noc - al shaheen offshore field development plan oil & gas

1
PROJECT WATCH – QATAR * *Sources: DMS Projects EP: Engineering & Procurement PROJECT FACILITY BUDGET STATUS NOC - Al Shaheen Offshore Field Development Plan Oil & Gas Field 500,000,000 Construction Occidental Petroleum Corporation (OXY) - Expansion of Idd el-Shargi North Dome (ISND Phase-5) Oil Field 3,100,000,000 EPC ITB Oryx GTL - Expansion of Gas To Liquids Plant Gas to Liquids (GTL) 1,500,000,000 Feasibility Study Qatar Foundation (QF) - Education City People Mover System Railway 415,000,000 Construction Qatar Petroleum (QP) - Bul Hanine Redevelopment (Offshore) Oil Field Development 11,000,000,000 Engineering & Procurement Qatar Petroleum (QP) - Hamad International Airport Jet A1 Fuel Pipeline Jet Fuel Pipeline 350,000,000 Engineering & Procurement Qatar Petroleum (QP) - NFA complex - New NFA Wellhead Platform WHP-3 Offshore Platform 200,000,000 Construction Qatar Petroleum (QP) - Replacement Of Crude Transfer Lines At Dukhan Oil 42,000,000 EPC ITB Qatar Railways Company (QRC) - Doha Metro Network (Overview) Railway 37,000,000,000 Construction Qatar Railways Company (QRC) - Doha Metro Network - Blue Line/City Line Railway 3,000,000,000 Feasibility Study Qatar Railways Company (QRC) - Doha Metro Network - Education City Station Railway 600,000,000 Construction Qatar Railways Company (QRC) - Doha Metro Network - Gold Line/Historic Line (Elevated / At Grade Section) Railway 3,500,000,000 Construction Qatar Railways Company (QRC) - Doha Metro Network - Green Line/ Education Line Railway 3,000,000,000 Construction Qatar Railways Company (QRC) - Doha Metro Network - Metro Phase 1 Systems Rolling Stock and Track Work Railway 600,000,000 Construction Qatar Railways Company (QRC) - Doha Metro Network - Msheireb Downtown Station Railway 650,000,000 Construction Qatar Railways Company (QRC) - Doha Metro Network - Red Line North/ Coast Line (Elevated / At Grade Section) Railway 620,000,000 Construction Qatar Railways Company (QRC) - Doha Metro Network - Red Line South/ Coast Line (Elevated / At Grade Section) Railway 750,000,000 Construction Qatar Railways Company (QRC) - Lusail Light Rail Transit Network Railway 1,800,000,000 Construction Qatargas - NFB Offshore Living Quarters Accommodation Project Offshore Platform 150,000,000 Engineering & Procurement Qatargas - Zekreet Gasoline Production Facility - Phase 2 Gas Production 2,000,000,000 FEED QF - Education City - (Overview) Education/Training Facilities 7,500,000,000 Construction RasGas - Helium 3 Production Plant Helium 600,000,000 Construction RasGas - Qatar Barzan Gas Field Development Project - Offshore - Phase 2 Gas Field Development 700,000,000 Engineering & Procurement RasGas - Qatar Barzan Gas Field Development Project - Offshore - Phase 3 Gas Field Development 300,000,000 Engineering & Procurement RasGas - Qatar Barzan Gas Field Development Project - Onshore - Phase 2 Gas Field Development 2,000,000,000 Feasibility Study RasGas - Qatar Barzan Gas Field Development Project - Overview Gas Field Development 10,300,000,000 Construction Shell - Pearl GTL Scheme - Onshore & Offshore Facilities Natural Gas Liquefaction (NGL) 2,000,000,000 Construction

Upload: others

Post on 16-Mar-2022

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NOC - Al Shaheen Offshore Field Development Plan Oil & Gas

