north basin south basin lagoon - san francisco bay ferry...south basin ferry terminal design project...
TRANSCRIPT
Pier 1Pier 1Pier 1
Gate BGate B
Gate CGate C
Gate DGate DGate EGate E
Ferry PlazaFerry PlazaFerry Plaza
Ferry BuildingFerry Building AgricultureAgricultureBuildingBuilding
The EmbarcaderoThe EmbarcaderoHarry Bridges PlazaHarry Bridges Plaza
The EmbarcaderoThe Embarcadero
Gate B
Gate C
Gate DGate E
Ferry Building AgricultureBuilding
The EmbarcaderoHarry Bridges Plaza
The Embarcadero
North Basin South Basin
Lagoon
Pier 2Pier 2Pier 2
0 100 200FEET
Source: Roma Design Group, et al, 2010, Google Earth Pro 2013.
28067812
Downtown San Francisco Ferry TerminalSouth Basin Expansion
San Francisco Bay Area Water Emergency Transportation Authority
PROJECT AREA AND VICINITY MAP
FIGURE 1
8/5/
15 h
k...T
:\WE
TA\P
erm
its 2
015\
July
2015
\Fig
1_pr
ojec
t_ar
ea_v
icin
ity_m
ap.a
i
Project AreaMean High Water/High Tide Line
S a n
F r a n c i s c o
B a y
S a n
P a b l o
B a y
Pa
ci
fi
cO
ce
an
")
%&'(80
ProjectLocation
A L A M E D A
S A N M A T E O
M A R I N
C O N T R A C O S T A
S A NF R A N C I S C O
Orinda
Pinole
Novato
Moraga
Oakland
Vallejo
Hayward
Alameda
Concord
Benicia
Pacifica
Piedmont
Richmond
Millbrae
Brisbane
Larkspur
Martinez
Hercules
San Ramon
Sausalito
Lafayette
Union City
San Rafael
Burlingame
Emeryville
San Leandro
Mill Valley Walnut Creek
San Francisco
Pleasant Hill
%&'(680
%&'(580
%&'(238
%&'(80
%&'(880
%&'(780
%&'(280
%&'(980
%&'(380
%&'(238
%&'(580
%&'(580
|ÿ1
|ÿ92
|ÿ4|ÿ101
|ÿ112
|ÿ35
|ÿ123
|ÿ13
|ÿ185
|ÿ131
|ÿ84
|ÿ242
|ÿ29
|ÿ84
SOUTH BASIN FERRY TERMINAL DESIGN PROJECTU.S. Army Corps of Engineers, Department of Army Permit Application • Prepared for the Water Emergency Transportation Authority by ROMA Design Group • July 22, 2015
0 50 100 150 ft
THE EMBARCADERO
FERRY BUILDING
SOUTH BASIN
EXISTING GATE ETO BE RELOCATED
AND EXTENDED GATE F GATE G
AGRICULTUREBUILDING
FERRYPLAZA
THE EMBARCADERO
FERRY BUILDING
EAST BAYSIDE PROMENADE
PIER 14BREAKWATER
INTERIM ACCESSSTRUCTURE
GATE C
GATE D
GATE B
FIGURE 2: PROJECT IMPROVEMENTS
EMBARCADEROEMBARCADEROPLAZAPLAZA
AGRICULTUREBUILDING
Downtown San Francisco Ferry Terminal South Basin Expansion
San Francisco Bay Area Water Emergency Transportation Authority28067812
10/08
/15 h
k T:\
WET
A\Pe
rmits
2015
\BCD
C_Se
pt15\F
igs_W
ETA_
BCDC
_Sep
t15.in
dd
Source: Roma Design Group, et al, 2015
FIGURE 2
SOUTH BASIN IMPROVEMENTS PLAN VIEW
FEET
Source: Roma Design Group, et al, 2015
0 75 150
Existing Elements
New Project Improvements
Mean High Water/High Tide Line
SEAWALL
MAINTAINAND PROTECT
MAINTAIN FENDERING
GATE E
PIER 2
MAINTAINAND PROTECT
DEMOLISHAND REMOVE
10/8
/15
hk.
..T:\W
ETA
\Per
mits
201
5\B
CD
C_S
ept1
5\Fi
g3_d
emo_
repa
ir.ai
0 50 100FEET
SOUTH BASIN
Source: Roma Design Group, et al, 2011
Demolish and Remove
Maintain and Protect
Notes: 1. The America's Cup project will remove the building
located on Pier 2 prior to project construction.2. Portions of Pier 2 will be replaced.
