No. RFP Page Clause No. Clause Question MTML Response
1 pg 4, pg 10 SECTION-1 & II Query from prospective bidder
What is the bid security and what does it
guarantee us? Is it, $10,000 or $100 to enter
the bid? If we don't win the bid is there a
refund?
Yes, the Bid Security required as per SECTION-II (clause 11.1 & 11.2) of
US $ 10,000 (US Dollar TenThousand only), valid for 180 will be returned
as per SECTION-II (clause 11) of RFP. The fees $100 is to enter the bid
and is non-refundable as per RFP.
2 pg 20SECTION - II
(7.1)Query from prospective bidder
Under 7.1 under training, it states, "The
Contractor shall provide training for 15 man-
weeks to personnel (Technical and Finance)
of the Purchaser, free of cost at the
Contractor’s training centre." Does this mean
you will be sending someone from your team
to our office to train for 15 weeks?
The bidder will need to comply for the man-weeks indicated in RFP. It can
be discussed in details with MTML at later stages.
3 pg 105 Annexure-V Query from prospective bidder
Is there a penalty for scheduled downtime in
which there could be an upgrade to a new
version? You have on page 105 where there
is a $2 per day per subscriber downtime?
Also, what if the downtown is caused by
natural disaster or your own user error?
The penalty clause as per RFP will not be applicable in case scheduled
down time for upgrade to new version, natural disaster or own user error. In
case of service affecting situations, the services can be shifted to standby
servers and Emergency flow may be opened if downtime on both Active
and Standby is needed as per SECTION –IV (A) Clause 43 of RFP.
4 pg 22
SECTION - III
Clause 10.1 &
10.2Query from prospective bidder
Payment Terms for Hardware, Software and
Services. For Software and Services 80% on
TOC will be applicable for both?
The Hardware / Equipment will be as per clause 10.1 & 10.4. Software and
Services will be as per clause 10.2 considering both together as per RFP.
5 pg 20SECTION - III
Clause 6 Query from prospective bidder
Delivery and Warehousing - Who will bear
the cost of transport once the equipment
arrives in Mauritius since it is CIF.
The Purchaser shall be responsible for paying all the duties/ levies on
equipment & software within Mauritius (including local transport) and the
duties/ levies outside Mauritius, Freight till Mauritius, Insurance shall be
responsibility of the Vendor as per SECTION-1 clause 10 & 6.3 of RFP.
6 pg 3 SECTION-1 Query from prospective bidder
Would there be extension for Last Date of
Bid Submission ?
Last Date of Bid Submission has been extended to 15:00 Hrs on
11.02.2019
No. RFP Page Clause No. Clause Question MTML Response
7 pg 394SECTION –IV (B)
5.2.17
The Storage shall support multi-tier architecture to
support different performance requirement of storage for
different kind of data depending upon the policy defined
by user. High performance, mid performance, low
performance and off-line storage shall be supported.
How to understand this off-line storage?
Please give the detailed service scenario.
High performance Data: data directly service impacting, Low performance &
Offline : Not service affecting. The capacity and storage needs to be
ensured as per RFP conditions.
Mauritius MTML (RFP No.: MTML/OCS/B&CCS/RFP/ 2018/1 Dated 24.12.2018 )
ANNEXURE-I
Section-II (Technical Queries)
Section-I (Commercial & General Queries)
Page 1 of 9
8 pg 398SECTION –IV (B)
5.2.20-1
Pre-paid/Post paid subscribers Mix- In any
combination/proportion
of total subscribers
How to understand this?Do this mean we
need to provide pre-paid subscribers
proportion of total subscribers and post paid
subscribers proportion of total subscribers in
the sizing document?
Online charging for both prepaid and post paid is required. As per RFP
Total 500K (400K is Prepaid , 100K is Postpaid). For 100K Postpaid the
system will need to generate bills. The dimensioning should be as per RFP
and also ensure smooth expansion.
9 pg 399SECTION –IV (B)
5.2.20-6
6. CDR split factor - 1.6 Which product and which capability need to
satisfy this parameter?Please give the
detailed service scenario.
It is for long duration calls, sessions and long SMS. And assuming 60% of
the CDRs will be of long durations. And needs to be taken care as per RFP
for rating and billing of CDRs.
