north central railway · 2018. 5. 1. · core testing facilities to be available at this lab...
TRANSCRIPT
![Page 1: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/1.jpg)
1 | P a g e
North Central Railway
Central Chemical
and
Metallurgical
Lab
At a Glance
![Page 2: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/2.jpg)
2 | P a g e
CENTRAL CHEMICAL AND METALLUGICAL LABORATORY
![Page 3: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/3.jpg)
3 | P a g e
PREFACE
Quality is the jewel of production. When the work is judged with the whetstone of
quality, this increases not only the credibility of the work but it also raises the confidence
of user. The C&M Laboratories established under Mechanical department at Workshops,
Sheds advise Railway about suitability/ unsuitability of the material of Rolling stock
components, spares by ascertaining the quality, identification of materials the and its
acceptability for intended use through physical, chemical & metallurgical testing as per
standards which in turn ensures the safe running of the rolling stock.
Prior to constitution of the new zone of NCR, the existing C&M Laboratories in present
divisions of JHS, AGC, ALD divisions were affiliated to zonal laboratories of Central
Railway and Northern Railway. After constitution of NCR, the Railway Board sanctioned
a New Central C&M Laboratory for NCR at Jhansi. The estimated cost for this project
was 231 lakh in the year 2007-08. The building was handed over in February 2012 after
completion of civil construction work.
The procurement of different testing machines, instruments, equipments and apparatus
are required for managing quality system with production. Most of the items are received
and some are under process. Having received some items, the testing work has been
started but the unavailability of staff and funds for this Laboratory proved to be the main
obstacles for this project and they hampered its progress. In spite of all these odds the
important testing work like failure investigations of different components, welder’s
efficiency test and chemical testing by spectrometer have been started. In the future this
Central Chemical & Metallurgical Laboratory is hoped to acquire an esteemed place in
the realms of the quality testing and standards and will play its important role as expected
and needed by Railway.
Shivendra Mohan Manisha Goel B.P.S.Parihar
CWM/JHS Principal STC ACMT
![Page 4: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/4.jpg)
4 | P a g e
NORTH CENTRAL RAILWAY
CENTRAL CHEMICAL AND METALLUGICAL LABORATORY
PREAMBLE
The Chemical and Metallurgical Laboratories equipped with modern and sophisticated
testing instruments, machines and equipment are involved in carrying out destructive,
nondestructive, chemical and metallurgical testing of materials used in railways. These
labs are situated at different places like workshop, diesel loco sheds, electric loco sheds
ROH depots and sick lines to ensure the quality in production/maintenance, to control on
line failure causing derailment/accident and thereby playing an important role in saving
the valuable lives and revenue
ABSTRACT
Introduction
In the present scenario when Indian Railway is striving for high speed transportation with
a goal of online safety the quality assurance takes a place of immense importance. For
achieving this goal the quality assurance should inevitably be kept on the top priority. For
safe running of rolling stock the chemical and metallurgical testing of material is must.
This could not be achieved without having a strong infrastructure capable of sound
testing. This Central Chemical & Metallurgical Laboratory of NCR is being setup as a
tool of quality assurance to furnishing the chemical and metallurgical testing requirement
of entire NCR for quality control aspect.
These labs serve the Railway in two ways -
(1) Public safety
(2) Quality assurance
Public safety -
A C&M laboratory pays its full contribution in the safe running of the trains by
performing nondestructive tests of motion components periodically. Nondestructive test
of the motion components includes ultrasonic testing of axles of wagons, carriages,
diesel and electric locomotives, cranes etc., testing of armature shafts, cylinder head
valve seats, inserts, bolts, nuts and radiator fans, roller bearing, piston heads, valves,
springs are examined by Dye penetrant,Zyglo and MPI test for their serviceability. The
quality of welding of different components is assured by X-Ray/ γ-Ray radiography
testing in C&M Labs for safe running of trains.
![Page 5: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/5.jpg)
5 | P a g e
Quality Assurance -
The C & M lab assures the quality in production/maintenance/ repairs by various physical
as well as chemical methods of testing for materials. These items are tested according to
various IRS/ISS/BSS/EN/ISO/RDSO and other foreign specifications.
Scope of Testing for different types of material -
Testing of all types of material purchased by Stores department as per relevant
specifications.
Testing of non-ferrous scrap for selling price valuation of costly material according
to their constituents and elements present for estimating correct auction rates.
To make analysis and classification of all types of ferrous, non-ferrous metallic and
non-metallic material and scrap for correct tariff rates in case of any dispute/claim.
To make analysis of material and produce witness in court of law for prosecution
of alleged culprits notified by RPF, GRP, Police as “technical experts” to establish
whether these are railway properties.
Testing of overhead crane axles, overhead wires, cadmium alloy, pantograph tips,
transformer oil, grease, copper wires, special aluminum conductors etc.
Quality check for steels used for bridges, reinforcement, rails, fish, plates,
permanent way tools, building material and thermite welding material.
Testing of components for microwave towers, testing of phosphor bronze strips,
steel wire ropes etc.
To testing of ferrous, non-ferrous alloys, virgin metals, metallic and non-metallic
components, plastic, composite material, Teflon, mica, paints, lacquers, varnishes,
fuel, lube oil, grease, petroleum products, rubber component, bricks, coal, coke,
water, sand etc.
The above testing of material is classified in different section and requirement of
supervisors and supporting staff is given in annexure – 1.
![Page 6: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/6.jpg)
6 | P a g e
Cost of Mechanical Engg. Work
Fig. in Rs.
Particulars Original
PWP Cost
Original
P.B. Cost
(in 2006)
Detailed
Estimate
Cost
(in 2008)
Revised
Estimate
Cost
(in 2012)
MECHANICAL
ENGG. WORK
1,66,00,000 1,61,588,04 1,76,51,029 1,88,260,80
PINK BOOK PARTICULARS
Plan Head - 42
Sr No. PINK BOOK YEAR ITEM NO.
