Managing Projects Without Being Buried

In Schedules

Norm SmithVice President, SmithOps

Page 2: Norm smith

how did we get here?

High Costs – Can’t Keep Up with Changes – Frequent Project Surprises

Page 3: Norm smith

we want “balance”

Team Conduit

Schedule

PM

≥ Cost

Utility

1,000+ lines

Page 4: Norm smith

But we overdo detail

Team Conduit

Schedule

PM

Cost

Utility

10,000+ lines

=

Page 5: Norm smith

Change happens

Team Conduit

Schedule

PM

Cost

Utility

To

From

Page 6: Norm smith

Plus maintenance

Team Conduit

Schedule

PM

Cost

Utility

New %

Old %

<

Page 7: Norm smith

We Get buried

Team Conduit

Schedule

PM

Cost

Utility

+ Details+ Change+ Maintenance

<<

New

Old

Page 8: Norm smith

We Get Schedule Divergence

The gap formed when your people and your plan head in different directions.

Page 9: Norm smith

how do we prevent this?

(Now that we know how it happens)

High Costs – Can’t Keep Up with Changes – Frequent Project Surprises

Page 10: Norm smith

1. Control the Detail2. Control the Detail3. Control the Detail

Variables Are Details, Changes, and Maintenance

Electron Microscope Detail

Page 11: Norm smith

What’s the right amount of detail?

The minimum amount of detail required to successfully manage the project at a given

point in time.

Page 12: Norm smith

Diminishing granularityFine details near term. Coarse details

far term.Also known as Agile Scheduling.

Page 13: Norm smith

Rolling Wave Moving Focus – 6 Week Forward

Shuttle Tile Repair KitSTS-114

Return to Flight

Page 14: Norm smith

Flat schedulesEach level adds an order of magnitude

of detail.Learn to capture projects with fewer

levels.

Page 15: Norm smith

Use metricsDefine

ProgressTABLE B

Requirements

5 % Started

20 % Per Assignee

40 % Per Assignee

50 % From/To Language Delivered

60 % From/To Language Approved

75 % Submitted to SEIWG

85 % SEIWG Approved

90 % (Kickback for MOD)

100 % SCB Approved

ExampleRequirements Development

Page 16: Norm smith

With right-sized schedulesWE ARE FREE TO FLY

Reduced Costs – Fewer Surprises – More Success

Page 17: Norm smith

Why is this all so important?

SituationalAwareness

Enfranchisement

Boundary Maintenance

Schedules

Page 18: Norm smith

About the authorMr. Smith has over 20 years experience managing complex projects with geographically dispersed teams.  Norm Smith is Founder and Vice President of SmithOps, a consulting firm providing progress management services, products, and training to government (NASA) and commercial clients in industry (Power and Construction).  Mr. Smith authored the book “Got Progress?  Managing Projects with Ease, Results, and Style” now available on Amazon.  Prior to founding SmithOps, Mr. Smith served as a civil servant at NASA Marshall Space Flight Center involved in management of such projects as the US Propulsion Module for Space Station and the X34 Rocket Plane.  Mr. Smith holds US patents in rocketry and robotics and earned a Bachelor of Science degree in Mechanical Engineering from the University of Texas at Austin.