10 pg 399SECTION –IV (B)
5.2.20-7
7. Usage size - 511 bytes Do this mean the CDR size in CBP? CPB-Control Processor Board. From CPB these are transfered to CG-
servers. From CG servers the mediation will fetch the CDRs. CDR size may
vary and need to support the exsiting system. The CDR file size max is
10MB or 10minutes which ever earlier. Interconnect & Roaming CDRs (for
Calls and SMS: from GMSC and for Data from GGSN, SGSN, SGw, PGw).
Expected CDRs depend on traffic being handled by elements. (Normally 1-
file has 50K records and presently 150-200 files a day from each NEs for
Voice/SMS and Data). Need to comply as per RFP.
11 pg 399SECTION –IV (B)
5.2.20-9
9. Bill run duration per bill cycle - Less than 2 hours What's the max postpaid individual
subscribers numbers in one bill Cycle? What
the max postpaid community subscribers
numbers in one bill cycle?
As per RFP 100K customers need to be billed. And can be in one cycle or
distributed.
12 pg 399SECTION –IV (B)
5.2.20-10
10. Rating per day - Less than 2 hours What rating actions need to be included in
this 2 hours?
The rating action includes the collection of CDRs from all NEs, processing
and rating of CDRs as per tarriffs. All day CDRs can be rates in 2hrs,
should be supported as per RFP.
13 pg 399SECTION –IV (B)
5.2.20-13
13. Data customers - 100% active How to understand this data customer 100%
active? Please give a detailed service
example.
500K data customers all with acitve PDP sessions and being charged
online. Should be supported as per RFP.
14 pg 429SECTION –IV (B)
6.1.14
Should be able to transfer and/or export vouchers with
PINs and Passwords in CSV/flat file.
Please give the detailed service example of
the voucher card recharge,especially the
use of the PINs and password.
This is part of voucher generation process. The files generated can be
fetched from client and sent to prinit agency or other system. Should be
supported as per RFP.
15 pg 558SECTION –IV (B)
6.3.4.15
Facilities to provide discount, adjustment, rebate, fine
etc. on periodic bill
Facilities to produce the bill of permanently
disconnected customers as required by MTML.
What is "permanently disconnected
customers", does it refer to the terminated
customer?
Permanently Diconnected / Terminated customers if has Unpaid dues,
system should be able to generate bills with fines / surcharges etc till the
accounts are settled as per MTML requirement.
16 pg 602SECTION –IV (B)
6.3.5.2
During new installations, other charges shall be
accepted along with the deposit. However, separate
receipts shall be generated for such charges.
What is "installation", does it mean
subscription?
Installation: refers to the installation of various MTML products at customer
premises e.g WiFI modems, LTE terminals, GSM fix phones etc. The
installation charges (One Time Charge, OTC) applicable can be configured,
collected and receipt can be generated for to ensure proper accountability
and billing as per RFP.
17 pg 64SECTION –IV (B)
3.27
Account receivables using different channels cash,
credit card, debit card, net banking and other e-payment
facilities, ECS, post-office payment files, bank files etc.
What's the meaning by ECS, is it electronic
charging system?ECS: Electronic Clearing Service used by banks to transfer fund from
customer account to MTML bank account against the pending and invoiced
dues. ECS needs to be supported as per RFP.
18 pg 70SECTION –IV (B)
3.27
Track of dues and payment history atleast for 24
months.
could you please give explaination of
tracking of dues?For the purpose of proper accounting information related to the customer
and his bill payment history as per RFP.
Page 2 of 9
19 pg 83SECTION –IV (B)
3.27
International prepaid dialing for other network numbers
(VCC Prepaid)
What's the meaning by VCC? VCC (Virtual Card Calling): The VCC service is for customers of Other
operators using MTML network to make International calls using Carrier
Access Code (CAC). These customers use 060 , 061 prefixes to make
International Calls via MTMLs network. They access MTMLs VCC prepaid
service using MTMLs prepaid vouchers and the VCC postpaid are
registered on MTML Billing have credit control inplace and are billed
monthly for this service. MTML intends to move the VCC Prepaid service to
the new OCS and Billing along with the exsiting VCC Postpaid customers.