1. 2007-08 143
2. 2011-12 483
3. 2012-13 501
4. 2013-14 539
5. 2014-15 (Interim) 488
General Setup Plan: Building
No. of floor - Two
Total Covered Area - 510 + 510=1100 sq. meter
Plan – 30.5 m X 17.0 m
No. of Sections in Lab – 07 nos.
1. NDT, 2. X-Ray, 3. Spectrograph, 4. Metallography, 5. Chemical &
Rubber testing, 6. Physical & 7. Paint testing
Technical Library – 01 no.
Mini workshop for Laboratory purpose – 01 no.
Section Stores – 03; Lab. General Store – 01 no.
Meeting Room- 01 no, Calibration room-1
Supervisors’ Room – 01 no, In-charge Room-1
Other Rooms for officers & office staff – 03 nos.
![Page 7: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/7.jpg)
7 | P a g e
Core Testing Facilities to be available at this Lab
Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic
testing, Micrography, Electro-gravimetric analysis, Physical testing of metals and
polymers, NDT of material, Routine Chemical Testing, Ultrasonic Testing and Failure
investigation etc.
Scope of testing
The scope of the testing encompasses the testing of ferrous & non-ferrous metals and
alloys, Rubber, Plastic, polymers, Composites, Paint, Lube oil, grease, HSD, Chemical
testing, non-destructive testing, UST, Dye Penetrant Testing (DPT), Magnetic Particle
Inspection (Magnaflux), Zyglo, X-Ray and failure investigation of components failed in
service as Rails, Helical Coil Springs, Main Piston Pin, Camshafts, Connecting Rod
Blades, Centre Buffer Coupler, Yoke, Knuckle, Brake Beam Hanger, Wheels, Cartridge
Taper Roller Bearing etc.
SET UP PLAN: CENTRAL C&M LABORATORY OF NCR
(A) GROUND FLOOR
S.
NO
.
DESCRIPTION
ACTIVITIES
PROPOSED
SET UP/ MACHINES TO BE
INSTALLED
1 Technical
Library and
Incharge
Library of Technical
Literature and
Specifications
Book shelves, reading tables &
chairs, Catalogue, Computer
table, Photo-copier m/c.
2 MPI Testing
R.D.P. , ZYGLO,
MAGNAFLUX
Testing Lab
Ultrasonic Testing, Red
dye penetrant test of
failed components &
stores samples, Testing
by magnetic methods.
Ultrasonic flaw Detector,
Permanent electromagnetic
yoke, Portable Electromagnetic
yoke, RDP test bench,
Instrument table.
![Page 8: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/8.jpg)
8 | P a g e
3
Dark Room/
X-Ray
Radiography Lab
X-Ray film development
X-Ray testing of failed
rails (rail fractures
analysis), welding joints
of tank wagon, trolley,
carriage frame, welder’s
competency test etc.
X-Ray film development
Apparatus
Portable X-Ray Equipment,
Instrument table, X-Ray film
storage cabinet, Trolley, TLD
card (BARC) cabinet, X-Ray
film illuminator system, test
bench, etc.
4 Metallography &
Failure
Investigation Lab
Micrographic analysis of
failed jobs and fresh
metallic samples from
stores depots.
Inverted Metallurgical
Microscope, Specimen
Mounting Press, Image
analysis system, Specimen
Polishing m/c, Instruments
table, Stereo microscope,
Magnifiers, Instrument table,
Computer table.
5 Physical and
Mini Workshop
Hall
Sample preparation for
Ultimate tensile test
strength, Impact strength
Test, BHN & HRC test,
Drillings of metallic
samples for chemical
testing,
Universal Tensile Testing
(UTM) m/c, Lathe m/c,
Drilling m/c, Milling m/c,
Bench Grinder, Rockwell
hardness Tester, Brinell
Hardness Tester, Belt polisher,
Impact (30 kgm), Compression
Testing, Power hacksaw,
Abrasive Cut Off m/c.
6 Instrumentation
& Calibration
Lab
In house calibration of
UFD, hardness testers of
metals & polymers,
thermometers,
pyrometers,
spectrograph, etc.
Instrument tables, anti
vibration tables, Storage
cabinet, different standards:
IIW blocks, hardness standard
blocks, ferrous and non ferrous
standard metal blocks, pH
meter, DPT test Ni-Cr standard
panels, etc.
7 Spectrography
Lab
Instrumental elemental
analysis of metallic
samples.
Spectrograph for metals,
Computer table, test bench,
instrument table, inert gas
dispensation system, inert gas
cylinders.
8 Staff’s Room As per description Staff’s Seating arrangement
![Page 9: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/9.jpg)
9 | P a g e
9 Scrap & Lab
General Store
Room
As per description Storage cabinets, seating
arrangement
10 Officer’s room ACMT room
(B) FIRST FLOOR
S.
NO.
DESCRIPTION OF
ROOM/HALL/LAB
ACTIVITIES
PROPOSED
SET UP/ MACHINES TO
BE INSTALLED
1 Chemical, Rubber
& Plastic, Oil,
Paints ,
Miscellaneous
Testing Lab
Analytical testing of
ferrous and non ferrous
metals; physical,
chemical and
miscellaneous testing of
rubbers, polymers and
gaskets; testing of
paints, oils and
miscellaneous testing as
testing of coke, paint
brushes etc.
Chemicals, Ovens, Heaters,
Hot plates, Muffle furnace,
fuming chamber,
Centrifuge m/c, Stormer
viscometer, Humidity
cabinet, Ageing Oven,
Kinematic viscometer oil
tank bath, Abel’s flash
point Apparatus , Pensky –
Martins flash point
Apparatus , COC flash
point Apparatus, Tension
testing 2T with computer,
Penetrometer, Stirrer, Drop
point apparatus, Dean &
Stark apparatus, Distilled
water Plant, Island tables,
Instrument tables, work
benches, computer table,
Wall mounting chemical &
glassware storage cabinets.
2 Meeting cum
Seminar, training,
demonstration Hall
Regular UST
coordination meeting of
UT operators from all
UT units as C&W
depots, Sheds,
workshops of entire
NCR, One year job
induction training of
CMAs recruited by
RRBs, Demonstration
To be developed in future –
LCD projector system,
Lecture facilities, Seating
arrangement for meeting
Temporary given to Mod.