27Business

January 29, 2018

Fertilizer

IndustrialInfrastructure

MiningConstruction

Gas

Refining

Oil

Pipeline

Petrochemicals

Renewables

Power

Offshore

Water

SECTORS COVERED

SUBSCRIBE TODAY

• Tel: +973 1740 5590 • [email protected]• www.dmsprojects.net

Contact us for further information A Division of

REGIONS COVERED

• China• Europe

• India• Asia Pacific

• Latin America• Middle East

• East Africa• North Africa• West Africa

• Central America• North America

• Russia & CIS

resized advert OGN.pdf 1 8/31/2016 10:36:54 AM

COMPANY NEWSPROJECT WATCH – QATAR *

*Sources: DMS ProjectsEP: Engineering & Procurement

PROJECT FACILITY BUDGET STATUSNOC - Al Shaheen Offshore Field Development Plan Oil & Gas Field 500,000,000 ConstructionOccidental Petroleum Corporation (OXY) - Expansion of Idd el-Shargi North Dome (ISND Phase-5) Oil Field 3,100,000,000 EPC ITBOryx GTL - Expansion of Gas To Liquids Plant Gas to Liquids (GTL) 1,500,000,000 Feasibility StudyQatar Foundation (QF) - Education City People Mover System Railway 415,000,000 ConstructionQatar Petroleum (QP) - Bul Hanine Redevelopment (Offshore) Oil Field Development 11,000,000,000 Engineering & ProcurementQatar Petroleum (QP) - Hamad International Airport Jet A1 Fuel Pipeline Jet Fuel Pipeline 350,000,000 Engineering & ProcurementQatar Petroleum (QP) - NFA complex - New NFA Wellhead Platform WHP-3 Offshore Platform 200,000,000 ConstructionQatar Petroleum (QP) - Replacement Of Crude Transfer Lines At Dukhan Oil 42,000,000 EPC ITBQatar Railways Company (QRC) - Doha Metro Network (Overview) Railway 37,000,000,000 ConstructionQatar Railways Company (QRC) - Doha Metro Network - Blue Line/City Line Railway 3,000,000,000 Feasibility StudyQatar Railways Company (QRC) - Doha Metro Network - Education City Station Railway 600,000,000 ConstructionQatar Railways Company (QRC) - Doha Metro Network - Gold Line/Historic Line (Elevated / At Grade Section) Railway 3,500,000,000 ConstructionQatar Railways Company (QRC) - Doha Metro Network - Green Line/ Education Line Railway 3,000,000,000 ConstructionQatar Railways Company (QRC) - Doha Metro Network - Metro Phase 1 Systems Rolling Stock and Track Work Railway 600,000,000 ConstructionQatar Railways Company (QRC) - Doha Metro Network - Msheireb Downtown Station Railway 650,000,000 ConstructionQatar Railways Company (QRC) - Doha Metro Network - Red Line North/ Coast Line (Elevated / At Grade Section) Railway 620,000,000 ConstructionQatar Railways Company (QRC) - Doha Metro Network - Red Line South/ Coast Line (Elevated / At Grade Section) Railway 750,000,000 ConstructionQatar Railways Company (QRC) - Lusail Light Rail Transit Network Railway 1,800,000,000 ConstructionQatargas - NFB Offshore Living Quarters Accommodation Project Offshore Platform 150,000,000 Engineering & ProcurementQatargas - Zekreet Gasoline Production Facility - Phase 2 Gas Production 2,000,000,000 FEEDQF - Education City - (Overview) Education/Training Facilities 7,500,000,000 ConstructionRasGas - Helium 3 Production Plant Helium 600,000,000 ConstructionRasGas - Qatar Barzan Gas Field Development Project - Offshore - Phase 2 Gas Field Development 700,000,000 Engineering & ProcurementRasGas - Qatar Barzan Gas Field Development Project - Offshore - Phase 3 Gas Field Development 300,000,000 Engineering & ProcurementRasGas - Qatar Barzan Gas Field Development Project - Onshore - Phase 2 Gas Field Development 2,000,000,000 Feasibility StudyRasGas - Qatar Barzan Gas Field Development Project - Overview Gas Field Development 10,300,000,000 ConstructionShell - Pearl GTL Scheme - Onshore & Offshore Facilities Natural Gas Liquefaction (NGL) 2,000,000,000 Construction