28067812
Downtown San Francisco Ferry TerminalSouth Basin Expansion
San Francisco Bay Area Water Emergency Transportation Authority
AREAS PROPOSED FOR DEMOLITON AND REPAIR
FIGURE 3
SOUTH BASIN FERRY TERMINAL DESIGN PROJECTU.S. Army Corps of Engineers, Department of Army Permit Application • Prepared for the Water Emergency Transportation Authority by ROMA Design Group • July 22, 2015
FIGURE 4: AREAS PROPOSED FOR IMPROVEMENT
EXISTING GATE ETO BE RELOCATED
AND EXTENDED
ADAPT EXISTINGSTRUCTURE TO
NEW GRADE
NEW BERTHING STRUCTURES
GATE F GATE G
NEW FENDERING NEW FENDERING
INTERIM ACCESSSTRUCTURE
NEW DECK AND PILES
EAST BAYSIDE PROMENADE
0 50’ 100’ 200’
EMBARCADEROEMBARCADEROPLAZAPLAZA
Downtown San Francisco Ferry Terminal South Basin Expansion
San Francisco Bay Area Water Emergency Transportation Authority28067812
10/08
/15 h
k T:\
WET
A\Pe
rmits
2015
\BCD
C_Se
pt15\F
igs_W
ETA_
BCDC
_Sep
t15.in
dd
Source: Roma Design Group, et al, 2015
FIGURE 4
AREAS PROPOSED FOR IMPROVEMENT
Source: Roma Design Group, et al, 2015
0 50 100
New Deck and Piles
Relocated Float and Gangway
New Berthing Structures and Fendering
Interim Access Structure
Existing Areas to be Adapted to the New Grade
SOUTH BASIN FERRY TERMINAL DESIGN PROJECTU.S. Army Corps of Engineers, Department of Army Permit Application • Prepared for the Water Emergency Transportation Authority by ROMA Design Group • July 22, 2015
FIGURE 7: SIMULATED VIEW OF BERTHING FACILITIES
Gangway
Guide Piles
Float
Entry Portal
Downtown San Francisco Ferry Terminal South Basin Expansion
San Francisco Bay Area Water Emergency Transportation Authority28067812
07/27
/15 h
k T:\
WET
A\Pe
rmits
2015
\July_
2015
\Figs
_WET
A_Ju
l15.in
dd
Source: Roma Design Group, et al, 2015
FIGURE 5
SIMULATED VIEW OF BERTHING FACILITIES
Downtown San Francisco Ferry Terminal South Basin Expansion
San Francisco Bay Area Water Emergency Transportation Authority28067812
10/08
/15 h
k T:\
WET
A\Pe
rmits
2015
\BCD
C_Se
pt15\F
igs_W
ETA_
BCDC
_Sep
t15.in
dd
Source: Roma Design Group, et al, 2015
FIGURE 6
SITE PLAN
Source: Roma Design Group, et al, 2015
SOUTH BASIN FERRY TERMINAL DESIGN PROJECTU.S. Army Corps of Engineers, Department of Army Permit Application • Prepared for the Water Emergency Transportation Authority by ROMA Design Group • July 22, 2015
FIGURE 8: MODEL VIEW OF PLAZA AND PROMENADE
Downtown San Francisco Ferry Terminal South Basin Expansion
San Francisco Bay Area Water Emergency Transportation Authority28067812
07/27
/15 h
k T:\
WET
A\Pe
rmits
2015
\July_
2015
\Figs
_WET
A_Ju
l15.in
dd
Source: Roma Design Group, et al, 2015
FIGURE 7
MODEL VIEW OF EMBARCADERO PLAZA AND PROMENADE
SOUTH BASIN FERRY TERMINAL DESIGN PROJECTU.S. Army Corps of Engineers, Department of Army Permit Application • Prepared for the Water Emergency Transportation Authority by ROMA Design Group • July 22, 2015
FIGURE 9: CROSS-SECTION FROM THE BAY TO THE EMBARCADEROC R O S S - S E C T I O N F R O M T H E B A Y T O T H E E M B A R C A D E R O
South Basin Ferry Terminal Design ProjectPrepared for the Water Emergency Transportation Authority and the Port of San Francisco by ROMA Design Group
M A Y 2 0 1 5
0 8’ 16’ 32’