Cell
![Page 10: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/10.jpg)
10 | P a g e
of testing methods to
trainees other than C&M
cadre from STC
3 Balance Room Weighing of samples &
test products.
Anti-vibration tables,
analytical & other digital
balances
4 Paints stores Storage of paint drums
received for testing
Temporary given to AEN
Staff’s
5 Supervisor’s Room Common room for
supervisors
Temporary given to AEE
6 Office of Dy.
CCMT
Personal related and
general office work
Temporary given to AEN
7 Chemical,
Glassware,
Apparatus Stores
As per description Temporary given to AEN
Staff’s
8 CMT’s Room As per description Officer’s Seating
arrangement
CMT Cadre in N.C.Rly.
Present scenario
The N.C. Rly was reconstituted on 01-01-2003 by merger of Jhansi and ALD
division including Jhansi Workshop and RSK Workshop. Initially the strength of
chemical and metallurgical Lab staff (non-gazetted posts) were 64 nos. (52 nos. from
Central Railway & 12 nos. from Northern Railway) and two gazette posts (one post of
CMT from central railway and one post of ACMT from northern railway). After
restructuring and pin pointing of units/divisions, the staff strength is bring down to 57
nos. vide H.Q. Letter No. 707-E/Estt./Mech/C&M dated 02-12-2009.
![Page 11: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/11.jpg)
11 | P a g e
POSITION OF C&M SUPERVISORS On Date (11-06-2014)
A.Gazetted - 02 (01 ACMT w. c. at Jhansi and 01 CMT* revenue at RSK)
B. Non Gazetted Cadre- 63 (45 CMS+18CMA) & 04 Lab Asstt.
Posts will be vacant till Dec. - 2015 03 00
Total resultant vacancies 30 + 03 = 33
Two CMS will be promoted up to end of 2015 As ACMT, hence the total resultant
vacancy will be 33+02 =35.
Panel of 12 CMA received from RRB/ALD. Out of these only 07 CMA have
joined and 05 CMA are still awaited.
The proposal for indent of 18 vacant CMA posts is already sent to H.Q. vide this
office letter no. B/12A/Lab/staff/III dated 06-04-2013.Copy Attached.
Therefore it is request that another indent of 23 CMA posts (Instead of 18 CMA) is
required to be sent to RRB Allahabad by H.Q.
There is no any Helper and/ or Artisan staff for C&M cadre sanctioned by HQ
under revenue.
Sr
no.
Div/W.S. CMS Sanc On Roll CMA
Sanc
On Roll Total
Sanc
Vac.
1 HQ/ ALD (STC) 01 01 … … 01 --
2 ALD/ DSL 01 00 … … 01 01
3 JHS W/Jhansi
Central Lab
14
W.C. 05
07
-
05
01
02
-
19
06
10
06
4 JHS D/Shed 08 06 02 01 10 03
5 JHS/ TRS 01 01 01 … 02 01
6 JHS/ C&W 01 01 … … 01 --
7 CNB/ TRS 04 03 03 … 07 04
8 CNB/ DSL 01 01 … … 01 --
9 CNB/ TM Shop 01 01 01 … 02 01
10 GWL/ RSK 04 03 03 01 07 03
11 GWL/ DSL 01 01 … … 01 -
12 AGC/ Div. 03 03 02 01 05 01
Total 45 28 18 5 63 30
Vacant on Date … 17 … 13 30
![Page 12: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/12.jpg)
12 | P a g e
STATUS OF POST CREATION WORK ON DATE
STAFF POSITION ON DATE AT JHSW
NON GAZETTED
Sr.
No.
Desgn. Grade
Pay
Sanctioned
Strength
Vacant
Work
charged
Vacant
WC
Total
vacancy
1 CMS 4600 12+2* 06 05 05 13
2 CMA 4200 05 03 01 01 04
Total 17 09 06 06 17
GAZETTED
ACMT 4800 ----- ---- 01 00 00
* 01 CMS from ALD/Diesel and 01 CMS from GWL/Diesel have been transferred to
central lab Jhansi approved by competent authority.
STAFF REQUIREMENT TO OPERATE CENTRAL C&M LAB
Following staff is required to operate and manage the work of Central C&M Laboratory
NON-GAZETTED STAFF
C&M Supervisors
Sr. No. Designation No. of posts
1 Chemical and Metallurgical Superintendent (CMS) 14
2 Chemical and Metallurgical Assistant (CMA) 06
Total 20
Staff other than C&M Supervisors
Sr. No. Designation No. of posts
1 Office Superintendent 01
2 Clerk 02
3 Steno 01
4 Artisan (Grinder, Welder, Machinist) 03
5 Helper 10
6 TADK 01
Total 18
![Page 13: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/13.jpg)
13 | P a g e
GAZETTED STAFF
Sr.
No.
Designation No. of posts
1 Deputy Chief Chemist & Metallurgist (Dy. CCMT) 01
2 Chemist & Metallurgist (CMT) 01
3 Assistant Chemist & Metallurgist (ACMT) 01
Total 03
Note – Indents for above Gazetted and Non-gazetted staff under process at head quarter.
Originally a proposal for 40 posts (03 nos. C&M officers, 20 nos. C&M supervisors and
17 nos. other staff) was proposed as it is essential to operate the lab. At initial stage to
commence the work following two proposals have been moved and further creation of
posts will be proposed in future as the testing load increases.
1. Proposal for creation of non-gazetted 10 nos. posts of C&M supervisors (CMS-7 &
CMA-3), 01 post of Sr. Steno and 01 post of TADK under revenue is under
process at HQs/ ALD.
2. Proposal for creation of 03 nos. gazetted posts (Dy. CCMT- 01, CMT- 01 &
ACMT- 01) has been vetted by associated accounts.
REQUEST – It is requested to sanction proposed gazetted and non- gazetted staff along
with Helper/ Artisan to manage quality control work which is essential for safety of
Railway.