Both the services need to be supported by OCS and Billing as per RFP.
20 pg 88SECTION –IV (B)
3.28
Tele-voting services Could you give more information about this
business scenario?Tele-voting services: Dialing particular number to vote during an event or
survey. Customers dialing these lines need to be charged at premium rates.
And in Interconnect Partner Management the rental as well as call charges
need to be accounted as agreement with MTML and as per RFP.
21 pg 98SECTION –IV (B)
3.28
Data topup packages which can be used only when the
main package is finished or has been limited by QoS on
PCRF.
Regarding "Data topup packages which can
be used only used has been limited by QoS
on PCRF" ,could you give us more
information about this scenario?
Data topup packages: The Data users e.g for the Unlimted package
customers the QoS is resticted on PCRF after allowed usage. The
customer can restore his normal speed by ordering Data Topup plan which
will supplement with main package. The utilization of data top up plan will
be limited by volume and time and in any case will only be supplement to
main plan as per RFP.
22 pg 137SECTION –IV (B)
3.34.2
The vouchers for different services and topup plans can
be generated.
What' the meaning by topup plan, please
kindly provide more information.
Topup vouchers for different services can be generated seperatley. These
vouchers will not extend the validity and can be used seperately to enhance
credit for particular service as per RFP.
23 pg 152SECTION –IV (B)
4.5-8
5. Rating for roaming and interconnect settlement,
reconciliation for Voice Calls, SIP calls, SMS, Data for
IUC and IOT purpose.
what's the meaning by IUC? IUC: Interconnect Usage Charge for inter-operator settlement as per
agreement with partners need to be supported as per RFP.
24 pg 186SECTION –IV (B)
4.6
B&CCS shall support the provisioning, rating, billing and
accounting for the following
services:
i. Tele-services, Supplementary Services and Bearer
Services of GSM /UMTS/ LTE/ IMS
ii. General Packet Radio Services, EPC, QoS, APNs,
Static IPs etc
iii. Wireless Application Protocol Services
iv. Universal Mobile Telecommunication System and 3G
Services
v. Content Charging for subscriber and revenue sharing
for content provider
vi. Data Services GSM / UMTS/ LTE/ IMS
vii. Messaging Services such as SMS, MMS, UMS etc.
viii. Location Based Services such as Fleet
Management, Navigational,
ix. Informational, Entertainment, Advertisement etc.
x. Push To Talk over Cellular
xi. Cell Broadcast Services
xii. Over The Air Services such as content down load
using SIM browser.
What is the detailed function for "x. Push To
Talk over Cellular" and "xi. Cell Broadcast
Services"?
x. PPT (Push To Talk) service , xi. Cell Braodcast Service (CBS) service.
All services offered by MTML need to be taken care by B&CCS as per RFP.
Page 3 of 9
25 pg 194SECTION –IV (B)
4.14
Transfer of files to DCH and from DCH to the billing
system should be available. The file types can be TAP-
IN, TAP-OUT, NRTRDE, RAP, Missing files, etc. This
transfer of files between DCH and system will be using
secure tunnel GRE or IPSEC for VPN.
Is "DCH" for Data Cleaning House? DCH: Data Clearing House for Roaming. All features related to roaming
need to be supported as per RFP.
26 pg 321SECTION –IV (B)
5.1.16 iv.
Access from any shop for a user needs additional
security feature.
How to understand that "access from any
shop for a user"
MTML shop representatives may change shop. In this case, the
accountability and authority to allow access from any shop needs to be
controlled and enabled as per requirement. And the shop reports must take
into account the activites done by this user from the shop which has been
selected as per RFP.
27 pg 426SECTION –IV (B)
6.1.11
Should be able to get details of all vouchers present in
system like total count of vouchers, status wise count of
vouchers etc.
Please have further clarification of this total
count of vouchers, status wise count of
vouchers.What detailed information need to
be provided? Please give the detailed
service example.
The Voucher Management system should be able to display information
related to status of cards individually and for all in total. And should be able
to generate reports related to the status e.g generated, issued, unissued,
expired etc as per RFP.
28 pg 429SECTION –IV (B)
6.1.14
Should have password protected vouchers so that these
vouchers can be exported to external system in secure
way.
