00 FOR FINISHED SCUPPER DIMENSIONS. SCUPPERS SHOWN AT SECTORS C AND TWO AT SECTOR A ARE
NEW.
9. SCRAPE AND PRIME EXISTING ROOFTOP EQUIPMENT AND STEEL PENETRATIONS PRIOR TO REMOVAL OF EXISTING ROOF SYSTEM.
10. PROVIDE NEW TAPERED INSULATION NOT SHOWN ON DRAWINGS AND AS REQUIRED TO PREVENT PONDING WATER AT SECTOR C.
PONDING WATER IS DEFINED IN SECTION 07 22 16.
11. EXISTING LIGHTNING PROTECTION SYSTEM NOT SHOWN. REFER TO DETAIL 14 AND SECTION 07 72 00.
12. REMOVE EXISTING DRAIN COMPONENTS ABOVE DECK. REFER TO SECTION 07 01 50 FOR NEW STEEL PLATE INSTALLATION.
13. DEMOLISH EXISTING LIGHTWEIGHT INSULATION AS REQUIRED FOR INSTALLATION OF NEW TAPERED SYSTEM AT SECTOR C.
14. PROVIDE NEW STEEL PLATE AT LOCATION OF VENT TO BE REMOVED.
15. TAPERED SLOPE IS PROVIDED BY LIGHTWEIGHT CONCRETE AT SECTOR A.DETAIL NUMBER#
#
0'-5' 5' 10' 15'
SCALE: 1" = 10' - 0"
UN
IV
ER
SIT
Y O
F S
OU
TH
C
AR
OLIN
A
CO
LU
MB
IA
, S
C
RE
I P
RO
JE
CT
#: 14C
HS
-078
N
O
R
T
H
VENT TO BE REMOVED
ROOF HATCH
±9,769
±4,191
LIGHTNING PROTECTION TERMINAL
ROOF EDGE WITH GUTTER AND DOWNSPOUT
EXISTING LIGHTWEIGHT INSULATION LAYOUT
NEW TAPERED INSULATION LAYOUT
08/18/2015
RE
B
ID
W
IL
LIA
MS
B
RIC
E B
UIL
DIN
G A
ND
AU
DIT
OR
IU
M R
OO
F R
EP
LA
CE
ME
NT
8' TYP.
SLOPED METAL MANSARD
D
C
8' TYP.
A
B
DRAWING:
INSULATION ATTACHMENT PLAN
DRAWN BY: CGB
SCALE: 1"=10'-0"
R-102
SHEET 3 OF 7
DATE: 03/04/2015
EN
GIN
EE
RS
REVISION # REVISION DATE
2
1
3
4
RO
OF
IN
G, W
AT
ER
PR
OO
FIN
G &
B
UILD
IN
G
EN
VE
LO
PE
E
NG
IN
EE
RS
&
C
ON
SU
LT
AN
TS
ww
w.reiengineers.com
SEAL:
NOTES:
1. PLACEMENT OF INSULATION FASTENERS SHALL COMPLY WITH INSULATION
MANUFACTURER'S PUBLISHED LITERATURE AND THE MEMBRANE MANUFACTURER'S
REQUIREMENTS.
2. CUT OR SCORE BOARDS TO CONFORM TO ANY IRREGULAR SUBSTRATE CONDITIONS.
3. INSTALL NUMBER OF FASTENERS REQUIRED BY MEMBRANE MANUFACTURER'S TESTED
ASSEMBLY TO MEET WIND DESIGN UPLIFT PRESSURES SPECIFIED IN SECTION 07 54 00.
FIELD
PERIMETER
CORNER
UN
IV
ER
SIT
Y O
F S
OU
TH
C
AR
OLIN
A
CO
LU
MB
IA
, S
C
RE
I P
RO
JE
CT
#: 14C
HS
-078
4 A
DH
ES
IV
E R
IB
BO
NS
EQ
UA
LLY
S
PA
CE
D A
T
12" O
.C
.
MINIMUM FOAM ADHESIVE APPLICATION
8 A
DH
ES
IV
E R
IB
BO
NS
EQ
UA
LLY
S
PA
CE
D A
T
6" O
.C
.
FIELD PERIMETER
12 A
DH
ES
IV
E R
IB
BO
NS
EQ
UA
LLY
S
PA
CE
D A
T
3" O
.C
.