Roll of C&M Central Lab
The C & M Organization of Indian Railways is primarily responsible for quality control
& consequential safety on Indian Railways. Their duties include checking & testing &
certifying the Raw materials used in the manufacture of Rolling stocks to exact
specifications to avoid the use of sub-standard materials in the production repair &
maintenance of Railway Coaches, Wagons and Locomotives.
Safety items like Wheels, Axles, Springs, Rails, Bogie Frames and Springs Rails etc.
supplied to the Production & Repair Shops by Firms & Suppliers etc. are tested and
certified by CMT Staff and ensuring safety of travelling public.
![Page 14: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/14.jpg)
14 | P a g e
The Railway Board Management Services has considered C & M Organization as the
back bone of entire Quality Control and preventive maintenance exercise of all
Engineering Departments.
Material Testing:
• Chemical and Physical Testing of Ferrous/ Non-Ferrous metals, Rubber, Plastics,
Plywood, Composites, FRP materials, Electrical cables, Adhesives, Sealants & all
other materials used in Railways.
• Testing of Welding Consumables, Trials on Welding processes for coaches, bridges,
tracks etc.
• Radiographic testing of Welds (Critical joints) (100% of EMU Bogie Frames),
Castings, Forgings etc.
• 100% Ultrasonic Testing of Wheel & Axles of carriage, wagon and locos.
• 100% Magnetic Particle Inspection (MPI) of Spring Steel bars & springs for detection
of defects.
• Testing of Paints & surface coatings used for corrosion prevention on Railway
coaches & other useful assets.
• Testing of Oil, Grease, Coolants & other Lubricants in Production Units/Diesel Sheds
for proper running of Locomotives.
Process Control:
• Process control of welding of Bogie frames, Under-frames, Shell etc. at Shop Floor
for Conventional, Export and LHB coaches.
• Welder approval for SAW, MIG, TIG, Spot welding processes
• Process control in heat-treatments of Annealing, Normalizing of Forged Components.
• Process control in heat-treatments of Hardening and Tempering of Coiled Springs.
• Process control in Corrosion prevention &Phosphating.
• Process control in Paint shop.
Quality Management System (ISO-9001/ 2000):
• Calibration of Measuring & Testing Equipments.
• Updating of Quality Manuals and related documents.
• Co-ordination for Process Qualification Requirements.
• Co-ordination for Process Validation Requirements.
• Periodical Internal Audits and Subject to External Audits.
MAIN FUNCTIONS OF CMAs & CMSs:
Chemical and Metallurgical Engineers ensure effective quality control and safety on
Railways. Chemical & Metallurgical Organization is engaged in testing and certifying of
all raw materials, finished products & fuel etc. assuring usage of standard materials and
effective quality control of vital Safety required for Rolling stocks & Locomotives.
![Page 15: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/15.jpg)
15 | P a g e
To ensure the effective quality control and safe running of trains following important
functions are performed by CMAs & CMS working in the Chemical and Metallurgical
Labs on the Railways:
a) All the testing has to be done on a time bound basis to ensure productivity and
efficiency in production, repair and maintenance of Rolling Stock and punctuality of
Train services – even while ensuring optimum safety & quality control.
b) The C & M Engineers (CMAs & CMS) conduct Failure Investigation of Railway
components involved in derailment and accidents and making suitable
recommendations for preventing further failures & deficiencies.
c) The C & M Engineers use the NDE (Non-Destructive Evaluation) of critical
components and save crores of Rupees for Indian Railways.
d) Testing of materials and components for mechanical & metallurgical properties and
Chemical Compositions.
e) Testing of Welding consumables, control of Welding-processes, Periodical
Assessment of Welders and advice of suitable welding techniques for Stainless Steel
LHB / Sri Lankan coaches.
f) Non-destructive testing of Bogie frames, Bogie/Body Bolsters, Axles(100%) Spring
Bars (100%), Coiled Springs(100%) etc. which are critical & safety items.
g) Process control of Heat-treatment of Coiled Springs, Forged components etc.
h) Process control of phosphating process.
i) Assess the quality of fuel and lubricants to ensure smooth and safe running of rolling
stocks and Locos.
j) Check the quality of paints to avoid corrosion, safety, durability & required finish.
Testing of various paints used for painting of Detail/Assembly Components & System
Paints (Epoxy-cum-PU / other High Performance Coatings) for painting of coaches
and Control of System Painting in Paint-Booths. Inspection of outsourced components
like Bogie Frames, Outer Doors, PVC flooring, Water Tanks etc. at Firm's premises.
k) Measuring, monitoring and improving the environment control around work premises
to comply with the Standards of Environment Management system (ISO-14001/2004)
and Occupational Health & Safety Assessment service (OHSAS - BS-18001/2007).
Additional Duties:
Standardization of new materials used for rolling stock.
Consultancy to Design Wings of all Engineering Departments of Indian Railways for
selection of proper raw material, process etc.
Duties & responsibilities of C & M Staff have been continuously increasing and are
bound to further increase over the years – due to modernization of Rolling Stock,
Locomotives & all other systems on the Railways, introduction of high speed trains &
qualitative change in technology.
![Page 16: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/16.jpg)
16 | P a g e
DUTY LIST OF ASST. CHEMIST & METALLURGIST (Gazzeted)
Central Lab workshop Jhansi
ASST. CHEMIST &METALLURGIST (ACMT/JHS) will control and plan the testing of
material by UST, metallographic, physical, chemical and mechanically and also plan to
procurement of the testing materials for all the section of main laboratory.
The specific responsibilities of ACMT in Central Lab Workshop/JHS are given below:
(1) ACMT will directly supervise metallurgical investigation of failed components.
(2) ACMT will closely monitor the maintenance of all laboratory equipment/
instruments/ testing machines in working order including procurement of COFMOW/
M&P items.
(3) ACMT will serve as a nodal in charge for all UST work done by C&M lab. Staff in
entire NCR and summarized UST statement in MCDO.