Whether this password refer to the encrypt
for the the exported file after the card
generation?
The output files generated need to be secured by password protection
before transfer to print agency or other sytem. The security concerns at all
stages from generation to transfer should be complied as per RFP.
29 pg 446SECTION –IV (B)
6.1.31
Should be able to get details of generation status list of
vouchers, transfer notes of vouchers etc.
Please have further clarification of what
information need to be provided and how to
understand this generation status list of
vouchers and transfer notes of vouchers.
Voucher Management must be able to display status of generation process,
list of vouchers in this, status, transfer of vouchers to the agents or
customer. Viewing status of all vouchers and reporting is required as per
RFP.
30 pg 460SECTION –IV (B)
6.3.1.9
Billing information
The proposed billing system shall have the following
provisions:
i) Entering all billing related data
ii) Barring of subscribers manually and automatically
iii) Immediately Unbarring of subscribers manually and
automatically after payment is made
iv) Viewing and updating of customers’ bill history and
details like bill amount, calls related to bill etc.
v) Viewing of hot rated calls immediately
vi) Viewing of the chargeable calls
How to understand this entering all billing
related data? Need to enter which kind of
billing related data to which system in which
case?
i) Entering billing related data refers to search options for cycle, cutomer ID,
Account ID, Name etc. Queries will need to be supported as per RFP.
31 pg 473SECTION –IV (B)
6.3.3
(i) Management Reports :
a) Revenue collected in a month.
b) Revenue per DEL.
c) Comparison of Revenue per DEL with previous year.
d) Annual Revenue per DEL.
e) Cumulative Revenue collection in a Financial Year.
f) ARPU
g) Chrun
Please give the detailed service scenario of
Revenue collected in a month/Revenue per
DEL/Comparison of Revenue per DEL with
previous year/Annual Revenue per
DEL/Cumulative Revenue collection in a
Financial Year/ARPU/Chrun.
Management Reports are related to the senarios all mentioned in RFP.
Each subscriber is considered as DEL (Direct Exchange Line). Different
Reports/ Queries need to be Generated by the Billing and Accounting
Subsystem. Reports to be generated in Billing & Accounting Modules shall
be customizable as per RFP.
Page 4 of 9
32 pg 474SECTION –IV (B)
6.3.3
(ii) Action Reports :
a) Disconnection List.
b) Ringing List.
c) Excess Payments.
d) List of unaddressed bills.
e) Short Payments.
f) List of Abnormal STD/ISD calls.
g) List of Outstanding Bills at any point of time.
h) List of cheques dishonoured.
Please give the detailed service scenario of
Short Payments/Abnormal STD/ISD
calls/cheques dishonoured.
Action Reports are related to the senarios like Short Payments (part
payment), Abnormal STD/ISD calls(missing /wrong prefixes,spam or heavy
calls), cheques dishonoured (bounced cheques) and all mentioned in RFP.
Different Reports/ Queries Generated by the Billing and Accounting
Subsystem. Reports to be generated in Billing & Accounting Modules shall
be customizable as per RFP.
33 pg 475SECTION –IV (B)
6.3.3
(iii) Exception Reports:
a. List of Bills Cancelled
b. List of Bills Adjusted
c. List of voluntary Deposits Adjustments.
d. List of Deposit Adjustments
e. MIS Reports
f. Payments from various channnels
Please give the detailed service scenario of
voluntary deposits adjustments/Deposit
Adjustments
/MIS Reports.
Exception Reports are related to the senarios mentioned in RFP. The
voluntary deposits adjustments/Deposit Adjustments should be possible
and
will need to be reflected in bills and seperate reports shall be generated for
these. MIS (Management Information System) reports related to
accounting, revenue etc is required from the System. Different Reports/
Queries Generated by the Billing and Accounting Subsystem. Reports to be
generated in Billing & Accounting Modules shall be customizable as per
RFP.
34 pg 476SECTION –IV (B)
6.3.3
(iv) Archival Reports
a. Local call statement
b. Trunk, international Call statement
c. Bill Register
d. Outstanding Register
e. Subscriber Record Cards
f. List of Reconciled Payments
g. List of UN-Accounted/ Excess Payments
h. Ledger and Sub-Ledger Accounts.
i. Inventory statement for products
j. Notices and received payments, outstanding
payments.