CORNER
08/18/2015
MINIMUM INSULATION FASTENING PATTERN
36"
6"
6" 28" 28" 6"
6"
8 FASTENERS/BD FIELD
MINIMUM INSULATION FASTENING PATTERN
52-1/2"
6"
16 FASTENERS/BD PERIMETER
45"
15" 30"
MINIMUM INSULATION FASTENING PATTERN
24"
18"
18" 6"
6"
32 FASTENERS/BD CORNER
36"12"
RE
B
ID
W
IL
LIA
MS
B
RIC
E B
UIL
DIN
G A
ND
AU
DIT
OR
IU
M R
OO
F R
EP
LA
CE
ME
NT
DRAWING:
LOADING PLAN
DRAWN BY: CGB
SCALE: N.T.S.
R-103
SHEET 4 OF 7
DATE: 03/04/2015
EN
GIN
EE
RS
REVISION # REVISION DATE
2
1
3
4
RO
OF
IN
G, W
AT
ER
PR
OO
FIN
G &
B
UILD
IN
G
EN
VE
LO
PE
E
NG
IN
EE
RS
&
C
ON
SU
LT
AN
TS
ww
w.reiengineers.com
SEAL:
NOTES:
1. PROVIDE TEMPORARY FENCING WITH GREEN FABRIC WHERE INDICATED IN RED.2. UTILIZE SOUTHERN HALF OF MAIN ENTRANCE, ONLY, FOR LOADING AND UNLOADING. NORTHERN HALF OF ENTRANCE SHALL BE MAINTAINED FOR FULL USE BYOWNER THROUGHOUT DURATION OF PROJECT.3. PROVIDE MINIMUM OF TWO MONITORS WHERE INDICATED IN YELLOW TO DIRECT PEDESTRIAN TRAFFIC AWAY FROM LOADING AREA DURING LOADING ANDUNLOADING OPERATIONS.
#
UN
IV
ER
SIT
Y O
F S
OU
TH
C
AR
OLIN
A
CO
LU
MB
IA
, S
C
RE
I P
RO
JE
CT
#: 14C
HS
-078
N
O
R
T
H
RE
B
ID
W
IL
LIA
MS
B
RIC
E B
UIL
DIN
G A
ND
AU
DIT
OR
IU
M R
OO
F R
EP
LA
CE
ME
NT
CONT. EDGE
METAL CLEAT
EDGE METAL
ANCHOR
NEW WOOD NAILER
EXISTING LIGHTWEIGHT CONCRETE
EXISTING ROOF DECK
TERM. BAR
FLASHING MEMBRANE
HOT-AIR WELD
THERMOPLASTIC ROOF MEMBRANE
SPECIFIED INSULATION
FASTEN 16" O.C.
HAT CHANNEL FASTENED 24"
O.C. STAGGER FASTENERS
BETWEEN SIDES OF CHANNEL
METAL WALL PANEL
1"/
FT
. S
LO
PE
S.S. FASTENER W/ EPDM WASHER 24" O.C.
TERM BAR
2-PIECE COUNTERFLASHING
WIND CLIP 24" O.C.
8" M
IN
.
SEALANT TAPE
SHEET METAL UNDERLAYMENT
SPECIFIED INSULATION
THERMOPLASTIC ROOF MEMBRANE
SPECIFIED INSULATION
THERMOPLASTIC ROOF MEMBRANE
NEW WOOD NAILER
FLASHING MEMBRANE
HOT AIR WELD
HOT AIR WELD
HOT AIR WELD
FLASHING MEMBRANE
TERM BAR
EXISTING LIGHTWEIGHT CONCRETE
EXISTING ROOF DECK
EXISTING LIGHTWEIGHT CONCRETE
EXISTING ROOF DECK
TERM. BAR
NEW
1
2
" GYPSUM BOARD
ADHERED TO EXISTING WALL
CLOSURE CLEAT
4"
4"
EDGE METAL
GUTTER BRACKET
GUTTER SPACER
EDGE METAL COVER
FIELD CRIMP
THERMOPLASTIC ROOF MEMBRANE
HOT-AIR WELD
FLASHING MEMBRANE
SEALANT
FLASHING MEMBRANE
POLYMER-CLAD METAL
THROUGH-WALL SCUPPER
SEALANT
SEALANT
SCUPPER FACE PLATE
SEALANT
EXISTING LIGHTWEIGHT CONCRETE
EXISTING ROOF DECK
SPECIFIED INSULATION
WIND CLIP 24" O.C.
TERM BAR
2-PIECE COUNTERFLASHING
S.S. FASTENER W/
EPDM WASHER 24" O.C.
FASTEN 16" O.C.
