north central railway...uttar pradesh, the most populous state of nation is served by north central...
TRANSCRIPT
NORTH CENTRAL RAILWAY
SITAPUR PARLIAMENTARY CONSTITUENCY
Uttar Pradesh, the most populous state of Nation is served
by North Central Railway along with Northern, North Eastern
and East Central Railways. Indian Railways (IR) plays a very
important role in development of the state and provides
connectivity for freight and passengers, including international
tourists. IR has a history of more than 160 years in the state and
has the highest route kilometers - 9100 route kilometers - within
it, which is 14% of entire railway network. IR has made Uttar
Pradesh proud by giving it Nation's first semi high speed train
Gatimaan Express, which initially ran between Agra and Delhi.
It has now been extended upto Jhansi with effect from
01.04.2018 - a move that will boost tourism in bundelkhand
region of Uttar Pradesh. Efforts for further development of
railway infrastructure in Uttar Pradesh have been intensified in
last four years with 376% more investment in comparison to
previous years. Results of such a massive investment are
becoming visible with enhanced infrastructure and modern
passenger amenities. Soon the era of congestion and
inconvenience will be a matter of past and a new Railway
equipped with state-of-the-art facilities will be able to serve the
citizens with greater level of satisfaction. The longest stretch of
the under construction Eastern Dedicated Freight Corridor i.e.
almost 57% of the entire length lies in Uttar Pradesh from
Pt. Deen Dayal Upadhyaya Jn. to Ghaziabad.
In this brochure, we have compiled the important
contributions and achievements of Indian Railways in the
development of the SITAPUR constituency of Uttar Pradesh in
the last four years. I hope that it will serve as a ready reckoner
for those eager to know about the role of Railways in the
development of this constituency.
It may be noted that the budgets allocated to various
projects are not apportioned constituency wise but reflect the
cost of the project.
M. C. ChauhanGeneral Manager
North Central Railway
INPUTS BY RAILWAY IN SITAPUR PARLIAMENTARY CONSTITUENCY
SITAPUR PARLIAMENTARY CONSTITUENCY
A. ASSEMBLY SEGMENTSLaharpur, Biswan, Mahmoodabad, Sitapur, Sevata
B. WORKS COMPLETED IN LAST FOUR YEARS1. INFRASTRUCTURAL DEVELOPMENT
Electrification of Sitapur - Burhwal City (101.2 km) at a cost of Rs. 6293 Lakh.
Electrification of Rosa-Sitapur Section (83 km)
NI work of Neri completed & commissioned on 18.06.2016 in connection with Rosa - Sitapur - Two crossing station.
Energy efficient LED lights at stations.
Limited Height Subways (LHS) in lieu of
Level Crossing No. 46/C on Saraiyan - Biswan section at a cost of Rs. 180 Lakh.
Level Crossing No. 50/C on Saraiyan - Biswan section at a cost of Rs. 185 Lakh.
Level Crossing No. 55/C on Sidhuli- Kamlapur section at a cost of Rs. 180 Lakh.
Level Crossing No. 60/C on Kamlapur- Baraijalapur section at a cost of Rs. 146 Lakh.
Level Crossing No. 64/C on Baraijalalpur-Khairabad section at a cost of Rs. 91 Lakh.
Level Crossing No. 65/C on Baraijalalpur-Khairabad section at a cost of Rs. 110 Lakh.
Level Crossing No. 69/C on Baraijalalpur-Khairabad section at a cost of Rs. 146 Lakh.
Level Crossing No. 78/C on Sitapur - Jharekhapur section at a cost of Rs. 146 Lakh.
Level Crossing No. 80/C on Sitapur- Jharekhapur section at a cost of Rs. 146 Lakh.
Level Crossing No. 81/C on Sitapur- Jharekhapur section at a cost of Rs. 146 Lakh.
Level Crossing No. 81/C on Persendi-Sitapur Cantt. section at a cost of Rs. 177 Lakh.
2. IMPROVEMENTS IN PASSENGERS AMENITIESBiswan Staion
02 (Ladies & Gents) Toilet in waiting room at a cost of Rs. 15 Lakh.
Waiting room at a cost of Rs. 15 Lakh.
05 Ticket Windows at a cost of Rs. 7 Lakh.
Sitapur Staion
Train Display Boards at Sitapur, Sitapur Cantt. & Biswan, Mahmoodabad, at a cost of Rs. 8.10 Lakh.
CCTV at Sitapur at a cost of Rs. 50 Lakh.
10 K Wp Solar panel under installation at Gaurd running room at Sitapur at a cost of Rs. 23 Lakh.
Other works
02 (Ladies & Gents) Hargaon Toilet at Platform at a cost of Rs. 15 Lakh.
Minimum Essential Amenities work completed.
D. OTHER DEVELOPMENTS:New Trains introduced with stoppage over Sitapur Constituency
Train No. 14009/14010 Anand Vihar (T) - Bapudham Motihari Weekly Express.
Train No. 15655/15656 Kamakhaya - Katra Weekly Express.
Train No. 22551/22552 Darbhanga - Jalandhar City Weekly Express.
Train No. 22423/22424 Amritsar - Gorakhpur Express.
Train No. 15531/15532 Sahrsa - Amritsar Weekly Jansadharan Express.
C. ON-GOING WORKS: Construction of Limited Height Subway in lieu of Level crossing no. 43 'C' at km. 46/12-13 between Manwa Halt-
Sidhauli stations at a cost of Rs. 88.16 Lakh..
Doubling of Rosa-Sitapur Cantt section.
Construction of Limited height subway on 22 Unmanned Level Crossing.
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
l
Waiting Hall at Biswan Station Gauge Conversion at Sitapur
Shelter with Fan at BiswanPassenger Hall at Sitapur Cantt
station with LED Lightings