Please give the detailed service scenario of
Trunk / Bill Register/Outstanding
Register/Subscriber Record
Cards/Reconciled Payments/UN-Accounted/
Excess Payments/Ledger and Sub-Ledger
Accounts.
Archival Reports for 3-years will be required for the senatios mentioned.
Different Reports/ Queries Generated by the Billing and Accounting
Subsystem. Reports to be generated in Billing & Accounting Modules shall
be customizable as per RFP.
35 pg 480SECTION –IV (B)
6.3.4.1
Online Data Transfer Please give the detailed service scenario of
this online data transfer.
The CDRs shall be transferred near real time from all NEs to ensure the
rating , viewing, exporting in excel from CRM and timely billing as per RFP.
36 pg 486SECTION –IV (B)
6.3.4.1
vi. Hot Rated calls shall be handled separately. Please give the detailed service scenario. The CDRs shall be transferred immediately near real time. This is in order
to ensure timely billing as per RFP.
37 pg 487SECTION –IV (B)
6.3.4.1
vii. All necessary tools, software and hardware interface
for such EDI transfer shall be provisioned in the system.
How to understand this EDI transfer? Electronic Data Interchange (EDI). The CDRs will need to be collected from
all the NEs irrespective of location and as per RFP for rating and billing.
38 pg 491SECTION –IV (B)
6.3.4.2
The proposed billing system shall have provision to
transfer the CDRs from core network and VAS to
B&CCS system from offline media, in case of EDI
failure.
Please give the detailed service scenario of
this EDI failure.
Failure of connectivity between the NEs and billing/ mediation for CDR
collection. There should be option to transfer the CDRs to mediation directly
using external device to ensure timely billing as per RFP.
39 pg 492SECTION –IV (B)
6.3.4.2
Off line data transfer or received shall be identified by
users in later dates.
Please give the detailed service scenario. This is applicable incase of failure of connectivity between the NEs and
billing/ mediation for CDR collection. There should be option to transfer the
CDRs to mediation directly using external device to ensure timely billing as
per RFP.
40 pg 534SECTION –IV (B)
6.3.4.7
The system shall provide different discounts on different
types of calls like local, STD, ISD, SMS, DATA etc.
How to understand this STD and ISD? STD (Subscriber Trunk Dialing) for National calls using area codes. ISD
(International Subscriber Dialing) for International calls using CC. As per
RFP all type of discounts will be applicable to all services.
Page 5 of 9
41 pg 342SECTION –IV (B)
5.2.6
The vendor shall supply 2 (two) units of external backup
drive of 16TB, cables, connectors, and software
necessary for full function of drive.
Do we need to provide external backup
drive? Or we just provide the internal backup
server will be enough?
Yes. Both the internal and external backups are required. The bidder needs
to provide a tool and device for backup as per RFP.
42 pg 36SECTION –IV (A)
Clause 40Query from prospective bidder
Is there existing Biometric Equipments for
integration with E-KYC system.
Presently the Biometric system is not in use, but the support is needed for
regulatory requirement. The present e-KYC should serve the purpose as
per RFP (document upload, verification, trigger sim activation, and
deactivation after wait period in case the verification fails ).
43 pg 37SECTION –IV (A)
Clause 47Query from prospective bidder
Is Mobile Money System to be proposed by
bidder.
Yes, may propose the Mobile Money System as Optional Item along with
others like AAS, eTOPUP, USSD platform etc.
44 pg 65SECTION –IV (B)
5.2.16Query from prospective bidder
Is Call-Centre system required to be
proposed by bidder.
MTML intends to extend the same CRM terminals to Call Centre. Trouble
Ticket, Complain Redressal and Handling is mandatory feature which is
required.
45 pg 30 & 36SECTION –IV (A)
Clause 13 & 42Query from prospective bidder
How many banks/payment GW's have been
integrated with existing system.
Banks: 10, Payment GW: 10 (need to be considered for dimensioning)
46 pg 87SECTION –IV (B)
6.3.7Query from prospective bidder
Please provide the details of PSTN service
and integration scope for the same.
