non-financial 2018/19 q1 preliminary performance...
TRANSCRIPT
1
NON-FINANCIAL
PERFORMANCE
REPORT
2018/19 Q1 PRELIMINARY
PERFORMANCE INFORMATION
2
TABLE OF CONTENTS
Contents Acronyms ....................................................................................................................................................................................................................... 3
Overview ....................................................................................................................................................................................................................... 5
2018/19 Planned Deliverables ................................................................................................................................................................................ 6
Quarter 1 Preliminary Performance ..................................................................................................................................................................... 7
Programme 1: Administration .................................................................................................................................................................................... 9
Programme 2: Agricultural Production, Health and Food Safety ....................................................................................................................... 18
Programme 3: Food Security and Agrarian Reform ............................................................................................................................................ 20
Programme 4: Trade Promotion and Market Access .......................................................................................................................................... 22
Programme 5: Forestry and Natural Resources Management .......................................................................................................................... 26
Programme 6: Fisheries ........................................................................................................................................................................................... 29
Conclusion .................................................................................................................................................................................................................. 33
3
Acronyms
AC Audit Committee
AgriBEE Agricultural Broad-Based Black Economic
Empowerment
APHS Agricultural Production, Health and Food Safety
APP Annual Performance Plan
AU African Union
BBBEE Broad Base Black Economic Empowerment
BCM Business Continuity Management
BCP Business Continuity Plans
BIA Business Impact Assessment
BRICKS Brazil,Russia,India,China, South Africa
CASP Comprehensive Agricultural Support Programme
CEO Chief Executive Officer
CCS Compulsory community service
CS Community Service
CIPC Companies and Intellectual Property Commission
CPA Community Property Association
CSA Climate Smart Agriculture
DAFF Department of Agriculture, Forestry and Fisheries
EXCO Executive Management Committee
FMD Foot-and-mouth disease
FPE Fish processing establishment
FPV Fisheries Protection Vessels
FNRM Forestry and Natural Resource Management
FS Free State
FSAR Food security and Agrarian Reform
GP Gauteng Province
Ha Hacters
HoD Head of Department
IBSA India Brazil South Africa
ICT Information and Communication Technology
ICT DRP Information and Communication Technology Disaster
Recovery Plan
4
IGR Inter Governmental Relation
ISP Internet Service Provider
IPAP Industrial Policy Action Plan
KyD Kaonafatso ya Dikgomo
KZN KwaZulu Natal
LP Limpopo
Mafisa Micro-agricultural Financial Institutions of South Africa
MEC Member of Executive Committee
MINMEC Minister and Members of Executive Council
MINTECH Ministerial Technical Committee
MP Mpumalanga
M&S Monitoring and Surveillance
NCOP National Council of Provinces
NFAC National Forestry Advisory Council
NW North West
ODG Office of The Director General
PPME Policy, Planning, Monitoring & Evaluation
PPR Pestes des Petits Ruminants
SADC Southern African Development Community
SA-GAP South African Good Agricultural Practices
SAVC South Africa Veterinary Council
SDO Service Delivery and Operations
SES Stakeholder Engagement Strategy
TAC total allowable catch
TAE total allowable estimate
TUPs Temporary Unplanted Areas
#YAFF YOUTH IN AGRICULTURE, FORESTRY AND
FISHERIES
5
Overview
In this organisational report, the Department presents its preliminary Quarter 1 Performance Report for the period April to June 2018, against
the planned deliverables as reflected in Part B and Annexure 1 of Part D of the Annual Performance Plans (APP). This Report has been
compiled in accordance with the requirements of sections 92 and 114 of the Constitution and other government legislative prescripts that guide
performance management in the public sector to display and promote transparency and accountability to stakeholders and the public
concerning matters under their control. This reported information will also be utilised to respond to the Department`s commitments in the
achievement of Government Outcomes 4, 7 and 10. This report and other forthcoming quarterly reports will form the basis of the of
Department`s Annual Report, to be compiled at the end of the current financial year.
There were 43 planned milestones for the 1st quarter of the current financial year and during the compilation of the preliminary
report, the achievement of 74% against set targets was recorded with 23% in progress and 3% not done.