GATES E, F & GFERRY TERMINAL ENTRANCES
EAST BAYSIDEPROMENADE EXTENSION
NEW EMBARCADERO PLAZA
EXISTING SEAWALL
EXISTING EMBARCADERO PROMENADE
Downtown San Francisco Ferry Terminal South Basin Expansion
San Francisco Bay Area Water Emergency Transportation Authority28067812
07/27
/15 h
k T:\
WET
A\Pe
rmits
2015
\July_
2015
\Figs
_WET
A_Ju
l15.in
dd
Source: Roma Design Group, et al, 2015
FIGURE 8
TYPICAL CROSS-SECTION VIEW FROM SAN FRANCISCO BAY TO EMBARCADERO
0 16 32FEET
Seawall
Downtown San Francisco Ferry Terminal South Basin Expansion
San Francisco Bay Area Water Emergency Transportation Authority28067812
09/09
/15 h
k T:\
WET
A\Pe
rmits
2015
\BCD
C_Se
pt15\F
igs_W
ETA_
BCDC
_Sep
t15.in
dd
Source: Google Earth Pro., 2015
FIGURE 10
VIEWS OF THE EXISTING PROJECT AREA
The Embarcadero
View Point
EDG
E OF BART PLATFO
RM
EXISTING 90 L.F. OFPERIMETER ACCESS
TO BAY & 50 FT WIDEVIEW CORRIDOR TO
BAY & BERTHINGACTIVITIES
PORT OF SFSOUTH BAYSIDE
PROMENADE (NOTPART OF PROJECT)
220 L.F. OF NEW PERIMETER ACCESSTO BAY & 140 FT WIDE VIEW CORRIDOR
TO BAY & BERTHING ACTIVITIES
220 L.F. OF NEW PERIMETER ACCESSTO BAY & 140 FT WIDE VIEW CORRIDOR
TO BAY & BERTHING ACTIVITIES
200 L.F. OF NEW PERIMETER ACCESS TO BAY & A 180˚ VISTA TO PIER 14, DOWNCOAST ALONG EMBARCADERO PROMENADE TO RINCON PARK, BOW & ARROW SCULPTURE, BAY BRIDGE & BACK TO CITY SKYLINE
40 F
T
140 FT27 FT
27 F
T
140 FT50 FT
210 FT WINDOW
145 FT
110 FT
100 FT X 130 FT
TOTAL PUBLIC ACCESS AREA = 36,000 SF
EMBARCADERO PROMENADE
PUBLIC ACCESS 50 YEAR SLR ELEVATION (29,100 SF )
(5,300 SF )PUBLIC ACCESS TRANSITION AREA
INTERIM INFILL AREA AT EXISTING GRADEOF AGRICULTURE BUILDING APRONS (2,500 SF)
PROMENADEPROMENADE
PLAZA
PIER
14
AGRICULTUREBUILDING
FERRYBUILDING
LIMIT OF PROJECT WORK
INTERIM ACCESS STRUCTURE(1,600 SF)
40 F
T
40 F
T
0 20’ 40’ 80’PROPOSED PUBLIC ACCESS AND VIEW CORRIDORS
Downtown San Francisco Ferry Terminal South Basin Expansion
San Francisco Bay Area Water Emergency Transportation Authority28067812
10/12
/15 h
k T:\
WET
A\Pe
rmits
2015
\BCD
C_Se
pt15\F
igs_W
ETA_
BCDC
_Sep
t15.in
dd
Source: Roma Design Group, et al, 2015
FIGURE 11
PUBLIC ACCESS PLAN
Source: Roma Design Group, et al, 2015
0 40 80
Perimeter Access
View Corridors
Public Access (50 year sea level rise elevation)
Public Access (transition grade)
SOUTH BASIN FERRY TERMINAL DESIGN PROJECTU.S. Army Corps of Engineers, Department of Army Permit Application • Prepared for the Water Emergency Transportation Authority by ROMA Design Group • August 10, 2015
FIGURE 5: AREAS REQUIRING DREDGING DURING CONSTRUCTION
0 50 100 150 ft
0 50’ 100’ 200’
GATE E GATE F GATE G
DREDGE VOLUMES GATE F GATE G TOTAL
Area (AC) 0.78 1.64 2.42Cut Volume (CY) 3,600 9,549 13,1492’ Overdredge (CY) 2,406 4,924 7,330
Total Cut Volume (CY) 6,006 14,473 20,479
Downtown San Francisco Ferry Terminal South Basin Expansion
San Francisco Bay Area Water Emergency Transportation Authority28067812
09/28
/15 h
k T:\
WET
A\Pe
rmits
2015
\BCD
C_Se
pt15\F
igs_W
ETA_
BCDC
_Sep
t15.in
dd
Source: Roma Design Group, et al, 2015
FIGURE 12
AREAS REQUIRING DREDGING DURING CONSTRUCTION
Source: Roma Design Group, et al, 2015
0 100 200FEET