(4) ACMT will ensure 100 % testing of axles in workshop, diesel shed and electric loco
shed and open line i.e. ROH depot of Jhansi and Allahabad division of NCR.
(5) ACMT will co-ordinate the safety meeting on ultrasonic testing of axles with all the
UST operators of NCR.
(6) ACMT will solve the problems faced by ultrasonic operators in regard to testing of
axles.
(7) ACMT will plan a code for procedure for ultrasonic testing of axles if the same is not
available with RDSO/LKO.
(8) ACMT will plan the procurement of UST flaw detectors and its accessories on age
basis for effective UST testing over NCR.
(9) ACMT will also look after the work of indents for stock and non-stock items with
help of section in-charge Material control and stores.
(10) ACMT will control over staff management in central lab including personal and DAR
matters. He will look after the work of CMT in his absence.
(11) Supervise the duty of all section in-charges and authorized for sending the reports to
other depots & railways.
![Page 17: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/17.jpg)
17 | P a g e
DUTY LIST OF ASST. CHEMIST & METALLURGIST (Gazzeted)
Rail spring Karkhana, Sithouli, Gwalior
ASST. CHEMIST &METALLURGIST (ACMT/RSK) will control and plan the testing
of materials by UST, metallographically, physical, chemical and mechanically and will
also plan for procurement of the testing materials for RSK lab, Diesel lab AGC, GWL
MTJ and Baad. The specific responsibilities of ACMT in RSK Workshop/GWL are given
below:
(1) ACMT will directly supervise metallurgical investigation of failed components and
manufactured springs heat wise.
(2) ACMT will closely monitor the maintenance of all laboratory instruments/equipment/
testing machines in working order including procurement of COFMOW/ M&P items.
(3) ACMT will closely keep a watch over entire heat treatment and manufacturing
process of conventional and fiat bogie springs.
(4) ACMT will ensure 100 % testing of springs by Magnaflux and 3 samples per batch for
decarburization depth, core to case hardness, grain size, inclusion rating, almen test
and 10 samples per batch for surface hardness test.
(5) ACMT will ensure appropriate chemical composition as per material compositions
referred in concerned IS/EN/ISO as per RDSO directives.
(6) ACMT will plan to prepare a code of procedure/reliable drawings and specifications
for different parts/ components used in spring manufacturing at RSK.
(7) ACMT will plan the procurement of new testing machines/instruments/ equipment/
apparatus and accessories on requirement.
(8) ACMT will also look after the work of stock and non-stock items with help of Lab in-
charge and stores.
(9) ACMT will look after the staff matter including indent of posts and DAR.
![Page 18: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/18.jpg)
18 | P a g e
DUTY LIST OF CHEMIST & METALLURGIST (Gazzeted)
The Indian Railways is planning for huge improvement in its infrastructure, technology
and service on account of “Vision 2020”, which will further add to the burden &
responsibilities of C&M Engineers.
The chemist and Metallurgist will control and plan the testing and other activities in
various sections of Central Laboratory and other field Laboratories situated at all
divisions of N.C. Railway including RSK Sithouli Karkhana and MLR workshop. CMT
will be responsible for proper functioning of Central Laboratory.
The specific responsibilities of CMT in NCR are given below:
(1) CMT will issue the testing certificates for materials tested in laboratory and will have
quality check to relevant specifications. He will also carry out the metallurgical
investigation of failed components and will suggest the remedial measures.
(2) CMT will monitor the maintenance of all laboratory equipments/instruments testing
machines in working order.
(3) CMT will plan for recruitment, selection promotion and transfer of C&M staff. CMT
will plan to conduct the induction training to new recruits and arrange for periodic
training of other staff.
(4) CMT will ensure the implementation of quality system procedure in compliance to
quality policy and quality objectives.
(5) CMT will ensure and get maintained safety environment in the laboratory work place.
(6) CMT will control over the quality control on the manufacturing and repair and
maintenance operations in the workshop diesel shed, electric loco shed and C &W
ROH depots.
(7) CMT will recommend the alterative specifications and materials with respect to
foreign specifications and transfer of technology projects.
(8) CMT will keep closely liason with PHOD’s of mechanical dept. and with RDSO/LKO
for special tasks. He will also act as an advisor to mechanical, electrical, civil, S&T,
stores, operating and safety deptt. Of NCR.
(9) CMT will have regular inspection of other laboratories over NCR.
(10) CMT will conduct the co-ordination meeting of its technical staff and will organize
in house training programme to increase the efficiency to laboratory staff.
DY. CHIEF CHEMIST & METALLURGIST (Gazetted)
No. of post – 01(one)
Grade- Rs. 14300-18300(pre revised )
![Page 19: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/19.jpg)
19 | P a g e
Dy. Chief Chemist & Metallurgist (Dy. CCMT) attached to the major work shop of
NCR in Jhansi will work as an advisor on chemical and metallurgical aspect of repairs,
productions and other activities for all the work shop, Diesel shed, Electric loco shed ,and
sick line /ROH depots at JHS, GWL, AGC, CNB and ALD. The specific responsibilities
of Dy. CCMT. in North Central Railway are given below.
(1) MONITORING UST WORK - He will be responsible for carrying out the ultrasonic
testing of rolling stock axle, wheel and other components in all the workshops, divisions,
loco sheds ensuring availability of required flaw detectors and consumables, RDSO
trained operators man power as and when required. He will be making tentative code of
procedure for ultrasonic testing of components and keep liasoning with RDSO for
preparation of final UST code of procedure. He will be responsible for compiling the
statistical data on UST and time to time taking necessary corrective action to tackle up
the failure prone areas and to send the statistical data of UST to RDSO for further
analysis. He will also be conducting regular meeting with UST operators of the zonal
railways to sort out the problems related to ultrasonic and refresh their knowledge so that
the UST work in zonal can be carried out effectively. Roughly 1.5 lack axles and others
items are examined yearly in this zonal railway ultrasonically to ensure the safety and
reliability of rolling stock.