GULF Petrochem, the integrated energy services provider and product manufacturer, has marked a new chapter in its growth with a new cor-porate identity - GP Global - reflecting the organisation’s fast-growing international presence, and strengthening its reputation and recognition among the global business community and stakeholders.

A multi-billion dollar business, GP Global encapsulates the significant growth achieved by the company with several complementary business streams offering turnkey solutions that meet customer needs across the energy value chain. The new identity creates stronger synergies across its operations and highlights the organisation’s focus on the global de-livery of best-in-class service.

The new identity builds on GP Global’s vision to become a global energy conglomerate that catalyses growth by expanding into new mar-kets, expanding its product portfolio and supporting its customers.

With its focus on offering bespoke solutions to meet commodity needs to businesses worldwide, GP Global celebrates three core values of the organisation – Reliability, Integrity and Agility.

Committed to the highest standards of conduct, meeting and exceed-ing regulatory requirements, GP Global combines the resources of a multinational business with the responsiveness of a start-up, ensuring that all client requirements are met quickly and efficiently by mobilis-ing its network of offices.

Ashok Goel, chairman and founder of GP Global said: “Our new cor-porate identity is a compelling testament to the evolution and transfor-mation of our organisation from a UAE-based entity to a global player. The new branding breathes fresh life into our business and highlights the opportunity areas for us to expand into even newer markets and businesses. Honouring our past and embracing the future, GP Global’s brand essence is about catalysing mutual growth – of our organisation as well as that of our stakeholders.Global progress and economic devel-opment requires innovative and bespoke commodity solutions.”

Gulf Petrochem Group rebrands

Name of Client : ExxonMobil Corporation, QPBudget : $10.3 billionFacility type : Gas Field DevelopmentSector : GasStatus : ConstructionLocation : North FieldFeed : McDermott International, Chiyoda CorporationMain Contractor : Hyundai Heavy Industries, JGC CorporationBackground

The joint venture of Qatar Petroleum (QP) and Exx-onMobil plans to develop the Barzan Gas project to produce gas from Qatar’s non-associated North Field for utilization in the domestic market, primarily for power generation and water desalination.

Project StatusJanuary 2018: Development of the project has been

delayed due to pipeline leaks but will be repaired in a couple of years.

Project ScopeThe Barzan gas project will produce some 1.5 billion

cubic feet per day of sales gas dedicated for Qatar’s growing domestic gas consumption. The scope of work for the offshore package includes:

• three unmanned offshore wellhead platforms• riser tower platforms• power supply to existing offshore platforms• subsea intrafield pipelines• two 34-inch, 72-kilometre-long wet gas pipelines running to the shore• two 28-inch intrafield pipelines of six kilometres and nine kilometres• two 34-inch onshore gas export pipelines to the inlet gas reception facilitiesContractors expect Barzan to develop the 6.2 billion cubic feet per day (cfd) structure in three phases. • The winning bidder for the first phase will build two onshore gas processing trains by the end of 2013, with a combined capacity of 1.7 billion cfd• The second phase will deliver a further 2 billion cfd• The third phase another 2.5 billion cfd of gasThe Barzan project aims to meet the natural gas require-ments of Qatar’s power and water generating companies.

Project Schedule Feasibility Study Q1-2007Feed ITB Q2-2007Feed Q2-2008EPC ITB Q2-2010Engineering & Procurement Q4-2010Completion Q4-2021

RasGas - Barzan Gas Field Development

Barzan ... project being developed in tie-up with Exxon