6
2018/19 Planned Deliverables
PROGRAMME ANNUAL TARGETS Q1 MILESTONES Q2 MILESTONES Q3 MILESTONES Q4 MILESTONES
ADMIN:ODG 2 2 2 2 2
ADMIN :CS 5 5 5 5 8
ADMIN:PPME 5 6 6 6 6
APHFS 9 8 8 8 8
FSAR 7 1 4 3 7
TPMA 14 9 9 9 13
FNRM 9 2 6 5 9
FM 16 10 15 14 14
TOTAL 67 43 55 52 67
7
Quarter 1 Preliminary Performance
PROGRAMME ANNUAL TARGETS Q1 MILESTONE
IN PROGRESS
NOT DONE COMPLETED % COMPLETED
ODG 2 2 0 0 2 100%
CS 5 5 0 0 5 100%
PPME 5 6 1 0 5 83%
APHFS 9 8 3 1 4 50%
FSAR 7 1 1 0 0 0%
TPMA 14 9 0 0 9 100%
FNRM 9 2 2 0 0 0%
FM 16 10 3 0 7 70%
TOTAL 67 43 10 1 32 74%
8
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
ODG CS PPME APHFS FSAR TPMA FNRM FM
IN PROGRESS 0% 0% 17% 37% 100% 0% 100% 30%
NOT DONE 0% 0% 0% 13% 0% 0% 0% 0%
COMPLETED 100% 100% 83% 50% 0% 100% 0% 70%
Pe
rce
nta
ge %
Quarter 1 Preliminary Report
9
Programme 1: Administration
Programme /
Sub-Programme
Performance
Indicators
2018/19 Annual Target
As Per Annual
Performance Plans
(APP)
Quarter1 Progress Comments
Quarter 1 Target As
Per APP
Quarter 1 Output –preliminary Reason For
Deviation
Corrective Action
1.1.1
Efficient and
effective risk
management
Full implementation of
Risk Management
Strategy
Review the Risk
Communication and
Awareness Plan
The Risk Communication and Awareness
Plan has been reviewed
N/A N/A
1.1.2
Risk-based
Internal Audit Plan
implemented
Annual Risk- Based
Internal Audit Plan
implemented
2017/18 Q4 report
approved by the Audit
Committee(AC)
Quarterly report for 2017/18 quarter 4 has
been approved by the audit committee on
the 24th of May 2018
N/A N/A
1.1.3
Business
Continuity Plans
developed
Departmental Business
Continuity Management
(BCM) operational risk
assessed
Develop draft Business
Continuity Plans for the
identified core
directorates Branch:
Fisheries
A Business Impact Assessment (BIA)
Interview Schedule or Questionnaire was
developed to conduct interviews with the
branch Fisheries Management
Ten (10) core directorates were identified
in collaboration with the Fisheries
Management Branch and after face-to-
face interviews were conducted in Cape
Town
Ten Draft Business Continuity Plans
(BCP’s) were developed and forwarded to
the relevant Directors for input and
N/A N/A
10
Programme /
Sub-Programme
Performance
Indicators
2018/19 Annual Target
As Per Annual
Performance Plans
(APP)
Quarter1 Progress Comments
Quarter 1 Target As
Per APP
Quarter 1 Output –preliminary Reason For
Deviation
Corrective Action
comments
1.1.4
ICT Disaster
Recovery Plan
reviewed
DAFF ICT DR site
implementation in
Stellenbosch
Direct internet link
enabled to Stellenbosch
office
For the direct Internet, link enablement to
Stellenbosch office: The ICT Service
Delivery and Operations unit (SDO)
obtained property owner approval to
enable internet service break out in
Stellenbosch on the 7th May 2018
Installation of the radio links, Internet
Service Provider (ISP) Router finalised
and Direct Internet link tested successfully
N/A N/A
Firewall configuration The installation and configuration of the
Stellenbosch Firewall has been finalised
and accessible from Pretoria
N/A N/A
1.1.5
Information and
Communication
Technology (ICT)
Plan implemented
One prioritised ICT Plan
project implemented
Business requirement
documentation for the
Fire Protection
Association system
completed
The Business Requirement Specification
for the Fire Protection Association system
has been completed.
Document has been provided.
N/A N/A
1.1.6
Number of Bills
submitted to
Minister
2 (Feeds and Pet Food
Bill and Fertilizers Bill)
- - - -
11
Programme /
Sub-Programme
Performance
Indicators
2018/19 Annual Target
As Per Annual
Performance Plans
(APP)
Quarter1 Progress Comments
Quarter 1 Target As
Per APP
Quarter 1 Output –preliminary Reason For
Deviation
Corrective Action
1.1.7
HRD Strategy
implemented
2018/19 Workplace
Skills Plan approved by
the DG and
implemented
2018/19 Workplace
Skills Plan developed
and approved by the DG
2018/19 Workplace Skills Plan developed
and approved by the Acting Director
General (A/DG) on 18 April 2018
N/A N/A
1.2.1
Communication
Strategy
implemented
Media plans
implemented
Media Plans
implemented
(National Assembly and
National Council of
Provinces
Budget Votes, Youth
Month/#YAFF, World
Oceans
Day, Imbizo Week)
The following events have been
successfully coordinated:
- Minister’s National Council of Provinces
(NCOP) budget Vote Presentation.