(2) FAILURE ANALYSIS-The Dy. CCMT will be responsible for carrying out the
metallurgical and chemical investigation of failed components received form divisions &
workshops and suggest remedial measures. Every month about 70 to 100 failed
components will be subjected to failure analysis involving the knowledge of mechanical
metallurgy, mechanical behavior, stress analysis, fracture analysis, design, chemical
composition and testing of various other parameters by destructive and non-destructive
methods The failure analysis reports are used as guiding to by the mechanical and
electrical officers of the workshops, sheds and divisions for taking corrective and
preventive actions to work improving safety and reliability of coaches, wagons and locos.
Failure analysis reveals are required to be metallurgically tested for identifying the cause
of failure suggestive remedial measures. Thermite welding and butt welding of rails is an
important activity where the n depth knowledge of metallurgy is required time to time for
obtaining sound weld joints having maintaining desire strength under functioning,
condition of environmental temperature. About 25 to 30 cases of failed rails will be
investigated in laboratory under guidance.
![Page 20: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/20.jpg)
20 | P a g e
(3) MODIFICATION IN THE MATERIAL SPECIFICATION- The Dy. CCMT will
be required to technically examine the exisiting failure prone material specification of
the components of coaches, wagons and locomotives and suggest appropriate material/
process to the technical officers of headquarter as well as officers working in the field.
(4) FAILURE ANALYSIS OF ELECTRICAL COMPONENTS – Large number of
components such as components of OHE, electric loco, rail cars, is required to be
analysed and remedial measures suggested for prevention of failure. About 20
components related to the electrical department received from division and electrical
dept. will be subjected to failure analysis under the guidance and supervision of Dy.
CCMT.
(5) DEVELOPMENT OF IMPORT SUBSTITUTION – The services of the Dy. CCMT
are required for in demising the components of electric loco diesel loco and coaches by
testing the material and finding out equivalent Indian standard so that the vendors for the
same could be developed indigenously.
(6) DEVELOPMENT OF WELDING PROCEDURE AND testing – More then 50% of
activities of repair and maintenance involve welding. Welding metallurgy plays an
important role in achieving the sound and strong weld joint. Dy. CCMT will contribute
in development of welding procedures, suggesting effective ways in carrying out
welding procedures emphasizing on pre welding and post welding heat treatment
requirements. It is also essential to have a panel of proficient welders for critical
applications. Dy. CCMT will organize the proficiency examination of welders as per
mandatory requirements. He will also maintain a fully equipped X-ray radiography
examination laboratory with all essential safety measures.
(7) QUALITY ASSURANCE CHECK- Stock as well as non-stock items are procured /
purchase by stores department of workshop as well as divisional level, Dy. CCMT will
carry out the quality assurance check on purchase item as apart of purchase inspector.
This will help in eliminating / rejecting of sub-standard items. Thus improving the
reliability of rail services.
(8) QUALITY CHECK IN WORKSHOP- Dy. CCMT through subordinate officers
shall maintain the quality control checks on the manufacturing, repair and maintenance
activities in workshop related to metallurgical and chemical aspects.
(9) PREVENTIVE MAINTENANCE CHECKS-In NCR there are two diesel loco sheds
and two electric loco sheds. Dy. CCMT will require to plan the preventive maintenance
check/ tests for smooth functioning of diesel loco and electric loco of respective sheds so
![Page 21: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/21.jpg)
21 | P a g e
that no point of time out turn of locos is affected which is related to the punchuality of
running trains.
(10) PLANNING AND IMPLEMENTATION OF UST –ultrasonic examination of
rolling stock is a prime activity on NCR under technical control of Dy. CCMT . He is
responsible to procure and maintain all the necessary test equipments / instruments
ultrasonic flaw detectors probe etc. in working condition and in calibrated status.
(11) NON GAZETTED LABORATORY CADRE CONTROLLING – Dy.CCMT will be
responsible for recruitment, promotion and transfer of lab cadre non gazetted staff. He
will also require to human resource development by identifying areas of training. He will
plan and impart training to all laboratory staff so as to have fully trained and proficient
man power He will also plan induction training for apperentices recruited through RRB.
(12) MONITORING OF ENVIRONMENTAL RELATED ISSUES- With the latest
directives from Rly. Bd. regarding setting of an environmental management system for
mechanical workshop. Dy CCMT. will be require to put up for effective implementation
of environmental management system. In view of legislative requirement and of the
setting up efficient treatment plans etc. The advisory role of Dy. CCMT will be very
much required. On the other railway Dy. CCMT is functioning as a management
representative (MR) in the ISO14000 certification programme.
ACTIVITIES
At present no staff is available for this Lab and the proposal for creation of ten (10) nos.
of posts of Chemical and Metallurgical supervisors is under process. Despite the lack of
the technical staff a few of the Chemical & Metallurgical testing activities has been
started anyhow with the extra efforts of CMT staff of Jhansi workshop over their regular
duties there. Their contribution is really appreciable as they are already over burdened
due to heavy vacancy at Jhansi workshop. The activities started are summarised below –
(i) Spectrographic analysis of different components/ jobs for their chemical
composition/ chemistry.
![Page 22: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/22.jpg)
22 | P a g e
April 2012 to March 2013
Sr.
No.
Month Item Name/
Particulars
Item recd. from No. of
samples
1 Apr’12 Steel Samples RSK/STLI 04
2 May’12 Screw Coupling Shackle Pin,
Spring for cut off angle cock,
Steel Samples
Dy.CMM/JHS,
RSK/STLI
16
3 June’12 Angle Iron Fillet, Round Bar
28 mm, Steel Samples, Rivet
Snap Head 20X100 mm long,
Hot Forged Rivet, MS Steel
Rivet Snap, Top Side Wear
Liner, Spring Steel, Pin Flat
Head for Break Gear Type A
Dy.CMM/JHS,
RSK/STLI
53
4 July’12 Steel Samples RSK/STLI 05
5 Aug’12 Shearing Blade SSE/Panel
Plate/JHSW
01
6 Sept’12 Steel sample, Welding
Electrode
RSK/STLI,
SSE/Welding/JHS
W
02
7 Oct’12 Steel Samples RSK/STLI 09
8 Nov’12 Steel Samples, Welding
Electrode, Roller
RSK/STLI,
SSE/Welding/JHS
W,CMS/
Metallography
04
9 Dec’12 Steel Samples, Coupler, MS
Bush Bar, Welding Electrode
RSK/STLI, CMS/
Metallography,
SSE/Welding/JHS
W
06
![Page 23: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/23.jpg)
23 | P a g e
10 Jan’13 Welding Electrode, Rail Piece,
Head stock
SSE/Welding/JHS
W , CRWS/BPL
03
11 Feb’13 Steel Samples, CTRB Rollers RSK/STLI, CMS/
Metallography
13
12 Mar’13 Welding Electrode, Steel
Samples, Journal Thrower,
Knuckle, Lug Liner
SSE/Welding/JHS
W, RSK/STLI,
CMS/
Metallography,
ADME(DSL)/JHS
14
Spectrographic analysis April 2013 to March 2014
Sr.
