north elevation - dublin, ohio · north elevation calculations 05-11-2018 1" =...
TRANSCRIPT
FIRST FLOOR WEST
813'-8"
SECOND FLOOR
831'-4"
THIRD FLOOR
842'-8"
FOURTH FLOOR
854'-0"
FIFTH FLOOR
864'-8"
SIXTH FLOOR
875'-4"
BRICK #2
WINDOW-WALL SYSTEM
BRICK #1
FIBER CEMENT
COMPOSITE FRAME WINDOW
12'-6" 46'-0" 62'-0" 26'-7" 15'-7" 52'-9" 8'-8"
STOREFRONT SYSTEM
BRIDGE
ALUMINUM METAL TILE BRICK #3
P220
1
P221
3 P220
2
LINEAR WALL SCONCE
UP/DOWN WALL SCONCE
P222
4
T/O ROOF DECK - GARAGE
886'-0"
T/O ROOF DECK - LOBBY
893'-1 5/8"
10'-8
"10
'-8"
11'-4
"11
'-4"
17'-8
"
HORIZONTAL FACADE DIVISIONS(Required within 3' of top of ground story onbuildings 3 stories and taller)
PRINCIPAL ENTRANCE LOCATION(As applicable along primary street facade)
10'-8
"7'
-2"
T&G WOOD SIDING
BRICK #2
CANOPY
CALCIUM SILICATE
MASONRY UNITS
STREET FACADE TRANSPARENCY - CORRIDOR BUILDING
4th Story Story Area: Transparency: Required:Provided:
3rd Story Story Area: Transparency: Required:Provided:
2,604 sf 742 sf30.0%28.5%
2nd Story Story Area: Transparency: Required:Provided:
2,766 sf 788 sf30.0%28.5%
Story Area: Transparency: Required:Provided:
2,766 sf 823 sf30.0%29.8%
5th Story
BrickGlass
Aluminum Metal TileFiber Cement SidingMisc. MaterialsBatu Wood Siding
Material Primary/Secondary Area (SF) Percentage Required
PrimaryPrimary
SecondarySecondarySecondarySecondary
6,580 sf 1,443 sf
8,023 sf
56.2%12.3%68.6% 80%
844 sf2,098 sf
440 sf297 sf
3,382 sf <20%
N
Y
7.2%17.9% 3.8%2.5%
31.4%
Overall Area of Elevation:Area of Doors and Openings:Net Area of Elevation:
FACADE MATERIALS - CORRIDOR BUILDING
14,506 sf-2,804 sf11,702 sf
Met?
2,604 sf753 sf30.0%28.9%
1st Story Story Area: Transparency: Required:Provided:
953 sf 355 sf60.0%37.3%
Misc. Elements: Metal Trim, Aluminum Plate, Louvers, Cast stone, etc.
Story Area: Transparency: Required:Provided:
6th Story 535 sf264 sf30.0%49.3%
KEY PLAN
MOONEY STREET
BA
NK
ER
DR
IVE
BR
IDG
E P
AR
K A
VE
NU
E
MOONEY STREET
LONGSHORE STREET
LONGSHORE STREET
CORRIDOR BUILDING TYPE
MOONEY WAY
LONGSHORE L
OOP
D4/D5
P201
NORTHELEVATIONCALCULATIONS
05-11-2018
1" = 30'-0"
NORTH ELEVATION1
1
VERTICAL FACADE DIVISIONS(30' OR LESS REQUIRED)
FIRST FLOOR WEST
813'-8"
SECOND FLOOR
831'-4"
THIRD FLOOR
842'-8"
FOURTH FLOOR
854'-0"
FIFTH FLOOR
864'-8"
SIXTH FLOOR
875'-4"
BRIDGE
ALUMINUM METAL
TILE
STOREFRONT SYSTEM
BRICK #1
WINDOW WALL SYSTEM
STEEL CABLE CRASH RAIL
BRIDGE1
P211
10'-8
"11
'-4"
11'-4
"17
'-8"
BRICK #3
BRICK #2