BRICS roadshow, Western Cape
- Summit on Farm Killings held at
Manhattan Hotel on 14 June 2018.
- SADC Ministers meeting 4 – 8 June
2018
- BRICS Minister of Agriculture, Protea
Hotel, Kruger Gate, Mpumalanga on 19 –
22 June 2018.
- SANFEAS Consultative Workshop held
at ARC Hatfield : 28 – 29 June 2018
- #YAFF Awards Held at Velmore Hotel,
on 29 June 2018.
- Minister’s Imbizo in Encweleni, O R
Tambo District Municipality, Eastern Cape
17 June 2018.
The directorate Communication Services
is currently playing a pivotal role towards
the planning of 2018 Arbor Week Launch
No report and
supporting documents
for World Oceans
Day.
The following media
plans are outstanding:
NCOP budget vote;
Youth Month/#YAFF;
and
Imbizo week.
12
Programme /
Sub-Programme
Performance
Indicators
2018/19 Annual Target
As Per Annual
Performance Plans
(APP)
Quarter1 Progress Comments
Quarter 1 Target As
Per APP
Quarter 1 Output –preliminary Reason For
Deviation
Corrective Action
in Mpumalanga Province and Landcare
Coference scheduled to take place in Free
State Province.
National Assembly Budget Vote was held
on 16 May 2018
SADC joint meeting with Ministers for
Agriculture, Food security, fisheries and
aquaculture from 04 - 08 June 2018.
1.2.2 Stakeholder
Engagement
Strategy (SES)
implemented
SES implemented
Structured stakeholder
engagements
coordinated (CEO’s
Forum/Committee,
Minister’s Service
Delivery Forum,
commodity
groups/sector
stakeholders)
Coordinated and facilitated the hosting
Youth in Agriculture, Forestry and
Fisheries 2018 Awards on 29 June 2018
in Gauteng Province, Melmore Hotel in
Centurion.
Coordinated and facilitated commodity
groups engagement on priorities of the
Sector in the month of June 2018 with
various commodity groups. Coordinated
and facilitated a CEO Steering Committee
on the 13 June 2018 on the 13 June 2018
in Pretoria, Gauteng Province.
Facilitated and coordinated Brics road
show for Minister at Elsenburg Farm,
N/A N/A
13
Programme /
Sub-Programme
Performance
Indicators
2018/19 Annual Target
As Per Annual
Performance Plans
(APP)
Quarter1 Progress Comments
Quarter 1 Target As
Per APP
Quarter 1 Output –preliminary Reason For
Deviation
Corrective Action
Western Cape Province held on the 19
June 2018.
Coordinated and Facilitated the National
Forestry Advisory Council (NFAC) meeting
on the 09-10 May 2018 at Protea Hotel
Coordinated and Facilitated the CEO
Steering Committee meeting held on the
04 April 2018 at Imbizo Hall.
Key strategic
intergovernmental
engagements
coordinated (MINMEC,
MINTECH, IGR, Forum,
Imbizo)
1 MINMEC: The directorate has
coordinated and facilitated the sitting of
the above-mentioned intergovernmental
structure.
2 MINTECH: This structure has
reconvened on 2 encounters during the
quarter period under review.
3 INTERGOVERNMENTAL FORUM:
Following a plethora of forestry invasions
in the province of the Eastern Cape
Province, the Directorate reconvened the
sitting of the Intergovernmental Forum to
hammer a headway and a solution to the
invasions in eastern Pondoland in
particular Ntabankulu.
4 FARM KILLINGS: The directorate
played a role by ensuring the participation
N/A N/A
14
Programme /
Sub-Programme
Performance
Indicators
2018/19 Annual Target
As Per Annual
Performance Plans
(APP)
Quarter1 Progress Comments
Quarter 1 Target As
Per APP
Quarter 1 Output –preliminary Reason For
Deviation
Corrective Action
of concerned Government Departments,
Provincial Departments of Agriculture,
District Municipalities, etc, to come up with
a galvanise opinion towards unblocking
insecurity within the farming environment.