As per RFP clause: 6.3.7 it is only for Interconnect and IUC purpose. The
CDRs from GMSC will be sufficient to bill the Trunk Groups of PSTN local
interconnects.
47 pg 39, pg 40SECTION –IV (B)
3.7 & 3.17Query from prospective bidder
Is SDP required to be proposed by bidder. If
yes, please provide functional use cases
regarding the same.
SDP (Service Disribution Point) is currently on IN along with SCP, SMP
which are handling the VCC (Virtual Card Calling) services. The VCC
service is for customers of Other operators using Carrier Access Code
(CAC) 060 , 061 to make International Calls via MTMLs network. They
access MTMLs VCC prepaid service using MTMLs prepaid vouchers and
the VCC postpaid are registered on MTML Billing have credit control inplace
and are billed monthly for this service. MTML intends to move the VCC
Prepaid service to the new OCS and Billing along with the exsiting VCC
Postpaid customers. Both the services need to be supported by OCS and
Billing as per RFP.
48 pg 39, pg 40SECTION –IV (B)
3.2 & 3.17Query from prospective bidder
If OCS is capable of handling real time
charging for both prepaid & postpaid
subscribers, hence we assume SSP/IN is not
required to be proposed.
Yes, the SSP/IN is not required as OCS will need to handle the Prepaid
and Postpaid customers as per RFP.
49 pg 3SECTION –IV (B)
3.3Query from prospective bidder
Who will be taking care of the hardware
Infrastructure and supporting software for the
implementation Page- 3, Section 3.3
The bidder will need to supply, install and commission the Hardware and
supporting software. The successful bidder shall carry out all the functions
of operation and maintenance during the first 3 months of commercial
launch as per clause 24 of SECTION –IV (A). After issuance of TOC the
system will handed over to MTML.
50 pg 31SECTION –IV (A)
Clause 22Query from prospective bidder
Do we need to provide the plan and
procedure for Acceptance Testing in the
RFP submission as per in Section 22, page
31.
Yes. All tests related to service and functionality will need to be performed
as per SECTION –IV (A) Clause 22 before commissioning of equipment as
per RFP. The details can be discussed with MTML later once the system is
ready for tests.
51 pg 34SECTION –IV (A)
Clause 32Query from prospective bidder
In page 34: Section 32 – International
Roaming: Can you please explain “IOT
implementation as per agreement with
partners”
International Roaming: generally AA14 rates are applicable as per GSMA
for inter-partner settlements using TAP files. Some partners are offered with
special IOT (Inter-Operator-Tariffs) and TAP files for these will need to have
rates as per agreement with partner and support different tariffs as per
RFP.
Page 6 of 9
52 pg 36SECTION –IV (A)
Clause 43 Query from prospective bidder
Section 43: Redundancy, Backup and
Emergency Flow (Page 36): Please mention
whether the hardware and deployment is
owned by the vendor or by MTNL
Redundancy, Backup and Emergency Flow for the system proposed will
need to be ensured by the bidder as per SECTION –IV (A) Clause 43 of
RFP.
53 pg 37SECTION –IV (A)
Clause 45Query from prospective bidder
Section 43, page 37: Network Management
System & Performance Monitoring: Please
confirm whether the requirement is that the
BSS solution should support and interface
with the existing NMS and PM to give the
performance stats.
Network Management System & Performance Monitoring: it is for the
system being deployed for the OCS, Billing, VC etc. It should be able to
monitor all the NEs and network elements provided by the bidder.
SECTION –IV (A) Clause 45 of RFP.
54 pg 72SECTION –IV (B)
6.3.4.18
Report of calls before and after invoice run for a billing
period.
Generally, there should not be calls after
invoice run for a billing period, please explain
it.
This is realed to reports before and after invoice. Needed in order to verify if
the invoice generated has taken into account all the calls or CDRs as per
RFP.
55 pg 92SECTION –IV (B)
9.1
System must support distribution of scratch card via
Dealers and SMS instead of a physical recharge
voucher and transfer the talk time from Prepaid to
Prepaid and Postpaid to Prepaid subscribers.
