north elevation - dublin, ohio · north elevation calculations 05-11-2018 1" =...

3
FIRST FLOOR WEST 813'-8" SECOND FLOOR 831'-4" THIRD FLOOR 842'-8" FOURTH FLOOR 854'-0" FIFTH FLOOR 864'-8" SIXTH FLOOR 875'-4" BRICK #2 WINDOW-WALL SYSTEM BRICK #1 FIBER CEMENT COMPOSITE FRAME WINDOW 12'-6" 46'-0" 62'-0" 26'-7" 15'-7" 52'-9" 8'-8" STOREFRONT SYSTEM BRIDGE ALUMINUM METAL TILE BRICK #3 P220 1 P221 3 P220 2 LINEAR WALL SCONCE UP/DOWN WALL SCONCE P222 4 T/O ROOF DECK - GARAGE 886'-0" T/O ROOF DECK - LOBBY 893'-1 5/8" 10'-8" 10'-8" 11'-4" 11'-4" 17'-8" HORIZONTAL FACADE DIVISIONS (Required within 3' of top of ground story on buildings 3 stories and taller) PRINCIPAL ENTRANCE LOCATION (As applicable along primary street facade) 10'-8" 7'-2" T&G WOOD SIDING BRICK #2 CANOPY CALCIUM SILICATE MASONRY UNITS STREET FACADE TRANSPARENCY - CORRIDOR BUILDING 4th Story Story Area: Transparency: Required: Provided: 3rd Story Story Area: Transparency: Required: Provided: 2,604 sf 742 sf 30.0% 28.5% 2nd Story Story Area: Transparency: Required: Provided: 2,766 sf 788 sf 30.0% 28.5% Story Area: Transparency: Required: Provided: 2,766 sf 823 sf 30.0% 29.8% 5th Story Brick Glass Aluminum Metal Tile Fiber Cement Siding Misc. Materials Batu Wood Siding Material Primary/Secondary Area (SF) Percentage Required Primary Primary Secondary Secondary Secondary Secondary 6,580 sf 1,443 sf 8,023 sf 56.2% 12.3% 68.6% 80% 844 sf 2,098 sf 440 sf 297 sf 3,382 sf <20% N Y 7.2% 17.9% 3.8% 2.5% 31.4% Overall Area of Elevation: Area of Doors and Openings: Net Area of Elevation: FACADE MATERIALS - CORRIDOR BUILDING 14,506 sf -2,804 sf 11,702 sf Met? 2,604 sf 753 sf 30.0% 28.9% 1st Story Story Area: Transparency: Required: Provided: 953 sf 355 sf 60.0% 37.3% Misc. Elements: Metal Trim, Aluminum Plate, Louvers, Cast stone, etc. Story Area: Transparency: Required: Provided: 6th Story 535 sf 264 sf 30.0% 49.3% KEY PLAN MOONEY STRE ET B A N K E R D R IV E B R I DGE P A R K A V E N U E MOONEY STREET LONGSHORE STRE ET LONGSHORE STREET CORRIDOR BUILDING TYPE MOONEY WAY L ONGSHOR E LOOP D4/D5 P201 NORTH ELEVATION CALCULATIONS 05-11-2018 1" = 30'-0" NORTH ELEVATION 1 1 VERTICAL FACADE DIVISIONS (30' OR LESS REQUIRED)

Upload: others

Post on 04-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NORTH ELEVATION - Dublin, Ohio · north elevation calculations 05-11-2018 1" = 30'-0" 1 north elevation 1 vertical facade divisions (30' or less required) first floor west 813'-8"

FIRST FLOOR WEST

813'-8"

SECOND FLOOR

831'-4"

THIRD FLOOR

842'-8"

FOURTH FLOOR

854'-0"

FIFTH FLOOR

864'-8"

SIXTH FLOOR

875'-4"

BRICK #2

WINDOW-WALL SYSTEM

BRICK #1

FIBER CEMENT

COMPOSITE FRAME WINDOW

12'-6" 46'-0" 62'-0" 26'-7" 15'-7" 52'-9" 8'-8"

STOREFRONT SYSTEM

BRIDGE

ALUMINUM METAL TILE BRICK #3

P220

1

P221

3 P220

2

LINEAR WALL SCONCE

UP/DOWN WALL SCONCE

P222

4

T/O ROOF DECK - GARAGE

886'-0"