5 MEETING WITH WESTERN CAPE
URBAN FARMERS AND COMMUNITY:
The directorate held a dialogue and
discussion with Urban Farmers from the
above-mentioned Province. The intention
of the dialog was to unlock challenges met
by these farmers
6 FORESTRY CONGRESS: The
directorate represented the Department of
Agriculture, Forestry and Fisheries on the
above-mentioned convention. The
directorate participated and attended with
a broader understanding of strengthening
relations with all three spheres of
government as there were District
Municipalities whose economic base is
bolted upon forestry as a job driver and
creator.
7 IMBIZO: The directorate played a
decisive role in putting up a public
participation venture between the Minister
of Agriculture, Forestry and Fisheries and
15
Programme /
Sub-Programme
Performance
Indicators
2018/19 Annual Target
As Per Annual
Performance Plans
(APP)
Quarter1 Progress Comments
Quarter 1 Target As
Per APP
Quarter 1 Output –preliminary Reason For
Deviation
Corrective Action
small holder farmers in the province of the
Eastern Cape.
8 BRICS ROAD SHOW: the roadshow
was taken off in Western Cape Province.
The Unit worked in collaboration with the
Western Cape Province concerned and
directorate responsible for colleges of
Agriculture, in putting the gathering
together.
9 BRICS SUMMIT OF MINISTERS OF
AGRICULTURE::This meeting took place
in Mpumalanga Province during the period
under review. The directorate took its
mandate afoot by informing both the
Province and District and Local
municipalities concerned of where the
summit was going to take place.
10 SADC SUMMIT: The Directorate was
an active participant on the plan of above
mentioned. This finds expression in the
invitation and meetings with the
Johannesburg and Ekurhuleni office of the
mayors.
11 YOUTH IN AGRICULTURE,
FORESTRY AND FISHERIES - #YAFF:
16
Programme /
Sub-Programme
Performance
Indicators
2018/19 Annual Target
As Per Annual
Performance Plans
(APP)
Quarter1 Progress Comments
Quarter 1 Target As
Per APP
Quarter 1 Output –preliminary Reason For
Deviation
Corrective Action
The directorate played an active role in
putting together a plan on the above
mentioned event. It did so by inviting
MECs, HODs and other intergovernmental
stakeholders to attend the gathering.
12 2018 ARBOR DAY LAUNCH: The unit
is currently playing an active role towards
putting together a successful plan on the
Launch of 2018 Arbor Day. The launch is
scheduled to take place in Mbombela
Local Municipality, Mpumalanga Province.
13 SOCIAL CLUSTER :It is the view of the
directorate that cluster reporting by the
Department of Agriculture is at an
acceptable levels.
1.3.1
Sector information
management
system
strengthened
Report on sector
economic and
statistical information
outlook
Quarterly report on
sector
economic and statistical
information submitted to
EXCO
Quarterly report developed for the sector
in terms of economic and statistical
information. Presentation of the report
was done at EXCO, MINTECH and our
departmental Quarterly Planning Review
meeting with all stakeholders.
N/A N/A
1.3.4
Number of project
verification
Four project verification
reports
submitted to EXCO
2017/18 Annual report
on verified projects
submitted
The Annual report on verified projects was
concluded and signed off. A total of 292
CASP, 6 colleges, 87 MAFISA projects, 3
N/A N/A
17
Programme /
Sub-Programme
Performance
Indicators
2018/19 Annual Target
As Per Annual
Performance Plans
(APP)
Quarter1 Progress Comments
Quarter 1 Target As
Per APP
Quarter 1 Output –preliminary Reason For
Deviation
Corrective Action
reports submitted
to EXCO
to EXCO forestry projects were visited by the DAFF
verification team and reports with
recommendations for each of the projects
visited were drafted.
1.3.3
Sector Research
Agenda monitored
Sector Research
Agenda monitored
Report on the
monitoring of the sector
research agenda
Report on the monitoring of the
sector research agenda developed.
