Page 1: Nobles finmgr5 ppt_19

Chapter 19Cost

Management Systems:

Activity-Based, Just-In-Time, and

Quality Management

Systems

Page 2: Nobles finmgr5 ppt_19

Learning Objectives

1. Assign direct costs and allocate indirect costs using predetermined overhead allocation rates with single and multiple allocation bases

19-2© 2016 Pearson Education, Inc.

Page 3: Nobles finmgr5 ppt_19

Learning Objectives

2. Use activity-based costing (ABC) to compute predetermined overhead allocation rates and allocate indirect costs

3. Use activity-based management (ABM) to make decisions

4. Use activity-based management (ABM) in a service company

19-3© 2016 Pearson Education, Inc.

Page 4: Nobles finmgr5 ppt_19

Learning Objectives

5. Describe a just-in-time (JIT) management system and record its transactions

6. Describe quality management systems (QMS) and use the four types of quality costs to make decisions

19-4© 2016 Pearson Education, Inc.

Page 5: Nobles finmgr5 ppt_19

Learning Objective 1

Assign direct costs and allocate indirect costs using predetermined overhead allocation rates with single and multiple allocation bases

19-5© 2016 Pearson Education, Inc.

Page 6: Nobles finmgr5 ppt_19

How Do Companies Assign and Allocate Costs?

• Product costs consist of direct materials, direct labor, and manufacturing overhead. – Easily traced and assigned to the product:

• Direct materials costs• Direct labor costs

– Allocated to the product:• Manufacturing overhead costs

19-6© 2016 Pearson Education, Inc.

Page 7: Nobles finmgr5 ppt_19

Single Plantwide Rate

• A single plantwide rate is called the predetermined overhead allocation rate and is calculated before the period begins.– Traditional approach of allocating

manufacturing overhead– Simplest method– One allocation base is used and applied to all

units

19-7© 2016 Pearson Education, Inc.

Page 8: Nobles finmgr5 ppt_19

Single Plantwide Rate

• Predetermined overhead allocation rate formula and example:

• The manufacturing overhead costs can now be allocated to each model by multiplying this rate by the actual direct labor costs incurred.

19-8© 2016 Pearson Education, Inc.

Page 9: Nobles finmgr5 ppt_19

Multiple Department Rates

• What if there are two departments with different allocation bases?

• For example: – The overhead allocation base for the

Production Department is machine hours.– The overhead allocation base for the Software

Department is direct labor costs.

19-9© 2016 Pearson Education, Inc.

Page 10: Nobles finmgr5 ppt_19

Production Department

• The total estimated overhead costs for the Production Department are $80,000, and the total machine hours are 20,000.

19-10© 2016 Pearson Education, Inc.

Page 11: Nobles finmgr5 ppt_19

Software Department

• The estimated overhead costs for the Software Department are $20,000, and direct labor costs are $31,250.

19-11© 2016 Pearson Education, Inc.

Page 12: Nobles finmgr5 ppt_19

Total Cost

19-12© 2016 Pearson Education, Inc.

Page 13: Nobles finmgr5 ppt_19

Analysis

19-13© 2016 Pearson Education, Inc.

Page 14: Nobles finmgr5 ppt_19

Learning Objective 2

Use activity-based costing (ABC) to compute predetermined overhead allocation rates and allocate indirect costs

19-14© 2016 Pearson Education, Inc.

Page 15: Nobles finmgr5 ppt_19

How Is an Activity-Based Costing System Developed?

19-15

• Activity based-management (ABM) – Focuses on the primary activities the business

performs – Uses cost information to make decisions that

lead to greater profits • Activity-based costing (ABC) is the process

of determining the cost of the activities as building blocks for allocating indirect costs to products and services.

© 2016 Pearson Education, Inc.

Page 16: Nobles finmgr5 ppt_19

How Is an Activity-Based Costing System Developed?

19-16© 2016 Pearson Education, Inc.

Page 17: Nobles finmgr5 ppt_19

How Is an Activity-Based Costing System Developed?

