Town MeetingMarch 19, 2012
NORTH READING MIDDLE AND HIGH SCHOOLS
![Page 2: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/2.jpg)
AGENDA
WelcomeIntroductionsProject HistoryMSBA Board Submission / Project OverviewEstimated Project CostsNext StepsPublic Comment
![Page 3: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/3.jpg)
• SSBC Reconvened
• Town-Sponsored Feasibility Study Completed
• Meeting with MSBA to Consider Shared-Core Option
• Initial MSBA Feasibility Study Appropriation
• Educational Vision and Program Completed
• Develop/Review Multiple Design Options
PROJECT HISTORY AND MILESTONES
December 2005
2006
October 2009
June 2010
May / June 2011
May / July 2011
![Page 4: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/4.jpg)
• Select Preferred Design Option August 19, 2011• New Stand-Alone Middle School & High School• New High School & Renovated Middle School (Stand-Alone)• MS/HS Shared-Core Facilities• “No-Build” Option
• Feasibility Study Approved by MSBA September 28, 2011
• Schematic Design Submitted to MSBA December 9, 2011
• MSBA Board Meeting to Approve Project January 25, 2012• $107.7 million Project Approved• $47- 49 million Grant Authorized
• MSBA Approves Scope & Budget February 22, 2012
PROJECT HISTORY AND MILESTONES
![Page 5: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/5.jpg)
The New Middle/High School Project will be the result of a partnership with the Massachusetts School Building Authority (MSBA)
The MSBA has provided $8.4 billion towards school construction projects in the Commonwealth over the past 7 years
The total Project Cost will be $107.7 million
51.49% of Eligible Project Costs ($47-49 million) for the North Reading Middle/High School Project will be paid for by the MSBA
The MSBA Board Approved the project on January 25, 2012 and the Town of North Reading has 120 days to secure local authorization and funding
MSBA PARTNERSHIP
![Page 6: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/6.jpg)
Enrollment
21st Century Teaching and Learning
Learning Communities• Opportunities• Environment
Technology Integration
PROVIDING A 21ST CENTURY EDUCATION
![Page 7: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/7.jpg)
SITE PLAN
SOFTBALL FIELD
MULTI-PURPOSEFIELD
EXISTINGFACILITIES
PAR
K S
TREE
T / R
OU
TE 6
2
TENNIS COURTS
ACCESS ROAD &SIDEWALK
BUS DROP-OFF& PICK-UP
PARENT DROP-OFF & PICK-UP
SHER
MA
N R
OA
D
EXISTING HIGH SCHOOL
![Page 8: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/8.jpg)
PHASING PLANS – EXISTING SITE PLAN
![Page 9: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/9.jpg)
PHASING PLANS – PHASE 1
MAY 2012 – DECEMBER 2012
1. Start Project
2. Relocate MS Modular Classrooms
3. Construct Site Access Road
![Page 10: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/10.jpg)
PHASING PLANS – PHASE 2
DECEMBER 2012 – SEPTEMBER 2014
1. Build HS & Shared-Core Facilities
2. New HS Opens
3. Relocate MS to Existing HS
![Page 11: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/11.jpg)
PHASING PLANS – PHASE 3
JUNE 2014 – AUGUST 2015
1. Renovate MS
SEPTEMBER 2015
2. Renovated MS Opens
![Page 12: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/12.jpg)
PHASING PLANS – PHASE 4
JUNE 2015 – SEPTEMBER 2015
1. Demolish Existing HS
AUGUST 2015 – DECEMBER 2015
2. Complete Fields, Parking, & Landscaping
![Page 13: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/13.jpg)
LEVEL 1 FLOOR PLAN
![Page 14: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/14.jpg)
MIDDLE SCHOOL FLOOR PLAN
![Page 15: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/15.jpg)
MIDDLE SCHOOL COLLABORATION SPACE
![Page 16: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/16.jpg)
SHARED CORE FACILITIES
![Page 17: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/17.jpg)
GYMNASIUM – COMPETITION COURT
![Page 18: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/18.jpg)
GYMNASIUM – FULL SIZE PRACTICE COURTS
![Page 19: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/19.jpg)
WEIGHTS – FITNESS – ADAPTIVE PHYS ED
![Page 20: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/20.jpg)
MIDDLE SCHOOL LOCKER ROOMS
![Page 21: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/21.jpg)
HIGH SCHOOL LOCKER / TEAM ROOMS
![Page 22: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/22.jpg)
GYMNASIUM / MAIN STREET ENTRANCE
![Page 23: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/23.jpg)
GYMNASIUM
![Page 24: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/24.jpg)
MAIN STREET
![Page 25: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/25.jpg)
PROPOSED AUDITORIUM
![Page 26: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/26.jpg)
ENTRY PLAZA
![Page 27: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/27.jpg)
Existing Science Lab • 822 sq. ft.
Proposed Science Lab • 1440 sq.ft.
SCIENCE LABS
![Page 28: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/28.jpg)
Existing General Classrooms
• 634 - 750 sq. ft.Proposed General Classrooms
• 850 sq. ft.