N/A N/A
18
Programme 2: Agricultural Production, Health and Food Safety
Programme/ Sub-
Programme
Performance Indicators
2018/19 Annual Target
As Per Annual
Performance Plans
(APP)
Quarter 1 Progress Comments
Quarter1 Target As
Per APP
Quarter 1 Output –
Preliminary
Reason For Deviation Corrective Action
2.1.1
Number of animal
Improvement schemes for
prioritised value
chain commodities
implemented
Report on animal
improvement schemes
(Kaonafatso ya
Dikgomoand poultry)
implemented
Mobilise farmer
participation into the
KyD and poultry
schemes
970 farmers have been
mobilised for KYD and are
awaiting validation and 0 has
been reported for poultry
ID validation of KYD is in
progress
Insufficient evidence has
been provided to support
poultry farmers (
attendance registers and
farmer profile forms)
Reporting on KYD will
be finalised after
validation processes
2.1.2
Number of plant
Improvement schemes for
prioritised value
chain commodities
implemented
Two plant improvement
schemes (seed crops and
seed potato) monitored
Monitoring reports on
seed crops and seed
potato schemes
Monitoring reports on seed
crops and seed potato
schemes has been compiled
N/A N/A
2.2.1
Number of planned animal
diseases risk
surveillances
conducted
Two animal diseases risk
surveillances conducted
(FMD-protection zone and
PPR)
- - - -
2.2.2
Number of planned plant
pest risk surveillances
conducted
One plant pest
surveillance conducted
(exotic fruit fly)
Document and analyse
surveillance results
Surveillance results were
analysed and documented,
and a report has been
compiled.
N/A N/A
2.2.3
Number of regulatory
Compliance and
monitoring interventions
implemented
Four regulatory
compliance and
monitoring interventions
implemented
(quarantine, inspections,
Quarterly report on
regulatory interventions
implemented
(quarantine, inspections,
surveillance and testing)
Quarterly report on
regulatory interventions
implemented (quarantine,
inspections, surveillance and
testing) is still in progress
Individual listing to support
summative reported
information has not been
provided
Random sample validation
A workshop with
managers was held on
the 18-20 July 2018 to
deal with evidence
submission from of all
19
Programme/ Sub-
Programme
Performance Indicators
2018/19 Annual Target
As Per Annual
Performance Plans
(APP)
Quarter 1 Progress Comments
Quarter1 Target As
Per APP
Quarter 1 Output –
Preliminary
Reason For Deviation Corrective Action
surveillance and testing) of source documents at
entry points are in progress
ports of entries.
2.2.4
Veterinary Strategy
implemented
A legislative framework
for animal identification
and traceability developed
First draft of Animal
Identification and
Traceability Policy
developed
None A legislative Framework on
animal identification and
traceability LITS was
developed in the previous
financial year. The Bill and
draft regulations are part of
the implementation plan
The activity need to be
changed to: “LITS
implementation plan is
developed”
2.2.5
Number of CCS
Veterinarians deployed
150 CCS veterinarians
deployed
Application from final
year students and
veterinarians who will be
registered for the first
time with SAVC
received
175 Application from final
year students and
veterinarians who will be
registered for the first time
with SAVC were received
More than planned,
students applied
N/A
4.1.1
Number of targeted taxa
conserved ex situ
Two targeted taxa
conserved ex situ
(Bambara, Calabash
gourd)
Vegetative characters
characterised and
documented
Vegetative Characters were
characterised and
documented and a report
compiled
N/A N/A
4.1.2
Number of indigenous
goat conservation projects
monitored
Four community based
indigenous goat
conservation
Projects in Limpopo
monitored
Community based
indigenous goat
conservation projects in
Limpopo monitored
Community based
indigenous goat conservation
project in Waterberg District
was monitored and a report
compiled
ID validation of famers is in
progress
Reporting on community
based indigenous goat
conservation project in
Waterberg District will
be finalised after
validation processes
20
Programme 3: Food Security and Agrarian Reform
Programme/ Sub-
Programme Performance
Indicators
Target for 2018/19 as
per Annual
Performance Plan
(APP)
Quarter 1 Comments
Quarter 1 Target as per
APP
Quarter 1 output –
Preliminary
Reason For Deviation Corrective Action
3.1.1
Number of reports on national
food and nutritional security
interventions developed
Four Quarterly review
reports on national
food and nutritional
security interventions
developed
Quarterly report on
national food and
nutritional security
interventions developed
Draft Q1 Nation food
and nutritional security
interventions compiled
The report is undergoing
departmental approval
processes
3.1.2
Food and nutrition security
baseline assessments
conducted in provinces
Food and nutrition
security baseline
assessments
conducted in six
provinces(NW,LP,MP,
KZN,FS and GP)
- - - -
3.2.1
Number of Graduates placed
in Agriculture, Forestry and
Fisheries sector for capacity
development
225 graduate placed - - - -
3.2.2
National Policy on Extension
and Advisory Service
implemented
Five year status report
on National Policy on
Extension and
Advisory Services
- - - -
3.2.3
Deployment of extension
support practitioners to
commodity organisations
monitored
Annual report on
deployment of