EXISTING METAL WALL PANEL
EXISTING LIGHTWEIGHT CONCRETE
EXISTING ROOF DECK
SPECIFIED INSULATION
THERMOPLASTIC ROOF MEMBRANE
HOT AIR WELD
FLASHING MEMBRANE
TERM BAR
EXISTING METAL WALL PANEL UNDERLAYMENT
8" M
IN
.
1"/
FT
. S
LO
PE
SPECIFIED INSULATION
THERMOPLASTIC ROOF MEMBRANE
HOT AIR WELD
FLASHING MEMBRANE
TERM BAR
COPING
CONTINUOUS CLEAT
FLASHING MEMBRANE
NEW WOOD NAILERS
TAPERED EDGE STRIP
8" M
IN
.
EXISTING LIGHTWEIGHT CONCRETE
EXISTING ROOF DECK
CONTINUOUS
CLEAT
SEALANT TAPE
SPECIFIED INSULATION
THERMOPLASTIC
ROOF MEMBRANE
SPECIFIED INSULATION
THERMOPLASTIC ROOF MEMBRANE
NEW WOOD NAILER
FLASHING MEMBRANE
HOT AIR WELD
HOT AIR WELD
HOT AIR WELD
TERM BAR
FLASHING MEMBRANE
TERM BAR
EXISTING LIGHTWEIGHT CONCRETE
EXISTING ROOF DECK
6"
6"
EDGE METAL
GUTTER BRACKET
GUTTER SPACER
EDGE METAL COVER
FIELD CRIMP
DRAWING:
ROOF DETAILS
DRAWN BY: CGB
SCALE: VARIES
R-201
SHEET 5 OF 7
DATE: 03/04/2015
EN
GIN
EE
RS
REVISION # REVISION DATE
2
1
3
4
RO
OF
IN
G, W
AT
ER
PR
OO
FIN
G &
B
UILD
IN
G
EN
VE
LO
PE
E
NG
IN
EE
RS
&
C
ON
SU
LT
AN
TS
ww
w.reiengineers.com
SEAL:
1
SCALE: 3"=1'-0"
PARAPET WALL
NOTES:
1. CANT STRIP NOT SHOWN FOR CLARITY.
NOTES:
1. NEW METAL WALL PANELS REQUIRED AT SECTOR A NOT SHOWN FOR CLARITY. REFER TO DETAIL 4.
2. CANT STRIP NOT SHOWN FOR CLARITY.
NOTES:
1. PROVIDE NEW WOOD NAILERS AS REQUIRED TO ACHIEVE 8" MINIMUM PARAPET HEIGHT.
2. PROVIDE EDGE METAL EXTENSION WHERE EDGE METAL FACE HEIGHT EXCEEDS 9 INCHES.
3. CANT STRIP NOT SHOWN FOR CLARITY
2
SCALE: 2"=1'-0"
ROOF EDGE
3
SCALE: 3"=1'-0"
THROUGH WALL OVERFLOW SCUPPER
4
ROOF TO WALL
5
PARAPET WALL
6
ROOF EDGE
UN
IV
ER
SIT
Y O
F S
OU
TH
C
AR
OLIN
A
CO
LU
MB
IA
, S
C
RE
I P
RO
JE
CT
#: 14C
HS
-078
SCALE: 3"=1'-0" SCALE: 3"=1'-0" SCALE: 3"=1'-0"
NOTES:
1. CANT STRIP NOT SHOWN FOR CLARITY.
NOTES:
1. CANT STRIP NOT SHOWN FOR CLARITY.
NOTES:
1. CANT STRIP NOT SHOWN FOR CLARITY.
06/04/2015
08/18/2015
RE
B
ID
W
IL
LIA
MS
B
RIC
E B
UIL
DIN
G A
ND
AU
DIT
OR
IU
M R
OO
F R
EP
LA
CE
ME
NT
SPECIFIED INSULATION
THERMOPLASTIC ROOF MEMBRANE
HOT AIR WELD
FLASHING MEMBRANE
TERM BAR
EXISTING LIGHTWEIGHT CONCRETE
EXISTING ROOF DECK
INNER GLAZING
8" M
IN
.