GENERAL CLASSROOMS
![Page 29: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/29.jpg)
Existing Library / Media Center • 5851 sq.ft. Proposed
Library / Media Center• 8463 sq.ft.
LIBRARY / MEDIA CENTER
![Page 30: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/30.jpg)
HIGH SCHOOL ACADEMIC FLOOR PLAN
![Page 31: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/31.jpg)
Perimeter Classrooms
Teacher Planning & Storage
Teaching Wall
Flexible Collaboration Space
Bench Seating
TYPICAL 21ST CENTURY CLASSROOM WING
![Page 32: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/32.jpg)
Perimeter Casework
Perimeter Utilities
Moveable Lab Tables
TYPICAL SCIENCE LAB
![Page 33: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/33.jpg)
“GREEN” DESIGN
• High performance exterior wall system including increased wall insulation, high efficiency windows with high thermal performance and high visible light transmittance.
• Maximum daylight and views for 90% of the spaces in the building including automatically dimming classroom lighting as sunlight increases.
What makes North Reading Middle & High School a “Green” School?
• Management of stormwater on site for both quality and quantity.
• Acoustics
The project will pursue a LEED “Gold” Certification
![Page 34: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/34.jpg)
“GREEN” DESIGN
• Increased water efficiency by use of low-flow fixtures
• Improved indoor air quality with use of low-emitting materials
• Building products will be sourced from recycled material, supplied from regional locations, 75% of construction waste material will be recycled
• Commissioning of building systems
• Reduced heat island effect by use of light colored materials.
What makes North Reading Middle & High School a “Green” School?
![Page 35: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/35.jpg)
Secondary School Project Cost and Tax Impact
![Page 36: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/36.jpg)
Project Cost : $107.7 million
Estimated Town Share: $58-60 million
Estimated State Share: $47-49 million
Estimated Cost to Homeowner: $700 / Year *Estimated Tax Rate Increase: 10.75%Estimated Increase per $100,000 $155
* Based on an average home assessment of $450,100
PROJECT COST – TAX IMPACT
![Page 37: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/37.jpg)
SECONDARY SCHOOL FINANCING
PROPOSED HYBRID BONDING SCHEDULE
• Bond $50 million, at 4% beginning 2012
• Bond up to $10 million, at 5% when needed
METHOD OF BONDING
• 50 million, 25 year, Level Payment
• 10 million, 25 year, Level Payment
* Information provided by First Southwest
![Page 38: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/38.jpg)
PROPERTY VALUES & YOUR TAXES
Levy Limit (Proposition 2 ½)
Tax Rate Impact on Average Home
![Page 39: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/39.jpg)
LEVY LIMIT (PROP 2 ½)
F/Y 12 Levy Limit
Add 2.5%
F/Y 13 Levy Limit
F/Y 12 Tax RateF/Y 13 Tax Rate (2.5% increase)
$36,042,373
901,059
$36,943,432
$14.38
$14.74
![Page 40: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/40.jpg)
TAX RATE IMPACT ON AVERAGE PROPERTY
CURRENT HOME VALUE: $450,100
Annual tax bill: 450,100 x $1.55/per $1,000 = $700 annual payment
VALUE INCREASES 10%; NEW HOME VALUE: $495,100
Annual tax bill: 495,100 x $1.41/per $1,000 = $700 annual payment
VALUE DECREASES 10%; NEW HOME VALUE: $405,100
Annual tax bill: 405,100 x $1.73/per $1,000 = $700 annual payment
* Calculations rounded to the nearest $10.
![Page 41: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/41.jpg)
The Total Cost for a new project is $107.7 million (MSBA share $47-49 million)
North Reading’s cost for a new project is $60 million
North Reading’s cost to “Not Build” is $50 million
No-Build Cost includes:• Accessibility Improvements• Waste Water Treatment Plant• Code/Fire• Mechanical Systems: HVAC, Plumbing, Electrical, Fire Protection
No-Build Cost does not include:• Educational Program Deficiencies• Modular Classroom Replacement
THE “NO-BUILD” COST
![Page 42: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/42.jpg)
NEIGHBORING MSBA PROJECTS
![Page 43: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/43.jpg)
SPECIAL ELECTION March 24, 2012 (Saturday)
MSBA Project Funding Agreement March 2012
Project Design January 2012 – January 2013
High School Construction June 2012 - August 2014
Middle School Construction June 2014 – August 2015
Demolition of HS & Completion of Fields November 2015
NEXT STEPS
![Page 44: North Reading Town Meeting 120319](https://reader034.vdocuments.us/reader034/viewer/2022042715/55899ee5d8b42a912b8b4733/html5/thumbnails/44.jpg)
• $60 million local share
• $47-49 million state grant
• Two new schools
• 21st Century Learning needs met
• Science labs increase from 6 to 12
• No out-of-town relocation of students
• No modular classrooms
• Accreditation issues addressed
COST OF “NO”
• $50 million local share
• No state grant
• Renovation work completed while students are in session – difficult phasing
• Limited technology, no new science labs
• Modular classrooms in use; replacement not part of $50 million cost
• Renovation work limited to maintaining accreditation
COST OF “YES”