Step 1: Identify activities and estimate their total costs.Step 2: Identify the allocation base for each activity and estimate the total quantity of each allocation base.Step 3: Compute the predetermined overhead allocation rate for each activity.Step 4: Allocate indirect costs to the cost object.

19-17© 2016 Pearson Education, Inc.

Page 18: Nobles finmgr5 ppt_19

Step 1: Identify Activities and Estimate Their Total Costs

• Identify activities used to allocate manufacturing overhead.

• Examples of activities include:– Quality inspections—inspecting raw materials

or finished products.– Shipping—shipping finished products to

customers– Setups—setting up machines for production– Purchasing—purchasing raw materials

19-18© 2016 Pearson Education, Inc.

Page 19: Nobles finmgr5 ppt_19

19-19

Step 1: Identify Activities and Estimate Their Total Costs

© 2016 Pearson Education, Inc.

Page 20: Nobles finmgr5 ppt_19

Step 2: Identify the Allocation Base for Each Activity and Estimate the Total Quantity of

Each Allocation Base

19-20

• Smart Touch Learning determines that setup, production, and testing are the ABC allocation bases.

© 2016 Pearson Education, Inc.

Page 21: Nobles finmgr5 ppt_19

Step 3: Compute the Predetermined Overhead Allocation Rate for Each Activity

19-21© 2016 Pearson Education, Inc.

Page 22: Nobles finmgr5 ppt_19

Step 4: Allocate Indirect Costs to the Cost Object

19-22© 2016 Pearson Education, Inc.

Page 23: Nobles finmgr5 ppt_19

Traditional Costing Systems Compared with ABC Systems

19-23© 2016 Pearson Education, Inc.

Page 24: Nobles finmgr5 ppt_19

Learning Objective 3

Use activity-based management (ABM) to make decisions

19-24© 2016 Pearson Education, Inc.

Page 25: Nobles finmgr5 ppt_19

How Can Companies Use Activity-Based Management to Make Decisions?

• Activity-based management (ABM) uses activity-based costs to make decisions that increase profits while meeting customer needs.

• ABM decisions include:– Pricing and product mix – Cost management

19-25© 2016 Pearson Education, Inc.

Page 26: Nobles finmgr5 ppt_19

Pricing and Product Mix Decisions

• Pricing decision:• If the cost per unit changes, should the selling

price also change?• Product mix decision:

• Compare the gross profit of two products and sell the product with the greatest gross profit to maximize total gross profit, considering limited production capabilities.

19-26© 2016 Pearson Education, Inc.

Page 27: Nobles finmgr5 ppt_19

Cost Management Decisions

• Companies adopt ABC to get more accurate product costs for pricing and product mix decisions.

• Value engineering reevaluates activities to reduce costs while satisfying customer needs.– Cross-functional teams work together,

including marketers, engineers, production personnel, and accountants.

19-27© 2016 Pearson Education, Inc.

Page 28: Nobles finmgr5 ppt_19

Cost Management Decisions

• Target pricing:– The target price is the amount customers are

willing to pay for a product or service.– The target cost is the maximum cost to

develop, produce, and deliver the product or service and earn the desired profit.

• Cost-based pricing:– The full product cost is the cost to develop,

produce, and deliver the product or service.– Desired profit is added to this full product cost

to determine sales price.19-28© 2016 Pearson Education, Inc.

Page 29: Nobles finmgr5 ppt_19

Cost Management Decisions

19-29© 2016 Pearson Education, Inc.

Page 30: Nobles finmgr5 ppt_19

Learning Objective 4

Use activity-based management (ABM) in a service company

19-30© 2016 Pearson Education, Inc.

Page 31: Nobles finmgr5 ppt_19

Can Activity-Based Management Be Used in Service Companies?

Use the same steps to develop overhead rates used for manufacturing companies:

Step 1: Identify activities and estimate their total costs.Step 2: Identify the allocation base for each activity and estimate the total quantity of each allocation base.Step 3: Compute the predetermined overhead allocation rate for each activity.Step 4: Allocate indirect costs to the cost object.

19-31© 2016 Pearson Education, Inc.