No.
Month Item Name/
Particulars
Item recd. from No. of
samples
1 Apr’13 Steel Samples SSE/weld.&XEN
TMC
3
2 May’13 Water pump, bolt, welding
electrode T-bar hanger &
samples of spring
Dy.CMM/JHS,
RSK/STLI
12
3 June’13 Spring material electrode,
power hacksaw blade, bolt,
WS/JHS,
RSK/STLI
24
4 July’13 Spring rods samples, tapered
shank portion
RSK/STLI and tool
room JHSW
10
5 Aug’13 --- --- ---
6 Sept’13 Failed Steel sample, Welding
Electrode
ADME/Baad
SSE/Welding/JHS
W
07
7 Oct’12 Steel Samples electrode and
hexa nipple
SSE/JHS & RBL 02
![Page 24: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/24.jpg)
24 | P a g e
8 Nov’12 --- --- ---
9 Dec’12 Key for brake block, bracket
pillar for LHB coaches
Dy CME/RBL
Dy CME/JHS,
18
10 Jan’13 Electrode, CBC and knuckle SSE/Welding/JHS
W , M&P
05
11 Feb’13 Hexa gonal cap screw,
equalizing lever, bend cutter
Sr. DME/D, SMM
ELS/JHS
06
12 Mar’13 Draw-bar hook, cattle guard,
couple body knuckle
Dy CMM/ ELE,
SR. DME/AGC,
DRM/JHS
07
Failure investigation of components as CTRB, CBC, J/Thrower 2012-13
Sr.
No.
Month Item Name/
Particulars
Item recd. from No. of
samples
1 Sept’12 CTRB SSE/M/c &Wheel
Shop/JHSW
02
2 Dec’12 CTRB SSE/M/c &Wheel
Shop/JHSW
01
CBC body SSE/C&W/GMC/C
NB
01
3 Feb’13 CTRB SSE/M/c &Wheel
Shop/JHSW
01
4 Mar’13 Knuckle DRM(M) JHS 01
Journal thrower Sr.DEE/RS/CNB 01
![Page 25: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/25.jpg)
25 | P a g e
Failure investigation of components as CTRB, CBC, J/Thrower 2013-14
Sr.
No.
Month Failure CTRB Total
No. of
samples
1 Apr’13 --- --- ---
2 May’13 --- 02 02
3 June’13 03 02 05
4 July’13 01 --- 01
5 Aug’13 --- 01 01
6 Sept’13 --- 01 01
7 Oct’13 --- --- ---
8 Nov’13 --- 01 01
9 Dec’13 --- 02 02
10 Jan’14 --- 02 02
11 Feb’14 01 05 06
12 Mar’14 03 --- 03
Total tested 24
![Page 26: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/26.jpg)
26 | P a g e
Chemical and Miscellaneous testing as Paint brush testing of tender samples, chemical
testing of store samples, Hard coke, Welding Electrodes, etc.
Sr.
No.
Month Item Name/
Particulars
Item recd. from No. of
samples
2 May’12 Punch set, Screw Coupling
Shackle Pin, Spring for cut off
angle cock, Steel Samples,
Angle Iron Fillet, Round Bar
Dy.CMM/JHS 86
![Page 27: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/27.jpg)
27 | P a g e
28 mm, Steel Samples, Rivet
Snap Head 20X100 mm long,
Hot Forged Rivet, MS Steel
Rivet Snap, H.S. Steel samples
3 June’12 Top Side Wear Liner, Spring
Steel, Pin Flat Head for Break
Gear Type A, Punch, Hand
Brake Sleeve
Dy.CMM/JHS,
RSK/STLI
14
4 July’12 BK beam Spring Washer Dy.CMM/JHS 05
5 Aug’12 Foundry coke, Rivet 22X100
mm
WM(R)/JHSW 02
6 Sept’12 Brush Paint & Varnish, Sash
Tool, Steel sample, Welding
Electrode, Bush Metallic, Pin
Flat Head
Dy. CMM/JHS,
SSE/Welding/JHS
W
09
7 Oct’12 Brush Paint & Varnish, AMM(G)/ALD 04
8 Nov’12 Welding Electrode SSE/Welding/JHS
W
01
9 Dec’12 Brush Paint & Varnish Dy.CMM/JHS 05
10 Jan’13 Hanger Block, Metal Piece,
Roller, Brush Paint & Varnish
ADME(DSL)/JHS,
AMM(G)/ALD
07
11 Feb’13 Foundry Coke Dy.CMM/JHS 01
12 Mar’13 Brush Paint & Varnish SMM ALD 18
![Page 28: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/28.jpg)
28 | P a g e
Chemical and Miscellaneous testing as Paint brush testing of tender samples, chemical
testing of store samples, Hard coke, Welding Electrodes 2013-14.
Sr.
No.
Month Pass Failure Total
No. of
samples
1 Apr’13 07 07 14
2 May’13 --- --- ---
3 June’13 03 01 04
4 July’13 01 --- 01
5 Aug’13 01 --- 01
6 Sept’13 04 02 06
7 Oct’13 13 11 24
8 Nov’13 03 --- 03
9 Dec’13 06 02 08
10 Jan’14 02 --- 02
11 Feb’14 02 --- 02
12 Mar’14 --- --- ---
Total tested 65
![Page 29: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/29.jpg)
29 | P a g e
Hardness testing of temping tools and store samples 2012-13
Sr.