T/O ROOF DECK - LOBBY

893'-1 5/8"

10'-8

"10

'-8"

11'-4

"11

'-4"

17'-8

"

HORIZONTAL FACADE DIVISIONS(Required within 3' of top of ground story onbuildings 3 stories and taller)

PRINCIPAL ENTRANCE LOCATION(As applicable along primary street facade)

10'-8

"7'

-2"

T&G WOOD SIDING

BRICK #2

CANOPY

CALCIUM SILICATE

MASONRY UNITS

STREET FACADE TRANSPARENCY - CORRIDOR BUILDING

4th Story Story Area: Transparency: Required:Provided:

3rd Story Story Area: Transparency: Required:Provided:

2,604 sf 742 sf30.0%28.5%

2nd Story Story Area: Transparency: Required:Provided:

2,766 sf 788 sf30.0%28.5%

Story Area: Transparency: Required:Provided:

2,766 sf 823 sf30.0%29.8%

5th Story

BrickGlass

Aluminum Metal TileFiber Cement SidingMisc. MaterialsBatu Wood Siding

Material Primary/Secondary Area (SF) Percentage Required

PrimaryPrimary

SecondarySecondarySecondarySecondary

6,580 sf 1,443 sf

8,023 sf

56.2%12.3%68.6% 80%

844 sf2,098 sf

440 sf297 sf

3,382 sf <20%

N

Y

7.2%17.9% 3.8%2.5%

31.4%

Overall Area of Elevation:Area of Doors and Openings:Net Area of Elevation:

FACADE MATERIALS - CORRIDOR BUILDING

14,506 sf-2,804 sf11,702 sf

Met?

2,604 sf753 sf30.0%28.9%

1st Story Story Area: Transparency: Required:Provided:

953 sf 355 sf60.0%37.3%

Misc. Elements: Metal Trim, Aluminum Plate, Louvers, Cast stone, etc.

Story Area: Transparency: Required:Provided:

6th Story 535 sf264 sf30.0%49.3%

KEY PLAN

MOONEY STREET

BA

NK

ER

DR

IVE

BR

IDG

E P

AR

K A

VE

NU

E

MOONEY STREET

LONGSHORE STREET

LONGSHORE STREET

CORRIDOR BUILDING TYPE

MOONEY WAY

LONGSHORE L

OOP

D4/D5

P201

NORTHELEVATIONCALCULATIONS

05-11-2018

1" = 30'-0"

NORTH ELEVATION1

1

VERTICAL FACADE DIVISIONS(30' OR LESS REQUIRED)

Page 2: NORTH ELEVATION - Dublin, Ohio · north elevation calculations 05-11-2018 1" = 30'-0" 1 north elevation 1 vertical facade divisions (30' or less required) first floor west 813'-8"

FIRST FLOOR WEST

813'-8"

SECOND FLOOR

831'-4"

THIRD FLOOR

842'-8"

FOURTH FLOOR

854'-0"

FIFTH FLOOR

864'-8"

SIXTH FLOOR

875'-4"

BRIDGE

ALUMINUM METAL

TILE

STOREFRONT SYSTEM

BRICK #1

WINDOW WALL SYSTEM

STEEL CABLE CRASH RAIL

BRIDGE1

P211

10'-8

"11

'-4"

11'-4

"17

'-8"

BRICK #3

BRICK #2

2

P215

CORRIDOR

BUILDING

PARKING

STRUCTURE

6'-1

0"

COMPOSITE FRAME

WINDOW

LINEAR WALL SCONCE

UP/DOWN

SCONCE

T&G WOOD WOOD SIDING

T/O ROOF DECK - GARAGE

886'-0"31'-7" 11'-4"1'-4"

38'-0" 1'-4" 25'-0" 1'-4" 42'-0" 1'-4" 30'-2" 19'-2" 25'-4" 1'-4" 47'-4" 1'-4" 28'-0"

T/O ROOF DECK - LOBBY

893'-1 5/8"

HORIZONTAL FACADE DIVISIONS(Required within 3' of top of ground story onbuildings 3 stories and taller)