What is the meaning for "transfer the talk
time from Prepaid to Prepaid and Postpaid
to Prepaid subscribers. " here.
Presenlty, the transfer of talk time from Prepaid to Prepaid subscribers and
Prepaid to Post paid subscriber (for settlement of penidng dues) is only
required as per RFP.
56 pg 63SECTION –IV (A)
5.2.8
Is the LINUX operating system up for discussion? Is the LINUX operating system up for
discussion?
As per 5.2.8 (i) the LINUX can be proposed in solution as per RFP.
57 pg 63 SECTION –IV (A)
5.2.9
Operating with a Microsoft SQL database, would that
work instead of Oracle? We operate with a Microsoft SQL database,
would that work instead of Oracle?
As per clause 5.2.9 ORACLE is required to be proposed in solution as per
RFP.
58 pg 33SECTION –IV (A)
27Query from prospective bidder
Please confirm 500K capacity is for acitve
subscribers or provisioned
As per RFP capacity should be 500K (400K Prepaid, 100K Postpaid) all
active.
59 pg 40SECTION –IV (B)
3Query from prospective bidder
Please confirm the BHCA for the design
perspective
The BHCA of 1.5, BHSM of 1Million, 100% Data users with active PDP for
Online Charging for 500K customers as per RFP SECTION –IV (B) Clause
3.16
60 pg 50SECTION –IV (B)
3.34Query from prospective bidder
As per our understanding Voucherless
recharge feature is optional item since e-
PIN, e-TOP UP and e-Voucher are optional.
Please confirm
Yes. E-PIN, e-TOPUP and e-Voucher are Optional items which can be
quoted seperately along with others like AAS, USSD Platform, SMSC etc.
In case MTML does not go for these from new supplier the integration with
exsting needs to be ensured by bidder as per RFP.
61 pg 42SECTION –IV (B)
3.26Query from prospective bidder
In case of advice of charge, please confirm
what type of interface has to be used to
receive tariff information from external
system.
AOC through channels – SMS, USSD, App, IVR, email, announcement etc
as per service requirement in RFP SECTION –IV (B) clause 3.28
62 pg 44SECTION –IV (B)
3.28Query from prospective bidder
As per our understanding Advance Airtime
system is optional item please confirm
Yes. Airtime Advance System (AAS) is Optional item which can be quoted
seperately along with others like USSD Platform, SMSC,E-PIN / e-TOPUP /
e-Voucher system etc. In case MTML does not go for these from new
supplier the integration with exsting needs to be ensured by bidder as per
RFP.
63 pg 44SECTION –IV (B)
3.28 (A)Query from prospective bidder
Could you please elaborate on the password
modification under PPS features.
Password is for Prepaid Account. Generally being used for Balance
Transfer & ACC (Account Card Calling )service. Should be supported as
per RFP.
64 pg 44SECTION –IV (B)
3.28 (A)Query from prospective bidder
Could you please further elaborate on the
blacklist, the used case
Blacklisting of prepaid account when trying recharge card PIN more than
permissible attempts. Same will be applicable for ACC and VCC services
as per RFP.
65 pg 46SECTION –IV (B)
3.28 (C)Query from prospective bidder
Further clarification required on Bonus on
Life time accumulation
Bonus on Life Time Accumulation: Awarding bounus, when the customer
recharges and extends the validity and accumulates time.
66 pg 48SECTION –IV (B)
3.33Query from prospective bidder
Further clarification required on Limit on user
configuration.
User Configuration refers to activation of supplementary features by user
like Call Forward, Call Wait, Call Barring, PIN entry etc..
Page 7 of 9
67 pg 54SECTION –IV (B)
4.26Query from prospective bidder
For migration please confirm following:
1. No. of different subscription types/
categories of subscribers
2. No. of services/packages
3. No. of rate plans
All the details regarding no. of subscription types / category of subscribers,
No of services/ packages, rate plans can be discussed in details with MTML
once the implementations start. As such there should be no limitations for
these on the proposed system as per RFP.
68 pg 55SECTION –IV (B)
5.1.1 cQuery from prospective bidder
Could you please confirm the difference
between test and train, can it be same
system?
The Test and Train environment should be separate as per SECTION –IV
(B) Clause: 5.2.4 of RFP.