OUTER GLAZING
ALUMINUM RETAINING FRAME
BUTYL TAPE
EXPRESS TAPE
VHB TAPE
PERMATHERM CURB
RETAINER SCREW
CONT. MASTIC COMPATIBLE
WITH ROOFING MATERIAL
SLIP COUNTERFLASHING
FLASHING MEMBRANE
HOT-AIR WELD
THERMOPLASTIC ROOF MEMBRANE
NEW DRAIN CLAMPING RING
NEW DRAIN DOME
SPECIFIED ROOF INSULATION
EXISTING ROOF DECK
8" M
IN
IM
UM
SPECIFIED INSULATION
THERMOPLASTIC ROOF MEMBRANE
HOT-AIR WELD
PRE-FABRICATED BOOT FLASHING
S.S. CLAMPING RING
MULTI PURPOSE SEALANT
MULTI-PURPOSE SEALANT
EXISTING ROOF DECK
8" M
IN
.
EXISTING EQUIPMENT CURB
FASTENER
TERM. BAR
SLIP COUNTERFLASHING
ADD WOOD NAILER AND CONTINUOUS ZEE,
IF NECESSARY TO RAISE HEIGHT OF CURB
EXISTING WOOD NAILER
EXISTING ROOF DECK
SPECIFIED INSULATION
THERMOPLASTIC ROOF MEMBRANE
HOT AIR WELD
MEMBRANE TERMINATION
FLASHING MEMBRANE
NEW WOOD NAILER
8" M
IN
.
THERMOPLASTIC ROOF MEMBRANE
NEW ROOF HATCH
FASTEN 4" O.C.
S.S. FASTENER W/ EPDM
WASHER FASTENED 8" O.C.
SLIP COUNTERFLASHING
8" M
IN
.
SPECIFIED INSULATION
EXISTING ROOF DECK
NEW WOOD NAILERS
MEMBRANE TERMINATION
FLASHING MEMBRANE
TERM BAR
HIGH TEMP. SEALANT
S.S. BANDS
UMBRELLA
MINERAL WOOL
INSULATION
FLANGE
THERMOPLASTIC ROOF MEMBRANE
HOT-AIR WELD
MEMBRANE
TERMINATION
FLASHING
MEMBRANE
S.S. BAND
8" M
IN
.
4" M
IN
.
SPECIFIED INSULATION
EXISTING ROOF DECK
DRAWING:
ROOF DETAILS
DRAWN BY: CGB
SCALE: VARIES
R-202
SHEET 6 OF 7
DATE: 03/04/2015
EN
GIN
EE
RS
REVISION # REVISION DATE
2
1
3
4
RO
OF
IN
G, W
AT
ER
PR
OO
FIN
G &
B
UILD
IN
G
EN
VE
LO
PE
E
NG
IN
EE
RS
&
C
ON
SU
LT
AN
TS
ww
w.reiengineers.com
SEAL:
7
SCALE: 3"=1'-0"
SKYLIGHT
NOTES:
1. PROVIDE NEW WOOD BLOCKING TO ACHIEVE 8" MIN. FLASHING HEIGHT.
2. CANT STRIP NOT SHOWN FOR CLARITY.
8
SCALE: 3"=1'-0"
ROOF DRAIN
9
SCALE: 3"=1'-0"
PIPE PENETRATION
10
EQUIPMENT CURB
11
ROOF HATCH
12
HOT STACK
UN
IV
ER
SIT
Y O
F S
OU
TH
C
AR
OLIN
A
CO
LU
MB
IA
, S
C
RE
I P
RO
JE
CT
#: 14C
HS
-078
SCALE: 3"=1'-0" SCALE: 3"=1'-0" SCALE: 3"=1'-0"
NOTES:
1. PROVIDE NEW WOOD BLOCKING TO ACHIEVE 8" MIN. FLASHING HEIGHT.
2. CANT STRIP NOT SHOWN FOR CLARITY.
NOTES:
1. PROVIDE NEW WOOD BLOCKING TO ACHIEVE 8" MIN. FLASHING HEIGHT.
2. CANT STRIP NOT SHOWN FOR CLARITY.
NOTES:
1. SECURE MEMBRANE AT DRAIN AS REQUIRED BY MEMBRANE MANUFACTURER.
NOTES:
1. SECURE MEMBRANE AT PIPE PENETRATION AS REQUIRED BY MEMBRANE MANUFACTURER.
RE
B
ID
W
IL
LIA
MS
B
RIC
E B
UIL
DIN
G A
ND
AU
DIT
OR
IU
M R
OO
F R
EP
LA
CE
ME
NT
FASTEN 12" O.C.
STAGGERED
THERMOPLASTIC ROOF MEMBRANE
HOT-AIR WELD
MEMBRANE
TERMINATION
FLASHING
MEMBRANE
SPECIFIED INSULATION
EXISTING ROOF DECK
8" M
IN
.