7'-2

"10

'-8"

10'-8

"3'-1

0"

STOREFRONT SYSTEMCALCIUM SILICATE

MASONRY UNITS

CALCIUM SILICATE

MASONRY UNITS

STREET FACADE TRANSPARENCY - PARKING STRUCTURE

4th Story Story Area: Transparency: Required:Provided:

3rd Story Story Area: Transparency: Required:Provided:

3,112 sf 1,548 sf

N/A49.7%

2nd Story Story Area: Transparency: Required:Provided:

3,112 sf 1,523 sf

N/A48.9%

1st Story Story Area: Transparency: Required:Provided:

1,648 sf 1,259 sf

65.0%76.4%

BrickGlassCalcium Silicate Masonry

Aluminum Metal TileMisc. ElementsBatu Wood Siding

Material Primary/Secondary Area (SF) Percentage Required

PrimaryPrimaryPrimary

SecondarySecondarySecondary

6,383 sf 2,175 sf

390 sf

8,948 sf

56.0%19.1%3.4%

78.5%80%

925 sf538 sf988 sf

2,451 sf <20%

N

N

8.1%4.7%

8.7%

21.5%

Overall Area of Elevation:Area of Doors and Openings:Net Area of Elevation:

FACADE MATERIALS - PARKING STRUCTURE

17,950 sf-6,551 sf11,399 sf

Met?

2,928 sf1,502 sf

N/A51.3%

Misc. Elements: Metal Trim, Louvers, Cast stone, etc.

5th Story Story Area: Transparency: Required:Provided:

2,928 sf1,455 sf

N/A49.7%

6th Story Story Area: Transparency: Required:Provided:

278 sf151 sf

N/A54.3%

STREET FACADE TRANSPARENCY- CORRIDOR BUILDING

4th Story Story Area: Transparency: Required:Provided:

3rd Story Story Area: Transparency: Required:Provided:

436 sf 200 sf30.0%45.9%

2nd Story Story Area: Transparency: Required:Provided:

436 sf 206 sf30.0%47.2%

5th Story Story Area: Transparency: Required:Provided:

BrickGlassCalcium Silicate Masonry

Aluminum Metal TileFiber Cement SidingMisc. ElementsBatu Wood Siding

Material Primary/Secondary Area (SF) Percentage Required

PrimaryPrimaryPrimary

SecondarySecondarySecondarySecondary

85 sf 647 sf

4 sf

736 sf

3.4%26.3%0.2%

29.9% 80%

1,311 sf199 sf

137 sf81 sf

1,695 sf <20%

N

N

53.2%8.1%

5.6%3.3%

70.1%

Overall Area of Elevation:Area of Doors and Openings:Net Area of Elevation:

FACADE MATERIALS - CORRIDOR BUILDING

3,075 sf-611 sf

2,464 sf

Met?

410 sf 154 sf30.0%37.5%

410 sf 192 sf30.0%46.8%

Misc. Elements: Metal Trim, Cast stone, etc.

1st Story Story Area: Transparency: Required:Provided:

231 sf 202 sf60.0%87.4%

6th Story Story Area: Transparency: Required:Provided:

410 sf 84 sf

30.0%20.5%

KEY PLAN

MOONEY STREET

BA

NK

ER

DR

IVE

BR

IDG

E P

AR

K A

VE

NU

E

MOONEY STREET

LONGSHORE STREET

LONGSHORE STREET

CORRIDOR BUILDING TYPE

MOONEY WAY

LONGSHORE L

OOP

D4/D5

P203

WESTELEVATIONCALCULATIONS

05-11-2018

1" = 30'-0"

WEST ELEVATION1

VERTICAL FACADE DIVISIONS(30' OR LESS REQUIRED)

Page 3: NORTH ELEVATION - Dublin, Ohio · north elevation calculations 05-11-2018 1" = 30'-0" 1 north elevation 1 vertical facade divisions (30' or less required) first floor west 813'-8"

FIRST FLOOR WEST

813'-8"

SECOND FLOOR

831'-4"

THIRD FLOOR

842'-8"

FOURTH FLOOR

854'-0"

FIFTH FLOOR

864'-8"

SIXTH FLOOR

875'-4"