extension support
practitioners to
commodity
- - - -
21
Programme/ Sub-
Programme Performance
Indicators
Target for 2018/19 as
per Annual
Performance Plan
(APP)
Quarter 1 Comments
Quarter 1 Target as per
APP
Quarter 1 output –
Preliminary
Reason For Deviation Corrective Action
organisations
3.3.1
National Policy on
Comprehensive Producer
Development support
implemented
National Policy on
Comprehensive
producer Development
Support tablet in
cabinet
- - - -
3.3.3
Annual progress report on
black commercialisation
programme developed
Annual progress report
on black
commercialisation
programme approved
by EXCO
- - - -
22
Programme 4: Trade Promotion and Market Access Programme/
Sub-Programme
Performance
Indicators
2018/19 Annual Target
As Per Annual
Performance Plans
(APP)
Quarter 1 Progress Comments
Quarter 1 Target As Per
APP
Quarter 1 Output –
Preliminary
Reason For Deviation Corrective Action
2.3.1
Enabling
environment for
smallholder
access to market
Annual report on the
implementation of SA-
GAP Certification
Programme for
producers of fresh
produce for exports
Quarterly progress report
of SA-GAP Certification
Programme for producers
of fresh produce for
exports
Quarterly progress report of
SA-GAP Certification
Programme for producers of
fresh produce for exports has
been compiled
N/A N/A
2.3.2
Number of agro-
processing
entrepreneurs
trained on
processing norms
and standards
45 - - - -
2.3.3
Number of
commodity-based
cooperatives
established
14 3 Three (3) commodity -based
cooperatives were
established as follows:
• Flagstaff secondary
cooperative for poultry,
(Eastern Cape)
• Ephraim Mogale poultry
farmers cooperative for
23
Programme/
Sub-Programme
Performance
Indicators
2018/19 Annual Target
As Per Annual
Performance Plans
(APP)
Quarter 1 Progress Comments
Quarter 1 Target As Per
APP
Quarter 1 Output –
Preliminary
Reason For Deviation Corrective Action
poultry (Limpopo)
• Engcobo secondary
cooperative for poultry and
vegetables (Eastern Cape)
2.3.4
Number of
cooperatives
supported with
training
126 18 18 cooperatives were
supported on
FARMTOGETHER training
as follows:
Six (6) in Gauteng
Six (6) in Limpopo
Six (6) North West
N/A N/A
2.3.5
AgriBEE
Enforcement
Regulation
developed
AgriBEE Enforcement
Guideline published
Consultations with
regulators
Consultations with
regulations with regulators
was held through the
AgriBEE Enforcement
Guidelines Workshop on the
18th April 2018.
N/A N/A
2.3.6
BBBEE Sector
Codes for
Agriculture and
Forestry
implemented
Report on implementation
of the AgriBEE Sector
Code government
undertakings
- - - -
Report on implementation
of the Forestry Sector
Code government
- - - -
24
Programme/
Sub-Programme
Performance
Indicators
2018/19 Annual Target
As Per Annual
Performance Plans
(APP)
Quarter 1 Progress Comments
Quarter 1 Target As Per
APP
Quarter 1 Output –
Preliminary
Reason For Deviation Corrective Action
undertakings
2.3.7
Market
Opportunity
Profile Research
Report developed
Market Opportunity Profile
Research Report for fish
developed
- - - -
2.3.8
Trade agreements
implemented
Report on the
implementation of trade
agreements
Quarterly progress report
on the implementation of
trade agreements
Quarterly progress report on
the implementation of trade
agreements has been
compiled
Report on participation in
trade negotiations
Quarterly progress report
on participation in trade
negotiations
Quarterly progress report on
participation in trade
negotiations has been
compiled
N/A N/A
2.3.9
International
Relations Strategy
implemented
Report on strategic
engagement of partners
within south -south, north
south and multilateral
agencies/ forums
Report on strategic
engagements of partners
within South-South,
North-South and
multilateral agencies/
forums
Report on strategic
engagements of partners
within South-South, North-
South and multilateral
agencies/ forums has been
compiled
N/A N/A
Report on strategic
engagement of partners
within Africa and Africa
Report on strategic
engagement of partners
within Africa and Africa
Report on strategic
engagement of partners
N/A N/A
25
Programme/
Sub-Programme
Performance
Indicators
2018/19 Annual Target
As Per Annual
Performance Plans
(APP)
Quarter 1 Progress Comments
Quarter 1 Target As Per
APP
Quarter 1 Output –
Preliminary
Reason For Deviation Corrective Action
agencies agencies within Africa and Africa
Agencies has been compiled
Status report on
compliance to AU and
SADC obligations
Progress report on
compliance to AU and
SADC obligations
Progress report on
compliance to AU and SADC
obligations has been
compiled
N/A N/A
Report on facilitating the
implementation of BRICS
and IBSA action plans
- - - -
26
Programme 5: Forestry and Natural Resources Management
Programme/ Sub-
Programme
Performance
Indicators
2018/19 Annual Target As
Per Annual Performance
Plans (APP)
Quarter 1 Progress Comments
Quarter1 Target
As Per APP
Quarter 1 Output –
Preliminary
Reason For Deviation Corrective Action
2.1.1
Number of hectares
planted in temporary
unplanted areas (TUPs)
550 ha - - - -
2.1.2
Re-commissioning of
Western Cape state
forest plantations
Establishment of
six legal entities
Consultations with
communities
on the options of
the legal entity to
adopt
Directorate has drafted terms
of reference to appoint
Professional Service Provider
for the formation of Community
Trust for the Boland Package.