3" WIDE MEMBRANE STRAP,
HOT-AIR WELDED IN PLACE
CABLE
WALKPAD, HOT-AIR WELDED IN PLACE
LIGHTNING ROD
METAL BASE PLATE
CABLE
LIGHTNING ROD
WALKPAD, HOT-AIR WELDED
METAL BASE PLATE
3" WIDE MEMBRANE STRAP,
HOT-AIR WELDED IN PLACE
ROOF MEMBRANE
INSULATION
STRUCTURAL DECK
EXISTING RIGID LIGHTNING
PROTECTION TERMINAL
PVC COATED FLANGE
EPDM BASE SEAL
BONDED TO METAL
SLEEVE
URETHANE INSULATION
PRE-MOLDED TO INNER
SIDE OF SLEEVE
S.S.
FLASHING
SLEEVE
S.S. CAP FOR FLASHING
SLEEVE (CAP FASTENED
USING TWO STAINLESS
STEEL SCREWS)
EPDM TRIPLE PRESSURE
GROMMET SEAL
3"
1'-6"
4"
EDGE METAL
EXISTING WOOD NAILER
NEW WOOD NAILERS
HOT-AIR WELD
EXISTING METAL WALL PANEL
HOT-AIR WELD
THERMOPLASTIC ROOF MEMBRANE
SPECIFIED INSULATION
CONT. CLEAT
6
1 2
"
SEALANT TAPE
SPRAY FOAM INSULATION
EDGE METAL COVER
NEW COLLECTOR HEAD
NEW DOWNSPOUT
NEW DOWNSPOUT
BRACKETS AS
SPECIFIED
SEALANT
SCUPPER LINER
FLASHING MEMBRANE
HOT-AIR WELD
MEMBRANE
SPECIFIED INSULATION
EXISTING ROOF DECK
EXISTING LIGHTWEIGHT CONCRETE
PARAPET BEYOND
CONTINUOUS
CLEAT
SEALANT TAPE
NEW COPING
NEW SCUPPER
NEW COLLECTOR BOX
AND DOWNSPOUT
DRAWING:
ROOF DETAILS
DRAWN BY: CGB
SCALE: VARIES
R-203
SHEET 7 OF 7
DATE: 03/04/2015
EN
GIN
EE
RS
REVISION # REVISION DATE
2
1
3
4
RO
OF
IN
G, W
AT
ER
PR
OO
FIN
G &
B
UILD
IN
G
EN
VE
LO
PE
E
NG
IN
EE
RS
&
C
ON
SU
LT
AN
TS
ww
w.reiengineers.com
SEAL:
13
SCALE: 3"=1'-0"
SUPPORT CURB
14
LIGHTNING PROTECTION
UN
IV
ER
SIT
Y O
F S
OU
TH
C
AR
OLIN
A
CO
LU
MB
IA
, S
C
RE
I P
RO
JE
CT
#: 14C
HS
-078
SCALE: N.T.S.
15
RIGID CONDUIT FLASHING
SCALE: N.T.S.
NOTES:
1. EXISTING CABLE SHALL BE CLEANED FREE OF ASPHALT CONTAMINATION PRIOR TO REINSTALLATION.
2. PROVIDE CONT. LAYER OF ASPHALT RESISTANT MEMBRANE FLASHING UNDER LOCATION OF CABLE. HOT-AIR WELD IN-PLACE.
3. REFER TO SECTION 07 72 00 FOR SUPPORT REQUIREMENTS AND FASTENERS FOR ATTACHMENT TO SHEET METAL COMPONENTS.
16
SCALE: 3"=1'-0"
ROOF EDGE
NOTES:
1. CANT STRIP NOT SHOWN FOR CLARITY.
NOTES:
1. ROOF MEMBRANE AND FLASHING NOT SHOWN FOR CLARITY.
NOTES:
1. CUT, MODIFY EXISTING CLEAT/CLOSURE AS REQUIRED FOR INSTALLATION OF NEW EDGE METAL.
2. SECURE CLEAT THROUGH OUTSIDE FACE OF EXISTING METAL ROOF PANEL.
17
SCALE: 2"=1'-0"
PRIMARY SCUPPER W/ COLLECTOR BOX
06/04/2015
RE
B
ID
W
IL
LIA
MS
B
RIC
E B
UIL
DIN
G A
ND
AU
DIT
OR
IU
M R
OO
F R
EP
LA
CE
ME
NT