No.
Month Item Name/
Particulars
Item recd. from No. of
samples
1 June’12 Hand Brake Sleeve Dy.CMM/JHS, 02
2 July’12 BK beam Spring Washer
,Tamping tools
SSE/TD/JHS 51
3 Aug’12 Rivet 22X100 mm WM(R)/JHSW 01
4 Oct’12 Tamping tools SSE/TD/JHS 25
5 Nov’12 Spindle, Welding Electrode Dy. CMM/JHS,
SSE/Welding/JHS
W
02
6 Dec’12 Tamping tools SSE/TD/JHS 18
Hardness testing of temping tools and store samples 2013-14
Sr.
No.
Month Item Name/
Particulars
Item recd. from No. of
samples
1 May 13 Misc. ---- 11
2 Nov 13 Misc. ---- 06
Welder’s competency test. During 2012-13
![Page 30: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/30.jpg)
30 | P a g e
Sr.
No.
Month Item Name/
Particulars
Item recd. from No. of
samples
1 Jan’13 Welded piece for welder’s
competency test
BTC/JHSW 35
2 Feb’13 ---do--- ---do--- 17
3 Mar’13 ---do--- ---do--- 14
Welder’s competency test. During 2013-14
Sr.
No.
Month Item Name/
Particulars
Item recd. from No. of
samples
1 Apr’13 Welded piece for welder’s
competency test
BTC/JHSW 03
2 May’13 ---do--- ---do--- 05
3 June’13 ---do--- ---do--- 09
4 July’13 ---do--- ---do--- 07
5 Aug’13 ---do--- ---do--- 03
6 Sept’13 ---do--- ---do--- 04
7 Nov’13 ---do--- ---do--- 02
8 Dec’13 ---do--- ---do--- 05
9 Jan’14 ---do--- ---do--- 04
Total tested 42
UST SUMMARY OF C&M LAB JHSW 2012-13
Sr.
No
Month Axle Type No of
axles
tested
Total No
of axles
tested
No of
axles
rejected
Rejection
percentage
1 Apr’12 CTRB 1872 2280 00 00
RB & Others 336
2 May’12 CTRB 2442 2724 08 029
RB & Others 282
3 June’12 CTRB 2481 2741 07 0.26
![Page 31: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/31.jpg)
31 | P a g e
RB & Others 260
4 July’12 CTRB 2338 2533 06 0.24
RB & Others 195
5 Aug’12 CTRB 2223 2486 12 0.48
RB & Others 263
6 Sept’12 CTRB 2469 2748 10 0.36
RB & Others 279
7 Oct’12 CTRB 2418 2635 12 0.46
RB & Others 217
8 Nov’12 CTRB 2037 2204 09 0.40
RB & Others 167
9 Dec’12 CTRB 2319 2587 11 0.43
RB & Others 268
10 Jan’13 CTRB 2388 2703 13 0.48
RB & Others 315
11 Feb’13 CTRB 2331 2625 10 0.38
RB & Others 294
12 Mar’13 CTRB 2166 2505 11 0.44
RB & Others 340
Total tested 30699 109 0.35
![Page 32: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/32.jpg)
32 | P a g e
Rejection percentage in UST
![Page 33: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/33.jpg)
33 | P a g e
UST SUMMARY OF C&M LAB JHSW 2013-14
Sr.
No
Month Axle Type No of
axles
tested
Total No
of axles
tested
No of
axles
rejected
Rejection
percentage
1 Apr’13 CTRB 2341 2631 12 0.45
RB & Others 290
2 May’13 CTRB 2600 2919 22 0.75
RB & Others 319
3 June’13 CTRB 2234 2523 12 0.48
RB & Others 289
4 July’13 CTRB 2400 2732 14 0.51
RB & Others 332
5 Aug’13 CTRB 2376 2645 05 0.19
RB & Others 269
6 Sept’13 CTRB 2576 2866 15 0.58
RB & Others 290
7 Oct’13 CTRB 2357 2671 08 0.30
RB & Others 314
8 Nov’13 CTRB 2438 2800 08 0.28
RB & Others 362
9 Dec’13 CTRB 2530 2873 10 0.34
RB & Others 343
10 Jan’14 CTRB 2485 2797 05 0.18
RB & Others 312
11 Feb’14 CTRB 2432 2724 06 0.22
RB & Others 292
12 Mar’14 CTRB 2426 2761 09 0.33
RB & Others 335
Total tested 32942 126 0.38
![Page 34: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/34.jpg)
34 | P a g e
Rejection percentage in UST
![Page 35: North Central Railway · 2018. 5. 1. · Core Testing Facilities to be available at this Lab Spectrographic analysis of steels, X-Ray Radiography of welding joints, Metallographic](https://reader035.vdocuments.us/reader035/viewer/2022070213/610e0a0d9d465c1e091e9cef/html5/thumbnails/35.jpg)
35 | P a g e
TARGETS
TARGETS
1. Quality test of stores materials.
2. Improvement of welding quality and material.
3. Quality test of paint and painting quality monitoring.
4. Ultrasonic testing of Axles & Wheels
5. Nondestructive testing of components by ZYGLO, MAGNAFLUX and DPT.
6. Failure investigations of Couplers, CTRB etc.
7. Chemical composition determination by Spectrometer.
8. Physical & Metallurgical examination, Macro, Micro, T.S., Bend test,
Compression test.
9. X-ray radiography of weld joints.
10. Material chasing, Indents, Stores, Post creation proposals, Staffing proposals,
Installation, Commissioning, PTC, Personnel related matters of C&M staff,
Miscellaneous testing.
FUTURE PLAN
1. MLR shop related testing facility development.
2. To arrange technical C&M staff by filling vacant posts and by proposing for
creation of new posts with increasing workload in different units of NCR.