Page 32: Nobles finmgr5 ppt_19

Learning Objective 5

Describe a just-in-time (JIT) management system and record its transactions

19-32© 2016 Pearson Education, Inc.

Page 33: Nobles finmgr5 ppt_19

How Do Just-In-Time Management Systems Work?

• A just-in-time management system reduces inventory costs. – Raw materials and finished goods are

completed just in time for delivery to customers.

– The cost of buying, storing, and moving inventory can be significant for companies.

19-33© 2016 Pearson Education, Inc.

Page 34: Nobles finmgr5 ppt_19

How Do Just-In-Time

Management Systems Work?

19-34© 2016 Pearson Education, Inc.

Page 35: Nobles finmgr5 ppt_19

Just-in-Time Costing

• Just-in-time costing is a costing system that simplifies accounting for companies.– Tracks costs after the units are completed– Combines Raw Materials Inventory and Work-

in-Process Inventory into Raw and In-Process Inventory

– The Conversion Costs account combines direct labor and manufacturing overhead costs.

19-35© 2016 Pearson Education, Inc.

Page 36: Nobles finmgr5 ppt_19

Just-in-Time Costing

19-36© 2016 Pearson Education, Inc.

Page 37: Nobles finmgr5 ppt_19

Recording Transactions in JIT

Transaction 1Smart Touch Learning purchased $305,000 of raw materials on account.

19-37© 2016 Pearson Education, Inc.

Page 38: Nobles finmgr5 ppt_19

Recording Transactions in JIT

19-38

Transaction 2Smart Touch Learning incurred $255,000 for labor and overhead.

© 2016 Pearson Education, Inc.

Page 39: Nobles finmgr5 ppt_19

Recording Transactions in JIT

19-39

Transaction 3Smart Touch Learning completed 2,000 standard model tablets that it moved to Finished Goods Inventory. The standard cost of each tablet is $276.75, ($150.00 direct materials + $126.75 conversion costs).

© 2016 Pearson Education, Inc.

Page 40: Nobles finmgr5 ppt_19

Recording Transactions in JIT

19-40

Transaction 4Smart Touch Learning sold 1,900 tablets on account for $500 each, for a total of $950,000. The cost of goods sold is $525,825 (1,900 tablets × $276.75).

© 2016 Pearson Education, Inc.

Page 41: Nobles finmgr5 ppt_19

Recording Transactions in JIT

19-41© 2016 Pearson Education, Inc.

Page 42: Nobles finmgr5 ppt_19

Recording Transactions in JIT

19-42

AdjustmentThe actual conversion costs incurred were $255,000. The amount of conversion costs allocated was $253,500. The difference is $1,500.

© 2016 Pearson Education, Inc.

Page 43: Nobles finmgr5 ppt_19

Recording Transactions in JIT

19-43© 2016 Pearson Education, Inc.

Page 44: Nobles finmgr5 ppt_19

Learning Objective 6

Describe quality management systems (QMS) and use the four types of quality costs to make decisions

19-44© 2016 Pearson Education, Inc.

Page 45: Nobles finmgr5 ppt_19

How Do Companies Manage Quality Using a Quality Management System?

• A system that help managers improve the business’s performance by providing quality products and services is called a quality management system.

• The goals of quality management systems are to:– Improve performance– Increase customer satisfaction– Increase profits

19-45© 2016 Pearson Education, Inc.

Page 46: Nobles finmgr5 ppt_19

The Four Types of Quality Costs

• Prevention costs: Costs incurred to avoid poor-quality goods or services.

• Appraisal costs: Costs incurred to detect poor-quality materials, goods, or services.

• Internal failure costs: Costs incurred to correct goods or services before delivery to customers.

• External failure costs: Costs incurred after delivery to the customer has occurred.

19-46© 2016 Pearson Education, Inc.

Page 47: Nobles finmgr5 ppt_19

The Four Types of Quality Costs

19-47© 2016 Pearson Education, Inc.

Page 48: Nobles finmgr5 ppt_19

Quality Improvement Programs

19-48© 2016 Pearson Education, Inc.

Page 49: Nobles finmgr5 ppt_19

19-49© 2016 Pearson Education, Inc.