Consultations with
communities
on the options of the legal
entity to adopt has not taken
place as planned
The consultation could not
take place because the
department had to first take a
decision on legal entities to
be established for
recommissioning. A meeting
was held on the 25th of June
2018 where the decision to
form Trust as oppose to
Community Property
Association (CPA) was taken
Community consultation
meeting has been
secured for the 25th and
26th of July 2018 at
Meerlus and
Wemmershoek. The
meeting will be about
the Community Trust as
a preferred legal entity
and the election of the
working committee.
3.1.1
Agro-forestry Strategy
framework implemented
Project plans on the two pilot
sites implemented
- - - -
4.1.1
Monitoring of agricultural
land rehabilitation
interventions
Annual performance
monitoring report on
agricultural land rehabilitation
interventions
- - - -
27
Programme/ Sub-
Programme
Performance
Indicators
2018/19 Annual Target As
Per Annual Performance
Plans (APP)
Quarter 1 Progress Comments
Quarter1 Target
As Per APP
Quarter 1 Output –
Preliminary
Reason For Deviation Corrective Action
Preservation and
development of
Agricultural Land
Bill implemented
Draft Bill submitted to the
Office of the State Law
Advisor for pre-certification
- - - -
4.1.2
Number of hectares of
state indigenous forests
rehabilitated
300 ha of state indigenous
forests
- - -
4.1.3
Number of projects to
support revitalisation of
irrigation schemes
implemented
1 - - -
4.2.1
Climate Change Adaptation and Mitigation Plan for Agriculture, Forestry and Fisheries implemented
Climate Change Mitigation
and Adaptation Plan
implementation
guidelines developed
- - - -
4.2.2
Climate Smart
Agriculture (CSA)
Strategic Framework
implemented
CSA Strategic Framework
approved by DG
CSA Strategic
Framework
gazetted for public
inputs and
comments
The submission to gazette the
Climate Smart Agriculture
(CSA) Strategic Framework
was approved by the Minister
on the 22nd
of June 2018.
CSA Strategic Framework was
not gazetted for public inputs
This was due to internal
approval delays
The documents have
now been submitted to
supply chain
management for
submission to
Government Printings
for gazetting
28
Programme/ Sub-
Programme
Performance
Indicators
2018/19 Annual Target As
Per Annual Performance
Plans (APP)
Quarter 1 Progress Comments
Quarter1 Target
As Per APP
Quarter 1 Output –
Preliminary
Reason For Deviation Corrective Action
and comments as per the plan
29
Programme 6: Fisheries
Programme Sub-
Programme
Performance Indicators
2018/19 Annual Target as
per Annual Performance
Plan (APP)
Quarter 1 Progress Comments
Quarter 1 Target as per
APP
Quarter 1 output –
preliminary
Reason for
Deviation
Corrective Action
2.1.1
Number of aquaculture
catalyst projects (identified
and listed under Operation
Phakisa) supported
Four Operation
Phakisa projects
supported
One Operation Phakisa
project supported
Doring Baai Abalone project
supported through the
Aquaculture Development and
Enhancement Programme.
N/A N/A
2.1.2
Small-scale Aquaculture
Support Programme
developed and
implemented
Small-scale Aquaculture
Support Programme
concept note
- - - -
2.1.3
Aquaculture Development
Act developed and
implemented as per
Operation Phakisa
Aquaculture Development
Bill/ Act implementation
plan
- - - -
2.1.4
Number of aquaculture
research projects con-
ducted
One new research on
economics of new candidate
species for aquaculture
conducted (Sea urchin)
Progress report on
economics of new
candidate Species for
aquaculture conducted
(Sea urchin)
Progress report on economics
of new candidate species for
aquaculture conducted (Sea
urchin) completed.