2
P215
CORRIDOR
BUILDING
PARKING
STRUCTURE
6'-1
0"
COMPOSITE FRAME
WINDOW
LINEAR WALL SCONCE
UP/DOWN
SCONCE
T&G WOOD WOOD SIDING
T/O ROOF DECK - GARAGE
886'-0"31'-7" 11'-4"1'-4"
38'-0" 1'-4" 25'-0" 1'-4" 42'-0" 1'-4" 30'-2" 19'-2" 25'-4" 1'-4" 47'-4" 1'-4" 28'-0"
T/O ROOF DECK - LOBBY
893'-1 5/8"
HORIZONTAL FACADE DIVISIONS(Required within 3' of top of ground story onbuildings 3 stories and taller)
7'-2
"10
'-8"
10'-8
"3'-1
0"
STOREFRONT SYSTEMCALCIUM SILICATE
MASONRY UNITS
CALCIUM SILICATE
MASONRY UNITS
STREET FACADE TRANSPARENCY - PARKING STRUCTURE
4th Story Story Area: Transparency: Required:Provided:
3rd Story Story Area: Transparency: Required:Provided:
3,112 sf 1,548 sf
N/A49.7%
2nd Story Story Area: Transparency: Required:Provided:
3,112 sf 1,523 sf
N/A48.9%
1st Story Story Area: Transparency: Required:Provided:
1,648 sf 1,259 sf
65.0%76.4%
BrickGlassCalcium Silicate Masonry
Aluminum Metal TileMisc. ElementsBatu Wood Siding
Material Primary/Secondary Area (SF) Percentage Required
PrimaryPrimaryPrimary
SecondarySecondarySecondary
6,383 sf 2,175 sf
390 sf
8,948 sf
56.0%19.1%3.4%
78.5%80%
925 sf538 sf988 sf
2,451 sf <20%
N
N
8.1%4.7%
8.7%
21.5%
Overall Area of Elevation:Area of Doors and Openings:Net Area of Elevation:
FACADE MATERIALS - PARKING STRUCTURE
17,950 sf-6,551 sf11,399 sf
Met?
2,928 sf1,502 sf
N/A51.3%
Misc. Elements: Metal Trim, Louvers, Cast stone, etc.
5th Story Story Area: Transparency: Required:Provided:
2,928 sf1,455 sf
N/A49.7%
6th Story Story Area: Transparency: Required:Provided:
278 sf151 sf
N/A54.3%
STREET FACADE TRANSPARENCY- CORRIDOR BUILDING
4th Story Story Area: Transparency: Required:Provided:
3rd Story Story Area: Transparency: Required:Provided:
436 sf 200 sf30.0%45.9%
2nd Story Story Area: Transparency: Required:Provided:
436 sf 206 sf30.0%47.2%
5th Story Story Area: Transparency: Required:Provided:
BrickGlassCalcium Silicate Masonry
Aluminum Metal TileFiber Cement SidingMisc. ElementsBatu Wood Siding
Material Primary/Secondary Area (SF) Percentage Required
PrimaryPrimaryPrimary
SecondarySecondarySecondarySecondary
85 sf 647 sf
4 sf
736 sf
3.4%26.3%0.2%
29.9% 80%
1,311 sf199 sf
137 sf81 sf
1,695 sf <20%
N
N
53.2%8.1%
5.6%3.3%
70.1%
Overall Area of Elevation:Area of Doors and Openings:Net Area of Elevation:
FACADE MATERIALS - CORRIDOR BUILDING
3,075 sf-611 sf
2,464 sf
Met?
410 sf 154 sf30.0%37.5%
410 sf 192 sf30.0%46.8%
Misc. Elements: Metal Trim, Cast stone, etc.