BRICK #3

BRICK #2

STEEL CABLE

CRASH RAIL

CAST STONE

SILL

STOREFRONT

WINDOW-

WALL SYSTEM

26'-0"

1'-4"

10'-8"

1'-4"

26'-0" 1'-4" 41'-4"

1'-4"

11'-8"

1'-4"

32'-8" 1'-4" 32'-8" 8'-1" 28'-8"

CORRIDOR

BUILDING

PARKING

STRUCTURE METAL COPING

FIRST FLOOR EAST

821'-4"

HORIZONTAL FACADE DIVISIONS(Required within 3' of top of ground story onbuildings 3 stories and taller)

ALUMINUM PLATE CANOPY

17'-8

"

LINEAR WALL SCONCE

FIBER CEMENTT/O ROOF DECK - GARAGE

886'-0"

10'-8

"10

'-8"

10'-8

"11

'-4"

11'-4

"10

'-0"

4'-1

0"

UP/DOWN

SCONCE

T&G WOOD

SIDING

WINDOW WALL SYSTEM

BRICK #1

STREET FACADE TRANSPARENCY- CORRIDOR BUILDING

4th Story Story Area: Transparency: Required:Provided:

3rd Story Story Area: Transparency: Required:Provided:

575 sf 169 sf30.0%29.4%

2nd Story Story Area: Transparency: Required:Provided:

542 sf 163 sf30.0%30.0%

Ground Story Story Area: Transparency: Required:Provided:

539 sf 74 sf

60.0%25.2%

5th Story Story Area: Transparency: Required:Provided:

BrickGlass

Aluminum Metal TileFiber Cement SidingMisc. Elements

Material Primary/Secondary Area (SF) Percentage Required

PrimaryPrimary

SecondarySecondarySecondary

1,855 sf 447 sf2,332 sf

69.0%16.4%85.4% 80%

35 sf294 sf 71 sf

400 sf <20%

Y

Y

1.3%10.7% 2.6%

14.6%

Overall Area of Elevation:Area of Doors and Openings:Net Area of Elevation:

FACADE MATERIALS - CORRIDOR BUILDING

3,174 sf-442 sf

2,732 sf

Met?

543 sf 163 sf30.0%30.0%

Misc. Elements: Metal Trim, Cast stone, etc.

6th Story Story Area: Transparency: Required:Provided:

250 sf 64 sf

30.0%25.6%

543 sf 163 sf30.0%30.0%

STREET FACADE TRANSPARENCY - PARKING STRUCTURE

4th Story Story Area: Transparency: Required:Provided:

3rd Story Story Area: Transparency: Required:Provided:

2,141 sf 982 sf

N/A45.9%

2nd Story Story Area: Transparency: Required:Provided:

2,141 sf 982 sf

N/A45.7%

1st Story Story Area: Transparency: Required:Provided:

1,133 sf 383 sf65.0%33.8%

BrickGlassCalcium Silicate Masonry

Aluminum Metal tileMisc. ElementsBatu Wood Siding

Material Primary/Secondary Area (SF) Percentage Required

PrimaryPrimaryPrimary

SecondarySecondarySecondary

6,730 sf 164 sf

45 sf

6,939 sf

88.7%2.2%0.6%

91.5% 80%

0 sf 495 sf155 sf

650 sf <20%

Y

Y

0.0% 6.5%

2.0%

8.5%

Overall Area of Elevation:Area of Doors and Openings:Net Area of Elevation:

FACADE MATERIALS - PARKING STRUCTURE

12,042 sf-4,453 sf7,589 sf

Met?

2,015 sf 982 sf

N/A48.7%

Misc. Elements: Metal Trim,Louvers, Cast stone, etc.

5th Story Story Area: Transparency: Required:Provided:

2,015 sf 939 sf

N/A46.6%

KEY PLAN

MOONEY STREET

BA

NK

ER

DR

IVE

BR

IDG

E P

AR

K A

VE

NU

E

MOONEY STREET

LONGSHORE STREET

LONGSHORE STREET

CORRIDOR BUILDING TYPE

MOONEY WAY

LONGSHORE L

OOP

D4/D5

P204

SOUTHELEVATIONCALCULATIONS

05-11-2018

1" = 30'-0"

SOUTH ELEVATION1