69 pg 55SECTION –IV (B)
5.1.1 eQuery from prospective bidder
Further clarification required For transactions, pl. refer SECTION –IV (B) Clause 5.2.20 as per RFP
70 pg 89SECTION –IV (B)
7.3Query from prospective bidder
Please confirm No. of SMPP accounts to be
migrated to the SMSC.
SMSC must support 256 content providers as per SECTION –IV (B) Caluse
7.3 of RFP.
71 pg 90SECTION –IV (B)
7.4 hQuery from prospective bidder
Further clarification required SMSC can be configured in StoreAndForward mode, ForwardAndStore
(fast) mode, Combined fast store and save store or StoreAndForward
(normal) mode, all needs to be supported by SMSC.
72 pg 92SECTION –IV (B)
10Query from prospective bidder
For migration please confirm following:
1. No. of different subscription types/
categories of subscribers for which menus
need to be triggered differently.
2. No. of languages
3. No. of menus and sub menus.
All the details regarding no. of subscription types / category of subscribers,
menus & sub menus, languages (2 or more) can be discussed in details
with MTML once the implementations start. As such there should be no
limitations for these on the proposed system as per RFP.
73 Query from prospective bidderPlease mention the total customer and
subscriber volume
As per RFP capacity should be 500K (400K Prepaid, 100K Postpaid)
74 Query from prospective bidder
Does CRBT system require provisioning as
well as charging integrations. If Yes what are
the interfaces.
Postpaid customers: monthly recurring is done by OCS subscribed for
CRBT. Prepaid customers: files from CRBT provider will be sent to OCS for
deduction of monthly subscription fees. Interface: MML needed with CRBT
(Supplier: Pyro) for provisioning to OCS, FTP for recurring files.
75 Query from prospective bidder
Is Integration with USSD & SMSC required
for both provisioning and charging.If Yes
what are the interfaces.
Yes. For USSD-OCS interface: MML (for Bal. query and Bal. transfer). For
SMSC-OCS interface: SMPP (for Notifications) and FTP (for CDRs and
refund files incase of undelivered SMSs after 48 hrs)
76 Query from prospective bidder
How many CDR's are expected per month
for the Interconnect/Roaming system. What
is the size of CDR.
Presently the CDR file size max is 10MB or 10minutes which ever earlier.
Interconnect & Roaming CDRs (for Calls and SMS: from GMSC and for
Data from GGSN, SGSN, SGw, PGw). Expected CDRs depend on traffic
being handled by elements. (Normally 1-file has 50K records and presently
150-200 files a day from each NEs for Voice/SMS and Data)
77 Query from prospective bidder
Please provide the number of Interconnect &
Roaming partners currently integrated with.
Interconnect Partners: 200 & Roaming Partners: 800.
78 Query from prospective bidder
Is Ro interface required for IMS call charging
between OCS & IMS modules
IMS presently is not deployed. The interface Ro will be needed when the
IMS deployment starts in 2019-20. Bidder needs to comply as per RFP.
79 Query from prospective bidder
Please provide details of NE's that needs to
be integrated with Mediation system.
Mediation System: USPP(HLRe/HLR/HSS combo) provisioning, GMSC,
SGSN, GGSN, SGw, PGw, SMSC for CDR collection.
80 Query from prospective bidder
How many Dealers are expected to be
managed by Dealer management solution ?
Dealer / Agent management: for the SIM & Voucher distribution network
2500 dealers. Dealers here means those who are selling MTML products.
81 Query from prospective bidder
Please provide details of the current ERP
solution and how it is integrated with existing
BSS modules.
Presently the ERP solution is inbuilt on OCS and Billing and has the
business flow also.
Page 8 of 9
82 Query from prospective bidder
Please mention the system we need plan for
migration and also specify the preferable
data format
The present system has been provided by ZTE (Product: Zsmart). The
present data base is Oracle. The MIDDLE TABEL will need to be prepared
for migration by the bidder as per requirement to ensure successful
migration.
83 Query from prospective bidder
Is it possible to provide a split of the
subscribers base between prepaid and
postpaid.
As per RFP capacity should be 500K (400K Prepaid, 100K Postpaid)
Page 9 of 9