1st Story Story Area: Transparency: Required:Provided:
231 sf 202 sf60.0%87.4%
6th Story Story Area: Transparency: Required:Provided:
410 sf 84 sf
30.0%20.5%
KEY PLAN
MOONEY STREET
BA
NK
ER
DR
IVE
BR
IDG
E P
AR
K A
VE
NU
E
MOONEY STREET
LONGSHORE STREET
LONGSHORE STREET
CORRIDOR BUILDING TYPE
MOONEY WAY
LONGSHORE L
OOP
D4/D5
P203
WESTELEVATIONCALCULATIONS
05-11-2018
1" = 30'-0"
WEST ELEVATION1
VERTICAL FACADE DIVISIONS(30' OR LESS REQUIRED)
FIRST FLOOR WEST
813'-8"
SECOND FLOOR
831'-4"
THIRD FLOOR
842'-8"
FOURTH FLOOR
854'-0"
FIFTH FLOOR
864'-8"
SIXTH FLOOR
875'-4"
BRICK #3
BRICK #2
STEEL CABLE
CRASH RAIL
CAST STONE
SILL
STOREFRONT
WINDOW-
WALL SYSTEM
26'-0"
1'-4"
10'-8"
1'-4"
26'-0" 1'-4" 41'-4"
1'-4"
11'-8"
1'-4"
32'-8" 1'-4" 32'-8" 8'-1" 28'-8"
CORRIDOR
BUILDING
PARKING
STRUCTURE METAL COPING
FIRST FLOOR EAST
821'-4"
HORIZONTAL FACADE DIVISIONS(Required within 3' of top of ground story onbuildings 3 stories and taller)
ALUMINUM PLATE CANOPY
17'-8
"
LINEAR WALL SCONCE
FIBER CEMENTT/O ROOF DECK - GARAGE
886'-0"
10'-8
"10
'-8"
10'-8
"11
'-4"
11'-4
"10
'-0"
4'-1
0"
UP/DOWN
SCONCE
T&G WOOD
SIDING
WINDOW WALL SYSTEM
BRICK #1
STREET FACADE TRANSPARENCY- CORRIDOR BUILDING
4th Story Story Area: Transparency: Required:Provided:
3rd Story Story Area: Transparency: Required:Provided:
575 sf 169 sf30.0%29.4%
2nd Story Story Area: Transparency: Required:Provided:
542 sf 163 sf30.0%30.0%
Ground Story Story Area: Transparency: Required:Provided:
539 sf 74 sf
60.0%25.2%
5th Story Story Area: Transparency: Required:Provided:
BrickGlass
Aluminum Metal TileFiber Cement SidingMisc. Elements
Material Primary/Secondary Area (SF) Percentage Required
PrimaryPrimary
SecondarySecondarySecondary
1,855 sf 447 sf2,332 sf
69.0%16.4%85.4% 80%
35 sf294 sf 71 sf
400 sf <20%
Y
Y
1.3%10.7% 2.6%
14.6%
Overall Area of Elevation:Area of Doors and Openings:Net Area of Elevation:
FACADE MATERIALS - CORRIDOR BUILDING
3,174 sf-442 sf
2,732 sf
Met?
543 sf 163 sf30.0%30.0%
Misc. Elements: Metal Trim, Cast stone, etc.
6th Story Story Area: Transparency: Required:Provided:
250 sf 64 sf
30.0%25.6%
543 sf 163 sf30.0%30.0%
STREET FACADE TRANSPARENCY - PARKING STRUCTURE
4th Story Story Area: Transparency: Required:Provided:
3rd Story Story Area: Transparency: Required:Provided:
2,141 sf 982 sf
N/A45.9%
2nd Story Story Area: Transparency: Required:Provided:
2,141 sf 982 sf
N/A45.7%
1st Story Story Area: Transparency: Required:Provided:
1,133 sf 383 sf65.0%33.8%
BrickGlassCalcium Silicate Masonry
Aluminum Metal tileMisc. ElementsBatu Wood Siding
Material Primary/Secondary Area (SF) Percentage Required
PrimaryPrimaryPrimary
SecondarySecondarySecondary
6,730 sf 164 sf
45 sf
6,939 sf
88.7%2.2%0.6%
91.5% 80%
0 sf 495 sf155 sf
650 sf <20%
Y
Y
0.0% 6.5%
2.0%
8.5%
Overall Area of Elevation:Area of Doors and Openings:Net Area of Elevation:
FACADE MATERIALS - PARKING STRUCTURE
12,042 sf-4,453 sf7,589 sf
Met?
2,015 sf 982 sf
N/A48.7%
Misc. Elements: Metal Trim,Louvers, Cast stone, etc.
5th Story Story Area: Transparency: Required:Provided:
2,015 sf 939 sf
N/A46.6%
KEY PLAN
MOONEY STREET
BA
NK
ER
DR
IVE
BR
IDG
E P
AR
K A
VE
NU
E
MOONEY STREET
LONGSHORE STREET
LONGSHORE STREET
CORRIDOR BUILDING TYPE
MOONEY WAY
LONGSHORE L
OOP
D4/D5
P204
SOUTHELEVATIONCALCULATIONS
05-11-2018
1" = 30'-0"
SOUTH ELEVATION1
VERTICAL FACADE DIVISIONS(30' OR LESS REQUIRED)