N/A N/A
One new research project
on production systems for
new candidate species
for aquaculture conducted
(Scallops)
Progress report on
production systems for new
candidate species for
aquaculture conducted
(Scallops)
Progress report on production
systems for new candidate
species for aquaculture
conducted (Scallops)
completed.
N/A N/A
30
Programme Sub-
Programme
Performance Indicators
2018/19 Annual Target as
per Annual Performance
Plan (APP)
Quarter 1 Progress Comments
Quarter 1 Target as per
APP
Quarter 1 output –
preliminary
Reason for
Deviation
Corrective Action
One aquatic animal health
research project (Epizootic
Ulcerative Syndrome)
Progress report on aquatic
animal health research
project
Progress report on aquatic
animal health research
Project completed.
N/A N/A
One research
project on climate change:
Assessment of temperature,
deoxygenation and
acidification on aquaculture
Progress report on climate
change: Assessment of
temperature, eoxygenation
and acidification on
aquaculture
Progress report on climate
change: Assessment of
temperature, deoxygenation
and acidification on
aquaculture completed.
N/A N/A
3.1.1
Commercial fishing rights
allocated and appeals
process managed
Allocate Rights in the
abalone Sector
- - - -
Revised policies and
application forms for 12
fishing sectors which expire
in 2020
- - - -
Support the
FRAP 2015/16
appeals process
Draft regulation
5(3) report
Meetings have been held to
discuss the Regulation 5(3)
reports for the appeals in the
WCRL Nearshore and
Offshore sectors.
The Regulation 5(3) reports for
KZN Beach seine have been
prepared and submitted to the
Minister.
The Minister has decided on
and finalized the KZN Beach
Seine appeals on 25 April
Supporting
documents
outstanding
N/A
31
Programme Sub-
Programme
Performance Indicators
2018/19 Annual Target as
per Annual Performance
Plan (APP)
Quarter 1 Progress Comments
Quarter 1 Target as per
APP
Quarter 1 output –
preliminary
Reason for
Deviation
Corrective Action
2018.The Regulation 5(3)
reports for Netfish have been
prepared and submitted to the
Minister.
The Minister has decided on
and finalized the Netfish
appeals on 25 April 2018.
3.1.2
Small-scale Fisheries
Policy implemented
Rights allocated
to registered small-scale
fisheries cooperatives
Register outstanding
small-scale
fisheries
cooperatives
Registration of Northern Cape
co-operatives were completed.
Completed compulsory training
workshops for Eastern Cape
communities as a precursor to
registration of co-ops.
First small-scale fishing co-
operative was registered with
CIPC. Started co-operative
training of Eastern Cape
communities.
Supporting
documents
outstanding
N/A
4.1.1 Sustainable
management of fish stock
Recovery plans for the 2
sectors: Abalone and West
Coast rock lobster
- - - -
Research reports and
TAC/TAE recommendations
compiled for two sectors:
Abalone and WCRL
- - - -
32
Programme Sub-
Programme
Performance Indicators
2018/19 Annual Target as
per Annual Performance
Plan (APP)
Quarter 1 Progress Comments
Quarter 1 Target as per
APP
Quarter 1 output –
preliminary
Reason for
Deviation
Corrective Action
4.1.2
Number of
inspections conducted
4 500 compliance And
enforcement measures in the
six prioritised fisheries
sectors: hake, abalone, rock
lobster, linefish, pelagic and
squid implemented
875 A total of 482 inspections
conducted as follows:
Compliance – 369
FPV – 113
Reason for
underachievement
not provided
N/A
4.1.3 Number of
joint operations
conducted with partners,
including Operation
Phakisa initiative 5
40 operations 9 operations A total of 11 joint operations
conducted as follows:
Compliance – 5
FPV – 3
M&S – 3
Reason for
overachievement
not provided
4.1.4
Number of investigations
conducted
280 investigations 70 investigations A total of 71 investigations
conducted
Reason for
overachievement
not provided
N/A
33
Conclusion
The department has shown a major progress/ a great improvement towards achieving its set targets. There were 43 planned
milestones for the 1st quarter of the current financial year and during the compilation of the preliminary report, the achievement of
74% against set targets was recorded with 23% in progress and 3% not done.
The following are highlighted for the period under review:
Challenge with confirmation of the actual performance due to a lack of supporting evidence to validate and substantiate the
actual performance reported by programmes.
Continued noncompliance to the monthly reporting resulting in bulk of the evidence being submitted at the end of the
quarter
Reasons for variances that are either not provided or if provided they are not supported by evidence
No corrective action for milestones that are not achieved.